1264R420R0005- Attachment 1 - Bid Schedule.xlsx

XLSX spreadsheet 12 KB Posted

Attached to
Gooseneck Low Water Crossing
Solicitation number
1264R420R0005
Issued by

About this file

This document outlines a federal contract opportunity for replacement of an existing low water crossing structure on the Mark Twain National Forest. The contractor will remove the existing structure and replace it with a precast reinforced concrete box culvert. The contractor must provide all necessary labor, equipment, materials, permits and incidentals to complete the work as depicted in the drawings and specifications. The government's estimated price range for all contract line items is between $500,000 and $1,000,000. Interested parties must register in the System for Award Management prior to award. This procurement is set aside 100% for small businesses with a size standard of $36.5 million or less. The solicitation and attachments will be issued electronically via SAM on or about August 12, 2020. A formal site visit will be scheduled. The contract will be awarded on a firm fixed price basis by the USDA Forest Service for work to be completed on the 11 Point Ranger District in Missouri.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1264R420R0005

ITEM DESCRIPTION MEASURE QTY UNIT COST TOTAL COST

A100015101-0000Mobilization - This work consists of mobilization of personnel, equipment, materials and supplies. Other items included but not limited to: construction surveying and staking, temporary erosion control, bonding, insurance, permit fees, testing of materials, closeout procedures including record drawings, submittals, operations and maintenance manuals and material submittal and final cleaning, field office and staff, temporary utilities, site clean-up, waste disposal, field office vehicles and there operational costs, superintendent, safety and QC costs, and any other project costs not directly associated with a line item below. This item also includes the cost of bonds.LPSM1
A102015201-0000CONSTRUCTION SURVEY AND STAKINGLPSM1
A104015401-0000CONTRACTOR TESTINGLPSM1
A106015702-4000SOIL EROSION CONTROL, FILTER BAGLPSM1
A108015705-1400SOIL EROSION CONTROL, FIBER ROLLLNFT480
A110015705-1800SOIL EROSION CONTROL, TEMPORARY DIVERSION BERMLNFT300
A112015720-0000STORM WATER POLLUTION PREVENTION PLANLPSM1
A114020103-0000CLEARING AND GRUBBINGSQYD3900
A116020304-1000REMOVAL OF STRUCTURES AND OBSTRUCTIONS (LOW WATER CROSSING, CONCRETE SLAB, LOW WATER CROSSING FOOTINGS, GATES, BARBED WIRE FENCE)LPSM1
A118020401-0000ROADWAY EXCAVATIONCUYD1050
A120020701-0200SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE BSQYD2250
A122025102-0300PLACED RIPRAP, METHOD A, CLASS 3TON1900
A124030101-4000AGGREGATE BASE GRADING C OR DTON110
A126030110-0000AGGREGATE SURFACE COURSETON520
A128030210-0000BEDDING AND BACKFILL AGGREGATE (SIZE NUMBER 57)CUYD62
A130030303-1000ROADBED RECONDITIONINGSQYD1450
A132050101-0800MINOR CONCRETE PAVEMENT, REINFORCED, 8-INCH DEPTHSQYD365
A134055201-0200STRUCTURAL CONCRETE, CLASS A (AE) (WINGWALLS, CURBS, AND CUT-OFF WALLS)CUYD28
A136060202-020018-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERTLNFT180
A138060220-18008 FEET SPAN, 4 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERTLNFT154
A140062502-0000TURF ESTABLISHMENTSQYD1600
A142063303-0900SIGN, ALUMINUM PANEL, TYPE 3 SHEETINGEACH8
A144063316-1000REMOVE AND RESET SIGNEACH1
A146063502-0600TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 (4 FOOT WIDE)EACH10
A148063502-3900TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGNEACH22
A150064630-0000ROADSIDE DEVELOPMENT (BARBED WIRE FENCE, 4 STRAND, STEEL POST)LPSM1
Final As Builtsn/aAs Built Plans - Survey file will be delivered in CSV format. Point, Northing, Easting, Elevation, Description. Needs to be delivered in AutoCad Civil 3d, 2018 or later. Contractor shall make all the breaklines, countours, and surface shall be named existing. All notes provided as applicable. Control points and bench marks shall not be in the surface. Government shall provide AutoCad files - contractor responsible for submitted FINAL version within 15 days of project completion.LPSM1