Questions for 12405B22Q0095

1. Item (6) in statement of Work-Extend hot water supply to new sink. There are two sinks currently at the lab. Is the sink location proposed to be altered?

There are currently 4 sinks in the work room. The sink location will be altered. See the attached Loc Scientific cabinet diagram.

2. Item (8) modify water & electrical to suit new casework. Is new casement different than existing layout?

The new casement/cabinetry will be different than existing layout. See the attached Loc Scientific cabinet diagram.

3.Item (13) New epoxy flooring only required for Lab portion (22.7'x17.9') and not for adjacent mill area The new epoxy flooring is only required for the Work Room/Lab portion of the building. HOWEVER, at the door that allows passage from the Work Room/Lab to the mill room, the epoxy flooring will need to taper from the epoxy flooring in Work Room/Lab to the concrete floor in the mill room.