This document contains an amendment to a federal solicitation for construction services. The Mark Twain National Forest is seeking to replace an existing low water crossing with a box culvert. The selected contractor will remove the current structure and install the new culvert. The estimated price range for all work is between $500,000 and $1,000,000. The solicitation is set aside exclusively for small businesses with average annual revenue below $36.5 million. Interested parties must register in the System for Award Management prior to award. The final solicitation and drawings will be issued electronically on or around August 12, 2020 through beta SAM. A mandatory site visit will also be held. The amendment provides answers to contractor questions, clarifying acceptable design alternatives and material specifications for the project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1264R418R0005 - Amendment 01.pdf | ||
| 1264R420R0005 - Attachment 6B - Permit.pdf | ||
| 1264R420R0005.pdf | ||
| 1264R420R0005- Attachment 1 - Bid Schedule.xlsx | XLSX spreadsheet | |
| 1264R420R0005 - Attachment 3 - Special Project Specs.pdf | ||
| 1264R420R0005 - Attachment 5 - Bid Copy.pdf | ||
| 1264R420R0005 - Attachment 7 - SWWP.doc | DOC document | |
| 1264R420R0005 - Attachment 2 - Plans.pdf | ||
| 1264R420R0005 - Attachment 4 - DBA MO20200001.docx | DOCX document | |
| 1264R420R0005 - Attachment 6A - Land Disturbance Permit.pdf | ||
| MO ERFO FS 2017-1(2)_plans_adv.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
64R4
Amendment 02 - Q&A posted.
See attached document.
64R4 Mark Twain National Forest Service Attn: Brittany Rohrer, CO 401 Fairgrounds Road Rolla, MO 65401
1264R418R0005
1 2
09/09/2020
08/17/2020
1264R420R0005
Q1: Is the Government open to an alternate box culvert design if the proper skew is maintained?
A1: Reference Attachment 3, 602.03 – which refers to FP 104.03(b)(2). Drawings can be considered for box culverts that have minor changes but they would have to be from a qualified ENG and bear the seal/signature.
Q2: Is there any additional detail for the wing walls such as profile or reinforcement diagrams?
A2: No, since it’s unknown if the wing walls will have to be squared up or not depending on the grade there are no additional details on the plans. Contractors should bid appropriately for this contingency.
Q3: Precast suppliers have said type 5 cement is typically rare for applications in MO and in the Midwest, it calls for a high sulfate content, which they say is typically for coastal areas handling sea water. Is there any other mix design acceptable?
A3: A locally available MODoT approved mix that meets the strength requirements per the drawings and specifications would be acceptable.
Q4: The top panel of the boxes call for epoxy mesh, and suppliers have relayed to me that this is usually an all or none addition, can the design team review this or explain the reasoning?
A4: Contractors should bid appropriately to add the epoxy mesh to the entire box culvert.