This document is an amendment to a solicitation for the Hell Canyon Dam Boat Launch project. The amendment provides additional details on the project including an attendee list from an on-site pre-bid meeting, and responses to contractor questions. The project involves repairs to the boat launching facility including relocation of the dock slide mechanism, demolition and removal of steel materials, and placement of riprap and grout. The riprap stockpile is located approximately 1.4 miles upstream from Hell Canyon Dam. Camping may be allowed for crews on an adjacent Forest Service property with approval. Work hours are limited to Monday through Friday from 5:30 a.m. to 7 p.m. unless otherwise approved. Cutting and grinding will require a waiver and adherence to specified fire safety conditions. The Forest Service will coordinate power shut-offs as needed and assist with fill compaction requirements.

View the file

Other files for this federal contract opportunity

Other files attached to Hell Canyon Dam Boat Launch, newest first.
File Type Posted
Amendment01.pdf PDF
Final Solicitation HC Boat Launch.pdf PDF
024113-SELECTIVE-DEMO.pdf PDF
003010-BID-DESC.pdf PDF
FireProtectionandSuppressionr6_fS_6300_52.pdf PDF
IFC Dwgs 170331.pdf PDF
015700-TEMPCONTROLS.pdf PDF
IFC Specs 170331.pdf PDF
Work Limits Plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

CONTRACT ID CODE PAGE 1 OF 3 PAGES

2 AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

07/23/2020

4. REQUISITION/PUCHASE REQ. NO. 5. PROJECT NO.(IF APPLICABLE)

6. ISSUE BY CODE 7.ADMINISTERED BY (if other than item 6) CODE

Wallowa-Whitman National Forest 1550 Dewey Ave, Suite A Baker City, OR 97814

8.NAME AND ADDRESS OF CONTRACTOR(No., street, county, State and ZIP Code) 9A.Amend Solicitation. 1204M320R0003

* 9B.Dated 06/30/2020

* 10A.Mod Contract/Order #

* 10B.Dated (see Item 13) code facility code

11. THIS ITEM APPLIES ONLY TO AMENDMENT OF SOLICITATION

[x] The above numbered solicitation is amended as set forth in the item 14. The hour and date specified for receipt of Offers [ ] is extended [x ] is not extended. Offerors must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15 and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted, or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegam or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. Accounting and Appropriation Data (if required)

13. THIS ITEM APPLIES ONLY TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. This change order is issued pursuant to; (specifiy authority)

The changes set forth in item 14 are made in the Contract/Order # in item 10A.

B. The above numbered Contract/Order is modified to reflect the administrative changes (such as changes in paying office, appropriation date, etc.) set forth in item 14, pursuant to the authority of FAR 43.103(b)..

C. This supplemental agreement is entered into pursuant to authority of:

D Other: (Specify type of modification and authority):

E. IMPORTANT: Contractor [ ] is not [ ] is required to sign this document and return _ Original to the issuing office.:

14. DESCRIPTION OF AMENDMENT/MODIFICATION

Project Name and Location: Hell Canyon Creek Visitor Center Boating Facility Repairs This amendment addresses the following (see attached addendum)

1. List of Attendee’s Site Visit (see attached addendum)

2. Pre-Bid Inquiries (PBI’s) for Contract Bidding (see attached addendum)

By signature in Block 15B Contractor releases the Government from all claims relating to this modification. This settlement is complete accord and satisfaction. Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A.NAME AND TITLE OF SIGNER (Type or print)

16A.NAME AND TITLE OF CONTRACTING OFFICER

Contracting Officer

15B.CONTRACTOR/OFFEROR

By ______________________________ (Signature of person authorized to sign)

15C.DATE SIGNED 16B.UNITED STATES OF AMERICA

By______________________________ (Signature of Contracting Officer)

16C.DATE SIGNED

Standard Form 30 Prescribed by GSA FAR (48CFR) 53.243

Addendum to Amendment 2

REVISIONS, PRE-BID INQUIRIES, REQUEST FOR INFORMATION HELL CANYON BOAT LAUNCH

Onsite Pre-bid Site Visit – 7/22/2020, 1:00 PM

An on-site prebid site was attended by:

Dave Plummer, USFS, COR 541-519-5417 Riven Fenton, Alabar Construction, Tony Britt, Alabar Construction, Tonita Britt, Alabar Construction Bo Fisher, Fabco Welding, 208-830-0854 John Fenton, Alabar Constrction, 541-379-4654 Quaid Kettering, K2, 858-776-0239 Brent Gyllenberg, Gyllenberg Construction 541-523-5000

Pre-Bid Inquiries (PBI’s) for Contract Bidding

PBI-010

Question:Does the Forest Service furnish a waste site for the brush removed from the dock slide mechanism?

Answer: No, the contractor must haul away and dispose.

PBI-011

Question: There is steel materials, jersey barriers and other materials specified for removal and demolition. Does the Forest Service want salvage on them?

Answer: No. Contractor shall dispose off off-site. Any salvageable materials become contractor property.

PBI-012

Question: Can work be done 7 days a week?

Answer: Section H-17 of the solicitation limits construction activities to 5:30 a.m. to 7:00 p.m., Monday through Friday, unless other hours are approved in writing by the CO.

PBI-013

Question: What fire protection and limitations will be in place? Some grinding and/or cutting may be required in the steel fitting on the dock slide.

Answer: If fire protection levels are elevated and in place during the project, a waiver to do cutting and grinding will be required and will require conditions to be met. Since adequate water is available on site, a pump and hose set up and on standby during cutting and grinding operations, along with fire extinguisher, shovel and adequate personnel monitoring operations would normally be the conditions required for the waiver.

PBI-014

Question: How does contractor shut off power to the dock slide to do the relocation work on the panel/pedestal, and the electrical demolition work required?

Answer: Forest Service will coordinate shutting off the poser as required.

PBI-015

Question:Compaction on 2:1 slope behind the gabion wall to required 95% density, and proctor tests as shown on the plans will be impractical.

Answer: Agree. COR will work with contractor to establish procedure that will give equivalent performance, without testing required.

This will include wetting of fill material and mechanical compaction in 6 to 8 inch, lifts. Procedure will be modified as needed based on material encountered, such as coarse rock fill or granular soil. No laboratory testing (proctor) will be required.

PBI-016

Question: Is camping available in the area for crews?

Answer: Forest service does not have developed or dispersed camping sites available in the area. Idaho Power has camping areas available near/in Oxbow. Contractor will be responsible for any reservation, fees, and coordination with Idaho Power for the use of their campsites.

There is an operations yard used by the Forest Service available immediately adjacent to the Visitor Center and the construction work area that may be used for camping with written approval of Contracting Officer and District Ranger. Access to this area is from the visitor center parking lot, with a steep access road at the westerly end of the lot. Camping conditions will include no open fires, no dogs or pets, and limitations on noise and traffic. No utilities of any kind are available at the site.

This area may be used for Contractor parking, storage, and contractor staging for the project also. Some moving and re-arranging of stored materials and equipment on the site may be required to utilize the site.

PBI-017

Question: Discussion of sequencing of grout. Can riprap fill be placed prior to grout?

Answer: Yes, the sequencing and method of placing the riprap fill and grout is open for contractor technical approach and proposal.

The technical approach to this project is critical in successfully planning and executing the project. Evaluation of the technical approach in their proosal will be a major part of the contractor selection for this project.

PBI-018

Question:Where is the riprap stockpile for the project?

Answer: The riprap is stockpiled on the right hand side of the Hell Canyon Dam road approximately 1.4 miles upstream from the dam.

The stockpile site was visited during the pre-bid conference.

PBI-019

Question: Can the contractor re-use gabion rock to re-fill the new baskets?

Answer: Yes, and additional rock can be sorted from the rip rap stockpile. The intention is not to furnish commercial material.