This document is an amendment to Solicitation 12639524Q0176 for the replacement of an evaporative cooler in Phoenix. The amendment modifies the Statement of Work (SOW) to indicate that CADD drawings are not required, and hand-drawn sketches are acceptable. The key requirements outlined in the SOW include:
- The contractor shall prepare a fee proposal and schedule, conduct a site survey, comply with building codes, coordinate with local building officials, and provide cost proposals in CSI Master Format 2004.
- Prior to construction, the contractor shall submit required submittals for review and approval.
- The government agency involved is the Department of Agriculture Animal and Plant Health Inspection Service Marketing and Regulatory Programs Business Services.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| More RFIs.docx | DOCX document | |
| 12639524Q0176-0003.pdf | ||
| Requests for Information.docx | DOCX document | |
| 12639524Q0176-0001.pdf | ||
| Swamp cooler walk thu attendance 060624.pdf | ||
| Atch 1_SOW Replace Evaporative Coolers.docx | DOCX document | |
| Atch 2_Federal Construction Wage Rates_Maricopa County.pdf | ||
| 12639524Q0176.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12639524Q0176 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
APHIS-MN-126395
06/12/20240002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
USDA APHIS
250 MARQUETTE AVE
SUITE 410
MINNEAPOLIS MN 55401
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
05/23/2024
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is written to incorporate a replacement page to the Statement of Work, attachment
1. The change is to paragraph 3.3. CADD drawings are not required. Hand drawn sketches are acceptable.
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
JAMES G. ROLOFF
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
06/12/2024
Solicitation 12639524Q0176, Attachment 1, Amendment 0001
[ ] Transfer As-Built information to Record CADD drawings. Furnish Record drawings and specifications as follows:
One full size sets of prints, one half size sets of prints, and one set of ’s to
COR.
Two full size sets of prints, and thumb drive to Engineering Project Manager.
4.0 Project Requirements:
4.1 Fee Proposal and Schedule: Based upon this SOW, the Contractor shall prepare an itemized fee proposal and schedule for services required to complete the contract. A cover letter shall set forth all assumptions made in development of the fee proposal.
4.2 Field Investigation and Site Survey: The Contractor shall coordinate with the PM and inform the CO and EPM of all scheduled site investigations. Contractor shall investigate proposed construction site to ascertain project boundaries, site conditions prior to construction. Contractor shall evaluate capacity of site utility systems to support the proposed construction and any equipment installations. Contractor shall submit minutes of this site survey and the approved minutes shall be included in the project scope of work.
4.3 Compliance with Building Codes: In accordance with Public Law 100-678, Federal Agencies must comply with National Building Codes, Local Building Codes, and Zoning Ordinances. The Contractor shall comply with the appropriate statutes governing the signing and sealing of engineering reports and drawings.
4.4 Coordination with Local Building Officials: Public Law 100-678 requires Federal Agencies to offer Local Building Officials the opportunity to review projects for code conformance. The design effort must include coordination efforts with the Local Building Officials including Officials at the Airport, Military Base, etc. The federal Government will not pay for reviews but is amendable on a case-by-case basis. If the code authority declines to review the project without payment, the Contractor shall document the effort was made to coordinate with the code authority, but that they declined the offer. If the code authority chooses to review the design without payment, the Contractor shall coordinate all project submissions with the local code authorities.
4.5 Cost Proposal: Cost proposals shall be presented in CSI Master Format 2004 in sufficient detail to facilitate a review and verification of all quantities and cost assumptions.
4.6 Meeting Minutes: The Contractor shall document and distribute all project meeting minutes. The meeting minutes need only record the date, time, location, attendees, major issues discussed, and conclusions reached.
4.7 Prior to the start of construction, Contractor shall submit for review and approval submittal(s) for all proposed work including manufacturers’ catalog cut sheets for all materials. Submittals shall meet the requirements of section 6.0 “Project Submittals.”