Attachment A
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment_B_-_Specifications.pdf | ||
| Attachment_C_-_Drawings-Plans.pdf | ||
| Attachment_D_-_WI_DNR_General_Permit.pdf | ||
| 12569R19B0002.pdf | ||
| Attachment_E_-_USACE_General_Permit.pdf | ||
| Attachment_F_-_Davis-Bacon_Wage_Determination.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PART I ‐ SCHEDULE OF ITEMS
SECTION B – SERVICES AND PRICES
FR 143 over Squaw Creek Culvert Replacement Park Falls Ranger District
Chequamegon‐Nicolet National Forest
Price County, Wisconsin
B‐ 1 ‐ SCHEDULE OF ITEMS
ITEM
NO.
DESCRIPTION
PAY
UNIT
EST.
QTY.
UNIT
PRICE
TOTAL
PRICE
15101
Mobilization Lump Sum 1
15201
Construction Survey and Staking, Method 1, Tolerance Mile 0.21
Class B
15702
Silt Fence Foot 1000
20101
Clearing and Grubbing, Disposal Method F Acres 0.1
20301
Removal of Pipe Culvert Each 2
20401 Roadway Excavation Cubic Yard 47 $________ $________
20404
Unclassified Borrow, Compaction Method 2 Cubic Yard 350
20415
Waste Excavation Cubic Yard 289
20801
Structure Excavation Cubic Yard 986
20803
Structural Backfill Cubic Yard 290
20805
Dewatering Lump Sum 1
25101 Riprap, Class IV Cubic Yard 30 $________ $________
25116
Geotextile, Type IV, Class 1 Square Yard 100
30103
Aggregate Base, Grading D, Compaction Method B Cubic Yard 100
30118
Screened Aggregate, Grading P, Compaction Method B
Cubic Yard 72
40312 Asphalt Cement, Wisconsin State DOT Grade LT Ton 110 $________ $________
55114 Steel Sheet Piles, Temporary Lump Sum 1 $________ $________
55115 Steel Sheet Piles, Left‐in‐Place Lump Sum 1 $________ $________
55304 Precast Concrete Footings Each 2 $________ $________
60205 Precast Three‐Sided Culvert, 20‐0 span x 12‐0 rise With Wingwalls and Headwalls, Load Rating = HL‐93
Foot 38 $________ $________
60508 Granular Backfill Cubic Yard 203 $________ $________
62503 Seeding, Dry Method Lump Sum 1 $________ $________
62509 Mulching, Dry Method Lump Sum 1 $________ $________
63501 Temporary Traffic Control Lump Sum 1 $________ $________
64804 Streambed Simulation Rock, Bed Class 8 Cubic Yard 40 $________ $________
B‐2 ‐ NOTE: Payment for bond premiums in accordance with Clause 52.232‐5, Payments under Fixed‐Price Construction
Contracts, shall not be in addition to the contract price. Include bond payments under 151.01 Mobilization.
Payment will be made on actual work performed as described in FP‐14 109.01 unless otherwise noted.
1. The Standard Specifications for Construction of Roads and Bridges on Federal Highway Project FP‐14 edition has been used for this contract. Copies of this book are available at the USFS engineering office.
Contractor Acceptance Statement: By signing the offer, the Contractor agrees to all terms, conditions, and provisions included in the solicitation and agrees to furnish any awarded items at the price set in the schedule unless otherwise excepted as follows: _______________________________________________________________.