Mission Beach Wastewater Treatment Improvement
Awarded Award Notice Posted
- Solicitation number
- 13-102-SOL-00006
- Agency
- Indian Health Service Department of Health and Human Services
- Awarded
- to North Wind Construction Services, LLC
- Set-aside
- Competitive 8(a)
Opportunity facts
- Contract number
- HHSI102201500003C Federal contract award
- NAICS code
- 237110 Water and Sewer Line and Related Structures Construction
- PSC
- Not on record
- Place of performance
- Tulalip Indian Reservation, Snohomish County, WA Tulalip, Washington 98270, United States
Notice details come from SAM.gov. Updated .
Notice text
4 versions
Update #4 · Latest ·
Added: Oct 07, 2014 6:37 pm Please NOTE there are THREE Amendments, though they are not posted consistently. If you have questions you may call Jane Stuessy at 206-615-2533.
Update #3 ·
Added: Aug 08, 2014 12:25 pm IFB will be posted on or about August 19, 2014 instead of August 6, 2014. It is not the intent of IHS to award this project prior to the end of September, or before the Federal fiscal year 2013 end.
Update #2 ·
Added: Jul 23, 2014 5:22 pm Modified: Jul 25, 2014 10:34 amTrack Changes
Indian Health Services (IHS), Division of Engineering Services - Seattle, will release a solicitation/Invitation for Bids (IFB) in accordance with FAR Part 14 Sealed Bidding procedures on or about August 6, 2014 for subject project. Bids will be due approximately 30 days after solicitation issuance.
The project site is located at 3015 Mission Beach Dr., Tulalip, WA 98271 in the Tulalip Bay area of the Tulalip Reservation. This is a Federally Administered acquisition.
Solicitation No. 13-102-SOL-00006, Invitation for Bids and all amendments for this acquisition will be posted on FedBizOpps (FBO), (www.fbo.gov) and will be competitive limited to eligible 8(a) concerns, NAICS code of 237110, size standard of $33.5M, (SBA Requirement Number 1013-13-303908). It has been determined that this competition will be limited to 8(a) firms located within the geographical area of Small Business Administration Region 10 (Washington, Oregon, Idaho and Alaska), or other 8(a) construction firms with a bona fide place of business within the geographical competitive area, and the assigned NAICS code. All other 8(a) Business Development Participants are deemed ineligible to submit offers.
Hard copies of the Solicitation/IFB will not be available. All responsible sources meeting the 8(a) Set-Aside requirements listed herein that are registered in SAM.gov may submit a bid that will be considered by the agency.
This notice meets the requirements or FAR 5.201.
The scope of work contained within this project is summarized as follows:
The Tulalip Tribes and the Indian Health Service have partnered on a project to construct a new sewage lift station and to bring the non-functioning treatment track of an existing, activated sludge-oxidation ditch wastewater treatment facility back into full operation. This project includes replacement of an existing lift station located adjacent to the treatment facility with a new 1200 gpm vacuum prime packaged lift station and wet-well in addition to the replacement of approximately 20 lf of undersized wastewater forcemain.
The existing activated sludge sewage treatment track was originally constructed in the mid-1970's and operates in parallel with a currently well-functioning treatment track. This project will require close coordination with normal and continuous treatment operations at the facility. The facility improvements include electrical and control upgrades, fine-screen installation, headworks modifications, oxidation ditch modifications, clarifier modifications, return/waste activated sludge pumps and vault modifications, general yard piping, valve replacement, storm drain system installation and other related requirements. Some of the improvements are direct replacement of equipment, while some work is new construction.
Bid Guarantee (Bond), Performance and Payment Security are required with this solicitation and resulting contract.
Project Performance Period: Completion time will be 360 calendar days from the effective date of the Notice to Proceed.
Site Visit: The Government strongly recommends offerors attend a pre-bid meeting held on site, time and date yet to be determined. To register for the meeting, contact Mike Wynne at (206)615-2805 or email Mike.Wynne@ihs.gov.
Estimated Construction Cost: Between $1,000,000 and $5,000,000.
Government Furnished Material: There is no Government Furnished Material.
Award is subject to the availability of funds.
Please note that the Contracting Office Address within fbo.gov may be incorrect due to a recent office move. We anticipate this being corrected soon, however, the new Contracting Office Address is:
701 5th Avenue, Suite 1600
Seattle, Washington 98104
Update #1 ·
Added: Jul 23, 2014 5:22 pm
This Federally Administered project is being competitively set-aside for 8(a) Small Businesses.
The scope of work contained within this project is currently as follows:
The Tulalip Tribes and the Indian Health Service have partnered on a project to construct a new sewage lift station and to bring the non-functioning treatment track of an existing wastewater treatment facility back into full operation. This project includes replacement of an existing lift station located adjacent to the treatment facility with a new 1200 gpm vacuum prime packaged lift station and wet-well and the replacement of ~20 lf of undersized pressurized wastewater line.
The existing activated sludge sewage treatment track was originally constructed in the mid-1970's and operates in parallel with a currently well-functioning treatment track. This project will require close coordination with normal and continuous treatment operations at the facility. The facility improvements include electrical and control upgrades, fine-screen installation, headworks modifications, oxidation ditch modifications, clarifier modifications, return/waste activated sludge pumps and vault modifications, general yard piping, valve replacement, storm drain system installation and other related requirements. Some of the improvements are direct replacement of equipment, while some work is new construction.
The project site is located at 3015 Mission Beach Dr., Tulalip, WA 98271 in the Tulalip Bay area of the Tulalip Reservation.
This solicitation will be procured as in Invitation for Bids in accordance with FAR Part 14 procedures.
This solicitation will be available for download on or about August 6, 2014, with bids due approximately 30 days after solicitation issuance.
Project Performance Period: Completion time will be 360 calendar days after the Notice to Proceed.
Estimated Construction Cost: Between $1,000,000 and $5,000,000.
Government Furnished Material: There is no Government Furnished Material.
Award is subject to the availablility of funds.
Attachments
Show all 50
This notice has more attachments on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Mission Beach Wastewater Treatment Improvement | Award Notice | |
| Mission Beach Wastewater System Improvements | Award Notice |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity