Pricing_Worksheets.pdf

PDF 198 KB Posted

Attached to
Design/Build Bridge Repairs Federal contract opportunity
Solicitation number
127K1119R0002
Issued by
Department of Agriculture Forest Service R8-Southern Region

About this file

Bridge Pricing Work Sheets

View the file

Other files for this federal contract opportunity

Other files attached to Design/Build Bridge Repairs, newest first.
File Type Posted
sign_in_sheet.pdf PDF
Site_visit_Q&A.pdf PDF
L0-1.0.pdf PDF
287-7.5_INSP_190321.pdf PDF
SOW_2019-06-12.pdf PDF
PERFORMANCE_RELEVANCY_QUESTIONNAIRE.pdf PDF
DBWD_Winn.pdf PDF
231-1.3_INSP_190315.pdf PDF
DBWD_Grant.pdf PDF
Solicitation_127K1119R0002.pdf PDF
287-7.1_INSP_190319.pdf PDF
DBWD_Vernon.pdf PDF
Financial_Information.pdf PDF
L01-1.0_CFR.PDF PDF
339-1.3_INSP_190212.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITEM NO. DESCRIPTON PAY

UNIT

EST.

QTY. UNIT PRICE AMOUNT

E1 ENGINEERING SERVICES ROUTINE LS $ $

E2 ENGINEERING SERVICES ABUTMENT

EXCAVATION SITE VISIT LS $ $

15101 MOBILIZIATION AND BONDS LS $ $

20900 STRUCTURE EXCAVATION CY $ $

20910(A) STRUCTURE BACKFILL CY $ $

20910(B) STRUCTURE BACKFILL AT WINGWALLS CY $ $

30105 AGGREGATE SURFACE COURSE, GRADING F,

COMPACTION METHOD B. TON $ $

55600 REPAIR/REPLACE GUARDRAIL LS $ $

55708 FRAMING, ABUTMENT AND WING WALL TIMBER

REPLACEMENT/REPAIR SF $ $

55708 FRAMING, WING WALL TIMBER REPLACEMENT/

REPAIR SF $ $

63300 OBJECT MARKERS, TYPE 3 EA $ $

63500 TEMPORARY TRAFFIC CONTROL LS $ $

70502( A ) CLASS 3 RIP RAP, MACHINE PLACED TON $ $

70502( B ) CLASS 3 RIP RAP, HAND PLACED TON $ $

71200 JOINT SEALER LF $ $

72521( A ) PILE CAP REPAIR, EPOXY LAMINATED

COMPOSITE VOID REPAIR (OR OTHER) EA $ $

72521( B ) PILE REPAIR, EPOXY LAMINATED COMPOSITE

VOID REPAIR (OR OTHER) EA $ $

72521( C ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED (OR

OTHER) EA $ $

72521( D ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED AT

WING WALLS (OR OTHER) EA $ $

SUMMARY OF QUANTITIES AND COST ESTIMATE

ATTACHMENT 2-1 NFSR BRIDGE 231-1.33

TOTAL COST

EST.

QTY. UNIT PRICE AMOUNT

E1 ENGINEERING SERVICES ROUTINE LS $ $

E2 ENGINEERING SERVICES ABUTMENT

EXCAVATION SITE VISIT LS $ $

15101 MOBILIZIATION AND BONDS LS $ $

20900 STRUCTURE EXCAVATION CY $ $

20910(A) STRUCTURE BACKFILL CY $ $

20910(B) STRUCTURE BACKFILL AT WINGWALLS CY $ $

30105 AGGREGATE SURFACE COURSE, GRADING F,

COMPACTION METHOD B. TON $ $

55600 REPAIR/REPLACE GUARDRAIL LS $ $

55708 FRAMING, ABUTMENT AND WING WALL TIMBER

REPLACEMENT/REPAIR SF $ $

55708 FRAMING, WING WALL TIMBER REPLACEMENT/

REPAIR SF $ $

63300 OBJECT MARKERS, TYPE 3 EA $ $

63500 TEMPORARY TRAFFIC CONTROL LS $ $

70502( A ) CLASS 3 RIP RAP, MACHINE PLACED TON $ $

70502( B ) CLASS 3 RIP RAP, HAND PLACED TON $ $

71200 JOINT SEALER LF $ $

72521( A ) PILE CAP REPAIR, EPOXY LAMINATED

COMPOSITE VOID REPAIR (OR OTHER) EA $ $

72521( B ) PILE REPAIR, EPOXY LAMINATED COMPOSITE

VOID REPAIR (OR OTHER) EA $ $

72521( C ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED (OR

OTHER) EA $ $

72521( D ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED AT

WING WALLS (OR OTHER) EA $ $

SUMMARY OF QUANTITIES AND COST ESTIMATE

ATTACHMENT 2-2 NFSR BRIDGE 287-7.1

EST.

QTY. UNIT PRICE AMOUNT

E1 ENGINEERING SERVICES ROUTINE LS $ $

E2 ENGINEERING SERVICES ABUTMENT

EXCAVATION SITE VISIT LS $ $

15101 MOBILIZIATION AND BONDS LS $ $

20900 STRUCTURE EXCAVATION CY $ $

20910(A) STRUCTURE BACKFILL CY $ $

20910(B) STRUCTURE BACKFILL AT WINGWALLS CY $ $

30105 AGGREGATE SURFACE COURSE, GRADING F,

COMPACTION METHOD B. TON $ $

55600 REPAIR/REPLACE GUARDRAIL LS $ $

55708 FRAMING, ABUTMENT AND WING WALL TIMBER

REPLACEMENT/REPAIR SF $ $

55708 FRAMING, WING WALL TIMBER REPLACEMENT/

REPAIR SF $ $

63300 OBJECT MARKERS, TYPE 3 EA $ $

63500 TEMPORARY TRAFFIC CONTROL LS $ $

70502( A ) CLASS 3 RIP RAP, MACHINE PLACED TON $ $

70502( B ) CLASS 3 RIP RAP, HAND PLACED TON $ $

71200 JOINT SEALER LF $ $

72521( A ) PILE CAP REPAIR, EPOXY LAMINATED

COMPOSITE VOID REPAIR (OR OTHER) EA $ $

72521( B ) PILE REPAIR, EPOXY LAMINATED COMPOSITE

VOID REPAIR (OR OTHER) EA $ $

72521( C ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED (OR

OTHER) EA $ $

72521( D ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED AT

WING WALLS (OR OTHER) EA $ $

SUMMARY OF QUANTITIES AND COST ESTIMATE

ATTACHMENT 2-3 NFSR BRIDGE 277-7.7

EST.

QTY. UNIT PRICE AMOUNT

E1 ENGINEERING SERVICES ROUTINE LS $ $

E2 ENGINEERING SERVICES ABUTMENT

EXCAVATION SITE VISIT LS $ $

15101 MOBILIZIATION AND BONDS LS $ $

20900 STRUCTURE EXCAVATION CY $ $

20910(A) STRUCTURE BACKFILL CY $ $

20910(B) STRUCTURE BACKFILL AT WINGWALLS CY $ $

30105 AGGREGATE SURFACE COURSE, GRADING F,

COMPACTION METHOD B. TON $ $

55600 REPAIR/REPLACE GUARDRAIL LS $ $

55708 FRAMING, ABUTMENT AND WING WALL TIMBER

REPLACEMENT/REPAIR SF $ $

55708 FRAMING, WING WALL TIMBER REPLACEMENT/

REPAIR SF $ $

63300 OBJECT MARKERS, TYPE 3 EA $ $

63500 TEMPORARY TRAFFIC CONTROL LS $ $

70502( A ) CLASS 3 RIP RAP, MACHINE PLACED TON $ $

70502( B ) CLASS 3 RIP RAP, HAND PLACED TON $ $

71200 JOINT SEALER LF $ $

72521( A ) PILE CAP REPAIR, EPOXY LAMINATED

COMPOSITE VOID REPAIR (OR OTHER) EA $ $

72521( B ) PILE REPAIR, EPOXY LAMINATED COMPOSITE

VOID REPAIR (OR OTHER) EA $ $

72521( C ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED (OR

OTHER) EA $ $

72521( D ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED AT

WING WALLS (OR OTHER) EA $ $

SUMMARY OF QUANTITIES AND COST ESTIMATE

ATTACHMENT 2-4 NFSR BRIDGE 339-1.3

EST.

QTY. UNIT PRICE AMOUNT

E1 ENGINEERING SERVICES ROUTINE LS $ $

E2 ENGINEERING SERVICES ABUTMENT

EXCAVATION SITE VISIT LS $ $

15101 MOBILIZIATION AND BONDS LS $ $

20900 STRUCTURE EXCAVATION CY $ $

20910(A) STRUCTURE BACKFILL CY $ $

20910(B) STRUCTURE BACKFILL AT WINGWALLS CY $ $

30105 AGGREGATE SURFACE COURSE, GRADING F,

COMPACTION METHOD B. TON $ $

55600 REPAIR/REPLACE GUARDRAIL LS $ $

55708 FRAMING, ABUTMENT AND WING WALL TIMBER

REPLACEMENT/REPAIR SF $ $

55708 FRAMING, WING WALL TIMBER REPLACEMENT/

REPAIR SF $ $

63300 OBJECT MARKERS, TYPE 3 EA $ $

63500 TEMPORARY TRAFFIC CONTROL LS $ $

70502( A ) CLASS 3 RIP RAP, MACHINE PLACED TON $ $

70502( B ) CLASS 3 RIP RAP, HAND PLACED TON $ $

71200 JOINT SEALER LF $ $

72521( A ) PILE CAP REPAIR, EPOXY LAMINATED

COMPOSITE VOID REPAIR (OR OTHER) EA $ $

72521( B ) PILE REPAIR, EPOXY LAMINATED COMPOSITE

VOID REPAIR (OR OTHER) EA $ $

72521( C ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED (OR

OTHER) EA $ $

72521( D ) PILE SPLICE, EPOXY AND KEVLAR WRAPPED AT

WING WALLS (OR OTHER) EA $ $

SUMMARY OF QUANTITIES AND COST ESTIMATE

ATTACHMENT 2-5 NFSR BRIDGE L01-1.0

ITEM NO. DESCRIPTON

PAY

UNIT

EST.

QTY.

UNIT PRICE AMOUNT

E1 ENGINEERING SERVICES ROUTINE LS $

E2

ENGINEERING SERVICES ABUTMENT

EXCAVATION SITE VISIT

LS $

15101 MOBILIZIATION AND BONDS LS $

20900 STRUCTURE EXCAVATION CY $

20910(A) STRUCTURE BACKFILL CY $

20910(B) STRUCTURE BACKFILL AT WINGWALLS CY $

30105

AGGREGATE SURFACE COURSE, GRADING F,

COMPACTION METHOD B.

TON $

55600 REPAIR/REPLACE GUARDRAIL LS $

55708

FRAMING, ABUTMENT AND WING WALL

TIMBER REPLACEMENT/REPAIR

SF $

55708

FRAMING, WING WALL TIMBER REPLACEMENT/

REPAIR

SF $

63300 OBJECT MARKERS, TYPE 3 EA $

63500 TEMPORARY TRAFFIC CONTROL LS $

70502( A ) CLASS 3 RIP RAP, MACHINE PLACED TON $

70502( B ) CLASS 3 RIP RAP, HAND PLACED TON $

71200 JOINT SEALER LF $

72521( A )

PILE CAP REPAIR, EPOXY LAMINATED

COMPOSITE VOID REPAIR (OR OTHER)

EA $

72521( B )

PILE REPAIR, EPOXY LAMINATED COMPOSITE

VOID REPAIR (OR OTHER)

EA $

72521( C )

PILE SPLICE, EPOXY AND KEVLAR WRAPPED

(OR OTHER)

EA $

72521( D )

PILE SPLICE, EPOXY AND KEVLAR WRAPPED AT

WING WALLS (OR OTHER)

EA $

SUMMARY OF QUANTITIES AND COST ESTIMATE

ATTACHMENT 2-6 SUMMARY/ TOTAL ALL BRIDGES

attch 2-1.pdf
Sheet1
attch 2-2.pdf
Sheet1
attch 2-3.pdf
Sheet1
attch 2-4.pdf
Sheet1
attch 2-5.pdf
Sheet1

attch 2-6.pdf

File details come from the government source that posted it.