12837120Q0175 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ALBUQUERQUE NM 87102
333 BROADWAY SE
SOUTHWESTERN REGION
08/18/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
08/18/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
2540 D6 ENG South Yaqui House Asbestos Abatement and Remodel
LIST OF CHANGES:
Bids due date : 08-SEP-20 changed to 11-SEP-20
Solicitation due time : 15:00 PM changed to 12:00 PM
Also Added
Exhibit 2 - Pellet Stove
Exhibit 8 - Pre-Bid Meeting Notes
Period of Performance: 09/10/2020 to 02/04/2021
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
COLUMBUS E. CAMPBELL
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
03SEP2020
B - SECTION B - Supplies or Services and Prices/Costs Schedule of Items C - SECTION C - Description/Specifications/Statement of Work D - SECTION D - Packaging and Marking F - SECTION F - Deliveries or Performance G - SECTION G - Contract Administration Data I - SECTION I - Contract Clauses
J- SECTION J – LIST OF ATTACHMENTS
K - SECTION K - Representations, Certifications, and Other Statements of Offerors L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents
SECTION M--EVALUATION FACTORS FOR AWARD
PART I – THE SCHEDULE
SECTION B – SUPPLIES OR SERVICES AND PRICES/COSTS
SCHEDULE OF ITEMS
B1 – SCHEDULE OF BASE ITEMS
BASE
ITEM # DESCRIPTION OF PROJECT ITEMS UNIT OF
MEASURE
EST.
QTY UNIT PRICE EXTENDED AMOUNT
B1.1 Demolition and disposal of ACM flooring, doors, lighting, walls, kitchen, etc. LS 1 $_________ $____________
B2.1 Remodel restrooms, new walls, cabinets, fixtures, bath units, sinks, grab bars, etc. LS 1 $_________ $____________
B3.1 Rigid core vinyl flooring, floor preparation, baseboard, molding, etc. LS 1 $_________ $____________
B4.1 New doors, door hardware, frames, paint, etc. EA 7 $_________ $____________
B5.1 Closet door assemblies, new closet, etc. LS 1 $_________ $____________
B6.1 Hearth pad, pellet stove installation, vent piping, fresh air intake, rock work, etc. LS 1 $_________ $____________
B7.1 New floor registers and bathroom wall registers LS 1 $_________ $____________
B8.1 New lighting and switches LS 1 $_________ $____________
B9.1 New receptacle and switch plates with insulators LS 1 $_________ $____________
B10.1 Wall and ceiling prep, prime, and paint LS 1 $_________ $____________
B11.1 New wood faux blinds LS 1 $_________ $____________
B12.1 Kitchen cabinets, countertops, island, dishwasher, microwave, plumbing, electrical, etc.
LS 1 $_________ $____________
B13.1 Exterior prep, prime, and painting LS 1 $_________ $____________
TOTAL OF ALL BASE ITEMS
O1 – SCHEDULE OF OPTION ITEMS
OPTION
ITEM # DESCRIPTION OF PROJECT ITEMS UNIT OF
MEASURE
EST.
QTY UNIT PRICE EXTENDED AMOUNT
O1.1 Replace east windows LS 1 $_________ $____________
O2.1 Install new refrigerator and oven LS 1 $_________ $____________
TOTAL OF ALL OPTION ITEMS
SECTION C – STATEMENT OF WORK/DESCRIPTIONS
C.1 – GENERAL DESCRIPTION OF WORK
The Contractor shall furnish all supervision, materials, equipment and vehicles, tools, parts, labor, transportation, lodging, and miscellaneous items to remodel the South Yaqui House. The project is located on the Springerville Ranger District.
All work shall be in accordance with the plans and specifications contained herein. No changes to the specifications, terms, or conditions of this Request For Quotations (RFQ) shall be made without the prior approval of the Contracting Officer in writing.
The Government intends to award a contract based on Best Value -- LPTA (Lowest Price Technically Acceptable). The offeror that demonstrates that they have technical skill required and lowest price. In order to remain in the competitive range, Offerors (Contractors) shall submit the Return Package with the requirements in Section M, Evaluation Factors.
Reference Section J for Exhibits:
Exhibit 1 – U.S. Department of Labor, Wage Determination Exhibit 2 – Exhibit 3 – Drawings Exhibit 4 – Asbestos Survey Exhibit 5 – Energy Star Requirements Exhibit 6 – As-Built Drawings Exhibit 7 – Pictures
C.2 – LOCATION OF PROJECT
The project is located on the southeast corner of Pima Street and Yaqui Street in Springerville, AZ, with the following coordinates: LAT: 34.130126 deg. / LONG: -109.279609 deg.
C.3 – SPECIFIC SCOPE OF WORK
C3.1 General Requirements
All work shall be completed in accordance with the contract drawings and specifications, and outlined herein.
Please note: Exhibit 6 “As-built Drawings” are the standard drawings for this type of unit. Site specific items, such as sewer tie-in location, must be field verified to the maximum practicable extent, including mandatory site visits prior to bidding the work.
Submittals are required for all “approved equals” or substitutes to the specified finishes in the drawings.
C3.2 Base line item B1.1
Demolition of flooring, base boards, wainscot, lighting, walls, doors, closet doors, bath/shower unit, kitchen, etc.
and patch, skim, and texture as required and as a result of demolition activities. Refer to certified asbestos report for Asbestos-Containing Materials (ACM). Unit of measure is Lump Sum (LS).
C3.3 Base line item B2.1
Remodel restrooms, install new walls, cabinets, fixtures, bath/shower combination units, sinks, grab bars, accessories, etc. This line includes sewer tie-ins, plumbing, and final cleaning. Unit of measure is Lump Sum (LS).
C3.4 Base line item B3.1
Prepare concrete substrate, and install new rigid core vinyl flooring, baseboard, base molding, etc. Unit of measure is Lump Sum (LS).
C3.5 Base line item B4.1
Install new doors, door hardware and accessories, wood base trims, and prime and paint as described. Unit of measure is Each (EA).
C3.6 Base line item B5.1
Install new closet door assemblies, new closet with accessories and doors, etc. Unit of measure is Lump Sum (LS).
C3.7 Base line item B6.1
Install slate hearth pad, Government-Furnished (GF) pellet stove, new stove piping to ceiling, piping and terminations for fresh air intake, rock work, and electrical and dedicated switch for blower. Unit of measure is Lump Sum (LS).
C3.8 Base line item B7.1
Install new floor HVAC registers, and wall registers in the bathrooms. Relocate duct/register locations as shown on drawings. Unit of measure is Lump Sum (LS).
C3.9 Base line item B8.1
Install exterior and interior lighting and switches. Unit of measure is Lump Sum (LS).
C3.10 Base line item B9.1
Remove and replace all switch and receptacle face plates with new, ultra-white plates and insulators at all locations. Remove and replace receptacle outlets with new receptacle outlets, ultra-white. This line also includes re-labeling circuit breaker panel, laminated, per NEC to accurately reflect existing and new electrical conditions.
Unit of measure is Lump Sum (LS).
C3.11 Base line item B10.1
Prepare walls and ceiling for paint (including removing all wall fasteners, nails, hooks, etc., patching voids, etc.), prime, and paint. Unit of measure is Lump Sum (LS).
C3.12 Base line item B11.1
Install wood faux blinds on windows, excluding east windows (optional replacement) and bathrooms. Unit of measure is Lump Sum (LS).
C3.13 Base line item B12.1
New kitchen cabinets, countertops, over the range microwave, dishwasher, Kitchen Island, and all associated electrical and plumbing.
C3.14 Base line item B13.1
Exterior preparation, prime, and paint. Unit of measure is Lump Sum (LS).
C3.15 Option line item O1.1
Replace east windows with EnergyStar rated fixed windows. Unit of measure is Lump Sum (LS).
C3.16 Option line item O2.1
Remove two (2) existing refrigerators and one (1) electric range/oven. Install one (1) new refrigerator and one (1) oven.
SECTION D – PACKAGING AND MARKING
D1—GENERAL INFORMATION:
See Section J for Exhibits that are incorporated as part of the statement of work:
Reference Section J for Exhibits:
Exhibit 1 – U.S. Department of Labor, Wage Determination
Exhibit 3 – Drawings Exhibit 4 – Asbestos Survey Exhibit 5 – Energy Star Requirements Exhibit 6 – As-Built Drawings Exhibit 7 – Pictures
Technical Capability shall be submitted in the form of a statement or document that demonstrates the contractor’s capability to perform the work to meet or exceed the requirements of this solicitation. In order to meet the Technical Capability Requirements, offers shall address the following factors:
Factor a - tools, equipment, training, and general business practices should be developed in the statement or document to satisfy an evaluation panel that you the contractor has a level of technical capability that meets or exceeds the requirements to perform this work.
Factors b - Provide specific information to gain a better understanding of the requirements to remodel residential houses, that documents and addresses your firm’s experience and capability. You may provide your own drawings, illustrations, documents, or photos to support your capability to perform the work. Specifically address the following:
b.1) Remodeling wet areas (bathrooms, showers) b.2) Trade experience with electrical, plumbing, and finish work for remodel projects
Exhibit 3 – Drawings (see electronic attachment, 18 pages)
Exhibit 4 – Asbestos Survey (see electronic attachment, 15 pages)
Exhibit 5 – Energy Star Requirements (see electronic attachment, 1 page)
Exhibit 6 – As-Built Drawings (see electronic attachment, 3 pages)
Exhibit 7 – Pictures (see electronic attachment, 12 pages)
SECTION F – DELIVERIES OR PERFORMANCE
FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives notice-to-proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 90 calendar days from issuance of notice-to-proceed. The time stated for completion shall include final cleanup of the premises.
AGAR 452.236-75 MAXIMUM WORK WEEK – CONSTRUCTION SCHEDULE (NOV 1996)
Within 5 calendar days after receipt of a written request from the Contracting Officer, the Contractor must submit the following information in writing for approval:
(a) A schedule as required by FAR 52.236-15, Schedules for Construction Contracts, and
(b) The hours (including the daily starting and stopping times) and days of the week the Contractor proposed to carry out the work
The maximum workweek shall be Monday through Friday, 0700 – 1800. Any change in the work schedule shall be approved in writing by the Contracting Officer prior to commencement.
SECTION G – CONTRACT ADMINISTRATIVE DATA
Government Furnished Items:
The Government will provide the following items:
• Pellet Stove (see equipment schedule)
I - SECTION I - Contract Clauses
52.204-7 System for Award Management. (OCT 2018)
52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, or Proposed for Debarment. (OCT 2015)
(a) Definition. Commercially available off-the-shelf (COTS) item, as used in this clause-
(1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition in FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
(b) The Government suspends or debars Contractors to protect the Government's interests. Other than a subcontract for a commercially available off-the-shelf item, the Contractor shall not enter into any subcontract, in excess of $35,000 with a Contractor that is debarred, suspended, or proposed for debarment by any executive agency unless there is a compelling reason to do so.
(c) The Contractor shall require each proposed subcontractor whose subcontract will exceed $35,000, other than a subcontractor providing a commercially available off-the-shelf item, to disclose to the Contractor, in writing, whether as of the time of award of the subcontract, the subcontractor, or its principals, is or is not debarred, suspended, or proposed for debarment by the Federal Government.
(d) A corporate officer or a designee of the Contractor shall notify the Contracting Officer, in writing, before entering into a subcontract with a party (other than a subcontractor providing a commercially available off-the-shelf item) that is debarred, suspended, or proposed for debarment (see FAR 9.404 for information on the System for Award Management (SAM) Exclusions). The notice must include the following:
(1) The name of the subcontractor.
(2) The Contractor's knowledge of the reasons for the subcontractor being listed with an exclusion in SAM.
(3) The compelling reason(s) for doing business with the subcontractor notwithstanding its being listed with an exclusion in SAM.
(4) The systems and procedures the Contractor has established to ensure that it is fully protecting the Government's interests when dealing with such subcontractor in view of the specific basis for the party's debarment, suspension, or proposed debarment.
(e) Subcontracts. Unless this is a contract for the acquisition of commercial items, the Contractor shall include the requirements of this clause, including this paragraph (e) (appropriately modified for the identification of the parties), in each subcontract that-
(1) Exceeds $35,000 in value; and
(2) Is not a subcontract for commercially available off-the-shelf items.
(End of clause)
52.219-6 Notice of Total Small Business Set-Aside. (MAR 2020)
52.222-3 Convict Labor. (JUN 2003)
52.222-7 Withholding of Funds. (MAY 2014)
52.222-8 Payrolls and Basic Records. (AUG 2018)
52.222-9 Apprentices and Trainees. (JUL 2005)
52.222-10 Compliance With Copeland Act Requirements. (FEB 1988)
52.222-11 Subcontracts (Labor Standards). (MAY 2014)
52.222-12 Contract Termination - Debarment. (MAY 2014)
52.222-13 Compliance With Construction Wage Rate Requirements and Related Regulations. (MAY 2014)
52.222-14 Disputes Concerning Labor Standards. (FEB 1988)
52.222-15 Certification of Eligibility. (MAY 2014)
52.222-20 Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000. (MAY 2014)
52.222-21 Prohibition of segregated facilities. (APR 2015)
52.222-26 Equal Opportunity. (SEP 2016)
52.222-27 Affirmative Action Compliance Requirements for Construction. (APR 2015)
52.222-35 Equal Opportunity for Veterans. (OCT 2015)
(a) Definitions. As used in this clause-
"Active duty wartime or campaign badge veteran," "Armed Forces service medal veteran," "disabled veteran," "protected veteran," "qualified disabled veteran," and "recently separated veteran" have the meanings given at FAR 22.1301.
(b) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-300.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified protected veterans, and requires affirmative action by the Contractor to employ and advance in employment qualified protected veterans.
(c) Subcontracts. The Contractor shall insert the terms of this clause in subcontracts of $150,000 or more unless exempted by rules, regulations, or orders of the Secretary of Labor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.222-36 Equal Opportunity for Workers with Disabilities. (JUL 2014)
(a) Equal opportunity clause. The Contractor shall abide by the requirements of the equal opportunity clause at 41 CFR 60-741.5(a), as of March 24, 2014. This clause prohibits discrimination against qualified individuals on the basis of disability, and requires affirmative action by the Contractor to employ and advance in employment qualified individuals with disabilities.
(b) Subcontracts. The Contractor shall include the terms of this clause in every subcontract or purchase order in excess of $15,000 unless exempted by rules, regulations, or orders of the Secretary, so that such provisions will be binding upon each subcontractor or vendor. The Contractor shall act as specified by the Director, Office of Federal Contract Compliance Programs of the U.S. Department of Labor, to enforce the terms, including action for noncompliance. Such necessary changes in language may be made as shall be appropriate to identify properly the parties and their undertakings.
(End of clause)
52.222-37 Employment Reports on Veterans. (FEB 2016)
52.223-2 Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(SEP 2013)
52.223-5 Pollution Prevention and Right-to-Know Information. (MAY 2011)
52.223-6 Drug-Free Workplace. (MAY 2001)
52.223-15 Energy Efficiency in Energy-Consuming Products. (DEC 2007)
52.224-1 Privacy Act Notification. (APR 1984)
52.224-2 Privacy Act. (APR 1984)
52.225-9 Buy American - Construction Materials. (MAY 2014)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item- (1) Means any item of supply (including construction material) that is-
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
Construction material means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph
(1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means-
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if-
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
Foreign construction material means a construction material other than a domestic construction material.
United States means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference. (1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the component test of the Buy American statute is waived for construction material that is a COTS item. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute. (1)(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph
(d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description
Unit of measure Quantity
Price (dollars)*
Item 1
Foreign construction material ________ ________ ________
Domestic construction material ________ ________ ________
Item 2
Foreign construction material ________ ________ ________
Domestic construction material ________ ________ ________
* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued).
List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.
Include other applicable supporting information.
(End of clause)
52.225-13 Restrictions on Certain Foreign Purchases. (JUN 2008)
52.232-5 Payments Under Fixed-Price Construction Contracts. (MAY 2014)
52.232-27 Prompt Payment for Construction Contracts. (JAN 2017)
52.232-33 Payment by Electronic Funds Transfer - System for Award Management. (OCT 2018)
52.232-40 Providing Accelerated Payments to Small Business Subcontractors. (DEC 2013)
(a) Upon receipt of accelerated payments from the Government, the Contractor shall make accelerated payments to its small business subcontractors under this contract, to the maximum extent practicable and prior to when such payment is otherwise required under the applicable contract or subcontract, after receipt of a proper invoice and all other required documentation from the small business subcontractor.
(b) The acceleration of payments under this clause does not provide any new rights under the Prompt Payment Act.
(c) Include the substance of this clause, including this paragraph (c), in all subcontracts with small business concerns, including subcontracts with small business concerns for the acquisition of commercial items.
(End of clause)
52.233-1 Disputes. (MAY 2014)
52.233-3 Protest After Award. (AUG 1996)
52.233-4 Applicable Law for Breach of Contract Claim. (OCT 2004)
52.236-2 Differing Site Conditions. (APR 1984)
52.236-3 Site Investigation and Conditions Affecting the Work. (APR 1984)
52.236-5 Material and Workmanship. (APR 1984)
52.236-6 Superintendence by the Contractor. (APR 1984)
52.236-7 Permits and Responsibilities. (NOV 1991)
52.236-8 Other Contracts. (APR 1984)
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements.
(APR 1984)
52.236-10 Operations and Storage Areas. (APR 1984)
52.236-11 Use and Possession Prior to Completion. (APR 1984)
52.236-12 Cleaning Up. (APR 1984)
52.236-13 Accident Prevention. (NOV 1991)
52.236-15 Schedules for Construction Contracts. (APR 1984)
52.236-17 Layout of Work. (APR 1984)
52.236-21 Specifications and Drawings for Construction. (FEB 1997)
52.236-26 Preconstruction Conference. (FEB 1995)
52.243-5 Changes and Changed Conditions. (APR 1984)
52.244-6 Subcontracts for Commercial Items. (AUG 2019)
(a) Definitions. As used in this clause-
Commercial item and commercially available off-the-shelf item have the meanings contained in Federal Acquisition Regulation 2.101, Definitions.
Subcontract includes a transfer of commercial items between divisions, subsidiaries, or affiliates of the Contractor or subcontractor at any tier.
(b) To the maximum extent practicable, the Contractor shall incorporate, and require its subcontractors at all tiers to incorporate, commercial items or nondevelopmental items as components of items to be supplied under this contract.
(c)(1) The Contractor shall insert the following clauses in subcontracts for commercial items:
(i) 52.203-13, Contractor Code of Business Ethics and Conduct (OCT 2015) (41 U.S.C. 3509), if the subcontract exceeds $5.5 million and has a performance period of more than 120 days. In altering this clause to identify the appropriate parties, all disclosures of violation of the civil False Claims Act or of Federal criminal law shall be directed to the agency Office of the Inspector General, with a copy to the Contracting Officer.
(ii) 52.203-15, Whistleblower Protections Under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5), if the subcontract is funded under the Recovery Act.
(iii) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017).
(iv) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (JUN 2016), other than subcontracts for commercially available off-the-shelf items, if flow down is required in accordance with paragraph (c) of FAR clause 52.204-21.
(v) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (JUL 2018) (Section 1634 of Pub. L. 115-91).
(vi) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (AUG 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(vii) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C.
637(d)(2) and (3)), if the subcontract offers further subcontracting opportunities.
If the subcontract (except subcontracts to small business concerns) exceeds $700,000 ($1.5 million for construction of any public facility), the subcontractor must include 52.219-8 in lower tier subcontracts that offer subcontracting opportunities.
(viii) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
(ix) 52.222-26, Equal Opportunity (SEP 2016) (E.O. 11246).
(x) 52.222-35, Equal Opportunity for Veterans (OCT 2015)(38 U.S.C. 4212(a));
(xi) 52.222-36, Equal Opportunity for Workers with Disabilities (JUL 2014) (29 U.S.C. 793).
(xii) 52.222-37, Employment Reports on Veterans (FEB 2016) (38 U.S.C.
4212).
(xiii) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O. 13496), if flow down is required in accordance with paragraph (f) of FAR clause 52.222-40.
(xiv)(A) 52.222-50, Combating Trafficking in Persons (JAN 2019) (22 U.S.C.
chapter 78 and E.O. 13627).
(B) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
(xv) 52.222-55, Minimum Wages under Executive Order 13658 (DEC 2015), if flowdown is required in accordance with paragraph (k) of FAR clause 52.222- 55.
(xvi) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2017) (E.O. 13706), if flowdown is required in accordance with paragraph (m) of FAR clause 52.222-62.
(xvii)(A) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a) if flow down is required in accordance with 52.224-3(f).
(B) Alternate I (JAN 2017) of 52.224-3, if flow down is required in accordance with 52.224-3(f) and the agency specifies that only its agency-provided training is acceptable).
(xviii) 52.225-26, Contractors Performing Private Security Functions Outside the United States (Oct 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
(xix) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (DEC 2013), if flow down is required in accordance with paragraph (c) of FAR clause 52.232-40.
(xx) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (FEB 2006) (46 U.S.C. App. 1241 and 10 U.S.C. 2631), if flow down is required in accordance with paragraph (d) of FAR clause 52.247-64.
(2) While not required, the Contractor may flow down to subcontracts for commercial items a minimal number of additional clauses necessary to satisfy its contractual obligations.
(d) The Contractor shall include the terms of this clause, including this paragraph (d), in subcontracts awarded under this contract.
(End of clause)
52.245-1 Government Property. (JAN 2017)
52.246-21 Warranty of Construction. (MAR 1994)
52.246-21 Warranty of Construction. (APR 1984) - Alternate I (APR 1984)
52.249-10 Default (Fixed-Price Construction). (APR 1984)
52.253-1 Computer Generated Forms. (JAN 1991)
452.236-70 Additive or Deductive Items. (FEB 1988)
452.236-71 Prohibition Against the Use of Lead-Based Paint. (NOV 1996)
452.236-72 Use of Premises. (NOV 1996)
452.236-76 Samples and Certificates. (FEB 1988)
452.236-77 Emergency Response. (NOV 1996)
PART III – LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J – LIST OF ATTACHMENTS
EXHIBIT 1
EXHIBIT 2
EXHIBIT 3
EXHIBIT 4
EXHIBIT 5
U.S. DEPARTMENT OF LABOR, WAGE DETERMINATION NO.
Pellet Stove
DRAWINGS
ASBESTOS SURVEY
ENERGY STAR REQUIREMENTS
EXHIBIT 6 AS-BUILT DRAWINGS
EXHIBIT 7 PICTURES
EXHIBIT 8 Pre-Bid Notes
K - SECTION K - Representations, Certifications, and Other Statements of Offerors
52.223-1 Biobased Product Certification. (MAY 2012)
L - SECTION L - Instructions, Conditions, and Notices to Offerors or Respondents
52.216-1 Type of Contract. (APR 1984)
The Government contemplates award of a firm fixed price contract resulting from this solicitation.
(End of provision)
52.222-23 Notice of Requirement for Affirmative Action To Ensure Equal Employment Opportunity for Construction. (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
Goals for minority participation for each trade
[Contracting Officer shall insert goals]
Goals for female participation for each trade
[Contracting Officer shall insert goals]
These goals are applicable to all the Contractor's construction work performed in the covered area.
If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled Affirmative Action Compliance Requirements for Construction, and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the-
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the covered area is [Contracting Officer shall insert description of the geographical areas where the contract is to be performed, giving the state, county, and city].
(End of provision)
52.225-10 Notice of Buy American Requirement - Construction Materials. (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American-Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers. (1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers. (1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested-
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of provision)
52.252-1 Solicitation Provisions Incorporated by Reference. (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es): https://www.acquisition.gov/browse/index/far
(End of provision)
452.204-70 Inquiries. (FEB 1988)
452.237-71 Pre-Bid/Pre-Proposal Conference. (FEB 1988)
SECTION M--EVALUATION FACTORS FOR AWARD
M1.0 BASIS FOR AWARD:
BEST VALUE – LPTA (LOWEST PRICE TECHNICALLY ACCEPTABLE). Offers will be reviewed for conformance to the requirements of this RFQ. Award will be made based on the Lowest Price Technically Acceptable (LPTA) offer that meets or exceeds the acceptability standards for technical factors. Failure to provide adequate information for Technical subfactors a & b, will result in the offer not being placed in the eligibility group of technically acceptable, which will remove the offer from further consideration.
Under LPTA:
1. Evaluation factors and significant subfactors that establish the requirements of acceptability shall be set forth in the solicitation.
2. Tradeoffs are not permitted.
3. Offers are evaluated for acceptability but not ranked using non-cost/price factors.
M2.0 TECHNICAL CAPABILITY REQUIREMENTS:
Technical Capability shall be submitted in the form of a statement or document that demonstrates the contractor’s capability to perform the work to meet or exceed the requirements of this solicitation. In order to meet the Technical Capability Requirements, offers shall address the following factors:
Factor a - tools, equipment, training, and general business practices should be developed in the statement or document to satisfy an evaluation panel that you the contractor has a level of technical capability that meets or exceeds the requirements to perform this work.
Factors b - Provide specific information to gain a better understanding of the requirements to remodel residential houses, that documents and addresses your firm’s experience and capability. You may provide your own drawings, illustrations, documents, or photos to support your capability to perform the work. Specifically address the following:
b.1) Remodeling wet areas (bathrooms, showers) b.2) Trade experience with electrical, plumbing, and finish work for remodel projects
Failure to provide adequate information for Technically Capability may result in the offer being removed from the competitive range.
M3.0 PRICES:
Competitive offers will establish price reasonableness. Therefore, when contracting on a firm-fixed-price basis, comparison of the proposed prices will satisfy the requirement to perform a price analysis (cost analysis need not be performed). Contracting Officer intends to award without discussions, offerors shall provide their best prices up front. Pricing will serve as a final determining factor for award under LPTA.
(If the Contracting Officer elects to consider Past Performance as an additional evaluation factor, it shall be evaluated in accordance with FAR Subpart 15.305).
SITE VISIT LOCATION
POC: Chris Miller, 928-333-6274, chris.w.miller@usda.gov – COR mailto:chris.w.miller@usda.gov