Inspection Report 287-7.5
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sign_in_sheet.pdf | ||
| Site_visit_Q&A.pdf | ||
| L0-1.0.pdf | ||
| SOW_2019-06-12.pdf | ||
| 287-7.1_INSP_190319.pdf | ||
| DBWD_Vernon.pdf | ||
| Financial_Information.pdf | ||
| Pricing_Worksheets.pdf | ||
| L01-1.0_CFR.PDF | ||
| 339-1.3_INSP_190212.pdf | ||
| PERFORMANCE_RELEVANCY_QUESTIONNAIRE.pdf | ||
| DBWD_Winn.pdf | ||
| 231-1.3_INSP_190315.pdf | ||
| DBWD_Grant.pdf | ||
| Solicitation_127K1119R0002.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection Date: 3/21/2019
Route: 287 Milepost: 7.5040 Structure No:
OVER
County, (Signature)
BRIDGE INSPECTION AND MANAGEMENT PROGRAM
Insert Cover photo here.
287-7.7
KISATCHIE NATIONAL FOREST
USDA FOREST SERVICE, REGION 8
080602000002261
ROAD BRIDGE INSPECTION REPORT
ROUTINEINSPECTION TYPE:
Rapides Louisiana
287-7.7 CASTOR CREEK
INSPECTION TEAM LEADER: John K. Hardin
U.S. DEPARTMENT OF AGRICULTURE
Structure Name: (8)Structure No:
(5D)Route:
Forest:
86.0 23.3 23.3
(45)No. Main Spans: 4
(46)No. Appr Spans: 0
No. Substrs: 5
(in Tons) Inventory Safe Load Capacity
HL-93 (RF) -
HS-20
Type 3 Type 3S2 Yes/No Type 3-3 0 Months NRL (RF) 0 Months Rating Date: 0 Months
(41) Posting Status:
(70) Posting Capacity (31)Design Load:
(63,65)Method of Load Rating:
Yes No X
Date:
Inspection Team: Leader: Jurisdiction:
Weather: Latitude:
Township: 29 Meridian:
(9)Location:
Narrative Report: (Add additional sheets if necessary)
LOUISIAN TRUE 60
RAPIDES FALSE
287-7.7
Refer to the sketch included with this report for guidance in identifying and locating the bridge components. Girders and piles are numbered from left to right. Note that the data in the highlighted fields on this page has changed. The inventory should be updated accordingly.
Recommended Inspection Frequency:
John K. Hardin 31.20758572
11:25 AM
Clear, 68 degrees
NATIONAL FOREST ROAD
Months
3N Range: 2W Section:
Operating
(49)Overall Br Length:
Description:
Posting
0.0
Integral Concrete(108A)Wearin g Surface:Integral W/Prestress Unit
Channel Beam
NBIS Bridge Opening:
99.99 0
BRIDGE RATING SUMMARY:
(47)Horizontal (53)Vertical (34)Skew:
(107)Deck StructureType:
USDA FOREST SERVICE, REGION 8
CASTOR CREEK(11)Milepost: 7.5040
BRIDGE IDENTIFICATION AND LOCATION
080602000002261
KISATCHIE NATIONAL FOREST
(32)Approach Roadway Width:
(48)Max Span:
(52)Deck Width out-out: 24.8(51)Roadway Width (Curb to Curb):
Security ID 0806CALCASIEU
287 (6)Feature Crossed:
26.0
BRIDGE DESCRIPTION and MEASUREMENTS KISATCHIE District:
21.5 (27)Year Built:
1/8/1998 Open, No Restriction At Or Above Legal Loads
Critical Findings: SI&A Item 60 was reduced to 3 due to the decay of consecutive piles at Abutment 5.
SPECIALIZED INSPECTIONS:
(43B)Superstr Type:
Specialized Inspections Required
(23 CFR 650.303)
Based on this inspection, is additional inspection work needed in these specialized inspection If Yes How Soon Neede
Pile Bent
(43A)Superstr Material:
(44A)Superstr Material:
Concrete, Prestressed
Timber, TreatedSubstr Material:
(44B)Superstr Type:
Sam Karahalis Longitude: -92.59236716
Re-rating required based on this inspection?
Substr Type:
FS
Inspection Template Revision Date: 05/31/2017
Infra data used for this report was pulled on: 04/23/2017
1/4 Sect:
9:56 AM
(92A) Fracture Critical (92B) Underwater (92C) Special
HS20-44
U - UNKNOWN
Time Completed:
3/21/2019 Time Started:
INSPECTION INFORMATION
Special Equipment Need
3/21/2019
Milepost: 7.5040 080602000002261
CODE
N
* 1. F C1. G C2. P C3. - C4. P C5. G C6. F C7. No
* 1. F
* 2. -
* 3. -
* 4. -
C1. F C2. -
C3. NOB
C4. NOB
*1. G *2. F *3. G
*4. G *5. P *6. G *7. - *8. G
*9. - *10. - *11. - *12. - *13. F *14. G *15. F *16. G *17. F *18. - *19. - *20. P *21. -
A B
U
TM
E N
TS
P
IE
R
S
Timber Abutments (incl. WW)
Other Abutments
Columns or Walls
Structure Name:
Route:
Walls Piles
b. Portals
c. Verticals/Diagonals
Bearing Devices Paint
d. Bracing
Deflection Under Load Vibration Under Load
Alignment (tilting, rotating, etc.)
287-7.7
See Narrative Sheet
See Narrative Sheet
Erosion or Scour Settlement
Alignment (tipping, tilting, etc.)
Crib Walls/Tie Backs
Caps Footings
Wingwalls
See Narrative Sheet
See Narrative Sheet. No listing for wingwalls under Timber Abutment.
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
1 Also includes wingwalls connected to the superstructure above the beam seat.
2 Includes wingwalls integral with the abutment or the portion of the wingwall below the bearing seat.
See Narrative Sheet
59. SUPERSTRUCTURE:
Sidewalks Drains and Drainage See Narrative Sheet
Expansion Joints Curbs
Rideability Cleanliness Utilities
Floor Beams
60. SUBSTRUCTURE:
Caps
Structure No:
Date:
Footings Piles See Narrative Sheet
See Narrative Sheet
Caps
Backing Planks Sills/Footings
Settlement
See Narrative Sheet
See Narrative Sheet. Each channel unit has 2 girders.
Stringers
Erosion or Scour
Bracing
CONDITION CODES and REMARKS
Nine pre-cast concrete channel units.
See Narrative Sheet
Wearing Surface
Deck Slab/Panels/Joists
REMARKS(Overall Code for item, to be reported to FHWA, in bold box)
58. DECK:
Posts/Piles/Tie Backs
Girders 18 ea.
a. Diaphragms
See Narrative Sheet and Sketches Sheet
b. Bracing
a. Chords Trusses
Milepost: 7.5040
CODE
1. F
2. -
3. G
4. F
5. F
6. 10.4
N *1. - *2. - *3. - *4. -
5. -
F
1. F
2. G
3. F
4. F
36A 0 36B 0 36C 0 36D 0 A. P B. - C. - D. -
1. P
2. F
1. G
2. G
N
CONDITION RATING OF EACH MEMBER OR ELEMENT
-NOT APPLICABLE
-APPLICABLE, BUT NO OBSERVED. (Give reason unless obvious)
-ELEMENT IN NEW OR GOOD CONDITION WITH NO REPAIRS NECESSARY.
-ELEMENT IS STILL PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED BUT MAY NEED MAINTENANCE.
-ELEMENT IS PERFORMING AT REDUCED CAPACITY.
-ELEMENT IS NOT PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED
Approach Rail Ends Approach Guardrails
Approach Settlement APPRAISAL CODES and REMARKS
Bridge Railing See Narrative Sheet
C O
N D
IT
IO
N of e le m en ts
There are no approach guardrails.
See Narrative Sheet
36. TRAFFIC SAFETY FEATURES:
Rail Transitions
See Narrative Sheet
See Narrative Sheet
Channel Protection
Observed Lateral Movement
Surfacing (Not needed for reporting to FHWA)
Vegetation Waterway Obstructions/Drift
See Narrative Sheet
Shape Seams or Joints Material Condition
61. CHANNEL and CHANNEL PROTECTION:
(Overall Code for item, to be reported to FHWA, in bold box) REMARKS
Channel Scour/Erosion See Narrative Sheet
Foundations
See Narrative Sheet Shoulder Embankment Roadway Embankment
APPROACH CONDITION:
Headwall/Wingwall
G = GOOD
C = CRITICAL
72. APPROACH ROADWAY ALIGNMENT:
67. STRUCTURAL EVALUATION
NOB
F = FAIR
P = POOR
69. UNDERCLEARANCE:
Structure Name:
Route:
287-7.7
Signing See Narrative Sheet
Clear Height Height (feet) from thalwag to bottom of lowest superstructure member
62. CULVERTS
CONDITION CODES and REMARKS (continued) Structure No.:
Date:
080602000002261
3/21/2019
See Narrative SheetObject Markers
68. DECK GEOMETRY:
Horizontal Vertical
29. ROAD ADT
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
71. WATERWAY ADEQUACY:
113. SCOUR CRITICAL BRIDGES: Bridge is on deep foundation. (Pile supported)
Milepost: 7.5040 Structure No.:
Work Item Category Detailed Work Item Description
Deck Remove the dirt and vegetative debris from the gutterlines to improve drainage.
Deck
Replace the defective patches on Span 4. Patch the cracked areas on Spans 2 and 4. Reattach the angle iron that has broken away from one of the patches on the right side of Span 4.
Superstructure Consider replacing the steel bearing plates.
Substructure Consider driving an additonal pile between Piles 3 and 4 in Bent 3.
Replace Abutment 5, Piles 2 and 3.
Channel Remove the scrap bridge timber that is lodged in Bent 2.
Traffic Safety Features
Consider replacing the pipe bridge railing with a system that meets the current standard.
xxx xxx xxx xxx xxx
#N/A
#N/A
#N/A
#N/A
#N/A xxx
- xxx xxx
- xxx
- xxx
#N/A
#N/A
#N/A
#N/A
#N/A
Waterway Obstruction/Drift - Remove Debris/Vegetation 3
Bridge Railing - Upgrade Bridge Railing 172LF
EACH
HR
Timber Abutments/Piers - Repair/Replace Posts/Piles
Concrete Curb - Patch 5
Bearing Devices - Clean and Lubricate TBD
SF
HR
SFClean Deck
#N/A
#N/A
#N/A
8001002
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
4005001
5002004
6002001
Work Item Code
3006001003
Unit
RECOMMENDED WORK ITEMS
Work Item Quantity
080602000002261287
3/21/2019Date:287-7.7
Route:
Structure Name:
Date:
287 Milepost: 7.5040 Structure No:
Item Reference
58.1
58.C2
58.C4 58.C6
59.1
59.C1
60.2 60.15 61.1 61.5
60.5 60.20
60.13
60.17
ITEM REFERENCE AND REMARKS ~ NARRATIVE REPORT
Posts / Piles / Tie Backs - Bent 2, Pile 5 and Bent 3, Pile 3 have a new pile driven beside the original pile. The original pile at Bent 2, Pile 5 remains solid and capable of carrying load; however, the original pile at Bent 3, Pile 3 is not. This pile has failed (Photo 12), which has increased the pile spacing between Pile 2 and the new pile driven adjacent to Pile 3 to 7.8'. This should be considered when rating the bridge to determine its load carrying capacity.
Abutment 5, Pile 2 is severely decayed at the ground line. It has decayed to a depth of 4” to 5”. A core approximately 4” to 6” in diameter remains. (Photo 13) Abutment 5, Pile 3 is decaying internally. (See Sketch) Wingwalls - One of the wingwall piles on the right side of Abutment 1 is decayed at the ground line (Photo 14), but continues to support the wall.
Caps - The cap at Bent 3 has a 2”x2”x1’ decayed area adjacent to a check between Piles 1 and 2. (Photo 15) No significant decay was noted.
Remarks
Deck Slab / Panels / Joists - The deck surface is slightly worn. (Photos 1 and 2) Aggregate in the concrete is exposed. There are small sections of concrete breaking out of the deck surface at the corners of the deck units as follows:
Span Unit Bent Remarks 1 6 1 8”x3”x1” 1 6, 7, 8 2 7”x2” (Photo 1) 2 5 2 8”x2” 2 2 3 8”x2” 3 7 3 7”x2” 4 3, 4, 5 4 7”x2”
Some units have developed “D” cracking adjacent to the longitudinal joints as follows:
Span Unit 1 6, 7 (Photo 2) 2 2, 6 3 8 4 5
Span 1, Unit 3 has a 14”x4”x5” section of concrete broken out of the end over Abutment 1. This area has been filled with asphaltic material. Small sections of timber planks were attached to the backwall below this hole. (Photo 3) These were probably put in place to support a patch.
Curbs - The curbs have sections of concrete broken off of the ends at the point where the pipe bridgerail posts are embedded. An attempt was made to patch these areas, but the product used did not bond to the concrete in some areas. The patches on the left side of Span 1 and one of the patches on the left side of Span 4 remain intact. The other patches on Span 4 have fallen out. (Photo 4) The curbs were previously broken on the left side of Spans 1 and 3, and on both sides of Span 4. These areas were patched and a section of angle iron was welded to the post and turned down the face of the curb for additional support. (Photo 5) One of these angle irons on the right side of Span 4 has broken partially away from the post. (Photo 6) This could snag the wheel of an errant vehicle if not repaired. The curb is cracked adjacent to a bridge rail post on the left side of Span 2 (Photo 7) and the right side of Span 4.
Drains and Drainage, Cleanliness - Dirt and vegetative debris accumulating in the gutterlines is preventing proper deck drainage. (Photo 8)
Girders - Span 1, Girder 1 has a 20”x3”x2 ½” section of concrete broken out of the bottom 8’ from Abutment 1.
(Photo 9) The steel plates embedded in the ends of the girders are corroding adjacent to the bearing plates. (Photo 10) Bearing Devices - The steel bearing plates are corroding (Photo 11), but continue to serve the purpose for which they were intended.
Erosion or Scour, Channel Scour / Erosion, Observed Lateral Movement - The stream bank is scouring under Span 1 and at Bent 2 on the right side of centerline.
287-7.7Structure Name:
Route:
3/21/2019
080602000002261
287 Milepost: 7.5040 Structure No:
Item Reference
61.4
Approach
36.A
36.1
36.2
Remarks
Waterway Obstructions / Drift - There is a scrap 4”x10” timber lodged between Piles 2 and 3 at Bent 2. This could cause drift to accumulate. There is a small accumulation of drift on the right side of centerline on the far side of Bent 4.
The roadway surface was previously reported to be raveling adjacent to the Abutments. These areas have been patched with asphaltic material. (Photos 16 and 17) There is also a 5'x8' patch adjacent to Abutment 5 on the left side of centerline. (Photo 17) This is assumed to have been placed to address settlement in this area. The roadway is slightly lower than the bridge deck adjacent to Abutment 5.
Bridge Railing - The pipe bridge rails are rusting, but no significant corrosion was noted. The rail on Span 4 has been replaced. This rail system is inadequate. The condition of the concrete curbs also affects the adequacy of this system.
Signing - The approach roadway and the bridge deck are marked with a double yellow line painted at the centerline.
The striping has worn away on the deck and the approach roadway at the end of the bridge.
Object Markers - Object markers are in place. The object marker on the right side of Abutment 1 has been vandalized by gunfire, but the vandalism is minor. The object marker on the right side of Abutment 5 is bent at the top, but continues to serve its intended purpose.
Structure Name: 287-7.7 3/21/2019
Route: 080602000002261
ITEM REFERENCE AND REMARKS ~ NARRATIVE REPORT
Route: Milepost: 7.5040
3/21/2019
080602000002261Structure No:
287-7.7Structure Name:
Insert photo here.
Approach Ahead on Station
BRIDGE PHOTOS
Approach Back on Station
Insert photo here.
Route: Milepost: 7.5040
Structure Name: 287-7.7 3/21/2019
287 Structure No: 080602000002261
BRIDGE PHOTOS - cont.
Looking Upstream from the Bridge Deck
Looking Downstream from the Bridge Deck
Route: Milepost: 7.5040
Insert photo here.
Looking Downstream - Elevation Profile
Looking Upstream - Elevation Profile
3/21/2019
Structure No: 080602000002261
BRIDGE PHOTOS - cont.
Structure Name:
287-7.7
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Abutment 1
Insert photo here.
Bent 2
Structure Name: 287-7.7 3/21/2019
287 Structure No: 080602000002261
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Bent 3
Insert photo here.
Bent 4
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Abutment 5
Intentionally Left Blank
Route: Milepost: 7.5040
Photo 2
3/21/2019
Structure No: 080602000002261
Insert photo here.
Insert photo here.
Photo 1
BRIDGE PHOTOS - cont.
Structure Name:
Route: Milepost: 7.5040
Photo 4
3/21/2019
Structure No: 080602000002261
Insert photo here.
Insert photo here.
Photo 3
BRIDGE PHOTOS - cont.
Structure Name:
Route: Milepost: 7.5040
Structure Name: 287-7.7 3/21/2019
287 Structure No: 080602000002261
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 5
Photo 6
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 7
Insert photo here.
Photo 8
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 9
Insert photo here.
Photo 10
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 11
Insert photo here.
Photo 12
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 13
Insert photo here.
Photo 14
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 15
Insert photo here.
Photo 16
Route: Milepost: 7.5040
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 17
Route: Milepost: 7.5040
Structure Name:
287-7.7 3/21/2019
Structure No: 080602000002261
BRIDGE SKETCHES
Structure Name: Date:
Route: 287 Milepost: 7.5040
10.4
2019 2021 2023 2025 2027 2029 2031
0.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0
10.0 4.2 0.0 0.0 0.0 0.0 0.0 0.0
21.5 4.8 0.0 0.0 0.0 0.0 0.0 0.0
25.0 5.9 0.0 0.0 0.0 0.0 0.0 0.0
27.0 9.5 0.0 0.0 0.0 0.0 0.0 0.0
30.0 9.9 0.0 0.0 0.0 0.0 0.0 0.0
34.0 10.4 0.0 0.0 0.0 0.0 0.0 0.0
43.0 9.6 0.0 0.0 0.0 0.0 0.0 0.0
46.0 6.3 0.0 0.0 0.0 0.0 0.0 0.0
52.0 5.2 0.0 0.0 0.0 0.0 0.0 0.0
64.5 4.9 0.0 0.0 0.0 0.0 0.0 0.0
86.0 3.7 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
Water Surface 8.9
Channel Cross Section
Horizontal Dist Measured from A-1
Distance Measured from Top of Cap
3/21/2019 Structure No: 080602000002261
287-7.7
Input Cross-Section Data:
Height (feet) from thalwag to bottom of lowest superstructure member
0.0
2.0
4.0
6.0
8.0
10.0
12.0
0.0 10.0 20.0 30.0 40.0 50.0 60.0 70.0 80.0 90.0 100.0
Top of Cap
(Substructure elements can be inserted in the cross-section using Insert, Shapes )
Milepost:
ID
Description
Needed for Real Property Verification
N Re-rating required? (Enter Y/N) N Specialized Equipment Required? (Enter Y/N)
Infra Summary Data
Structure Name: 287-7.7 3/21/2019
Route: 287 7.5040 Structure No: 080602000002261
Main Data Appraisal Data
Insp Team Leader
Inspection_Type (System Generated) (System Generated) Inspection Date 3/21/2019 ROUTINE Inspection Freq 24
Wear Srfc Cond N Deck Cond (58) 6
Inspection Cost Aprch Cond F
Culvert Cond (62) N Channel Cond (61) 6
Supstr Cond (59) 6 Substr Cond (60) 3
Inspected By* John K. Hardin Done By (Org) FS - FOREST SERVICE
Scour Crit Br (113) 5 Insp Resp Name FS - FOREST SERVICE
Main Data Appraisal Data
Done By Name (Unit) REGIONAL OFFICE
Str Eval (67) 3 Deck Geom (68) 5
Approach Align (72) 8
Underclr (69) N Waterway Adq (71) 7
Insp Remarks
Refer to the sketch included with this report for guidance in identifying and locating the bridge components. Girders and piles are numbered from left to right. Note that the data in the highlighted fields on this page has changed. The inventory should be
Approach Rail Ends (36D) 0
Sam Karahalis John K. Hardin
Insp Team
Transition (36B) 0 Approach Guardrail (36C) 0
Traffic Rail Safety Features Appraisal Bridge Rail (36A)
| Cover |
| 1-Title |
| 2-Condition |
| 3-Condition(cont) & Appraisal |
| 4 Work Items |
| 5-Narrative |
| 5-Narrative (2) |
| 6a-Photos |
| 6b-Photos |
| 6c-Photos |
| 6c-Photos (2) |
| 6c-Photos (3) |
| 6c-Photos (4) |
| 6d-Photos |
| 6e-Photos |
| 6f-Photos |
| 6f-Photos (2) |
| 6f-Photos (3) |
| 6f-Photos (4) |
| 6f-Photos (5) |
| 6f-Photos (6) |
| 6f-Photos (7) |
| 7-Sketches |
| 8-Cross -Section |
| Infra Summary |
File details come from the government source that posted it.