Inspection Report 231-1.3
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| sign_in_sheet.pdf | ||
| Site_visit_Q&A.pdf | ||
| L0-1.0.pdf | ||
| 287-7.5_INSP_190321.pdf | ||
| SOW_2019-06-12.pdf | ||
| PERFORMANCE_RELEVANCY_QUESTIONNAIRE.pdf | ||
| DBWD_Winn.pdf | ||
| DBWD_Grant.pdf | ||
| Solicitation_127K1119R0002.pdf | ||
| 287-7.1_INSP_190319.pdf | ||
| DBWD_Vernon.pdf | ||
| Financial_Information.pdf | ||
| Pricing_Worksheets.pdf | ||
| L01-1.0_CFR.PDF | ||
| 339-1.3_INSP_190212.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Inspection Date: 3/15/2019
Route: 231 Milepost: 1.3300 Structure No:
OVER
County, (Signature)
BRIDGE INSPECTION AND MANAGEMENT PROGRAM
Insert Cover photo here.
231-1.3
KISATCHIE NATIONAL FOREST
USDA FOREST SERVICE, REGION 8
080602000002216
ROAD BRIDGE INSPECTION REPORT
ROUTINEINSPECTION TYPE:
Rapides Louisiana
231-1.3 SQUIRES BRANCH
INSPECTION TEAM LEADER: John K. Hardin
U.S. DEPARTMENT OF AGRICULTURE
Structure Name: (8)Structure No:
(5D)Route:
Forest:
31.0 23.4 23.4
(45)No. Main Spans: 2
(46)No. Appr Spans: 0
No. Substrs: 3
(in Tons) Inventory Safe Load Capacity
HL-93 (RF) -
HS-20
Type 3 Type 3S2 Yes/No Type 3-3 0 Months NRL (RF) 0 Months Rating Date: 0 Months
(41) Posting Status:
(70) Posting Capacity (31)Design Load:
(63,65)Method of Load Rating:
Yes No X
Date:
Inspection Team: Leader: Jurisdiction:
Weather: Latitude:
Township: 25 Meridian:
(9)Location:
Narrative Report: (Add additional sheets if necessary)
LOUISIAN TRUE 30
RAPIDES FALSE
231-1.3
Refer to the sketch included with this report for guidance in identifying and locating the bridge components. Girders and piles are numbered from left to right. Note that the data in the highlighted fields on this page has changed. The inventory should be updated accordingly.
Recommended Inspection Frequency:
John K. Hardin 31.12443203
10:00 AM
Partly Cloudy, 56 degrees
Months
2N Range: 3W Section:
Operating
(49)Overall Br Length:
Description:
Posting
0.0
Integral Concrete(108A)Wearin g Surface:Integral W/Prestress Unit
Channel Beam
NBIS Bridge Opening:
99.99 0
BRIDGE RATING SUMMARY:
(47)Horizontal (53)Vertical (34)Skew:
(107)Deck StructureType:
USDA FOREST SERVICE, REGION 8
SQUIRES BRANCH(11)Milepost: 1.3300
BRIDGE IDENTIFICATION AND LOCATION
080602000002216
KISATCHIE NATIONAL FOREST
(32)Approach Roadway Width:
(48)Max Span:
(52)Deck Width out-out: 24.9(51)Roadway Width (Curb to Curb):
Security ID 0806CALCASIEU
231 (6)Feature Crossed:
20.0
BRIDGE DESCRIPTION and MEASUREMENTS KISATCHIE District:
15.5 (27)Year Built:
4/30/2016 Open, No Restriction At Or Above Legal Loads
Critical Findings: SI&A Item 60 was reduced to 3 due to the continued deterioration of Abutment 3, Pile 4 and the decay of the splice at Bent 2, Pile 1.
SPECIALIZED INSPECTIONS:
(43B)Superstr Type:
Specialized Inspections Required
(23 CFR 650.303)
Based on this inspection, is additional inspection work needed in these specialized inspection If Yes How Soon Neede
Pile Bent
(43A)Superstr Material:
(44A)Superstr Material:
Concrete, Prestressed
Timber, TreatedSubstr Material:
(44B)Superstr Type:
Sam Karahalis Longitude: -92.63229227
Re-rating required based on this inspection?
Substr Type:
FS
Inspection Template Revision Date: 05/31/2017
Infra data used for this report was pulled on: 04/23/2017
1/4 Sect:
9:07 AM
(92A) Fracture Critical (92B) Underwater (92C) Special
HS20-44
8 - LRFR REPORTED AS RATING FACTOR
Time Completed:
3/15/2019 Time Started:
INSPECTION INFORMATION
Special Equipment Need
3/15/2019
Milepost: 1.3300 080602000002216
CODE
* 1. G C1. G C2. G C3. - C4. P C5. G C6. F C7. No
* 1. G
* 2. -
* 3. -
* 4. -
C1. F C2. -
C3. NOB
C4. NOB
*1. G *2. F *3. G
*4. G *5. P *6. G *7. - *8. G
*9. - *10. - *11. - *12. - *13. P *14. G *15. F *16. G *17. F *18. - *19. - *20. P *21. -
A B
U
TM
E N
TS
P
IE
R
S
Timber Abutments (incl. WW)
Other Abutments
Columns or Walls
Structure Name:
Route:
Walls Piles
b. Portals
c. Verticals/Diagonals
Bearing Devices Paint
d. Bracing
Deflection Under Load Vibration Under Load
Alignment (tilting, rotating, etc.)
231-1.3
See Narrative Sheet
See Narrative Sheet
Erosion or Scour Settlement
Alignment (tipping, tilting, etc.)
Crib Walls/Tie Backs
Caps Footings
Wingwalls
See Narrative Sheet
See Narrative Sheet. No listing for wingwalls under Timber Abutment.
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
1 Also includes wingwalls connected to the superstructure above the beam seat.
2 Includes wingwalls integral with the abutment or the portion of the wingwall below the bearing seat.
See Narrative Sheet
59. SUPERSTRUCTURE:
Sidewalks Drains and Drainage See Narrative Sheet
Expansion Joints Curbs
Rideability Cleanliness Utilities
Floor Beams
60. SUBSTRUCTURE:
Caps
Structure No:
Date:
Footings Piles See Narrative Sheet
See Narrative Sheet
Caps
Backing Planks Sills/Footings
Settlement
See Narrative Sheet
See Narrative Sheet. Each channel unit has 2 girders.
Stringers
Erosion or Scour
Bracing
CONDITION CODES and REMARKS
Asphaltic concrete.
Nine pre-cast concrete channel units.
Wearing Surface
Deck Slab/Panels/Joists
REMARKS(Overall Code for item, to be reported to FHWA, in bold box)
58. DECK:
Posts/Piles/Tie Backs
Girders 18 ea.
a. Diaphragms
See Narrative Sheet and Sketches Sheet
b. Bracing
a. Chords Trusses
Milepost: 1.3300
CODE
1. F
2. -
3. G
4. F
5. G
6. 6.1
N *1. - *2. - *3. - *4. -
5. -
G
1. F
2. G
3. G
4. G
36A 0 36B 1 36C 1 36D 0 A. F B. G C. F D. G
1. -
2. P
1. G
2. G
N
CONDITION RATING OF EACH MEMBER OR ELEMENT
-NOT APPLICABLE
-APPLICABLE, BUT NO OBSERVED. (Give reason unless obvious)
-ELEMENT IN NEW OR GOOD CONDITION WITH NO REPAIRS NECESSARY.
-ELEMENT IS STILL PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED BUT MAY NEED MAINTENANCE.
-ELEMENT IS PERFORMING AT REDUCED CAPACITY.
-ELEMENT IS NOT PERFORMING THE FUNCTION FOR WHICH IT WAS INTENDED
Approach Rail Ends Approach Guardrails
Approach Settlement APPRAISAL CODES and REMARKS
Bridge Railing See Narrative Sheet
C O
N D
IT
IO
N of e le m en ts
See Narrative Sheet
36. TRAFFIC SAFETY FEATURES:
Rail Transitions
See Narrative Sheet
See Narrative Sheet
Channel Protection
Observed Lateral Movement
Surfacing (Not needed for reporting to FHWA)
Vegetation Waterway Obstructions/Drift
Shape Seams or Joints Material Condition
61. CHANNEL and CHANNEL PROTECTION:
(Overall Code for item, to be reported to FHWA, in bold box) REMARKS
Channel Scour/Erosion See Narrative Sheet
Foundations
Shoulder Embankment Roadway Embankment
APPROACH CONDITION:
Headwall/Wingwall
G = GOOD
C = CRITICAL
72. APPROACH ROADWAY ALIGNMENT:
67. STRUCTURAL EVALUATION
NOB
F = FAIR
P = POOR
69. UNDERCLEARANCE:
Structure Name:
Route:
231-1.3
Signing
Clear Height Height (feet) from thalwag to bottom of lowest superstructure member
62. CULVERTS
CONDITION CODES and REMARKS (continued) Structure No.:
Date:
080602000002216
3/15/2019
See Narrative SheetObject Markers
68. DECK GEOMETRY:
Horizontal Vertical
29. ROAD ADT
* Only these items are used in the determination of the overall condition rating for that category, i.e. Deck, Superstructure, Substructure. Other items should be rated and remarked on but NOT included in determining the overall category rating. Items enumerated using a C (ex. C1) should be commented on but not rated. See the FHWA Coding Guide for further information as to what is included in condition ratings.
71. WATERWAY ADEQUACY:
113. SCOUR CRITICAL BRIDGES: Bridge is on deep foundation. (Pile supported)
Milepost: 1.3300 Structure No.:
Work Item Category Detailed Work Item Description
Deck Remove the dirt and vegetative debris from the deck and gutterlines to improve drainage.
Superstructure Consider replacing the steel bearing plates.
Substructure
Replace Bent 2, Pile 1 and Abutment 3, Pile 4. Replace the decayed wingwall piles at Abutments 1 and 3.
Deck Replace the damaged thrie-beam bridge rail.
Deck
Replace the damaged guardrail on the right side at the far end of the bridge and replace the damaged timber block on the left side at the far end of the bridge.
Traffic Safety Features
Replace the missing object marker decal on the guardrail terminal on the right side at the far end of the bridge.
xxx xxx xxx xxx xxx
#N/A
#N/A
#N/A
#N/A
#N/A xxx
- xxx xxx
- xxx
- xxx
#N/A
#N/A
#N/A
#N/A
#N/A
Bridge Approach Railing - Repair/Replace 13
Signing - Repair/Replace Object Markers 1EA
LF
LF
Steel Bridge Railing - Replace/Repair
Bearing Devices - Clean and Lubricate TBD
Timber Abutments/Piers - Repair/Replace Posts/Piles 6
HR
EACH
SFClean Deck
#N/A
#N/A
#N/A
8003001
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
#N/A
5002004
3007001
3007005
Work Item Code
4005001
Unit
RECOMMENDED WORK ITEMS
Work Item Quantity
080602000002216231
3/15/2019Date:231-1.3
Route:
Structure Name:
Date:
231 Milepost: 1.3300 Structure No:
Item Reference
58.C2
58.C4 58.C6
59.1
59.C1
60.2 60.15 61.1
60.5 60.20
60.13
60.17
61.4
Approach
36.A
36.C
36.2
ITEM REFERENCE AND REMARKS ~ NARRATIVE REPORT
Wingwalls - The wingwall piles are decaying on the right side of Abutment 1 and on both sides of Abutment 3. The interior pile on the right side of Abutment 3 and the outside pile on the left side of Abutment 3 (Photo 10) are severely decayed. The outside wingwall pile on the right side of Abutments 1 and 3 are decaying due, in part, to the absence of the protective metal hood. (Photo 11) Caps - The cap at Bent 2 is beginning to decay adjacent to a split in the near face of the cap between Piles 2 and 3.
Waterway Obstructions / Drift - High water has deposited debris on the bearing plates. (Photos 4 and 12)
The approach roadway has begun to rut in a wheel-path at the far end of the bridge.
Remarks
Curbs - There are small, shallow spalls on the face of the curb at the point where holes were drilled for the bridge rail attachment. (Photo 1)
Bridge Railing - The thrie-beam bridge rail is bent on the top on both sides of Span 1 as a result of being struck by a fallen tree. (Photo 13) Two of the bridge rail splices are not supported by posts.
Drains and Drainage, Cleanliness - Debris accumulating on the roadway surface and in the gutterlines is preventing proper deck drainage. (Photo 2)
Girders - Span 1, Girder 14 has a 4”x3”x1” section of concrete broken out of the bottom 2.5’ from Bent 2. (Photo 3)
Bearing Devices - The steel bearing plates are rusting and becoming corroded in some areas but continue to serve their intended purpose. (Photo 4)
Erosion or Scour, Channel Scour / Erosion - Minor scour of the streambed is occurring adjacent to Bent 2 and on the bank adjacent to Abutment 3. (Photo 5)
Posts / Piles / Tie Backs - Abutment 1, Pile 5 was replaced with a 12”x12” mudsill column on each side of the original pile. (Photo 6) This repair is functioning well at this time, but the embankment under the footings is vulnerable and needs to be monitored. Bent 2, Piles 1 and 2 were spliced. (Photo 7) The original pile stub supporting the splice at Bent 2, Pile 1 is becoming decayed. It is decayed to a depth of 1.5" in approximately half its circumerence, resulting in approximately 20% section loss. (Photo 8) Abutment 1, Pile 3 and Abutment 3, Pile 4 (Photo 9) are decaying.
(See Sketches)
Approach Guardrails - A 12’ 6” section of guardrail has been damaged on the right side at the end of the bridge.
(Photo 14) This is probably the result of being struck by mowing equipment. One of the 6"x8"x14" timber, guardrail blocks is split on the left side at the far end of the bridge. (Photo 15) Object Markers - Abutments are marked with Type 3 object markers and the guardrail ends are marked with adhesive, reflective sheeting applied to the terminals. The adhesive object marker is missing from the guardrail terminal on the right side at the end of the bridge.
231-1.3Structure Name:
Route:
3/15/2019
080602000002216
Route: Milepost: 1.3300
3/15/2019
080602000002216Structure No:
231-1.3Structure Name:
Insert photo here.
Approach Ahead on Station
BRIDGE PHOTOS
Approach Back on Station
Insert photo here.
Route: Milepost: 1.3300
Structure Name: 231-1.3 3/15/2019
231 Structure No: 080602000002216
BRIDGE PHOTOS - cont.
Looking Upstream from the Bridge Deck
Looking Downstream from the Bridge Deck
Route: Milepost: 1.3300
Insert photo here.
Looking Downstream - Elevation Profile
Looking Upstream - Elevation Profile
3/15/2019
Structure No: 080602000002216
BRIDGE PHOTOS - cont.
Structure Name:
231-1.3
Route: Milepost: 1.3300
BRIDGE PHOTOS - cont.
Abutment 1
Insert photo here.
Bent 2
Structure Name: 231-1.3 3/15/2019
231 Structure No: 080602000002216
Route: Milepost: 1.3300
BRIDGE PHOTOS - cont.
Abutment 3
Intentionally Left Blank
Route: Milepost: 1.3300
Photo 2
3/15/2019
Structure No: 080602000002216
Insert photo here.
Insert photo here.
Photo 1
BRIDGE PHOTOS - cont.
Structure Name:
Route: Milepost: 1.3300
Photo 4
3/15/2019
Structure No: 080602000002216
Insert photo here.
Insert photo here.
Photo 3
BRIDGE PHOTOS - cont.
Structure Name:
Route: Milepost: 1.3300
Structure Name: 231-1.3 3/15/2019
231 Structure No: 080602000002216
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 5
Photo 6
Route: Milepost: 1.3300
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 7
Insert photo here.
Photo 8
Route: Milepost: 1.3300
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 9
Insert photo here.
Photo 10
Route: Milepost: 1.3300
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 11
Insert photo here.
Photo 12
Route: Milepost: 1.3300
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 13
Insert photo here.
Photo 14
Route: Milepost: 1.3300
BRIDGE PHOTOS - cont.
Insert photo here.
Photo 15
Route: Milepost: 1.3300
Structure Name:
231-1.3 3/15/2019
Structure No: 080602000002216
BRIDGE SKETCHES
Structure Name: Date:
Route: 231 Milepost: 1.3300
6.1
2019 2021 2023 2025 2027 2029 2031
0.0 4.0 0.0 0.0 0.0 0.0 0.0 0.0
7.0 3.9 0.0 0.0 0.0 0.0 0.0 0.0
15.5 6.1 0.0 0.0 0.0 0.0 0.0 0.0
19.0 5.8 0.0 0.0 0.0 0.0 0.0 0.0
24.0 3.9 0.0 0.0 0.0 0.0 0.0 0.0
31.0 3.4 0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
0.0 0.0 0.0 0.0 0.0 0.0
Water Surface NA
Channel Cross Section
Horizontal Dist Measured from A-1
Distance Measured from Top of Cap
3/15/2019 Structure No: 080602000002216
231-1.3
Input Cross-Section Data:
Height (feet) from thalwag to bottom of lowest superstructure member
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
0.0 5.0 10.0 15.0 20.0 25.0 30.0 35.0
Top of Cap
(Substructure elements can be inserted in the cross-section using Insert, Shapes )
Milepost:
ID
Description
Needed for Real Property Verification
N Re-rating required? (Enter Y/N) N Specialized Equipment Required? (Enter Y/N)
Infra Summary Data
Structure Name: 231-1.3 3/15/2019
Route: 231 1.3300 Structure No: 080602000002216
Main Data Appraisal Data
Insp Team Leader
Inspection_Type (System Generated) (System Generated) Inspection Date 3/15/2019 ROUTINE Inspection Freq 24
Wear Srfc Cond 7 Deck Cond (58) 7
Inspection Cost Aprch Cond G
Culvert Cond (62) N Channel Cond (61) 7
Supstr Cond (59) 7 Substr Cond (60) 3
Inspected By* John K. Hardin Done By (Org) FS - FOREST SERVICE
Scour Crit Br (113) 5 Insp Resp Name FS - FOREST SERVICE
Main Data Appraisal Data
Done By Name (Unit) REGIONAL OFFICE
Str Eval (67) 3 Deck Geom (68) 5
Approach Align (72) 8
Underclr (69) N Waterway Adq (71) 6
Insp Remarks
Refer to the sketch included with this report for guidance in identifying and locating the bridge components. Girders and piles are numbered from left to right. Note that the data in the highlighted fields on this page has changed. The inventory should be
Approach Rail Ends (36D) 0
Sam Karahalis John K. Hardin
Insp Team
Transition (36B) 1 Approach Guardrail (36C) 1
Traffic Rail Safety Features Appraisal Bridge Rail (36A)
| Cover |
| 1-Title |
| 2-Condition |
| 3-Condition(cont) & Appraisal |
| 4 Work Items |
| 5-Narrative |
| 6a-Photos |
| 6b-Photos |
| 6c-Photos |
| 6c-Photos (2) |
| 6c-Photos (3) |
| 6d-Photos |
| 6e-Photos |
| 6f-Photos |
| 6f-Photos (2) |
| 6f-Photos (3) |
| 6f-Photos (4) |
| 6f-Photos (5) |
| 6f-Photos (6) |
| 7-Sketches |
| 8-Cross -Section |
| Infra Summary |