A603.pdf
PDF 579 KB Posted
- Attached to
- Roof Replacement Federal contract opportunity
- Solicitation number
- 12505B21R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.docx | DOCX document | |
| SF-30 Amendment 02.pdf | ||
| RFIs 2.pdf | ||
| A301.pdf | ||
| Site Visit Sign In Jan 12 PM.pdf | ||
| D102.pdf | ||
| G002.pdf | ||
| SF-30.pdf | ||
| RFIs.pdf | ||
| Site Visit Sign In Jan 13 PM.pdf | ||
| Wage Determination - Revised 01JAN2021.pdf | ||
| Site Visit Sign In Jan 12 AM.pdf | ||
| Site Visit Sign In Jan 13 AM.pdf | ||
| Drawings.pdf | ||
| As-Built Drawings.pdf | ||
| ARS-371.pdf | ||
| ARS-372.pdf | ||
| SF-1442 with Clauses and Provisions.pdf | ||
| Specifications.pdf | ||
| Wage Determination.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1st Floor 0' - 0"
2nd Floor 12' - 0"
EXISTING HEADHOUSE AREA -
NOT IN SCOPE
R-1
EX SLOPED CONCRETE DECK.
VERIFY SLOPE IN FIELD
NEW COUNTERFLASHING
WITH THRU-WALL FLASHING;
SEE SPEC 07 71 00
REMOVE BRICK AS NEEDED,
CLEAN, SALVAGE, AND
REINSTALL; SEE SPEC 04 20 00
NEW COPING; SEE
SPEC 07 71 00
PROVIDE MULTIPLE LAYERS CONT.
WOOD BLOCKING NECESSARY TO
MAKE T/COPING MIN. 3'-6" ABOVE
ROOF. STAGGER ALL JOINTS WITH
TOP LAYER OF BLOCKING LEAVING
APPROX. 3/8" GAP BETWEEN
BLOCKING JOINTS. FASTEN
BLOCKING WITH HOT-DIPPED
GALVANIZED FASTENERS
EXISTING RAILING BEYOND
EXISTING METAL COPING
PROVIDE CELL VENTS
EVERY 24" PER SPEC
04 20 00
VAPOR BARRIER TO
TURN UP AT THE WALLS.
SEE SPEC 07 53 23 FOR
VAPOR BARRIER
TESTING
ANCHOR WOOD BLOCKING INTO
EXIST. BOND BEAM WITH EXPANSION
ANCHOR. REMOVE LOOSE GROUT IN
BOND BEAM AND MORTAR. PATCH
BOND BEAM GROUT AND MASONRY
JOINTS AS NECESSARY. VERIFY THAT
EXPANSION ANCHOR IS FULLY
SECURED IN FULL-STRENGTH
SUBSTRATE
R O
O F
IN
G
H .P
T
O T
/C O
P
IN
G
M
IN
2nd Floor 12' - 0"
1st Floor Roof 11' - 0"
EXISTING METAL COPING
NEW COUNTERFLASHING
WITH THRU-WALL FLASHING;
SEE SPEC 07 71 00
R-1
EXISTING RAILING
PROVIDE CELL VENTS EVERY 24"
PER SPEC 04 20 00
VAPOR BARRIER TO TURN UP AT
THE WALLS. SEE SPEC 07 53 23
FOR VAPOR BARRIER TESTING
1st Floor 0' - 0"
2nd Floor 12' - 0"
1st Floor Roof 11' - 0"
NEW COPING; SEE
SPEC 07 71 00
R-1
PROVIDE MULTIPLE LAYERS CONT.
WOOD BLOCKING NECESSARY TO
MAKE T/COPING MIN. 3'-6" ABOVE
ROOF. STAGGER ALL JOINTS WITH
TOP LAYER OF BLOCKING LEAVING
APPROX. 3/8" GAP BETWEEN
BLOCKING JOINTS. FASTEN
BLOCKING WITH HOT-DIPPED
GALVANIZED FASTENERS
NEW
COUNTERFLASHING
WITH THRU-WALL
FLASHING; SEE SPEC
07 71 00
R O
O F
IN
G
H .P
T
O T
/C O
P
IN
G
M
IN
REMOVE BRICK AS
NEEDED, CLEAN,
SALVAGE, AND
REINSTALL; SEE SPEC
04 20 00
PROVIDE CELL
VENTS EVERY 24"
PER SPEC 04 20 00
VAPOR BARRIER TO
TURN UP AT THE WALLS.
SEE SPEC 07 53 23 FOR
VAPOR BARRIER
TESTING
ANCHOR WOOD BLOCKING INTO
EXIST. BOND BEAM WITH EXPANSION
ANCHOR. REMOVE LOOSE GROUT IN
BOND BEAM AND MORTAR. PATCH
BOND BEAM GROUT AND MASONRY
JOINTS AS NECESSARY. VERIFY THAT
EXPANSION ANCHOR IS FULLY
SECURED IN FULL-STRENGTH
SUBSTRATE
A603
1st Floor 0' - 0"
1st Floor Roof 11' - 0"
NEW COPING; SEE SPEC 07 71 00
NEW EXTENSION LEG OF
COUNTERFLASHING UNLESS
NOTED OTHERWISE; SEE
SPEC 07 71 00
R-1
PROVIDE MULTIPLE LAYERS
CONT. WOOD BLOCKING
NECESSARY TO MAKE T/COPING
MIN. 3'-6" ABOVE ROOF. STAGGER
ALL JOINTS WITH TOP LAYER OF
BLOCKING LEAVING APPROX. 3/8"
GAP BETWEEN BLOCKING JOINTS.
FASTEN BLOCKING WITH HOT-
DIPPED GALVANIZED FASTENERS
NEW COUNTERFLASHING
WITH THRU-WALL FLASHING;
SEE SPEC 07 71 00
R O
O F
IN
G
H .P
T
O T
/C O
P
IN
G
M
IN
NEW COPING; SEE SPEC 07 71 00
REMOVE BRICK AS NEEDED,
CLEAN, SALVAGE, AND
REINSTALL; SEE SPEC 04 20 00
PROVIDE CELL VENTS EVERY 24"
PER SPEC 04 20 00
VAPOR BARRIER TO TURN UP AT
THE WALLS. SEE SPEC 07 53 23
FOR VAPOR BARRIER TESTING
ANCHOR WOOD BLOCKING INTO
EXIST. BOND BEAM WITH EXPANSION
ANCHOR. REMOVE LOOSE GROUT IN
BOND BEAM AND MORTAR. PATCH
BOND BEAM GROUT AND MASONRY
JOINTS AS NECESSARY. VERIFY
THAT EXPANSION ANCHOR IS FULLY
SECURED IN FULL-STRENGTH
SUBSTRATE
STAINLESS STEEL CLAMP
RUBBER BOOT
ALUMINUM SPUN BASE
TOP VIEW
GASKET
SS LINER
HEAVY GAUGE GALV. STEEL
0' - 1 1/2"
WOOD NAILER
3# DENSITY RIGID INSULATION
CONTINUOUS ALUMINUM CAP
OVER ENTIRE CURB ASSEMBLY
INTERNALLY REINFORCED AND
STIFFENED AS REQ'D
RUN ROOFING UP AND
OVER CONTINUOUSLY
FILL VOID WITH RIGID
INSULATION
CURB SHALL BE
FOUR-SIDED AND
OFFSET THE SIZE OF
THE ROOF TOP
EQUIPMENT BY MIN. 1"
ANCHOR ALL SIDES TO EXISTING
DECK AS REQ'D
SPECIFIED NEW ROOFING
SYSTEM, FLASH UP CURB
EXIST. ROOFTOP MECH. UNIT TO
BE REINSTALLED AND
ANCHORED ON NEW CURB. VIF
EXIST. UNIT DIMS FOR CURB
SIZING AT EA. UNIT, TYPICAL
EXISTING PARAPET
WALL CONSTRUCTION
EXISTING RAILING
EXISTING METAL
COPING
NEW METAL COPING WITH
END DAM. SEE SPEC 07 71 00
PROVIDE MULTIPLE LAYERS
CONT. WOOD BLOCKING
NECESSARY TO MAKE T/COPING
MIN. 3'-6" ABOVE ROOF. STAGGER
ALL JOINTS WITH TOP LAYER OF
BLOCKING LEAVING APPROX. 3/8"
GAP BETWEEN BLOCKING
JOINTS. FASTEN BLOCKING WITH
HOT-GALVANIZED FASTENERS
3'-6" T/COPING
ABOVE ROOF H.P.
3'-3" (E)
ABOVE ROOF
H.P.
CLEAT PER METAL
COPING MANUFACTURER
(2) LAYERS OF BACK
BED SEALANT AND
BACKER ROD
MECHANICAL FASTENERS
WITH SILICONE WASHERS
SEALANT AND BACKER ROD
MIN.
0' - 2"
0' - 4"
PLYWOOD
STAGGER
JOINTS
D
ORDER DATE:
TASK ORDER NO.:
A
U S
DESCRIPTIONBYDATENO.
BAILEY EDWARD
DESIGN
EPM:
AOE:
DESIGNER:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
COPYRIGHT BAILEY EDWARD DESIGN 2020 - BED# 15042-20-01
DWG. NO.
SHEET OF
PEORIA IL 61604
USDA ARS MWA AAO
ACQ/PER PROP
1815 N UNIVERSITY STREET
Agricultural Research Service t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr
Suite 2800
Chicago, IL
60601-2308
©2020 Bailey Edward Design
Design Firm License No. 184-001962
BED01/27/2021004 ADDENDUM #1
/4
/2
:2
:3
P
M
C U s e rs
\j a u le r\ D o c u m e n ts \R
U
S D
A D a ir y F o ra g e
R o o f_
P
C e n tr a l_ ja u le r3
.r v t
A603
WALL SECTIONS
ROOF REPAIR DESIGN
TBD
MP
RD
TERRI GURENO
TIM GOLDEN
TBD
GW/MP AG-3K15-C-10-0016
10/23/202015042-20-01
1/2" = 1'-0"
WALL SECTION - SOUTH WALL @ HEADHOUSE AISLE ROOF
0 1' 2' 4' 0 6" 1'1 1/2" = 1'-0"
SLOPED PARAPET WALL SECTION
1/2" = 1'-0"
WALL SECTION @ HEADHOUSE AISLE ROOF
1/2" = 1'-0"
WALL SECTION @ EAST TRASH & HEAD HOUSE AISLE
0 1' 2' 4' 0 1' 2' 4'
WALL SECTION NOTES
1. VERIFY ALL DIMENSIONS IN FIELD PRIOR TO COMMENCING
THE WORK.
2. ONE (1) BRICK COURSE EQUALS APPROXIMATELY FOUR (4)
VERTICAL INCHES.
3. CLEAN, PATCH TO MATCH AND MAKE FLUSH TO PREPARE
SURFACE OF EXISTING CONCRETEAS NECESSARY FOR
INSTALLATION OF AIR AND MOISTURE BARRIER.
5. EXISTING STRUCTURAL STEEL, SHELF ANGLES, AND LINTELS
TO REMAIN. REMOVE RUST, CLEAN, PRIME, AND PAINT WITH
ZINC-RICH PRIMER, STEEL CONNECTIONS TYPICAL.
NOT TO SCALE
PIPE PENETRATION DETAIL
3" = 1'-0"
ROOF CURB DETAIL (TYP.)
0 3" 6"
3" = 1'-0"
COPING TRANSITION DETAIL
0 3" 6"
1 1/2" = 1'-0"
WOOD BLOCKING
| Sheets |
| A603 - WALL SECTIONS |
File details come from the government source that posted it. Updated .