Sample_design-build_project.pdf
PDF 14 KB Posted
- Attached to
- Road Construction MATOC Federal contract opportunity
- Solicitation number
- 127A8618R0001
About this file
Sample design-build project description
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BID_SCHEDULE_R4.pdf | ||
| SHEET_G-002.1_R4.pdf | ||
| SF_30_Amend_0004.pdf | ||
| BID_SCHEDULE-_REV.pdf | ||
| SF_30_Amend_0003.pdf | ||
| SHEET_G-002.1.pdf | ||
| Solicitation_127A8618R0001_-_Amend_002.pdf | ||
| Amendment_0002.pdf | ||
| Solicitation_127A8618R0001_-_Amend_001.pdf | ||
| ERFO_PLANS_RD_43.pdf | ||
| Ouachita_Road_43_Package.pdf | ||
| Solicitation_127K1118P0028_and_Exhibits.pdf | ||
| DBWD_AR258.pdf | ||
| Ozark_Cass_White_Package.pdf | ||
| DBWD_AR251.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Design/Build Project Mena Ranger District
Ouachita National Forest Polk County, Arkansas
Project Location:
This hypothetical project is located on the Mena Ranger District approximately 8 miles southwest of Mena, AR on a level 3 Forest System Road; it is a 14’ wide and gravel surfaced. A geotechnical investigation of the crossing area and nearby pit has been completed, as have hydraulics/hydrology and the preliminary engineering report, which would all be made available to you.
Work Description:
The project consists of designing and constructing a low water concrete bridge to replace a flood damaged hardened crossing. The project includes removing existing concrete slab, providing new reinforced concrete low water structure, clearing, aggregate, replacing culverts, removing debris, placing riprap, and seeding disturbed areas.
Plans and Specifications:
The standard specifications for this project will be Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects (FP-14). A copy of the FP-14 Standard Specifications can be obtained from the Federal Highway Administration (FHWA).
http://flh.fhwa.dot.gov/resources/pse/specs/
Required Submittal:
Your task is to provide a narrative explaining how you would go about performing this project.
You do NOT need to develop an actual design or cost estimate. You are limited to a maximum of three pages to outline any assumptions you have made and the steps you would go through to accomplish this project, and what you perceive those steps to include.
http://flh.fhwa.dot.gov/resources/pse/specs/