A301.pdf
PDF 343 KB Posted
- Attached to
- Roof Replacement Federal contract opportunity
- Solicitation number
- 12505B21R0001
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Past Performance Questionnaire.docx | DOCX document | |
| SF-30 Amendment 02.pdf | ||
| RFIs 2.pdf | ||
| A603.pdf | ||
| Site Visit Sign In Jan 12 AM.pdf | ||
| Site Visit Sign In Jan 13 AM.pdf | ||
| SF-30.pdf | ||
| RFIs.pdf | ||
| Site Visit Sign In Jan 13 PM.pdf | ||
| Wage Determination - Revised 01JAN2021.pdf | ||
| D102.pdf | ||
| G002.pdf | ||
| Site Visit Sign In Jan 12 PM.pdf | ||
| Wage Determination.pdf | ||
| SF-1442 with Clauses and Provisions.pdf | ||
| Specifications.pdf | ||
| Drawings.pdf | ||
| As-Built Drawings.pdf | ||
| ARS-371.pdf | ||
| ARS-372.pdf |
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
K L M N O P
/2 A301
/2 A301/3 A301
/3 A301
M A
T C
H L
IN
E
M A
T C
H L
IN
E
R1
R1R1R1
155' - 5"
59' - 0"
96' - 5" 59' - 0"
1' - 1" 28' - 11" 30' - 0" 30' - 0" 7' - 6" 13' - 0" 6' - 8" 39' - 4"
155' - 4 1/2"
/8
/8
/4
A603
A603
A60301.01
A603
A603
O P
/3 A301
M A
T C
H L
IN
E
/3 A301
M A
T C
H L
IN
E
R1
A603
A603
22.01
07.01
22.01
05.0105.02
05.01
05.01
05.02
05.02
/4
07.01
07.01
ROOF SLOPE AT
MEMBRANE SHALL
BE 1/4" PER FT1/4" PER FT (TYP.)
/4
P
E R
F T
(T
Y P
4'X4' SUMP SHALL BE
1/2" PER FT SLOPE
/4
P
E R
P
ROOF SLOPE AT
MEMBRANE SHALL
BE 1/4" PER FT1/4" PER FT (TYP.)
/4
P
E R
P
4'X4' SUMP SHALL BE
1/2" PER FT SLOPE
/4
P
E R
P
WALKWAY PADS,
TYP.
04.0104.01
04.01
K L M N /2 A301
M A
T C
H L
IN
E
/2 A301
M A
T C
H L
IN
E
R1 R1 R1
A603
23.01 23.01 23.01
07.0105.01 05.02
22.01 22.01
07.02
ROOF SLOPE AT
MEMBRANE SHALL
BE 1/4" PER FT1/4" PER FT (TYP.)
ROOF SLOPE AT
MEMBRANE SHALL
BE 1/4" PER FT
1/4" PER FT
(TYP.)
4'X4' SUMP SHALL BE
1/2" PER FT SLOPE
4'X4' SUMP SHALL BE
1/2" PER FT SLOPE
(E)CU-3
36" X 36"
(E)CU-2
42-1/2" X 30-1/4"
(E)CU-2
43-1/2" X 30-1/2"
A603
A603
A603
WALKWAY PADS,
TYP.
04.0104.01
D
ORDER DATE:
TASK ORDER NO.:
A
U S
DESCRIPTIONBYDATENO.
BAILEY EDWARD
DESIGN
EPM:
AOE:
DESIGNER:
BED PROJECT NO.:
CHECKED BY:
PROJECT MANAGER:
REAL PROPERTY:
SAFETY & HEALTH:
USDA
COPYRIGHT BAILEY EDWARD DESIGN 2020 - BED# 15042-20-01
DWG. NO.
SHEET OF
PEORIA IL 61604
USDA ARS MWA AAO
ACQ/PER PROP
1815 N UNIVERSITY STREET
Agricultural Research Service t 312.440.2300 f 312.440.2303 www.baileyedward.com
35 East Wacker Dr
Suite 2800
Chicago, IL
60601-2308
©2020 Bailey Edward Design
Design Firm License No. 184-001962
BED01/27/2021004 ADDENDUM #1
/4
/2
:2
:0
P
M
C U s e rs
\j a u le r\ D o c u m e n ts \R
U
S D
A D a ir y F o ra g e
R o o f_
P
C e n tr a l_ ja u le r3
.r v t
A301
ENLARGED ROOF PLAN
ROOF REPAIR DESIGN
TBD
MP
Designer
TERRI GURENO
TIM GOLDEN
TBD
Checker AG-3K15-C-10-0016
10/23/202015042-20-01
1/8" = 1'-0"
AREA PLAN - ROOF SCOPE OF WORK
1/4" = 1'-0"
AREA PLAN - ROOF SCOPE OF WORK - EAST
1/4" = 1'-0"
AREA PLAN - ROOF SCOPE OF WORK - WEST
NEW WORK KEYNOTES
01.01 EXISTING GREENHOUSES TO BE PROTECTED, TYP.
04.01 PROVIDE NEW CELL VENTS EVERY 24" AT BOTTOM OF PARAPET
WALL ABOVE FLASHING. SEE SPEC 04 20 00. SEE ALSO SHEET A603
FOR DETAILS.
05.01 PROVIDE BLOCKING AND COPING AT TOP OF EXISTING PARAPET TO
BE A MINIMUM OF 42" ABOVE ROOF HIGH POINT. SEE DETAIL
DRAWINGS SHEET A603.
05.02 NOT USED
07.01 PROVIDE NEW 2-PART FLASHING INCLUDING THROUGH-WALL
FLASHING AND EXTENSION PIECE. GRIND OUT REGLET AND PROVIDE
NEW MORTAR TO MATCH EXISTING.
07.02 PROVIDE NEW SEALANT ALONG INTERIOR BUILDING WALL.
22.01 PROVIDE NEW ROOF DRAIN STRAINER AND COLLAR.
23.01 REINSTALL EXISTING MECHANICAL EQUIPMENT AND ANY/ALL
ASSOCIATED CONNECTIONS. PROVIDE HOUSEKEEPING PAD ON
STEEL RAILS 18" ABOVE DECK. PROVIDE NEW INSULATED ROOF
CURB, FIELD VERIFY UNIT SIZE AND ORDER CURB SIZE
ACCORDINGLY TO ACCOMMODATE THE SIZE OF EACH OF THE UNITS.
| Sheets |
| A301 - ENLARGED ROOF PLAN |
File details come from the government source that posted it. Updated .