Questions Answers.docx

DOCX document 12 KB Posted

Attached to
Cooling Cell Replacement Federal contract opportunity
Solicitation number
12305B21R0005
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

About this file

This document includes a federal contract opportunity solicitation and related questions and answers. The United States Department of Agriculture Agricultural Research Service is soliciting proposals for a firm-fixed price order to replace an existing cooling cell system and conduct additional work at the Appalachian Fruit Research Station in Kearneysville, West Virginia. The total small business set-aside contract has a magnitude between $250,000 and $500,000, requires bonds, and has a period of performance of 180 days from notice to proceed. Questions regarding solicitation number 12305B21R0005 must be submitted by January 25, 2021, with answers posted as amendments. The solicitation incorporates FAR provisions and clauses and requires the use of biobased products.

View the file

Other files for this federal contract opportunity

Other files attached to Cooling Cell Replacement, newest first.
File Type Posted
Questions Answers 2.docx DOCX document
SOW Cooling Cell Replacement 12-17-2020 AFRS Kearneysville WV.docx DOCX document
12305B21R0005.pdf PDF
Attachment 2 Photographs.pdf PDF
Attachment 5 Contractor COVID Approval Procedure.pdf PDF
Attachment 1 Original Drawings.pdf PDF
Attachment 6 Sample COVID Safety Plan.pdf PDF
Attachment 4 Specificatons Cooling Cell Replacement.pdf PDF
ARS371.pdf PDF
Attachment 3 Material Submittal Log.pdf PDF
ARS372.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Question - The RO SOW states: "9. e. The maximum water consumption is estimated to be 12 gal/sf/of media/day" For all 10 evaporative pads (media), the cited total area is 882 sf x 12 equals 10,584 gal/day.

Is it the intent that the RO should have design "output" capacity of 120% of 10,584 gal/day?

Answer - The maximum water consumption of 12 gal/sf/of media/day is to be used to estimate the total amount of water that must be handled by the system each day. The amount of make-up water required due to evaporation would be between 1 to 2 gallons/sf/of media/day. This information is for estimating purposes. Prior to the start of any construction the Contractor shall engage the services of a Licensed Professional Engineer to design a functional R/O demineralized water plant and distribution systems.