D102.pdf
PDF 1 MB Posted
- Attached to
- Roof Replacement Federal contract opportunity
- Solicitation number
- 12505B21R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.docx | DOCX document | |
| A301.pdf | ||
| SF-30 Amendment 02.pdf | ||
| RFIs 2.pdf | ||
| A603.pdf | ||
| Site Visit Sign In Jan 12 AM.pdf | ||
| Site Visit Sign In Jan 13 AM.pdf | ||
| SF-30.pdf | ||
| RFIs.pdf | ||
| Site Visit Sign In Jan 13 PM.pdf | ||
| Wage Determination - Revised 01JAN2021.pdf | ||
| G002.pdf | ||
| Site Visit Sign In Jan 12 PM.pdf | ||
| Wage Determination.pdf | ||
| SF-1442 with Clauses and Provisions.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| As-Built Drawings.pdf | ||
| ARS-371.pdf | ||
| ARS-372.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
D E F G H J K L M N O P
6' - 8" 11' - 8" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 20' - 6" 6' - 8"
NOT IN SCOPE
NOT IN SCOPE
PROTECT
DEMOLISH EXISTING ROOF AND ASSOCIATED ITEMS SEE SHEET D301
HATCHED AREAS
INDICATED WORK NOT IN
SCOPE
D
ORDER DATE:
TASK ORDER NO.:
A
U S
DESCRIPTIONBYDATENO.
BAILEY EDWARD
DESIGN
EPM:
AOE:
DESIGNER:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
COPYRIGHT BAILEY EDWARD DESIGN 2020 - BED# 15042-20-01
DWG. NO.
SHEET OF
PEORIA IL 61604
USDA ARS MWA AAO
ACQ/PER PROP
1815 N UNIVERSITY STREET
Agricultural Research Service t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr
Suite 2800
Chicago, IL
60601-2308
©2020 Bailey Edward Design
Design Firm License No. 184-001962
BED01/27/2021004 ADDENDUM #1
/2
/2
:5 :5
A
M
C U s e rs
\j a u le r\ D o c u m e n ts \R
U
S D
A D a ir y F o ra g e
R o o f_
P
C e n tr a l_ ja u le r3
.r v t
D102
SECOND FLOOR DEMO PLAN
ROOF REPAIR DESIGN
TBD
MP TERRI GURENO
TIM GOLDEN
TBD
AG-3K15-C-10-0016
10/23/202015042-20-01
1/8" = 1'-0"
SECOND FLOOR PLAN - DEMO
0 4' 8' 16'
DEMO NOTES
8. REMOVE ALL TRASH AND DEBRIS DAILY. DEMOLITION WORK SHALL REMAIN SAVE
& CLEAN FOR THE BUILDING'S OCCUPANTS & CONSTRUCTION WORKERS.
OCCUPIED AREAS ADJACENT TO THE PROJECT WORK AREAS SHALL BE KEPT
CLEAN AT ALL TIMES DURING THE WORK.
9. IN AREAS WHERE CONTRACTOR FINDS SCOPE NOT SPECIFICALLY SCHEDULED,
REPAIR THE WALLS, ROOF, AND ASSOCIATED EDGE METALS TO MATCH EXISTING
AND ADJACENT CONSTRUCTION TO COMPLETE THE WORK, U.N.O.
10. PROVIDE TEMPORARY PROTECTION, SUPPORT, BRACING, SEALING AND
CAPPING, CEILINGS, PIPES, DUCTS, CONDUITS, ETC., SHOWN TO BE PARTIALLY
DEMOLISHED IN THIS PHASE OF WORK AS NECESSARY TO COMPLETE
CONSTRUCTION.
11. FIELD VERIFY ALL CONDITIONS PRIOR TO PROCEEDING WITH THE WORK.
12. REFER TO SHEET G001 CODE MATRIX AND ASSEMBLY TYPES FOR ADDITIONAL
DEMO INFORMATION.
13. REFER TO APPENDIX A ORIGINAL 1979 AS-BUILT DRAWINGS FOR DETAILS
REGARDING EXISTING EQUIPMENT.
14. NOT USED
15. CLEAN, PATCH TO MATCH AND MAKE FLUSH SURFACE OF EXISTING CONCRETE
AS NECESSARY FOR INSTALLATION OF AIR AND MOISTURE BARRIER. REFERENCE
WITH SECTION NOTES SHEET A601.
DEMO NOTES
1. IT IS RECOMMENDED TO VISIT THE SITE AND BECOME FAMILIAR WITH THE
EXISTING CONDITIONS PRIOR TO COMMENCING THE WORK. SEE SECTION L OF
SOLICITATION.
2. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN THE
DEMOLITION DRAWINGS AND ACTUAL CONDITIONS PRIOR TO PROCEEDING WITH
THE WORK.
3. IN AREAS DESIGNATED FOR DEMOLITION IN THE PLANS, THE DEMOLITION IS TO
INCLUDE ANCHORS, FLASHING, FASTENING DEVICES, AND ALL RELATED PARTS
U.N.O. COORDINATE ALL REMOVAL WITH EXISTING MECHANICAL, ELECTRICAL,
FIRE PROTECTION AND PLUMBING EQUIPMENT.
4. PROVIDE PROTECTION AGAINST MOISTURE, IMPACT, AND OTHER TYPES OF
DAMAGE AT ALL OPENINGS CREATED BY DEMOLITION WORK. PROTECT EXISTING
CONSTRUCTION FROM DAMAGE DURING THE DEMOLITION AND NEW WORK.
REPAIR OR REPLACE ANY DAMAGED EXISTING CONSTRUCTION AS REQUIRED AT
NO COST TO THE OWNER.
5. PROTECT EXISTING INTERIOR WALLS DURING REMOVAL AND CONSTRUCTION.
PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC., AND
CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS
CONSISTENT WITH THE SPECIFICATIONS SECTION, AND DIVISION 01, GENERAL
REQUIREMENTS.
6. REFER TO SHEET FLOOR PLANS, PROJECT MANUAL, SPECIFICATIONS DIVISION
01, AND GENERAL REQUIREMENTS, FOR RELATED PROJECT, DEMOLITION,
CONSTRUCTION AND PROTECTION REQUIREMENTS.
7. MUST OBTAIN ALL NECESSARY PERMITS, WORK ORDERS REQUIRED & SHALL
NOTIFY ALL UTILITIES HAVING SERVICE CONNECTIONS WITHIN THE SITE.
GREENHOUSE BELOW; CONTRACTOR TO PROTECT
EXISTING CONCRETE PAVERS;
CONTRACTOR TO PROTECT
DURING WORK
NOTE
CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD.
LEGEND
| Sheets |
| D102 - SECOND FLOOR DEMO PLAN |