This document contains an amendment to a solicitation for an aft deck crane for the NOAA research vessel Oscar Elton Sette. The amendment provides responses to questions from offerors, updates the statement of work to clarify requirements, and extends the proposal due date to May 20th. Key details include the solicitation requiring the design, fabrication, testing, and delivery of a knuckle boom crane with a 7,000 pound man rated lifting capacity at 45 feet of reach under sea state level 4 conditions. The crane must be ABS certified and delivered to the Marine Operations Center in Newport, Oregon.

View the file

Other files

File Type Posted
RFQ 1305M220QNMAN0158 5-21.docx DOCX document
Amendment 0005 5-21.pdf PDF
RFQ 1305M220QNMAN0158 5-19.docx DOCX document
Attachment I Crane SOW 5-19.docx DOCX document
Amendment 0004 5-19.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Attachment I Crane SOW 5-6.docx DOCX document
RFQ 1305M220QNMAN0158.docx DOCX document
Attachment III Past Performance Questionnaire.docx DOCX document
0606- Standards for Lifting Appliances on NOAA Ships.doc DOC document
Attachment I Crane SOW 5-1.docx DOCX document
0606-01 - Shipboard Lifting Appliance Certification and Inspections.doc DOC document
Attachment II Past Performance Information Form.rtf RTF text file
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

NSN 7540-01-152-8070

Previous edition unusable

Oscar Elton Sette Aft. Deck Crane 1305M220QNMAN0158

NOAA Acquisition and Grants Office (AGO) Eastern Acquisition Division

RFQ # 1305M220QNMAN0158

QUESTIONS

1. QUESTION: Section 3.2.1 mentions a telescoping, knuckle boom, but it appears only knuckle boom is mentioned elsewhere. Can you confirm only a knuckle boom configuration is required?

ANSWER: Only a knuckle boom crane is required. Please see the attached updated Attachment 1 with telescoping removed.

2. QUESTION: Will the crane require the API 2C monogram be applied?

ANSWER: The monogram is not required, but the crane must be built in accordance with API Spec 2C and certified by ABS in accordance with Section 3.1.1 of the SOW.

3. QUESTION: Will the crane have an operator’s cabin?

ANSWER: The crane shall be equipped with a seated control station which rotates with the crane and allows for unobstructed visibility of the load at all times. The control station does not need to be enclosed.

4. QUESTION: Would NOAA be able to make progress payment?

ANSWER: NOAA will make one payment at the time of acceptance of the crane.

5. QUESTION: If the crane is to have ABS approval, is it only the design that is to have ABS approval, or is this intended to include material certificates, the manufacturing process, and ABS witness to factory load tests as well?

ANSWER: ABS approval throughout the entire process, including design, fabrication and all testing required before leaving the factory. This includes an ABS Surveyor verifying all checkpoints during fabrication and testing.

6. QUESTION: Nowhere in the RFQ have we found mention of how the specified approvals and requirements are to be verified. ABS certification is often used for the purposes of 3rd party verification, and considering the multiple references to ABS approvals, the reference to the ABS Guide to the Certification of Lifting Appliances and other ABS references in the RFQ, would NOAA consider including ABS certification in the RFQ?

Oscar Elton Sette Aft. Deck Crane 1305M220QNMAN0158

ANSWER: ABS Certification is required in the RFQ. This has been incorporated into the item description.

7. Question 3: The RFQ indicates offerors proposals are to include shipping, but does not define the destination other than a shipyard located on the West Coast of the United States or Hawaii. Would it be possible for NOAA to specify a single destination so that we can be more accurate in our proposal price?

ANSWER: The crane will be delivered to:

Marine Operations Center - Pacific 2002 SE Marine Science Drive Newport, OR 97365-5229 United States

8. QUESTION: While not that large a crane, it does have some sophistication, and will take time to develop the design. Would it be possible to extend the due date for a few days or even a week?

ANSWER: NOAA will extend the closing date to May 20th at 4:00PM please see the updated RFQ and Posting.

9. QUESTION: Section 3.1.2 of the procurement specification states “Safe Working Load/Man Rated Load of 7,000 pounds (3175kg) shall be required at the maximum crane reach of 45ft +/- 3” (13.72m) at a dynamic sea state level 4.” Does it mean that 7,000 pounds should be considered in personnel lift mode? Or can we consider 7,000 pounds cargo mode and 3,500 pounds in personnel lift mode?

ANSWER: 7,000lbs is the man rated load that we need to carry. It's personnel, equipment and the boat.

10. QUESTION: What is the application of this crane?

ANSWER: The majority of the use of this crane is to put boats with personnel and equipment into the water, and then retrieving them when the boats return to the ship.

11. QUESTION: Is it possible for the lifitn requirement of 7,000 man rated lbs to be reduced?

ANSWER: No.

Amendment 0003
Amendment 0002
Amendment 0001 5-5
Amendment 0001
SF30

Q&A2

Q&A3

topmostSubform[0]:
Page1[0]:
AmendmentNo[0]: 0003
Code[0]: AJ930073
Code[1]:
AccountingData[0]: N/A
A13[0]:
C13[0]:
D13[0]:
NameandTitleSigner[0]:
NameandTitleOfficer[0]: Ashley Perry, Contracting Officer
Description[0]: Oscar Elton Sette Aft Deck Crane

This amendment hereby updates the following items.

1. Addresses Q&A 9-11 to the solicitation

FacilityCode[0]:
Code[2]:
IssuedBy[0]: NOAA/ERAD

200 GRANBY STREET

NORFOLK, VA 23510

NameandAddress[0]:
AdministeredBy[0]: See Block 6
ContractIDCode[0]:
ReqNumber[0]:
AmendmentNo[1]: 1305M220QNMAN0158
ModificationNo[0]:
ProjectNo[0]:
Page[0]: 1
Pages[0]: 2
EffectiveDate[0]: 5/15/2020
Dated9B[0]: 5/1/2020
Dated10B[0]:
CheckBox9[0]: 1
CheckBox10[0]: Off
CheckBox11[0]: 1
CheckBox13A[0]: Off
CheckBox13B[0]: Off
CheckBox13C[0]: Off
CheckBox13D[0]: Off
IsNot[0]: Off
Is[0]: Off
Extended[0]: Off
NotExtended[0]: 1
DateSigned[0]:
DateSigned[1]:
Copies[0]: 1
CopiesReturned[0]:

File details come from the government source that posted it. Updated .