About this file
This document contains an amendment to a solicitation for the modernization of the George Washington Carver Center located in Beltsville, Maryland. The solicitation is seeking a firm fixed-price construction contract awarded after evaluation of proposals on factors including prior construction experience, bonding capacity, project schedules, key personnel qualifications, small business participation plans, past performance references, and pricing. The amendment provides responses to offeror questions clarifying that a minimum of three and maximum of twenty pages may be used to demonstrate relevant prior experience, and that pictures and graphics are permitted within the prior experience response but count towards the page limit. The period of performance for the awarded contract is scheduled from June 2020 to May 2022. The contracting office is located within the Department of Agriculture.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| GWCC Modernization RFP.pdf | ||
| PAST PERFORMANCE QUESTIONNAIRE (PPQ).docx | DOCX document | |
| Factor 2 Prior Experience Form.docx | DOCX document | |
| GWCC Modernization DRAFT RFP updated 3-5-2020.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12314420B0001 x x copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Washington DC 20024-3243
DASO-OCP-POD-AMB-DC
10th Floor, Suite 10-149A 355 E Street S.W.
Acquisition Management Branch-WDC USDA, DM/OCP/POD/AMB, POD Acq Mgmt
03/05/20200001
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
03/05/2020
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
12314420B0001 Amendment 001
Solicitation for The George Washington Carver Center (GWCC) Modernization Construction.
This amendment address the following questions:
1. Regarding the Phase Proposal Submission, Factor 2, Prior Experience we understand that similar projects have to be completed within the past 7 years, and there is an overall page limit for Factor 2 of 20 pages. Is there a minimum and/or maximum number of projects offerors are required to submit?
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
TODD LENNOX
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12314420B0001/0001
The offeror should submit a sufficient amount of prior experience to show they are capable of completing a project of this size and complexity.
2. We understand that we are to use Attachment 2 to fill out our project information. Are offerors permitted to amend this form in any way?
Offerors shall not change the format or text of the form. If an offeror needs additional space in a particular area of the form they can expand it, please keep in mind there is a 20 page limit.
3. Can offerors add additional pages to
Attachment 2 to describe the scope of the project and its relevancy to the GWCC requirement?
Please see previous response for answer.
4. Can offerors add pictures and/or graphics to
Attachment 2?
Offerors can provide picture and/or graphics in their Prior Experience form. Please note that the pages used for graphics and pictures count towards the 20 page limit.
5. Will there be a pre-bid meeting scheduled for this solicitation?
There will not be a pre-bid meeting, but there will be a site visit. The date, time, and entrance location of the site visit will be provided in a later amendment after phase one is complete.
6. Is there a difference between Prior Experience and Past Performance?
There is a difference between Prior Experience and Past Performance. An attachment for both has been provided. Please note for phase one only
Prior Experience and Bond Capacity are to be submitted.
Period of Performance: 06/15/2020 to 05/02/2022
Contracting Officer: Todd Lennox
Todd.Lennox@usda.gov
Continued ...
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
3 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12314420B0001/0001
Contracting Specialist: Frederick Freeman
Frederick.Freeman@usda.gov
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .