This document is an amendment to a solicitation for an aft deck crane for the NOAA research vessel Oscar Elton Sette. The amendment extends the response deadline to May 26, 2020 at 4:00 PM Eastern Time and addresses additional questions from potential offerors. The solicitation seeks a knuckle boom crane with a safe working load of 7,000 pounds at a maximum reach of 45 feet under sea state level 4 conditions. The crane must be certified by the American Bureau of Shipping and built to API Spec 2C standards. Delivery will be to the Marine Operations Center - Pacific in Newport, Oregon. Payment terms involve a single payment upon acceptance of the crane which is expected in September.

View the file

Other files

File Type Posted
RFQ 1305M220QNMAN0158 5-21.docx DOCX document
Amendment 0005 5-21.pdf PDF
RFQ 1305M220QNMAN0158 5-19.docx DOCX document
Attachment I Crane SOW 5-19.docx DOCX document
Amendment 0003.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment I Crane SOW 5-6.docx DOCX document
RFQ 1305M220QNMAN0158.docx DOCX document
Attachment III Past Performance Questionnaire.docx DOCX document
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
Attachment I Crane SOW 5-1.docx DOCX document
0606-01 - Shipboard Lifting Appliance Certification and Inspections.doc DOC document
Attachment II Past Performance Information Form.rtf RTF text file
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Oscar Elton Sette Aft. Deck Crane 1305M220QNMAN0158

NOAA Acquisition and Grants Office (AGO) Eastern Acquisition Division

RFQ # 1305M220QNMAN0158

QUESTIONS

1. QUESTION: Section 3.2.1 mentions a telescoping, knuckle boom, but it appears only knuckle boom is mentioned elsewhere. Can you confirm only a knuckle boom configuration is required?

ANSWER: Only a knuckle boom crane is required. Please see the attached updated Attachment 1 with telescoping removed.

2. QUESTION: Will the crane require the API 2C monogram be applied?

ANSWER: The monogram is not required, but the crane must be built in accordance with API Spec 2C and certified by ABS in accordance with Section 3.1.1 of the SOW.

3. QUESTION: Will the crane have an operator’s cabin?

ANSWER: The crane shall be equipped with a seated control station which rotates with the crane and allows for unobstructed visibility of the load at all times. The control station does not need to be enclosed.

4. QUESTION: Would NOAA be able to make progress payment?

ANSWER: NOAA will make one payment at the time of acceptance of the crane.

5. QUESTION: If the crane is to have ABS approval, is it only the design that is to have ABS approval, or is this intended to include material certificates, the manufacturing process, and ABS witness to factory load tests as well?

ANSWER: ABS approval throughout the entire process, including design, fabrication and all testing required before leaving the factory. This includes an ABS Surveyor verifying all checkpoints during fabrication and testing.

6. QUESTION: Nowhere in the RFQ have we found mention of how the specified approvals and requirements are to be verified. ABS certification is often used for the purposes of 3rd party verification, and considering the multiple references to ABS approvals, the reference to the ABS Guide to the Certification of Lifting Appliances and other ABS references in the RFQ, would NOAA consider including ABS certification in the RFQ?

ANSWER: ABS Certification is required in the RFQ. This has been incorporated into the item description.

7. QUESTION: The RFQ indicates offerors proposals are to include shipping, but does not define the destination other than a shipyard located on the West Coast of the United States or Hawaii. Would it be possible for NOAA to specify a single destination so that we can be more accurate in our proposal price?

ANSWER: The crane will be delivered to:

Marine Operations Center - Pacific 2002 SE Marine Science Drive Newport, OR 97365-5229 United States

8. QUESTION: While not that large a crane, it does have some sophistication, and will take time to develop the design. Would it be possible to extend the due date for a few days or even a week?

ANSWER: NOAA will extend the closing date to May 20th at 4:00PM please see the updated RFQ and Posting.

9. QUESTION: Section 3.1.2 of the procurement specification states “Safe Working Load/Man Rated Load of 7,000 pounds (3175kg) shall be required at the maximum crane reach of 45ft +/- 3” (13.72m) at a dynamic sea state level 4.” Does it mean that 7,000 pounds should be considered in personnel lift mode? Or can we consider 7,000 pounds cargo mode and 3,500 pounds in personnel lift mode?

ANSWER: 7,000lbs is the man rated load that we need to carry. It's personnel, equipment and the boat.

10. QUESTION: What is the application of this crane?

ANSWER: The majority of the use of this crane is to put boats with personnel and equipment into the water, and then retrieving them when the boats return to the ship.

11. QUESTION: Is it possible for the lifit requirement of 7,000 man rated lbs to be reduced?

ANSWER: No.

12. QUESTION: Are we to supply a new HPU dedicated for the new crane, or will the new crane tie into an existing HPU?

ANSWER: Tying into an existing HPU.

13. QUESTION: If we are to supply a new HPU, will the HPU be mounted to the crane's pedestal or mounted remotely aboard the vessel on a skid? And will you require an electric motor starter provided with the HPU?

ANSWER: A new HPU is not required

14. QUESTION: If the crane is to tie into an existing HPU, do you have the pressure and flow settings of the existing HPU? And can you advise if the HPU is open center, close loop, or pressure compensated?

ANSWER: The pressures are 2400 psi, provided from a 75hp motor/pump at 50 gpm. See Hydraulic System No. 2 Diagram Attached. Please note these are the design pressures and the flow of the pumps has been lowered when they were installed earlier this year. This was to prevent a high constant load on the motors.

15. QUESTION: Are there any lift requirements for the crane beyond the 7,000 lbs. at 45 ft. man-rated? In other words, do you require the winch hoist to be rated for 7,000 lbs., or for a higher capacity?

ANSWER: 7,000 lbs of man rated capacity at 45-feet is all that is needed

16. Will our standard design temperature of 15 degrees F to 100 degrees F be acceptable, or will the equipment need to operate at temperatures outside of this range?

ANSWER: Yes, this is acceptable.

17. Can you please provide an indication of the pedestal height that is required for the crane? And will the pedestal be welded or bolted to the deck?

ANSWER: Height 6 feet 5-1/2 inches. Please see attached picture.

18. QUESTION: Can you please provide a specific paint color requirement for the crane if this information is available?

ANSWER: Black, added to section 3.1.2

19. QUESTION: Can an extension to the proposal deadline be considered?

ANSWER: Solicitation closing will be extended to May 26. 2020 at 4:00 PM Eastern Time.

20. QUESTION: When can a vendor expect payment after acceptance?

ANSWER: The vendor can expect payment 30 days from when the crane is accepted in September.

21. QUESTION: The crane requirements on that solicitation are very similar to the crane requirements for the R/V Oscar Elton Sette. Would NOAA consider procuring both cranes from the same supplier under a single contract so that we can take advantage of economies of scale, which would translate to a lower overall price for both cranes?

ANSWER: NOAA would not be able to purchase both cranes under the same contract.

Amendment 0004
Amendment 0003
Amendment 0002
Amendment 0001 5-5
Amendment 0001
SF30

Q&A3

Q&A
Pedestal
SE_556_556-001_RevA_Sht1-11_NONE_ADV-556-001 HYDRAULIC PIPING SYSTEM MODIFICATIONS
ADV_556_001_REVA_01_DRA
ADV_556_001_REVA_02_DRA
ADV_556_001_REVA_03_DRA
ADV_556_001_REVA_04_DRA
ADV_556_001_REVA_05_DRA
ADV_556_001_REVA_06_DRA
ADV_556_001_REVA_07_DRA
ADV_556_001_REVA_08_DRA
ADV_556_001_REVA_09_DRA
ADV_556_001_REVA_10_DRA
ADV_556_001_REVA_11_DRA
topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0004
Code[0]: AJ930073
Code[1]:
AccountingData[0]: N/A
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Ashley Perry, Contracting Officer
Description[0]: Oscar Elton Sette Aft Deck Crane

This amendment hereby updates the following items.

1. Addresses Q&A 12-21 to the solicitation

2. Extends the closing date of the solicitation to May 26, 2020 at 4:00 PM Eastern Time

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NOAA/ERAD

200 GRANBY STREET

NORFOLK, VA 23510

NameandAddress[0]:
AdministeredBy[0]: See Block 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 1305M220QNMAN0158
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 19
EffectiveDate[0]: 5/19/2020
Dated9B[0]: 5/1/2020
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: 1
NotExtended[0]: Off
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .