J-4 Exhibit 6 General Decision Number WA140100 dated 07-04-14 8 pages

View the file

Other files

File Type Posted
Amendment_4.pdf PDF
D1_Asbuilts_Wastewater_Treatment_Plant_Expansion.pdf PDF
A2_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
A7_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
A10_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
A16_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
D3_Asbuilts_Wastewater_Treatment_Plant_Expansion.pdf PDF
B11_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
B12_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
C1_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VII.pdf PDF
B16_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
A8_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
B13_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
A4_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
A12_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
B2_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
B5_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
B9_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
B15_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
D4_Asbuilts_Wastewater_Treatment_Plant_Expansion.pdf PDF
A5_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
B4_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
A1_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
B1_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
B8_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
A15_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
A3_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
B6_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
D2_Asbuilts_Wastewater_Treatment_Plant_Expansion.pdf PDF
B7_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
A14_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
A9_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
B3_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
A11_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
A13_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
B10_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
B14_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_VI.pdf PDF
A6_Asbuilts_Sewage_Collection_ _Treatment_Facilities_Schedule_III.pdf PDF
Amendment_3.pdf PDF
Amendment_2.pdf PDF
Amendment_1_and_Attachments.pdf PDF
Pages_from_J-2_Mission_Beach_WWTP_Improvements_-_Half_Size_Plans-_sheets_23-44.pdf PDF
J-1_02530-1_Sewer_Collection_System_Inspection.pdf PDF
J-4_Exhibit_5_Bond_Forms.pdf PDF
J-4_Exhibit_4_Forcemain_Replacement_Drawing_1_page.pdf PDF
Pages_from_J-2_Mission_Beach_WWTP_Improvements_-_Full_Size_Plans_-_sheets_46_-52.pdf PDF
13-102-SOL-00006_Mission_Beach_WWTP_Improvements_IFB.pdf PDF
Pages_from_J-2_Mission_Beach_WWTP_Improvements_-_Full_Size_Plans_-_sheets_25_-_31.pdf PDF
J-1_Mission_Beach_WWTP_Improvements_-_Specs.pdf PDF
Pages_from_J-2_Mission_Beach_WWTP_Improvements_-_Full_Size_Plans_-_sheets_53_-_59.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

General Decision Number: WA140100 07/04/2014 WA100

Superseded General Decision Number: WA20130100

State: Washington

Construction Type: Heavy including water and sewer line construction

County: Snohomish County in Washington.

HEAVY CONSTRUCTION PROJECTS (including sewer/water construction).

Modification Number Publication Date 0 01/03/2014 1 02/21/2014 2 03/28/2014 3 04/11/2014 4 05/16/2014 5 06/13/2014 6 07/04/2014

* ASBE0007-001 06/01/2014

Rates Fringes

ASBESTOS WORKER/HEAT & FROST

INSULATOR (Pipe and Duct Insulation)......................$ 44.36 16.45

CARP0770-030 07/01/2013

Rates Fringes

CARPENTER (Including Formwork)...$ 37.20 13.08

MILLWRIGHT.......................$ 38.30 13.08

PILEDRIVERMAN....................$ 37.45 13.08

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON – ALL CLASSIFICATIONS EXCEPT

MILLWRIGHTS AND PILEDRIVERS

Hourly Zone Pay shall be paid on jobs located outside of the free zone computed from the city center of the following listed cities:

Seattle Olympia Bellingham Auburn Bremerton Anacortes Renton Shelton Yakima Aberdeen-Hoquiam Tacoma Wenatchee Ellensburg Everett Port Angeles

Centralia Mount Vernon Sunnyside Chelan Pt. Townsend

Zone Pay:

0 -25 radius miles Free 26-35 radius miles $1.00/hour 36-45 radius miles $1.15/hour 46-55 radius miles $1.35/hour Over 55 radius miles $1.55/hour

(HOURLY ZONE PAY: WESTERN AND CENTRAL WASHINGTON – MILLWRIGHT AND PILEDRIVER ONLY)

Hourly Zone Pay shall be computed from Seattle Union Hall, Tacoma City center, and Everett City center

Zone Pay:

0 -25 radius miles Free 26-45 radius miles $ .70/hour Over 45 radius miles $1.50/hour

ELEC0077-001 02/01/2013

Rates Fringes

Line Construction:

LINEMEN.....................$ 45.62 4%+12.90

ELEC0191-013 06/01/2013

Rates Fringes

ELECTRICIAN......................$ 39.01 17.39

ENGI0302-029 06/01/2013

Rates Fringes

Power equipment operators:

Group 1A...................$ 37.39 16.65 Group 1AA..................$ 37.96 16.65 Group 1AAA.................$ 38.52 16.65 Group 1.....................$ 36.84 16.65 Group 2.....................$ 36.35 16.65 Group 3.....................$ 35.39 16.65 Group 4.....................$ 33.57 16.65

Zone Differential (Add to Zone 1 rates):

Zone 2 (26-45 radius miles) - $1.00

Zone 3 (Over 45 radius miles) - $1.30

BASEPOINTS: Aberdeen, Bellingham, Bremerton, Everett, Kent, Mount Vernon, Port Angeles, Port Townsend, Seattle, Shelton, Wenatchee, Yakima

POWER EQUIPMENT OPERATORS CLASSIFICATIONS

GROUP 1AAA - Cranes-over 300 tons, or 300 ft of boom (including jib with attachments)

GROUP 1AA - Cranes 200 to 300 tons, or 250 ft of boom (including jib with attachments); Tower crane over 175 ft in height, base to boom; Excavator/Trackhoe: Over 90 metric tons

GROUP 1A - Cranes, 100 tons thru 199 tons, or 150 ft of boom (including jib with attachments);Crane-overhead, bridge type, 100 tons and over; Tower crane up to 175 ft in height base to boom;

excavator/Trackhoe: over 50 metric tons to 90 metric tons;

GROUP 1 - Cranes 45 tons thru 99 tons, under 150 ft of boom (including jib with attachments);Crane-overhead, bridge type, 45 tons thru 99 tons; Derricks on building work; Excavator/Trackhoe: over 30 metric tons to 50 metric tons; Dozer D-10; Screedman; Scrapers: 45 yards and over; Grader/Blade; Paver

GROUP 2 - Cranes, 20 tons thru 44 tons with attachments; Crane-overhead, bridge type-20 tons through 44 tons; Drilling machine; Excavator/Trackhoe: 15 to 30 metric tons; Horizontal/directional drill operator; Scraper: under 45 tons; Mechanic; Piledriver; Boring Machine

GROUP 3 - Cranes-thru 19 tons with attachments;A-frame crane over 10 tons; Dozers-D-9 and under;

Motor patrol grader-nonfinishing; Roller-Plant Mix; Excavator/Trackhoe: under 15 metric tons; Service Oiler; Conveyors; Boom Truck over 10 tons: Forklift- 3000 lbs and over

GROUP 4 - Cranes-A frame-10 tons and under; Roller-other than plant mix; Grade Checker; Drill Assistant; Boom Truck 10 tons and under; Forklift under 3000 lbs

IRON0086-010 07/01/2013

Rates Fringes

IRONWORKER (Reinforcing, Structural and Ornamental).......$ 38.14 21.35

LABO0001-028 06/01/2014

ZONE 1:

Rates Fringes

Laborers:

GROUP 2.....................$ 25.79 10.30

GROUP 3.....................$ 32.29 10.30

GROUP 4.....................$ 33.08 10.30

GROUP 5.....................$ 33.62 10.30

ZONE DIFFERENTIAL (ADD TO ZONE 1 RATES):

ZONE 2 - $1.00

ZONE 3 - $1.30

BASE POINTS: BELLINGHAM, MT. VERNON, EVERETT, SEATTLE, KENT, TACOMA, OLYMPIA, CENTRALIA, ABERDEEN, SHELTON, PT. TOWNSEND, PT. ANGELES, AND BREMERTON

ZONE 1 - Projects within 25 radius miles of the respective city hall ZONE 2 - More than 25 but less than 45 radius miles from the respective city hall ZONE 3 - More than 45 radius miles from the respective city hall

LABORERS CLASSIFICATIONS

GROUP 2: Flagman

GROUP 3: Mason Tender-Cement/Concrete; Form Stripping;Sign Erector/Installer

GROUP 4: Grade Checker; Pipe Layer; Handheld Drill; High Scaler; Jackhammer

GROUP 5: Mason Tender-Brick

PAIN0005-031 03/01/2014

Rates Fringes

PAINTER (Including Brush, Roller, Spray and Prep Work).....$ 29.15 10.49

PLUM0026-001 01/01/2014

Rates Fringes

Plumbers and Pipefitters.........$ 41.87 19.40

* TEAM0174-006 01/01/2014

Rates Fringes

Truck drivers:

ZONE A:

GROUP 1:...................$ 32.18 16.69

GROUP 2:...................$ 31.34 16.69

ZONE B (25-45 miles from center of listed cities*): Add $.70 per hour to Zone A rates.

ZONE C (over 45 miles from centr of listed cities*): Add $1.00 per hour to Zone A rates.

*Zone pay will be calculated from the city center of the following listed cities:

BELLINGHAM CENTRALIA RAYMOND OLYMPIA

EVERETT SHELTON ANACORTES BELLEVUE

SEATTLE PORT ANGELES MT. VERNON KENT

TACOMA PORT TOWNSEND ABERDEEN BREMERTON

TRUCK DRIVERS CLASSIFICATIONS

GROUP 1 - Water Truck-3,000 gallons and over; Semi-Trailer Truck

GROUP 2 - Water Truck- less than 3,000 gallons

HAZMAT PROJECTS

Anyone working on a HAZMAT job, where HAZMAT certification is required, shall be compensated as a premium, in addition to the classification working in as follows:

LEVEL C: +$.25 per hour - This level uses an air purifying respirator or additional protective clothing.

LEVEL B: +$.50 per hour - Uses same respirator protection as Level A. Supplied air line is provided in conjunction with a chemical "splash suit."

LEVEL A: +$.75 per hour - This level utilizes a fully-encapsulated suit with a self-contained breathing apparatus or a supplied air line.

SUWA2009-066 08/07/2009

Rates Fringes

LABORER: Common or General......$ 23.05 5.44

LABORER: Landscape & Irrigation.......................$ 11.44 1.80

OPERATOR: Asphalt Plant.........$ 34.14 0.68

OPERATOR: Backhoe...............$ 26.18 7.20

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 10.63 0.00

OPERATOR: Broom/Sweeper.........$ 30.39 3.77

OPERATOR: Loader................$ 27.12 7.38

OPERATOR: Power Shovel..........$ 25.12 7.83

TRUCK DRIVER, Includes Dump Truck............................$ 24.10 7.33

TRUCK DRIVER: Flatbed Truck.....$ 22.74 6.29

TRUCK DRIVER: Lowboy Truck......$ 22.89 5.72

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is union or non-union.

Union Identifiers

An identifier enclosed in dotted lines beginning with characters other than "SU" denotes that the union classification and rate have found to be prevailing for that classification. Example: PLUM0198-005 07/01/2011. The first four letters , PLUM, indicate the international union and the four-digit number, 0198, that follows indicates the local union number or district council number where applicable , i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination.

The date, 07/01/2011, following these characters is the effective date of the most current negotiated rate/collective bargaining agreement which would be July 1, 2011 in the above example.

Union prevailing wage rates will be updated to reflect any changes in the collective bargaining agreements governing the rates.

0000/9999: weighted union wage rates will be published annually each January.

Non-Union Identifiers

Classifications listed under an "SU" identifier were derived from survey data by computing average rates and are not union rates; however, the data used in computing these rates may include both union and non-union data. Example: SULA2004-007 5/13/2010. SU indicates the rates are not union majority rates, LA indicates the State of Louisiana; 2004 is the year of the survey; and 007 is an internal number used in producing the wage determination. A 1993 or later date, 5/13/2010, indicates the classifications and rates under that identifier were issued as a General Wage Determination on that date.

Survey wage rates will remain in effect and will not change until a new survey is conducted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION