130-WTCC9227C SWC_SL_ RFQ for Designer_07-30-26_kgm.pdf
PDF 213 KB Posted
- Solicitation number
- 1006Bid #130-WTCC9227C
- Issued by
- Wake County, Teachey Town, North Carolina
About this file
This is a Request for Qualifications (RFQ) issued by Wake Technical Community College in Raleigh, North Carolina, for design consulting services related to Building L renovations at the Southern Wake Campus (NCCCS# 3051). The project involves architectural and engineering design consulting services including programming, schematic design, design development, construction documents, and construction administration for the renovation of a 105,669 square-foot, 3-story building housing student services, advising, classrooms, culinary training, and food services facilities. The scope includes mechanical, electrical, plumbing, and structural infrastructure upgrades along with interior and exterior finish improvements and building envelope upgrades. Statements of Qualifications must be submitted in five hard copies plus one electronic copy on USB drive to Kathy G. Monteiro, Director of Design & Construction, by September 11, 2026, at 2:00 p.m. at the Southern Wake Campus, Building S, Suite 200. The RFQ does not include a pre-RFQ meeting, though inquiries may be submitted by August 28, 2026. Following initial evaluation, selected firms may be required to participate in interviews anticipated within 30 days of the RFQ closing date. The evaluation team will present recommendations to Wake Technical Community College's Board of Trustees for final approval. The project timeline includes a 3-month designer selection period, 10-12 months for project design, and 14-18 months for construction.
Pricing and fee information is not requested and will not be used in the evaluation process; instead, firms will be evaluated solely on experience and qualifications. The total construction budget estimate is $39,500,000. The successful firm must be licensed to practice architecture and/or engineering in North Carolina and carry professional liability insurance with limits to be determined prior to contract award. The project will utilize a Construction Manager at Risk (CM@R) delivery system and must meet Green Globes (one globe) minimum standards, though higher achievement levels are encouraged. Firms must demonstrate capacity to provide or assemble a multidisciplinary team including architectural, civil/site engineering, landscape services, mechanical/electrical/plumbing/fire protection, structural engineering, IT/AV, card access and security, acoustical, and miscellaneous consulting services. The college encourages Small Business Enterprise (SBE) participation and requires firms to describe their approach to supporting SBE firms during the construction process. All SoQ submissions become property of Wake Technical Community College upon submission and will not be returned. Faxed or emailed submissions will not be accepted.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SWC Renovations SL Addendum 3 Final.docx | DOCX document | |
| SL Addendum 1_ 8-14-26 Final.docx | DOCX document | |
| SWC Renovations_ eVP RFQ Ad for Designer_07-29-2026.pdf | ||
| SL Addendum 2 - Final Copy 8-21-26.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUALIFICATIONS (RFQ)
For Design Consulting Services
Southern Wake Campus Renovations Building SL Renovation
NCCCS# 3051
RFQ Closing Time: September 11, 2026 at 2:00 p.m.
Wake Technical Community College Table of Contents
Part 1 – Submittal Requirements
Section No. Section Name
Section I Requests for Qualifications
Section II Statement of Qualifications (SoQ) Content Requirements
Section III Available Project Information
Section IV Sample SoQ Evaluation Form
Wake Technical Section I Community College Request for Qualifications
1. INTENT
The intent of this Request for Qualifications (RFQ) is to solicit Statements of Qualifications (SoQ), in accordance with the requirements described in this RFQ, for the following:
A. Professional architectural and engineering design consulting services for programming, schematic design, design development, construction documents, and construction administration from Architectural firm acting as the lead firm and their assembled sub-consultant teams. Wake Technical Community College encourages participation by Small Business Enterprise (SBE) firms and supports efforts to ensure and promote opportunities for SBE firms.
B. A Qualification and Performance analysis process will be employed for this selection. The successful Firm(s) will be those who show successful experience in the scope and types of work proposed.
C. The successful Firm will be required to enter into a fixed fee contract utilizing the Wake Technical Community College STANDARD FORM OF
AGREEMENT BETWEEN OWNER AND DESIGNER.
2. DEFINITIONS
A. “The Owner” means Trustees, officers, and/or employees of Wake Technical Community College, Raleigh, NC.
B. "Firm" means the person or organization responding to this RFQ.
C. "Statement of Qualifications (SoQ)" means the submission received from a Firm in response to this RFQ.
D. "Request for Qualifications" or "RFQ" means this entire document, including all of the documents and any addenda thereto issued before the RFQ closing time.
3. STATEMENT OF QUALIFICATIONS SUBMISSION
A. SoQs will be received at the Southern Wake Campus – Building S, Suite 200 up to 2:00 p.m. on Friday, September 11, 2026, (the RFQ closing time) by:
Kathy G. Monteiro Director, Design & Construction Wake Technical Community College Building T, Suite 201 4723 Advantage Way Raleigh, NC 27603 Telephone: (919) 866-5528
B. SoQ submitted via fax or e-mail are not acceptable and will not be considered.
C. SoQ sent by mail, please verify address and timing of delivery. Late SoQ will not be considered.
D. Firms will be evaluated on experience and qualifications. Fee related information is not requested and will not be used in the evaluation process.
E. On the envelope clearly indicate the name of the Firm and the name of Project for which the SoQ is being submitted for.
F. Refer to Section II - SoQ Content Requirements, for details.
G. There will not be a "public opening" of the SoQs with Firms present.
4. COST OF SUBMISSION AND OWNERSHIP OF SoQ
A. Wake Technical Community College is not responsible for any costs incurred by Firms in preparing, submitting, or presenting their SoQ.
B. All SoQs become the property of Wake Technical Community College upon submission and will not be returned.
5. THE SERVICES AND THE SCHEDULE
A. The Scope of Work to be provided under the contract is specified in Section III, Part 1. of the RFQ.
B. Tentative schedule objectives for the project are as follow:
1. Designer Selection 3 months
2. Project Design 10 - 12 months
3. Construction 14 - 18 months
6. MINIMUM QUALIFICATION REQUIREMENTS
A. Firms must be licensed to practice architecture and/or engineering in the State of North Carolina in accordance with the laws of the State of North Carolina.
B. Firms must have Professional Liability Insurance coverage. Limits shall be determined prior to award of the design contract(s).
7. EVALUATION PROCESS
A. The evaluation team will be comprised of representatives of Wake Technical Community College and others, as deemed appropriate by the college.
B. Firms are deemed to understand and agree that the SoQ submitted by them will be used by the evaluation team in determining, according to the evaluation team's sole and best judgment and discretion, the Firms who are best qualified to provide the required services.
8. SUPPLEMENTARY INFORMATION AND INTERVIEWS
A. Following the evaluation team's initial evaluation of the SoQ, Wake Technical Community College may require select Firms to attend an interview. Unsolicited supplementary or clarifying information received after the RFQ closing time will not be considered.
B. Interview Information:
1. The purpose of the interviews will be to obtain supplementary clarifying information in addition to the written SoQ.
2. Wake Technical Community College will notify those Firms selected for an interview.
3. The interviews will take place at a place and time determined by Wake
Technical Community College and are anticipated to be within 30 days after the RFQ closing time.
4. Selected Firm will receive supplemental information regarding the interview process with notification of selection.
5. Each Firm is expected to have in attendance the person(s) from their firm(s) who will be responsible for the execution of this project.
6. Firms are limited to seven in-person attendees for presentations. Additional team members may be online through Microsoft TEAMS, hosted by Wake Tech.
7. Wake Technical Community College reserves the right to independently verify the past performance of any Firm or any member of the Firm's project team.
8. Following the interviews, the evaluation team will make a selection based on a tabulation of the evaluation sheets from all of the team members. Results of the evaluation and selections will be presented to the Board of Trustees of Wake Technical Community College for approval.
9. PRE-RFQ MEETING
N/A
10. INQUIRIES
A. Inquiries for this RFQ are to be submitted on or about 08/28/2026 to provide time to submit an addendum response(s) one week prior to RFQ due date. Please direct your inquiries to the following person via email:
Kathy G. Monteiro Director, Design & Construction Wake Technical Community College kgmonteiro@waketech.edu
END OF SECTION
mailto:kgmonteiro@waketech.edu
Wake Technical Section II Community College Statement of Qualifications Page 1 Content Requirements
STATEMENT OF QUALIFICATIONS (SOQ) FORMATTING REQUIREMENTS
A. This Section specifies in detail, the form and minimum content requirements for information required to be submitted in each SoQ.
B. Firms may, at their discretion, include additional information which they consider relevant to ensure a full and proper evaluation, provided that the specified maximum allowable number of pages is not exceeded.
C. Limit SoQ submission to a maximum of 15 pages, sized 8½" x 11" or equivalent (e.g.
11" x 17" fold out sheets for charts, schedules, etc. count as a single page, any other use of 11” x 17” sheets counts as two pages). A page shall be considered to have printing only on one side. A sheet printed on both sides shall be considered as two pages. This page limit excludes a transmittal letter, title page, table of contents SF330.
The page limit includes resumes of key personnel and any unsolicited supplementary information such as corporate brochures, etc. The information found in SF330 does not replace the required information for this SoQ.
D. Organize the SoQ submission to clearly and succinctly present the required information. Use the main headings and present the information in the order provided in Section IV - SoQ Evaluation Form. All scores are dependent upon completeness and applicability of information within the SoQ.
E. Provide five [5] complete hard copies of the SoQ and one [1] electronic copy on USB drive.
1. CORPORATE PROFILE
A. Provide general information about the Firm, which need not be specific to this RFQ.
Include history of the Firm, years in business, office locations, number and experience of staff, types of services provided and specialist areas of expertise.
B. Completeness and applicability of the SoQ.
2. PROPOSED PRIME CONSULTANT AND SUBCONSULTANT TEAM
A. Firms must demonstrate in their SoQ that they, together with their sub-consultants, have the capacity available to commit to managing and performing all the consulting services and producing all the deliverables required for this particular project, within the required project schedule. Capacity includes sufficient qualified staff resources, technology, and equipment. Firms must demonstrate educational qualifications, experience, and track record of prime consultant’s leadership.
Page 2 Content Requirements
B. Firms must assemble, and identify in their SoQ, a consulting team that includes, as a minimum, the following specialist disciplines:
1. Architectural
2. Civil/Site Engineering (including Landscape Services)
3. Plumbing, Mechanical, Electrical Engineering, and Fire Protection
4. Structural Engineering
5. IT/AV
6. Card Access, Security Cameras
7. Acoustical Consultant
8. Miscellaneous Consultants
C. Firms must indicate whether each of the above disciplines will be resourced through the Firm's own staff or through sub-consultants.
D. Provide, for the Firm and for each proposed sub-consultant firm:
1. Name of firm, head office address, telephone number and fax number – if joint venture, whether special or ongoing relationship.
2. If different from the above, the firm’s branch, regional or other office address, and telephone number at the location from which most of the services will be performed.
3. Name, position, office address, telephone number, and e-mail address of firm’s primary contact person for purposes of this RFQ.
4. Name(s) of firm’s principal(s) and their professional credentials.
5. Names of key personnel proposed to be committed to the project. Identify their discipline, their role (e.g. team leader, lead designer, technical expert, etc.), their professional credentials and experience and their proposed extent of participation in the project.
6. Other relevant information, at the Firm’s discretion, within the specified maximum page limitation requirement for the proposal
E. Describe how the prime consultant and sub-consultant team will be organized, by indicating formal reporting lines and informal lines of communication in a proposed organization chart.
Page 3 Content Requirements
3. EXPERIENCE AND PAST PERFORMANCE
A. Firms should provide summaries of three to six projects completed within the last five years, for which the Firm has provided prime consultant services. These referenced projects must include:
1. At least two projects similar in nature and scope of services to the project for which proposals are being sought.
2. At least two projects that have been performed by the prime consultant and sub-consultant team, including key personnel who are substantially the same as the one proposed for this project.
3. The referenced projects may be past projects for Wake Technical Community
College or for other clients.
4. The summary for each referenced project should include:
a) Name, location and brief description of the project.
b) Name of client (owner) and name, telephone number and e-mail address of client representative.
c) Identification of prime consultant and sub-consultant team, including names of key personnel.
d) Name of construction contractor and name, telephone number and e-mail address of contractor representative.
e) Planned and actual start and completion/occupancy dates, with an explanation of any significant deviations.
f) Original construction budget and final construction cost, with an explanation of any significant deviations.
B. Client Satisfaction, client recommendations, etc.
C. Project management systems, services, and deliverables quality management systems (scope, time, cost, quality, etc.)
D. Green Globes Design experience.
4. PROPOSED WORK METHODOLOGIES
A. Describe proposed priorities, sequences, etc. for this project.
B. Describe how all of the required disciplines will be coordinated to optimize the design and ensure high quality properly coordinated construction documents.
Page 4 Content Requirements
C. Describe the Firm's design philosophy and how the building users' needs and requirements will be considered in the design process.
D. Describe the management systems, strategies and skills that will be employed to ensure that:
1. Wake Technical Community College’s expectations around project scope, time, cost, quality, performance and aesthetics will be met.
2. The highest quality of professional services and deliverables will be provided to
Wake Technical Community College within the required timelines.
E. Describe the Firm’s construction administration services approach.
F. Describe the Firm’s approach to supporting the growth/development of Small Business Enterprise (SBE) firms; and how the design will promote SBE participation during the construction process.
G. Describe the project close-out and completion effectiveness.
Wake Technical Section III Community College Available Project Information
1. PROJECT DESCRIPTION
A. Renovations to Building L Student Services - 105,669 sf 3-story building housing general student services, advising, classrooms, culinary training, student lounge w/ food services, and other ancillary spaces. Renovations in other buildings as funding allows. The scope of work will include mechanical, electrical, plumbing, and structural infrastructure upgrades as well as upgrades to interior and exterior finishes and building envelope. The instructional/functional programs will not significantly change; however, alterations may be made to accommodate current or anticipated program needs.
2. PROJECT BUDGET
A. The total construction estimate for this project is $39,500,000.
3. PROJECT SCHEDULE
A. See Section I, Part 5-B for project schedule objectives.
4. PROJECT DELIVERY SYSTEM
A. The anticipated project delivery system is by the Construction Manager at Risk (CM@R) process.
5. PROJECT MANAGEMENT FRAMEWORK
A. A Project Manager, employed by Wake Technical Community College, has authority and responsibility for the overall management and delivery of the project. No other Wake Tech representatives are authorized to make decisions or commit Wake Tech on the project unless specifically approved by the Wake Tech Project Manager or their supervisor chain.
B. The successful Firm will be expected to appoint a project leader who will interface with the Wake Technical Community College's project manager. This interface will be the formal and principal point of contact and communication between the successful Firm and Wake Technical Community College.
6. OTHER CONSULTANTS
A. Wake Technical Community College may retain the following special consultants under direct contract with the College.
1. Special Inspections
2. Surveying
3. Construction Materials Testing
4. Geotechnical
5. Commissioning
6. Structural Peer Review
7. Other Specialty Services as needed
Wake Technical Section III Community College Available Project Information
7. OTHER AVAILABLE PROJECT INFORMATION
A. The following additional information, which may be relevant to the consulting services, is appended to this Section for information purposes:
1.The project will be designed and built to meet, at minimum, Green Globe (one globe) standard; however, higher levels of achievement are encouraged.
Wake Technical Section IV Community College Sample SoQ Evaluation Form
NAME OF RFQ/PROJECT: Southern Wake Campus Renovations
EVALUATION CRITERIA
Item Description Score Max. Points
1) Corporate Profile (suitability of corporate profile for project needs): 2%
2) Proposed Prime Consultant and Sub-consultant Team: 38%
a) Demonstrates overall capacity, sufficiency of qualified staff resources, educational qualifications, experience, and track record of prime consultant’s team leadership.
b) Identify consulting team that includes, as a minimum the following disciplines:
1) Architect
2) Civil Engineering
3) Landscape Design
4) Plumbing, Mechanical, Electrical Engineering, and Fire Protection
5) Structural Engineering
6) IT/AV Consultants
7) Card Access and Security Cameras
8) Miscellaneous Consultant
c) Indicate whether each of the above disciplines will be resourced through the Firm’s own staff or through sub-consultants.
d) Provide detail information for the Firm and Sub-Consultant Firm. NOTE: Include the information requested for items 1 – 6 (Section II, 2 D).
e) Describe how the prime consultant and sub-consultant team will be organized, by indicating formal reporting lines and informal lines of communication in a proposed organization chart.
3) Experience and Past Performance Record: 30%
a) Provide a summary of three to six projects completed within the last five years.
NOTE: Include the information requested for items 1 – 4 (Section II, 3,A)
b) Provide original construction budget / final costs and actual start / completion date.
c) Client satisfaction, other project participants' satisfaction
d) Project management systems, services, and deliverables quality management systems (scope, time, cost, quality, etc.)
e) Green Globes Design experience
4) Proposed Work Methodologies: 30%
a) Proposed priorities, sequences, etc. for this project
b) Coordination of required disciplines to optimize design
c) Design philosophy
d) Management systems, strategies, and skills
e) Standard Construction Administration Services
f) Support for the development of Small Business Enterprise (SBE) firms
g) Project Close-out and Completion effectiveness
Wake Technical Section IV Community College Sample SoQ Evaluation Form
Total Score (All scores are dependent upon completeness and applicability of information within the SoQ.) 100
Firms may optionally provide a Standard Form 330 https://ncadmin.nc.gov/document/sf254-word https://www.gsa.gov/forms-library/architect-engineer-qualifications https://ncadmin.nc.gov/document/sf254-word https://www.gsa.gov/forms-library/architect-engineer-qualifications
File details come from the government source that posted it. Updated .