J2 Statement of Work - REVISED.pdf

PDF 82 KB Posted

Attached to
76 Bridge Replacement Federal contract opportunity
Solicitation number
12343420Q0012
Issued by
Department of Agriculture Forest Service R9-Eastern Region

View the file

Other files for this federal contract opportunity

Other files attached to 76 Bridge Replacement, newest first.
File Type Posted
J10 SignInSheetNForkBridgePreBid.pdf PDF
J8 76-21.60_NFrkCranberryRiver_Plans.pdf PDF
J9 ErectionNorthForkimages.jpg JPG image
J7 NorthForkPrebidQestions.pdf PDF
J5 Wage Determination WV20200020.pdf PDF
J1 Specification Statement.pdf PDF
RFQ_12343420Q0012_061620 sk.pdf PDF
J3 PLANS.pdf PDF
J2 Statement of Work.pdf PDF
J6 Site Visit Location Map North.kmz.jpg JPG image
J4 Schedule of Items.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FR 76 CRANBERRY RIVER- NORTH FORK BRIDGE REPLACEMENT

1. This solicitation is to provide construction services for furnishing and installing a replacement bridge for FR 76 Cranberry River- North Fork Bridge crossing. The work shall include, but not be limited to, construction survey and staking, clearing and grubbing, excavation, removal of existing structures, installation of replacement bridge on the existing abutment, and aggregate.

2. The contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Specifications. See contract drawings for general layout and details for each culvert replacement.

3. Prior to beginning construction, the Contractor is responsible for identifying appropriate commercial sources of material except where a specific source for a particular material is identified in the Contract, Contract Plans, or by the CO.

4. During the construction, the Contractor shall preserve and protect all vegetation (such as trees, shrubs, and grass) on or adjacent to the work site not found within the clearing limits, which are not to be removed and which do not unreasonably interfere with the work required under this contract. Operations shall be scheduled and conducted to minimize erosion of soils and to prevent silting and muddying of streams, rivers, irrigation systems, and impoundments (lakes, reservoirs, etc.)

5. Contractor shall also remove all sediment and erosion control features upon approval of permanent turf establishment.