D102.pdf

PDF 1 MB Posted

Attached to
Roof Replacement Federal contract opportunity
Solicitation number
12505B21R0001
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Midwest Area

View the file

Other files for this federal contract opportunity

Other files attached to Roof Replacement, newest first.
File Type Posted
Past Performance Questionnaire.docx DOCX document
A301.pdf PDF
SF-30 Amendment 02.pdf PDF
RFIs 2.pdf PDF
A603.pdf PDF
Site Visit Sign In Jan 12 AM.pdf PDF
Site Visit Sign In Jan 13 AM.pdf PDF
SF-30.pdf PDF
RFIs.pdf PDF
Site Visit Sign In Jan 13 PM.pdf PDF
Wage Determination - Revised 01JAN2021.pdf PDF
G002.pdf PDF
Site Visit Sign In Jan 12 PM.pdf PDF
Wage Determination.pdf PDF
SF-1442 with Clauses and Provisions.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
As-Built Drawings.pdf PDF
ARS-371.pdf PDF
ARS-372.pdf PDF
Show all 20

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D E F G H J K L M N O P

6' - 8" 11' - 8" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 30' - 0" 20' - 6" 6' - 8"

NOT IN SCOPE

NOT IN SCOPE

PROTECT

DEMOLISH EXISTING ROOF AND ASSOCIATED ITEMS SEE SHEET D301

HATCHED AREAS

INDICATED WORK NOT IN

SCOPE

D

ORDER DATE:

TASK ORDER NO.:

A

U S

DESCRIPTIONBYDATENO.

BAILEY EDWARD

DESIGN

EPM:

AOE:

DESIGNER:

BED PROJECT NO.:

CHECKED BY:

PROJECT MANAGER:

REAL PROPERTY:

SAFETY & HEALTH:

USDA

COPYRIGHT BAILEY EDWARD DESIGN 2020 - BED# 15042-20-01

DWG. NO.

SHEET OF

PEORIA IL 61604

USDA ARS MWA AAO

ACQ/PER PROP

1815 N UNIVERSITY STREET

Agricultural Research Service t 312.440.2300 f 312.440.2303 www.baileyedward.com

35 East Wacker Dr

Suite 2800

Chicago, IL

60601-2308

©2020 Bailey Edward Design

Design Firm License No. 184-001962

BED01/27/2021004 ADDENDUM #1

/2

/2

:5 :5

A

M

C U s e rs

\j a u le r\ D o c u m e n ts \R

U

S D

A D a ir y F o ra g e

R o o f_

P

C e n tr a l_ ja u le r3

.r v t

D102

SECOND FLOOR DEMO PLAN

ROOF REPAIR DESIGN

TBD

MP TERRI GURENO

TIM GOLDEN

TBD

AG-3K15-C-10-0016

10/23/202015042-20-01

1/8" = 1'-0"

SECOND FLOOR PLAN - DEMO

0 4' 8' 16'

DEMO NOTES

8. REMOVE ALL TRASH AND DEBRIS DAILY. DEMOLITION WORK SHALL REMAIN SAVE

& CLEAN FOR THE BUILDING'S OCCUPANTS & CONSTRUCTION WORKERS.

OCCUPIED AREAS ADJACENT TO THE PROJECT WORK AREAS SHALL BE KEPT

CLEAN AT ALL TIMES DURING THE WORK.

9. IN AREAS WHERE CONTRACTOR FINDS SCOPE NOT SPECIFICALLY SCHEDULED,

REPAIR THE WALLS, ROOF, AND ASSOCIATED EDGE METALS TO MATCH EXISTING

AND ADJACENT CONSTRUCTION TO COMPLETE THE WORK, U.N.O.

10. PROVIDE TEMPORARY PROTECTION, SUPPORT, BRACING, SEALING AND

CAPPING, CEILINGS, PIPES, DUCTS, CONDUITS, ETC., SHOWN TO BE PARTIALLY

DEMOLISHED IN THIS PHASE OF WORK AS NECESSARY TO COMPLETE

CONSTRUCTION.

11. FIELD VERIFY ALL CONDITIONS PRIOR TO PROCEEDING WITH THE WORK.

12. REFER TO SHEET G001 CODE MATRIX AND ASSEMBLY TYPES FOR ADDITIONAL

DEMO INFORMATION.

13. REFER TO APPENDIX A ORIGINAL 1979 AS-BUILT DRAWINGS FOR DETAILS

REGARDING EXISTING EQUIPMENT.

14. NOT USED

15. CLEAN, PATCH TO MATCH AND MAKE FLUSH SURFACE OF EXISTING CONCRETE

AS NECESSARY FOR INSTALLATION OF AIR AND MOISTURE BARRIER. REFERENCE

WITH SECTION NOTES SHEET A601.

DEMO NOTES

1. IT IS RECOMMENDED TO VISIT THE SITE AND BECOME FAMILIAR WITH THE

EXISTING CONDITIONS PRIOR TO COMMENCING THE WORK. SEE SECTION L OF

SOLICITATION.

2. NOTIFY THE CONTRACTING OFFICER OF DISCREPANCIES BETWEEN THE

DEMOLITION DRAWINGS AND ACTUAL CONDITIONS PRIOR TO PROCEEDING WITH

THE WORK.

3. IN AREAS DESIGNATED FOR DEMOLITION IN THE PLANS, THE DEMOLITION IS TO

INCLUDE ANCHORS, FLASHING, FASTENING DEVICES, AND ALL RELATED PARTS

U.N.O. COORDINATE ALL REMOVAL WITH EXISTING MECHANICAL, ELECTRICAL,

FIRE PROTECTION AND PLUMBING EQUIPMENT.

4. PROVIDE PROTECTION AGAINST MOISTURE, IMPACT, AND OTHER TYPES OF

DAMAGE AT ALL OPENINGS CREATED BY DEMOLITION WORK. PROTECT EXISTING

CONSTRUCTION FROM DAMAGE DURING THE DEMOLITION AND NEW WORK.

REPAIR OR REPLACE ANY DAMAGED EXISTING CONSTRUCTION AS REQUIRED AT

NO COST TO THE OWNER.

5. PROTECT EXISTING INTERIOR WALLS DURING REMOVAL AND CONSTRUCTION.

PROVIDE TEMPORARY PROTECTION FROM DUST, NOISE, DAMAGE, ETC., AND

CONSTRUCTION BARRIERS AND OTHER SITE PROTECTION REQUIREMENTS

CONSISTENT WITH THE SPECIFICATIONS SECTION, AND DIVISION 01, GENERAL

REQUIREMENTS.

6. REFER TO SHEET FLOOR PLANS, PROJECT MANUAL, SPECIFICATIONS DIVISION

01, AND GENERAL REQUIREMENTS, FOR RELATED PROJECT, DEMOLITION,

CONSTRUCTION AND PROTECTION REQUIREMENTS.

7. MUST OBTAIN ALL NECESSARY PERMITS, WORK ORDERS REQUIRED & SHALL

NOTIFY ALL UTILITIES HAVING SERVICE CONNECTIONS WITHIN THE SITE.

GREENHOUSE BELOW; CONTRACTOR TO PROTECT

EXISTING CONCRETE PAVERS;

CONTRACTOR TO PROTECT

DURING WORK

NOTE

CONTRACTOR TO VERIFY ALL DIMENSIONS IN FIELD.

LEGEND

Sheets
D102 - SECOND FLOOR DEMO PLAN

File details come from the government source that posted it. Updated .