About this file
From the source
Attachment C
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
The file's text, extracted by GovTribe without its formatting.
squaw signed cover
| SQUAW CREEK - SH2 - GEN NOTES AND QUANTITIES |
| SQUAW CREEK - SH3 - TRAFFIC CONTROL |
| SQUAW CREEK - SH4 - TYPICALS |
| SQUAW CREEK - SH5 - PLAN AND PROFILE |
| SQUAW CREEK - SH6 - PHASE 1 |
| SQUAW CREEK - SH7 - PHASE 2 |
| SQUAW CREEK - SH8 - CROSS SECTIONS |
| SQUAW CREEK - SH9 - CROSS SECTIONS |
| SQUAW CREEK - SH10 - CULVERT DETAILS |
| SQUAW CREEK - SH11 - CULVERT SECTION DETAILS |
| SQUAW CREEK - SH12 - SOIL BORING LOGS |
| COVER SHEET: | |
| TYPICAL SECTIONS: | |
| PLAN PROFILE SHEET: | |
| CULVERT DETAILS: | |
| SOIL BORING LOGS: | |
| undefined: | |
| 1: | |
| 2: | |
| undefined_2: | |
| undefined_3: | |
| RECOMMENDED BY: | |
| undefined_4: | |
| DESCRIPTION: | |
| Mobilization: | |
| LPSM: | |
| MILE: | |
| Silt Fence: | |
| LNFT: | |
| Clearing and Grubbing Disposal Method F: | |
| 20301: | |
| Removal of Pipe Culvert: | |
| EACH: | |
| 2_2: | |
| 20401: | |
| Roadway Excavation: | |
| CUYD: | |
| 47: | |
| Unclassified Borrow Compaction fvlethod 2: | |
| CUYD_2: | |
| Waste Excavation: | |
| CUYD_3: | |
| Structure Excavation: | |
| CUYD_4: | |
| Structural Backfill: | |
| CUYD_5: | |
| Dewatering: | |
| LPSM_2: | |
| Riprap Class IV: | |
| CUYD_6: | |
| Geotextile Type IV Class I: | |
| 30103: | |
| Aggregate Base Grading D Compaction Method B: | |
| CUYD_7: | |
| 100: | |
| Screened Aggregate Grading P Compaction fvlethod B: | |
| CUYD_8: | |
| Asphalt Cement Wisconsin State DOT Grade LT: | |
| TON: | |
| Steel Sheet Piles Temporary: | |
| LPSM_3: | |
| Steel Sheet Piles Leftinplace: | |
| LPSM_4: | |
| Precast Concrete Footings: | |
| EACH_2: | |
| Precast Threesided Culvert 20 span x 12 rise: | |
| LNFT_2: | |
| Granular Backfill: | |
| CUYD_9: | |
| Seeding Dry fvlethod: | |
| LPSM_5: | |
| Mulching Dry fvlethod: | |
| LPSM_6: | |
| Temporary Traffic Control: | |
| LPSM_7: | |
| Stream bed Simulation Rock Bed Class 8: | |
| CUYD_10: | |
| LOCATION: | |
| SPIKE: | |
| CP11: | |
| 72856 119 RT: | |
| 4891562600: | |
| 8594673200: | |
| 156222: | |
| SPIKE_2: | |
| CP13: | |
| 123163 169 RT: | |
| 4895276900: | |
| 859815 7900: | |
| 157750: | |
| SPIKE_3: | |
| SPIKE_4: | |
| SPIKE_5: | |
| SPIKE_6: | |
| SPIKE_7: | |
| CP19: | |
| 28594 136 LT: | |
| 4889509700: | |
| 8590715300: | |
| 156556: | |
| SPIKE_8: | |
| CP20: | |
| 0 752398 LT: | |
| 4887961000: | |
| 8589261700: | |
| 156647: | |
| DRAWING TITLE GENERAL NOTES AND QUANTITIESRow1: | |
| DATE 3302018: | |
| ARCHIVE NO: | |
| DRAWN J ALLEN: | |
| DWG SHEET NO C01: | |
| PROJECT NO U2817436: | |
| SEE SOD 1467 FOR BARRIER: | |
| SO I AX I I SO 1 1 I I I: | |
| ci: | |
| DATE 3302018_2: | |
| SQUAW CREEK: | |
| IF DRUMS ARE USED 1NIHEAO OFCONCRETE BARRIER WALL: | |
| It: | |
| J ALLEN: | |
| DWG SHEET NO C02: | |
| PROJECT NO U2817436_2: | |
| sooi FIELD LiBORA TORY TESTSRow1: | |
| WC DEN LL PL V1120: | |
| PAVEMENT: | |
| COURSE: | |
| FLLL: | |
| undefined_5: | |
| WC DEN LL PL 20: | |
| WC DEN LL PL 20Row1: | |
| waterbearing very loose to medium dense SP: | |
| GRAVEL with sand brown waterbeating loose: | |
| SOIL BORING LOGS_2: | |
| w: | |
| ss: | |
| DATE 3302018_3: | |
| ALLUVJUMEnd of boring al 315 feet: | |
| M X M X li X M li 1x I w X I w X I w X y i w X l w X r l wEnd of boring al 315 feet: | |
| WC DEN LL PL 20Row2: | |
| WC DEN LL PL 20Row2_2: | |
| WAIBR LEVEL MEASUREMENTS: | |
| ARCHIVE NO_2: | |
| 9529S RDwDMRow1: | |
| 1017llRow1: | |
| 1400Row1: | |
| lJ5Row1: | |
| 95Row1: | |
| 98Row1: | |
| NoneRow1: | |
| 1017lllmD 101711: | |
| 1400lmD 101711: | |
| lJ5lmD 101711: | |
| 95lmD 101711: | |
| 98lmD 101711: | |
| NonelmD 101711: | |
| 1017llDR MD LG NP Rio 84: | |
| 1400DR MD LG NP Rio 84: | |
| lJ5DR MD LG NP Rio 84: | |
| 95DR MD LG NP Rio 84: | |
| 98DR MD LG NP Rio 84: | |
| NoneDR MD LG NP Rio 84: | |
| GJUNTTILA: | |
| DWG SHEET NO C11: | |
| PROJECT NO U2817436_3: | |
| 2018-04-03T09:09:08-0500 |
| KARREN L BALZAR | |
| 2018-04-03T09:41:41-0500 |
| MARK BEUNING | |
| 2018-04-03T13:57:02-0500 |
| ROBERT HENNES | |
| 2018-04-10T16:29:28-0500 |
| PAUL STRONG | |
| 2018-04-18T08:35:21-0500 |
| JEFFREY DULKA | |
| 2018-04-18T08:44:47-0500 |
| JOSIAH KIM | |
File details come from the government source that posted it.