RFQ Vendor Questions - Response
| Technology Rental Bid Questions | |||
| Question #: | RFQ Location: | Question: | Answer: |
| 1 | 3.2.5 | Adobe Acrobat Pro DC is listed as being required to be installed on products but in Exhibit 1 Rental Equipment List this software is not listed anywhere. Can you confirm Adobe Acrobat Pro DC is required and if so on what equipment? | Adobe Acrobat Pro will be required on all laptops. |
| 2 | 3.2.7 | You mention shipping equipment within 12 hours of notification of defect. Would this include for example trying to ship on a Sunday when traditional shipping companies are not open? | The shipment of defective equipment will ship within 12 hours when shipping companies are open. We understand companies may be closed for holidays and on Sundays. |
| 3 | 3.3.12 | In 3.2.12 and in document “Exhibit 1-2020 Rental Equipment List v1.0” the list of equipment is significantly smaller than what our experience has been in supporting USFS in the past. How will the requests for other equipment be handled for the initial period? | Exhibit 1 lists the minimum requirements. Additional equipment can be added to the response to this quote. However, additional equipment will not be evaluated in the technical or price proposal for award. Additional equipment added in addendum will be evaluated for price reasonableness. |
| 4 | 3.3.5 | In 3.3.5 you state the equipment must be shipped in the most expedient delivery option available. Should we assume this to mean that if we are shipping via FedEx that you would want us to ship via FedEx First Overnight Service as opposed to FedEx Priority Overnight Service if available? | Yes, the vendor to use the fastest shipping option. |
| 5 | 3.6.2 | In section 3.6.2 it says tablet computers must include an unlimited cellular data plan but on Exhibit 1, it states tablets should be subscribed with a 5GB data plan. Which is it? | Tablets must have an active unlimited cellular data plan. This will be corrected on Exhibit 1. |
| 6 | 3.2.7, 3.2.8, 3.3 | For 3.2.7, 3.2.8 and 3.3 does USFS define “ship equipment” to be when the vendor’s shipping company takes possession of the shipment and registers in their system? | As it pertains to the identified sections the term "ship" means the time that a shipping company takes possession of the shipment. |
| 7 | 3.2.9 | On 3.2.9 it states the equipment will be rented on a monthly basis but on page 2 of the “Combined Synopsis Solicitation” document it is requesting pricing for per day, per week and per month. Will you need daily and weekly pricing? | Equipment will be rented on a monthly basis. Pricing shall be submitted for monthly rental only. |
| 8 | Under section 17, it states payments can be completed using the government wide purchase card or via EFT using form OF-286. Do we get to decide by host agency how we want payment? | Payment will be made by Gov. purchase card only. Language about OF-286 will be removed. | |
| 9 | Exhibit 1 | On Exhibit 1 document under the Advanced Fire Laptop, it mentions providing Windows Server 2016 (upon request). As Server 2016 can be configured different ways (such as # of client licenses and what roles need to be installed), do you have a set way this would be configured and if not, will the ship within 24 hours still apply for this item? | Server 2016 has been removed from the requirements. |
| 10 | 3.2.4 | For printer consumables can third party consumables be used or will you require manufacturer consumables? | 3rd party consumables are fine to use. |
| 11 | 3.2.5 | Can we use an alternative Adobe PDF editor to Adobe Acrobat Pro DC? | Vendor must install Adobe Acrobat Pro on all laptops. |
| 12 | Will incident teams be able to order equipment outside of this agreement? | Exhibit 1 lists the minimum requirements. Additional equipment can be added to the response to this quote. However, additional equipment will not be evaluated in the technical or price proposal for award. Additional equipment added in addendum will be evaluated for price reasonableness. | |
| 13 | |||
| 14 | 1 | Do you expect performance criteria met on a year-round basis, or just during peak season? Staffing and equipment staging, and therefore cost is affected by this answer. | Refer to RFQ |
| 15 | 3.2.7/3.3 | Is shipping within “12” or “24” hours, considered shipping within 12/24 business hours? Because within 12/24 non-business hours is not always possible | The shipment of defective equipment should be shipped within 12 hours after confirmation with the vendor has been established. Shipments must be complete withing 24 hours of order receipt. We understand shipping on holidays and Sundays may not be possible and the vendor will not be docked for not being able to ship when shipping companies are closed. |
| 16 | 3.2.5 | Will Foxit Business (specific name) work instead of Adobe Acrobat Pro DC? | Vendor must provide Adobe Acrobat Pro DC on all laptops. |
| 17 | Exhibit 1 | Are Gen 6 i5 processors really a requirement on the Standard Fire Laptops (vs. Gen 4 or better, which is what we’ve been providing without any known issues) | A minimum of Gen 4 i5 processors are a requirement on the Standard Fire Laptops. |
| 18 | Exhibit 1 | Are 55” monitors really a requirement (vs. 46-49” monitors, which is what we’ve been providing without any known issues) | A minimum of 46 inch monitors must be offered. |
| 19 | Exhibit 1 | Are display port video inputs really a requirement on External Monitors or Display Products (vs. HDMI, which is what we’ve been providing without any known issues) | Monitors must have display and HDMI ports or adaptors to go with each monitor. |
| 20 | Exhibit 1 | Is 10” really a requirement on the Tablets (vs. 9.7”, which is what we’ve been providing without any known issues) | A minimum of 9.7 inch tablets must be offered. |
| 21 | Exhibit 1 | Is RJ-45 really a requirement on large format printers (vs. a wireless NIC only, which is what we’ve been providing without any known issues) | All large format printers mush have RJ-45 ports. |
| 22 | For the Section 508 ACR requirement, does every item on the equipment list require an ACR? | Refer to RFQ | |
| 23 | 3.5.5 | What parts of your certified documentation of re-imaging specs are critical vs. non-critical? | The parts listed in a., b., c., and d. listed under 3.5.5 are the critical parts of the certified documentation. |
| 24 | 3.5.5 | This Certified documentation of re-imaging would require significant changes to our operational procedures. We would need time to phase in whatever is critical. Can we have phase in time? | Please refer to PWS section 3.5.5 and the certification document process must be part of the proposal and be operational at the beginning of the period of performance. |
| 25 | 3.1.7 | The monthly usage report requested would also require significant changes and/or programming. We would need time to phase in whatever is critical. Can we have phase in time? | Please refer to PWS section 3.1.7 and the usage report process must be part of the proposal and be operational at the beginning of the period of performance. |
| 26 | 3.3.7 | Providing return shipping labels will be tricky based on the incremental way equipment is returned. How do you see this working | This will be left up to the vendor to decide best practices for return shipping labels. |
| 27 | 3.3.1 | Since host agencies place orders, how do we get a list of users (or domains for the agencies) to setup the online ordering process? | The Forest Service can provide lists of dispatch centers and IMT to distribute the ordering form. Need to update table in PWS. |
| 28 | 16 | Can you clarify what you mean by "provide technical support for IPv4 and IPv6" | Please refer to section 16 |
| 29 | Do you really need us to quote per day and/or per week rates, or are monthly rates sufficient? | Rates will be monthly. PWS will be updated | |
| 30 | Exhibit 1 | Based on feedback from people in the field, may we suggest making ruggedized cases a requirement Tablets (which is what we’ve already been providing for many years? | This has been updated to reflect a ruggedized case requirement |
| 31 | 3.2.1 | "up to date on all updates/patches". Can we update these terminology to “[Mark] | Please clarify this question. |
| 32 | 3.2.5 | "current MS products" is not necessarily what your tech people have always wanted. We have typically done the latest, stable version of software, coordinating with your designated IT liaison. Possible to update that terminology? | Coordination with Government contact as necessary |
| 33 | Exhibit 1 | Exhibit 1 equipment list from 2020 was a bit outdated | This list is just the mimimum requirements. |
| 34 | Exhibit 1 | How do we add everything that we supplied last year, but not listed in Exhibit 1? | Exhibit 1 lists the minimum requirements. Additional equipment can be added to the response to this quote. However, additional equipment will not be evaluated in the technical or price proposal for award. Additional equipment added in addendum will be evaluated for price reasonableness. |
| 35 | Exhibit 1 | What’s the mechanism to bring new products to market and test viability? | Exhibit 1 lists the minimum requirements. Additional equipment can be added to the response to this quote. However, additional equipment will not be evaluated in the technical or price proposal for award. Additional equipment added in addendum will be evaluated for price reasonableness. |
| 36 | Exhibit 1 | Can you please clarify the “firewall” requirements under Networking (Standards) | Firewall has been removed from requirement. |
| 37 | Exhibit 1 | Are 8-port switches really a requirement (vs. 16- and 24-port, which is what we’ve been providing without any known issues) | 8 port switches have been removed from requirements. |
| 38 | Exhibit 1 | Are 2x full capacity toners (or sets of toners)/printer along with increased costs, really a requirement on the Printers (vs. partial toners w/minimum of x%, which is what we’ve been providing without any known issues). | Partials can be in the printer when it ships but there will need to be 2 NIB cartridges provided. |
| 39 | Exhibit 1 | Projector seems underspec'd – 1920x1080 should be the minimum | These are minimum requirements. |
| 40 | 3.3.5 | “Equipment must be shipped via the most expedient delivery option available for the requested location.” Are we really taking the courier vs. FedEx option away from the local decision-maker? | Equipment must be delivered fastest means possible. |
| 41 | 3.3.9 | How do we handle equipment lost and/or damaged by the agencies? | Please refer to the amended section 3.3.9 |