This document is a Q&A document related to the Necropsy Coolers Cove Base Repairs solicitation (Solicitation Number: 12805B24R0043) issued by the Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area.

The key details are:

  • All personnel are required to complete a 2-hour NBAF Site Security and Safety Orientation prior to working on site.
  • The contractor is allowed to store tools and materials within the work areas.
  • There will be a decontamination process for tools and materials entering and leaving the work area.
  • The color of the Mipolam flooring to be used is Chalk.
  • The rooms will be decontaminated prior to the start of work.
  • All 3 Necropsy rooms can be under construction at the same time, with one cooler remaining operational.
  • The product specifications for the existing Mipolam flooring are not publicly available.
  • The temperature rating for the existing Mipolam flooring is 55-85 degrees F.
  • If the new Mipolam is not rated for 34 degrees F, the same Mipolam product should be used.
  • The drywall to be removed is 2 layers of 5/8" gypsum board on metal studs.
  • After completion, the rooms will be brought back to cold room temperatures over a minimum of 1 week at a rate of no more than 10 degrees F per 24 hours.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 006 QandA Document

Please confirm all personnel are required to complete the 2-hour NBAF Site Security and Safety

Orientation prior to working on site.

Please reference section 8.1 Attachment 002 SOW Necropsy Coolers Cove Base Repairs.

Is the contractor allowed to store tools and material within the areas that the work will be performed?

Please reference section 8.4.2 Attachment 002 SOW Necropsy Coolers Cove Base Repairs.

Will there be a decontamination process for the tools and materials both entering and leaving the work area?

Please reference section 8.4.2.1 Attachment 002 SOW Necropsy Coolers Cove Base Repairs.

Can you provide the color of the Mipolam that is to be used for this project

0001 Chalk.

Will the rooms be decontaminated prior to start of work?

Rooms are decontaminated

Can all 3 Necropsy room be under construction at the same time?

Yes, one cooler is currently running and will take 5 days to bring back to room temperature with notice.

Please provide product # and manufacturer of the Mipolam that is currently on the walls.

MIPOLAM WALL SPM DECOCLEAN manufactured by Gerflor. Specifications publicly available on the manufacturer's website do not list a product #

What is the temperature rating for the Mipolam that is currently in the room.

55-85 degrees F.

What product should be used if the Mipolam is not rated to 34 degrees F.

Mipolam.

What is the thickness of the drywall that will be removed?

2 layers of 5/8” gypsum (Gold Bond Brand HI-IMPACT XP Gypsum Board) on metal stud.

How will the rooms be brought to temperature after completion of the project?

Temperatures will be brought down to cold room temperatures no sooner than 1 week after installation completion, at a rate of no more than 10 degrees Fahrenheit over 24 hours.