339-1.3_INSP_190212.pdf
PDF 2 MB Posted
- Attached to
- Design/Build Bridge Repairs Federal contract opportunity
- Solicitation number
- 127K1119R0002
About this file
Inspection Report 339-1.3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sign_in_sheet.pdf | ||
| Site_visit_Q&A.pdf | ||
| L0-1.0.pdf | ||
| 287-7.5_INSP_190321.pdf | ||
| SOW_2019-06-12.pdf | ||
| PERFORMANCE_RELEVANCY_QUESTIONNAIRE.pdf | ||
| DBWD_Winn.pdf | ||
| 231-1.3_INSP_190315.pdf | ||
| DBWD_Grant.pdf | ||
| Solicitation_127K1119R0002.pdf | ||
| L01-1.0_CFR.PDF | ||
| 287-7.1_INSP_190319.pdf | ||
| DBWD_Vernon.pdf | ||
| Financial_Information.pdf | ||
| Pricing_Worksheets.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection Date: 2/12/2019
Route: 339 Milepost: 1.3780 Structure No:
OVER
County, (Signature)
BRIDGE INSPECTION AND MANAGEMENT PROGRAM
Natchitoches Louisiana
339-1.3 BAYOU LUCE TRIB.
INSPECTION TEAM LEADER: John K. Hardin
U.S. DEPARTMENT OF AGRICULTURE
Insert Cover photo here.
339-1.3
KISATCHIE NATIONAL FOREST
USDA FOREST SERVICE, REGION 8
080603000002314
ROAD BRIDGE INSPECTION REPORT
ROUTINEINSPECTION TYPE:
Structure Name: (8)Structure No:
(5D)Route:
Forest:
20.0 23.4 23.4
(45)No. Main Spans: 1
(46)No. Appr Spans: 0
No. Substrs: 2
(in Tons) Inventory Safe Load Capacity
HL-93 (RF) -
HS-20
Type 3 Type 3S2 Yes/No Type 3-3 0 Months NRL (RF) 0 Months Rating Date: 0 Months
(41) Posting Status:
(70) Posting Capacity (31)Design Load:
(63,65)Method of Load Rating:
Yes X No
Date:
Inspection Team: Leader: Jurisdiction:
Weather: Latitude:
Township: 6 Meridian:
(9)Location:
Narrative Report: (Add additional sheets if necessary)
LOUISIAN TRUE 70
NATCHITO FALSE
Sam Karahalis Longitude: -93.02357089
Re-rating required based on this inspection?
Substr Type:
FS
Inspection Template Revision Date: 05/31/2017
Infra data used for this report was pulled on: 04/23/2017
1/4 Sect:
7:33 AM
(92A) Fracture Critical (92B) Underwater (92C) Special
H20-44
8 - LRFR REPORTED AS RATING FACTOR
Time Completed:
2/12/2019 Time Started:
INSPECTION INFORMATION
4/30/2016 Open, No Restriction At Or Above Legal Loads
Critical Findings: The Substructure Condition Rating (SI&A Item 60) was reduced to 3 due to propagation of the decay in the cap at Abutment 1.
SPECIALIZED INSPECTIONS:
(43B)Superstr Type:
Specialized Inspections Required
(23 CFR 650.303)
Based on this inspection, is additional inspection work needed in these specialized inspection If Yes How Soon Neede
Pile Bent
(43A)Superstr Material:
(44A)Superstr Material:
Concrete, Prestressed
Timber, TreatedSubstr Material:
(44B)Superstr Type:
USDA FOREST SERVICE, REGION 8
BAYOU LUCE TRIB.(11)Milepost: 1.3780
BRIDGE IDENTIFICATION AND LOCATION
080603000002314
KISATCHIE NATIONAL FOREST
(32)Approach Roadway Width:
(48)Max Span:
(52)Deck Width out-out: 24.9(51)Roadway Width (Curb to Curb):
Security ID 0806KISATCHIE
339 (6)Feature Crossed:
25.0
BRIDGE DESCRIPTION and MEASUREMENTS KISATCHIE District:
19.0 (27)Year Built:
0.0
Integral Concrete(108A)Wearin g Surface:Integral W/Prestress Unit
Channel Beam
NBIS Bridge Opening:
99.99 0
BRIDGE RATING SUMMARY:
(47)Horizontal (53)Vertical (34)Skew:
(107)Deck StructureType:
339-1.3
Refer to the sketch included with this report for guidance in identifying and locating the bridge components. Girders and piles are numbered from left to right. Note that the data in the highlighted fields on this page has changed. The inventory should be updated accordingly.
Recommended Inspection Frequency:
John K. Hardin 31.52321824
8:30 AM
Overcast, 57 degrees
Months
6N Range: 6W Section:
Operating
(49)Overall Br Length:
Description:
Posting
Special Equipment Need
2/12/2019
Milepost: 1.3780 080603000002314
CODE
N
* 1. G C1. G C2. G C3. - C4. P C5. G C6. P C7. No
* 1. G
* 2. -
* 3. -
* 4. -
C1. P C2. -
C3. NOB
C4. NOB
*1. G *2. G *3. G
*4. P *5. F *6. P *7. - *8. P
*9. - *10. - *11. - *12. - *13. P *14. - *15. - *16. - *17. - *18. - *19. - *20. - *21. -Bracing
CONDITION CODES and REMARKS
Nine pre-cast concrete channel units.
See Narrative Sheet
Wearing Surface
Deck Slab/Panels/Joists
REMARKS(Overall Code for item, to be reported to FHWA, in bold box)
58. DECK:
Posts/Piles/Tie Backs
Girders 18 ea.
a. Diaphragms
See Narrative Sheet and Sketches Sheet
b. Bracing
a. Chords Trusses
Structure No:
Date:
Footings Piles
Caps
Backing Planks Sills/Footings
Settlement
See Narrative Sheet
Each channel unit has 2 girders.
Stringers
Erosion or Scour
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
1 Also includes wingwalls connected to the superstructure above the beam seat.
2 Includes wingwalls integral with the abutment or the portion of the wingwall below the bearing seat.
59. SUPERSTRUCTURE:
Sidewalks Drains and Drainage See Narrative Sheet
Expansion Joints Curbs
Rideability Cleanliness Utilities
See Narrative Sheet and Sketches Sheet
See Narrative Sheet
See Narrative Sheet
Floor Beams
60. SUBSTRUCTURE:
Caps
Erosion or Scour Settlement
Alignment (tipping, tilting, etc.)
Crib Walls/Tie Backs
Caps Footings
Wingwalls See Narrative Sheet. No listing for wingwalls under Timber Abutment.
A B
U
TM
E N
TS
P
IE
R
S
Timber Abutments (incl. WW)
Other Abutments
Columns or Walls
Structure Name:
Route:
Walls Piles
b. Portals
c. Verticals/Diagonals
Bearing Devices Paint
d. Bracing
Deflection Under Load Vibration Under Load
Alignment (tilting, rotating, etc.)
339-1.3
See Narrative Sheet
Milepost: 1.3780
CODE
1. G
2. -
3. F
4. F
5. G
6. 3.7
N *1. - *2. - *3. - *4. -
5. -
G
1. G
2. G
3. G
4. G
36A 0 36B 0 36C 0 36D 0 A. F B. - C. - D. -
1. F
2. P
1. G
2. G
N
CONDITION RATING OF EACH MEMBER OR ELEMENT
-NOT APPLICABLE
-APPLICABLE, BUT NO OBSERVED. (Give reason unless obvious)
-ELEMENT IN NEW OR GOOD CONDITION WITH NO REPAIRS NECESSARY.
-ELEMENT IS STILL PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED BUT MAY NEED MAINTENANCE.
-ELEMENT IS PERFORMING AT REDUCED CAPACITY.
-ELEMENT IS NOT PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
71. WATERWAY ADEQUACY:
113. SCOUR CRITICAL BRIDGES: Bridge is on deep foundation. (Pile supported)
See Narrative SheetObject Markers
68. DECK GEOMETRY:
Horizontal Vertical
29. ROAD ADT
Structure Name:
Route:
339-1.3
Signing See Narrative Sheet
Clear Height Height (feet) from thalwag to bottom of lowest superstructure member
62. CULVERTS
CONDITION CODES and REMARKS (continued) Structure No.:
Date:
080603000002314
2/12/2019
G = GOOD
C = CRITICAL
72. APPROACH ROADWAY ALIGNMENT:
67. STRUCTURAL EVALUATION
NOB
F = FAIR
P = POOR
69. UNDERCLEARANCE:
Foundations
Shoulder Embankment Roadway Embankment
APPROACH CONDITION:
Headwall/Wingwall
61. CHANNEL and CHANNEL PROTECTION:
(Overall Code for item, to be reported to FHWA, in bold box) REMARKS
Channel Scour/Erosion
See Narrative Sheet
Channel Protection
Observed Lateral Movement
Surfacing (Not needed for reporting to FHWA)
Vegetation Waterway Obstructions/Drift
Shape Seams or Joints Material Condition
Approach Rail Ends Approach Guardrails
Approach Settlement APPRAISAL CODES and REMARKS
Bridge Railing See Narrative Sheet
C O
N D
IT
IO
N of e le m en ts
There are no approach guardrails.
36. TRAFFIC SAFETY FEATURES:
Rail Transitions
Milepost: 1.3780 Structure No.:
Work Item Category Detailed Work Item Description
Deck Remove the sand and gravel from the deck surface to improve drainage.
Substructure Replace the cap at Abutment 1.
Substructure Replace the decayed backwall, bulkhead, and wingwall planks.
Substructure Replace the decayed wingwall piles at Abutment 2.
Channel Remove the fallen tree from the channel downstream of the bridge.
Superstructure Remove the debris from the steel bearing plates.
Deck
Replace the damaged bridge rail post and terminal on the left side.
Correct the improperly lapped bridge rail terminals.
Traffic Safety Features
Remove the "One Lane Bridge" signs. These are not required at this site.
Traffic Safety Features
Replace the missing object marker on the left side of Abutment 2.
2/12/2019Date:339-1.3
Route:
Structure Name:
Unit
RECOMMENDED WORK ITEMS
Work Item Quantity
080603000002314339
5002005
5002004
6002001
Work Item Code
5002003
8003001
#N/A
#N/A
4005001
3007001
8003002
#N/A
#N/A
#N/A
#N/A
#N/A
Timber Abutments/Piers - Repair/Replace Caps 1
Timber Abutments/Piers - Repair/Replace Backing Planks/Bracing/Facing
TBD
EACH
FBM
SFClean Deck
Waterway Obstruction/Drift - Remove Debris/Vegetation 4
Bearing Devices - Clean and Lubricate 4HR
EACH
HR
Timber Abutments/Piers - Repair/Replace Posts/Piles xxx
- xxx
Signing - Repair/Replace Approach Signs 2
Signing - Repair/Replace Object Markers 1
LF
EA
EA
#N/A
#N/A
Steel Bridge Railing - Replace/Repair
#N/A
#N/A
#N/A
#N/A
#N/A xxx xxx xxx xxx xxx
Date:
339 Milepost: 1.3780 Structure No:
Item Reference
58.1
58.C4 58.C6
59.C1
60.4
60.5
60.6
60.8
60.13
61.4
36.A
36.1
36.2
339-1.3Structure Name:
Route:
2/12/2019
080603000002314
Object Markers - There is currently no object marker on the left side of Abutment 2. All other object markers are in place. The object marker on the right side of Abutment 1 has been vandalized by gunfire, but remains legible.
Signing - There is a “One Lane Bridge” sign in place at each end of the bridge. These signs are not required at this site.
Drains and Drainage, Cleanliness - The deck has approximately 1” of sand and gravel over most of the surface.
Bridgerail post spacing is excessive. Dirt and debris that have accumulated in the gutterlines prevent proper deck drainage. (Photo 2) Bearing Devices - The steel bearing plates are corroding (Photo 3), but continue to serve their intended purpose.
Caps - Caps consist of 2 separate members that are spliced over Pile 3. The cap at Abutment 1 is decayed in 10’ to 12’ of its length on the right side of centerline. (See Sketch) The decayed area bears on Piles 4 and 5. There was no sign of crushing, but the cap will continue to deteriorate. Consider reducing the weight limit of this structure until this cap is replaced.
Posts / Piles / Tie Backs - New piles were driven adjacent to the original piles at Abutment 1, Piles 2 and 4 and Abutment 2, Piles 1 and 4. Abutment 1, Piles 1 and 3 and Abutment 2, Pile 3 each have a small decayed area. (See Sketches) Backing Planks - The ends of 2 of the backwall planks are broken at the left end of Abutment 2. (Photo 4) These were probably struck by maintenance equipment.
ITEM REFERENCE AND REMARKS ~ NARRATIVE REPORT
Crib Walls / Tie Backs - One of the bulkhead planks is severely decayed on the right side of centerline at Abutment 2.
(Photo 5) Wingwalls - The wingwall piles are severely decayed on both sides of Abutment 2. (Photo 6) The topmost wingwall planks are loose or have fallen on the left side of Abutment 1 and on both sides of Abutment 2. (Photos 5 and 6) One of the wingwall planks is severely decayed on the right side of Abutment 2. (Photo 6)
Waterway Obstructions / Drift - Debris accumulating on the bearing plates is contributing to their corrosion. (Photo 3) Fallen trees have partially blocked the channel downstream of the bridge. Drift is accumulating in this area as a result. The drift is not affecting the bridge at this time.
Bridge Railing - Bridge rail post spacing is excessive. Bridge rail splices are not supported by posts. The bridge rail post and the terminal on the left side at the far end of the bridge have been struck. (Photo 7) Both are bent as a result. The bridge rail terminals are lapped incorrectly on the left side at the near end of the bridge and the right side at the far end.
Remarks
Deck Slab / Panels / Joists - The exposed portion of the deck surface is becoming worn. Aggregate in the concrete is exposed. (Photo 1)
Route: Milepost: 1.3780
Insert photo here.
Approach Ahead on Station
BRIDGE PHOTOS
Approach Back on Station
Insert photo here.
2/12/2019
080603000002314Structure No:
339-1.3Structure Name:
Route: Milepost: 1.3780
BRIDGE PHOTOS - cont.
Looking Upstream from the Bridge Deck
Insert photo here.
Looking Downstream from the Bridge Deck
Structure Name: 339-1.3 2/12/2019
339 Structure No: 080603000002314
Route: Milepost: 1.3780
Insert photo here.
Looking Downstream - Elevation Profile
Looking Upstream - Elevation Profile
2/12/2019
Structure No: 080603000002314
BRIDGE PHOTOS - cont.
Structure Name:
Route: Milepost: 1.3780
Structure Name: 339-1.3 2/12/2019
339 Structure No: 080603000002314
BRIDGE PHOTOS - cont.
Abutment 1
Insert photo here.
Abutment 2
Route: Milepost: 1.3780
Photo 2
2/12/2019
Structure No: 080603000002314
Insert photo here.
Insert photo here.
Photo 1
BRIDGE PHOTOS - cont.
Structure Name:
Route: Milepost: 1.3780
Photo 4
2/12/2019
Structure No: 080603000002314
Insert photo here.
Insert photo here.
Photo 3
BRIDGE PHOTOS - cont.
Structure Name:
Route: Milepost: 1.3780
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 5
Insert photo here.
Photo 6
339 Structure No: 080603000002314
Route: Milepost: 1.3780
Structure Name: 339-1.3 2/12/2019
339 Structure No: 080603000002314
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 7
Route: Milepost: 1.3780
Structure Name:
339-1.3 2/12/2019
Structure No: 080603000002314
BRIDGE SKETCHES
Structure Name: Date:
Route: 339 Milepost: 1.3780
3.7
2019 2021 2023 2025 2027 2029 2031 0 1.4 0.0 0.0 0.0 0.0 0.0 0.0 3 1.6 0.0 0.0 0.0 0.0 0.0 0.0 4 3.4 0.0 0.0 0.0 0.0 0.0 0.0 10 3.6 0.0 0.0 0.0 0.0 0.0 0.0 15 3.7 0.0 0.0 0.0 0.0 0.0 0.0 17 2.3 0.0 0.0 0.0 0.0 0.0 0.0 20 2.2 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
Water Surface 3.3
Channel Cross Section
Horizontal Dist Measured from A-1
Distance Measured from Top of Cap
2/12/2019 Structure No: 080603000002314
339-1.3
Input Cross-Section Data:
Height (feet) from thalwag to bottom of lowest superstructure member
0.0
0.5
1.0
1.5
2.0
2.5
3.0
3.5
4.0
0 5 10 15 20 25
Top of Cap
(Substructure elements can be inserted in the cross-section using Insert, Shapes )
Milepost:
ID
Description
Needed for Real Property Verification
N Re-rating required? (Enter Y/N) N Specialized Equipment Required? (Enter Y/N)
Insp Remarks
Refer to the sketch included with this report for guidance in identifying and locating the bridge components. Girders and piles are numbered from left to right. Note that the data in the highlighted fields on this page has changed. The inventory should be
Approach Rail Ends (36D) 0
Sam Karahalis John K. Hardin
Insp Team
Transition (36B) 0 Approach Guardrail (36C) 0
Traffic Rail Safety Features Appraisal Bridge Rail (36A) 0
Approach Align (72) 8
Underclr (69) N Waterway Adq (71) 5
Str Eval (67) 3 Deck Geom (68) 5
Main Data Appraisal Data
Done By Name (Unit) REGIONAL OFFICE
Inspected By* John K. Hardin Done By (Org) FS - FOREST SERVICE
Scour Crit Br (113) 5 Insp Resp Name FS - FOREST SERVICE
Culvert Cond (62) N Channel Cond (61) 7
Supstr Cond (59) 6 Substr Cond (60) 3
Wear Srfc Cond N Deck Cond (58) 7
Inspection Cost Aprch Cond G
Main Data Appraisal Data
Insp Team Leader
Inspection_Type (System Generated) (System Generated) Inspection Date 2/12/2019 ROUTINE Inspection Freq 24
Infra Summary Data
Route: 339 1.3780 Structure No: 080603000002314
| Cover |
| 1-Title |
| 2-Condition |
| 3-Condition(cont) & Appraisal |
| 4 Work Items |
| 5-Narrative |
| 6a-Photos |
| 6b-Photos |
| 6c-Photos |
| 6c-Photos (2) |
| 6d-Photos |
| 6e-Photos |
| 6f-Photos |
| 6f-Photos (2) |
| 7-Sketches |
| 8-Cross -Section |
| Infra Summary |