SF30 AMENDMENT 0002 SOLICITATION 12405B23R0016.pdf
PDF 143 KB Posted
- Attached to
- Replace Photo Period Building Federal contract opportunity
- Solicitation number
- 12405B23R0016
About this file
This document provides an amendment to a solicitation seeking a contractor to replace an existing photo period building. The amendment answers questions submitted by interested contractors regarding project requirements. The United States Department of Agriculture Agricultural Research Service Southeast Area Sugarcane Field Station is seeking a contractor to demolish an existing fire damaged photo period building and construct a new building of the same footprint, with the exception of moving the locker/breakroom and adding a drying shed. Interested contractors are encouraged to visit the site for project details. Questions must be submitted by July 17th and responses will be provided in an amendment. Proposals must be received by July 24th and should include detailed cost proposals in unlocked Excel format. The selected contractor will perform the work as specified in the statement of work while meeting all applicable codes.
View the file
Other files for this federal contract opportunity
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12405B23R0016 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
ARS-12405B
STONEVILLE MS 38776
141 EXPERIMENT STATION ROAD
USDA ARS SEA AAO ACQ/PER PROP
12405B23R001607/13/20230002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
06/06/2023
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0002 issued to provide answers to questions submitted by interested contractors
Q3. Should the design and proposal reflect installing an elevator to the second floor?
A3. An elevator is not required as there was not one present in the current structure.
Q4 Is fire protection required for the new building?. If so, is there an adequate water source available to the site ?
A4. Existing structure did not have a Fire Suppression or sprinkler system.
Q5. Are the existing slab on grade and footing to remain and the new building to be erected directly on top or would the slab and footings be demolished, and new ones poured?
A5. Existing Slab remains.
Continued ...
15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12405B23R0016/0002
Q6. Need as-builts of the existing building, as well as hazardous material assessment reports.
A6. There are no existing drawings of the existing building. There are no hazardous material assessment reports available to my knowledge.
Q7. Please provide building exterior pictures and dimensions (Length, width height).
A7. Detailed pictures of the building before the fire are not available in my files. Location will provide measurements and any pictures of original building they may have.
Q8. Technical Specifications for the new building (Materials, systems and finishes).
A8. Basic requirements are stated in Statement of Work (SOW). Potential Contractors will provide their design for evaluation for the replacement building in their proposal.
Q9. Opening quantity and dimensions (OH doors, man-doors, windows, louvers).
A9. Site will provide dimensions as best as possible.
Q10. Interior (partitions, finishes, etc.) specs and details.
A10. Site will provide desired finishes for break/washroom and locker requirements.
Q11. MEP systems, including Fore sprinklers if any.
A11. SOW includes the requirements for building systems including the inclusion of a fire protection system. The building must meet all codes before design is accepted and constructed.
Q12. Any temporary requirements like storage, power generation etc. needed for the duration of the project.
A12. Contractor is responsible for providing their own equipment and materials storage in a spot to be designated by the Lab. Government can provide a limited amount of electrical power.
Replace Photo Period Building
Period of Performance: 07/31/2023 to 04/26/2024
Construction Wage Rate Requirements Statute is
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12405B23R0016/0002 hereby incorporated into this contract.
FAR clauses for construction services apply to this contract.
FAR clause 52.232-18. Availability of funds.
Information concerning the REE policies and procedures regarding the definitization of equitable adjustments for change orders under construction contracts and the time required for definitization of those actions per 15 U.S.C. 644 is available at https://www.ars.usda.gov/afm/apd/acquisitions/.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .