This document contains an amendment and questions and answers related to a federal solicitation for construction services. The Mark Twain National Forest is seeking a contractor to remove an existing low water crossing structure and replace it with a box culvert. The solicitation number is 1264R420R0005. Interested parties must register in the System for Award Management and the procurement is set aside 100% for small businesses with a size standard of $36.5 million. The government's estimated price range for all items is between $500,000 and $1,000,000. The final solicitation documents will be issued electronically via SAM on or about August 12, 2020 and will include drawings, though draft drawings are provided for information. A site visit will also be held. The amendment and Q&A document provides additional specifications and requirements for the aggregate, culvert fabrication, and MODOT standards.

View the file

Other files for this federal contract opportunity

Other files attached to Gooseneck Low Water Crossing, newest first.
File Type Posted
1264R418R0005 - Amendment 02.pdf PDF
1264R420R0005.pdf PDF
1264R420R0005- Attachment 1 - Bid Schedule.xlsx XLSX spreadsheet
1264R420R0005 - Attachment 3 - Special Project Specs.pdf PDF
1264R420R0005 - Attachment 5 - Bid Copy.pdf PDF
1264R420R0005 - Attachment 7 - SWWP.doc DOC document
1264R420R0005 - Attachment 2 - Plans.pdf PDF
1264R420R0005 - Attachment 4 - DBA MO20200001.docx DOCX document
1264R420R0005 - Attachment 6B - Permit.pdf PDF
1264R420R0005 - Attachment 6A - Land Disturbance Permit.pdf PDF
MO ERFO FS 2017-1(2)_plans_adv.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

7. ADMINISTERED BY (If other than Item 6) CODE

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

FACILITY CODE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED (SEE ITEM 13)

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15C. DATE SIGNED

15A. NAME AND TITLE OF SIGNER (Type or print)

16C. DATE SIGNED

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

PAGE OF PAGES

6. ISSUED BY CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)

CODE

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

Previous edition unusable

64R4

Amendment 01 - Q&A posted.

See attached document.

64R4 Mark Twain National Forest Service Attn: Brittany Rohrer, CO 401 Fairgrounds Road Rolla, MO 65401

1264R418R0005

1 2

09/02/2020

08/17/2020

1264R420R0005

Q1: Is the SWWP to be included in the proposal or provided after award?

A1: Reference page 36 of the solicitation – AGAR 452.215-71. SWWP is one of the documents required to be submitted.

Q2: Is there any broader spec book for this project, similar to the 156 page spec book offered with Red Bluff Phase 2?

A2: Reference bottom left hand corner of the 1st page of the Gooseneck Plans – states FP14 will be the governing specifications. There are various construction notes throughout the plans.

Q3: Should all aggregate conform to the MODOT spec book? I didn’t see anything regarding the Type 3 gradation.

A3: The gradation only of the aggregate base may conform to the requirements of the Missouri Highways and Transportation Commission’s current edition of the Missouri Standard Specifications for Highway Construction, Section 1007.3.2, Type 5 Aggregate, found at https://www.modot.org/missouri-standard-specifications-highway-construction. Conform to the requirements of Subsections 703.05(a) and 703.05(b) for all other properties. Submit the request according to Subsection 301.03.”

The gradation only of the aggregate surface course may conform to the requirements of the Missouri Highways and Transportation Commission’s current edition of the Missouri Standard Specifications for Highway Construction, Section 1006.3, Grade A, found at https://www.modot.org/missouri-standard-specifications-highway-construction . Conform to the requirements of Subsections 703.05(a) and 703.05(c) for all other properties. Submit the request according to Subsection 301.03.”

Aggregate used for this project will conform to MODOT aggregate specifications for quality and gradation as approved by CO. This will allow for locally available aggregate for this project.

Q4: For the precast box culverts, would the government accept a box culvert with a 0 degree skew, or less than 9 degree skew?

A4: The skew as designed is important for alignment with the channel. As far as the length goes, if it has to be increased from the proposed 22’ to 24’, that will be fine.

If the contractor decides to fabricate the longer length then this will be at no extra cost to the government in unit prices and this extra length will need to be included in the 22’ unit price.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.modot.org%2Fmissouri-standard-specifications-highway-construction&data=02%7C01%7C%7Cc2bf44ff4c3c4703164508d84a9a2c4c%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C0%7C0%7C637341373314208042&sdata=xOuEc37tKolh48KTcg7f5mHm4NoaMJaRZw03PIyPmp0%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.modot.org%2Fmissouri-standard-specifications-highway-construction&data=02%7C01%7C%7Cc2bf44ff4c3c4703164508d84a9a2c4c%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C0%7C0%7C637341373314208042&sdata=xOuEc37tKolh48KTcg7f5mHm4NoaMJaRZw03PIyPmp0%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.modot.org%2Fmissouri-standard-specifications-highway-construction&data=02%7C01%7C%7Cc2bf44ff4c3c4703164508d84a9a2c4c%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C0%7C0%7C637341373314208042&sdata=xOuEc37tKolh48KTcg7f5mHm4NoaMJaRZw03PIyPmp0%3D&reserved=0 https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fwww.modot.org%2Fmissouri-standard-specifications-highway-construction&data=02%7C01%7C%7Cc2bf44ff4c3c4703164508d84a9a2c4c%7Ced5b36e701ee4ebc867ee03cfa0d4697%7C0%7C0%7C637341373314208042&sdata=xOuEc37tKolh48KTcg7f5mHm4NoaMJaRZw03PIyPmp0%3D&reserved=0

1264R418R0005 - Amendment 01z
Q1

File details come from the government source that posted it. Updated .