This document provides specifications for bid items on a federal construction contract solicitation to rehabilitate a boat launch facility. Thirteen bid items are defined and will be paid using various measurement methods including lump sum, contract quantity, and actual quantities. Mobilization will be paid in increments. Erosion control will be lump sum and include all required measures. Site demolition, selective demolition, fencing and gate installation, stairway construction, dock rehabilitation, floating dock installation, gabion wall replacement, riprap placement, and grout work will each be paid as lump sums. Debris removal from the dock slide and a project credit sign are identified as contract quantity and lump sum, respectively. The solicitation number and agency are provided, indicating this work supports rehabilitation of boat launching facilities at Hell Canyon Dam through the USDA Forest Service Pacific Northwest Region.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Final Amendment02.pdf | ||
| Amendment01.pdf | ||
| Final Solicitation HC Boat Launch.pdf | ||
| 024113-SELECTIVE-DEMO.pdf | ||
| FireProtectionandSuppressionr6_fS_6300_52.pdf | ||
| IFC Dwgs 170331.pdf | ||
| IFC Specs 170331.pdf | ||
| Work Limits Plan.pdf | ||
| 015700-TEMPCONTROLS.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USDA Forest Service Project Specifications
2/18/2011 DESCRIPTION OF BID ITEMS 00 30 10 - 1
USFS Hell Canyon Creek Visitor Center Boating Facility Repairs
SECTION 00301-
DEFINITION OF BID ITEMS
1. PART 1 -GENERAL
1.0 SUMMARY
A. All references to measurement and payment in the “Final Technical Specifications” are deleted and replaced by this section.
B. The basis for measurement and payment for all work performed under this contract shall be as listed in the “Bid Form.” Unless the work is specifically called out to be measured and paid for in the Bid Form, payment for such work shall be included in other applicable items of the Bid Form. There shall be no separate measurement and payment for any such work not specifically listed in the Bid Form.
C. The Contractor shall complete unit and total pricing for ALL items. If “optional” items are presented the “optional” item work shall be bid as mutually exclusive (stand alone) items. The Contracting Officer and the government reserves the right to award individual optional items, as funding becomes available.
D. The application of any pay item to more than one site will be marked by prefixes to differentiate between them on the Bid Form.
E. When more than one class, size, type, thickness, etc. is specified in the Bid Form for any pay item, suffixes will be added to the item number to differentiate between the pay items.
F. Mobilization - This item is intended to compensate the Contractor for operations including, but not limited to, those necessary for the movement of personnel, equipment, supplies, and incidentals to the project site; for payment of premiums for bonds and insurance for the project;
and for any other work and operations which must be performed or costs that must be incurred incident to the initiation of meaningful work at the site and for which payment is not otherwise provided for under the contract.
G. Items listed in the Bid Form as lump sum shall be on a lump sum all required basis. No direct measurement will be made for lump sum bid items. Bid items calling for unit prices show estimated quantities of work to be performed. These quantities, although shown with as much accuracy as possible, are approximate only and are for bidding purposes only. Payment to the contractor shall be made on the quantity of work actually performed by the Contractor.
H. The summation of all bid items under the Bid Form shall equal all work required by the drawings and Specifications regardless of whether individual items of work are described under bid item descriptions or not. Payment shall be made at the contract unit bid or lump sum prices listed in the Bid. The prices listed therein shall be payment in full for all labor, tools, equipment, materials, etc., which are required to construct respective bid items according to the Contract Documents, including all work and materials incidental thereto.
2/18/2011 DESCRIPTION OF BID ITEMS 00 30 10 - 2
USFS Hell Canyon Creek Visitor Center Boating Facility Repairs
I. Payment for unit bid items and lump sum bid items only partially completed at the end of monthly pay periods shall be based on a percentage of work completed as determined by the Government.
1.1 DETERMINATION OF QUANTITIES
A. The following measurements and calculations shall be used to determine contract quantities for payment.
1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control blankets shall be along slope lines.
2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by three-dimensional methods.
3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions.
4. For items that are measured by the linear foot, such as pipe, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed.
5. For standard manufactured items (such as wire, pipe) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications, manufacturer's tolerances shall be accepted.
B. Earthwork Tolerances - Adjustments of horizontal or vertical alignment, within the tolerances specified in this contract, or shifts of balance points up to 100 feet shall be made by the contractor as necessary to produce the designed sections and to balance earthwork. Such adjustments shall not be considered as "Changes."
1.2 UNITS OF MEASUREMENT
A. Payment shall be by units defined and determined according to U.S. Standard measure and by the following:
1. Cubic Yard (CY): A measurement computed by one of the following methods:
a. Excavation, Embankment, or Borrow. The measurement computed by the average end area method from measurements made longitudinally along a centerline or reference line.
2/18/2011 DESCRIPTION OF BID ITEMS 00 30 10 - 3
USFS Hell Canyon Creek Visitor Center Boating Facility Repairs
b. Material in Place or Stockpile. The measurement computed using the dimensions of the in-place material.
c. Material in the Delivery Vehicle. The measurement computed using measurements of material in the hauling vehicles at the point of delivery. Vehicles shall be loaded to at least their water level capacity. Leveling of the loads may be required when vehicles arrive at the delivery point.
2. Each (EA): One complete unit, which may consist of one or more parts.
3. Gallons (GAL): The quantity shall be measured by any of the following methods:
a. Measured volume in container.
b. Metered volume by approved metering system.
c. Commercially package volume.
4. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor.
5. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps.
6. Lump Sum (LS): One complete unit.
7. Square Foot (SF): Measured on a plane parallel to the surface being measured.
8. Square Yard (SY): Measured on a plane parallel to the surface being measured.
1.3 METHOD OF MEASUREMENT
A. One of the following methods of measurement for determining final payment is designated on the Schedule of Items for each pay item:
1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work.
2. CONTRACT QUANTITIES (CQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the preliminary survey information, design assumptions, calculations, drawings, and the presentation in the contract. Changes in the number of units shown in the Schedule of Items may be authorized under any of the following conditions:
a. As a result of changes in the work authorized by the CO.
b. As a result of the CO determining that errors exist in the original design, and cause a pay item quantity to change by 15 percent or more.
c. As a result of the Contractor submitting to the CO a written request showing evidence of errors in the original design that cause a pay item quantity to change by
2/18/2011 DESCRIPTION OF BID ITEMS 00 30 10 - 4
USFS Hell Canyon Creek Visitor Center Boating Facility Repairs
15 percent or more. The evidence must be verifiable and consist of calculations, drawings, or other data that show how the designed quantity is believed to be in error.
3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured.
2. DEFINITION OF BID ITEMS
A-1. Mobilization/Demobilization
a. There will be no measurement for payment of Mobilization and
Demobilization. These items shall include all bonds and miscellaneous items required for the project.
b. Payments shall be made at the lump sum price stated in the Bid Form for "Mobilization/Demobilization."
c. The mobilization lump sum will be paid as follows:
i. If applicable, bond premiums will be reimbursed according to FAR clause
52.232-5, Payment Under Fixed-Price Construction Contracts, after receipt of evidence of payment.
ii. Fifty percent of the lump sum, not to exceed 5 percent of the original contract amount, will be paid following completion of 5 percent of the original contract amount, not including mobilization.
iii. Payment of the remaining portion of the lump sum, up to 10 percent of the original contract amount, will be paid following completion of 10 percent of the original contract amount, not including mobilization.
iv. Any portion of the lump sum in excess of 10 percent of the original contract amount will be paid after final acceptance.
A-2. Erosion and Sediment Control
a. Measurement for payment of Erosion Control shall be measured on a lump sum basis and shall include all erosion control measures, monitoring of erosion control, replacement of the erosion control measures as necessary, removal of the erosion control measures at the completion of the project, restoration of the area, and other items.
b. Payment shall be made at the lump sum price stated in the Bid Form for "Erosion and Sediment Control."
2/18/2011 DESCRIPTION OF BID ITEMS 00 30 10 - 5
USFS Hell Canyon Creek Visitor Center Boating Facility Repairs
A-3. Site Demolition and Clearing
a. Measurement for payment of the Site Demolition and Clearing item shall be measured on a lump sum basis and shall include but not be limited to the site preparation, removal of concrete barriers, removal of cast in place concrete ramp, platform and steps, removal of platform elevator and associated hardware, removal of associated barriers, handrails, etc, and grading of the platform elevator and access site at the boat dock. All other materials, labor and equipment needed to complete the installation shall be incidental to the items which they relate.
b.
c. Payment shall be made at the unit price stated in the Bid Form for "Site demolition and clearing”.
A-4. Selective Demolition
a. Measurement for payment of the Selective Demolition shall be measured on a lump sum basis and shall include but not be limited to the removal of the existing stairs and elevator lift mechanism, by careful disassembly, so as to leave the items slated to remain intact and ready for installation of new components. All other materials, labor and equipment needed to complete the installation shall be incidental to the items to which they relate.
b. Payment shall be made at the lump sum price stated in the Bid Form for "Selective Demolition".
A-5. Chain Link Fencing and Gate
a. Measurement for payment of the chain Link Fencing and Gate shall be measured on a lump sum basis and shall include removal of existing fencing and gate, site preparation, supply and installation of new posts, fence, gate, and associated hardware and incidental items for a complete fence and gate assembly as shown on the plans.
b. Payment shall be made at the lump price stated in the Bid Form for "Chain Link Fencing and Gate".
A-6. Steel Stairway Including Concrete Supports
a. Measurement for payment of the Steel Stairway Including Concrete Supports shall be measured on a lump sum bais and shall include clearing and grubbing, footing excavation, forming and placing of concrete and associated rebar and imbedded items, supply and install steel stairway and all incidental hardware and items for a finished stairway assembly as shown on the plans.
b. Payment shall be at the lump sum price stated in the Bid form for “Steel Stairway Including Concrete Supports”.
2/18/2011 DESCRIPTION OF BID ITEMS 00 30 10 - 6
USFS Hell Canyon Creek Visitor Center Boating Facility Repairs
A-7. Excavation – Clearing Debris from Dock Slide
a. Measurement for Clearing Debris from Dock Slide shall be made on a CY basis at the Contract Quantity shown on the Bid Schedule.
b. Payment will be made at the Contract Quantity bid price stated in the Bid Form for "Clearing Debris from Dock Slide”.
A-8. Boat Dock Trolley System Rehabilitation and Adjustment
a. Measurement of “Boat Dock Trolley System Rehabilitation and Adjustment” shall be on a lump sum basis and shall include but not be limited to all disassembly, refurbishment, reconditioning, parts supply and replacement as needed, cleaning, adjustment, re-assembly, lubrication and other work needed to provide a fully functioning, correctly adjusted dock slide mechanism. In addition, this item will include all work to re-balance and adjust the mechanism to correctly counterbalance and operate the new dock supplied under this contract.
b. Payments shall be at the lump sum unit price stated in the bid form for “Boat Dock Trolley System Rehabilitation and Adjustment.”
A-9. Supply and Install Floating Dock
a. Measurement and payment for “Supply and Install Floating Dock” shall be made on a lump sum basis and shall include all work required to supply and install a floating dock assembly as shown on the plans and specifications.
b. Payment shall be at the lump sum price stated in the bid form for “Supply and Install Floating Dock”.
A-10. Gabion Wall -Selective Demolition and Replacement
a. Measurement and payment for the Gabion Wall – Selective Demolition and
Replacement shall be made on a lump sum basis and shall include selective demolition, excavation, salvage of rock fill materials for re-use, supply gabion basket and rockfill materials, placement of gabion baskets and filling with rock, backfill, grading and site restoration as shown on the plans and specifications.
“Gabion Wall – Selective Demolition and Replacement".
A-11. Riprap Placement, Boat Launch, Government Furnished Material
2/18/2011 DESCRIPTION OF BID ITEMS 00 30 10 - 7
USFS Hell Canyon Creek Visitor Center Boating Facility Repairs
a. Measurement and payment for the Riprap Placement, Boat Launch, Government Furnished Material shall be made on a per ton basis at the Contract Quantity shown on the Bid Schedule. This items shall include sorting, grading, loading of Government furnished materials at the stockpile sight, hauling to the boat launch site, selective placement as shown on the plans, cleanup and piling of remaining or waste materials at the stockpile site, and cleanup of the stockpile site at completion of the work.
b. Payment shall be made at the contract quantity bid price stated in the Bid Form for “Riprap Placement, Boat Launch, Government Furnished Material".
A-12. Concrete Grout under Existing Boat launch Concrete Ramp
a. Measurement and payment for Concrete Grout Under Existing Boat Launch Concrete Ramp shall be made on a lump sum basis and shall include underwater grading and base preparation including rock placement, supply and installation of turbidity curtain and other turbidity control measures, supply and install of grout bags, drilling and coring and installation of piping and hardware placement to facilitate pressure grouting, supply and pressure pumping/placement of grout, removal of pressure grouting items not slated to remain, and restoration of boat launch ramp structure and finish damaged or removed in the grouting process, all as shown on the plans and specifications.
Item shall also include turbidity monitoring to meet permit requirements, and materials testing and certification per specifications. Rock fill needed for preparation and leveling for this work item may be supplied from commercial sources, or sorted from government furnished materials furnished for the Riprap Placement. This rock fill is considered incidental to this item, and will not be paid separately.
“Concrete Grout under Existing Boat launch Concrete Ramp".
A-13. Project Credit Sign
a. Measurement and payment for Project Credit Sign shall be made on a lump sum basis and shall include supplying sign, posts, and installation as shown on the plans.
b. Payment shall be made at the lump sum price stated in the Bid Form for “Project Credit Sign”.
END OF SECTION
| 1. Part 1 -GENERAL |
| 1. For individual construction items, longitudinal and lateral measurements for area computations shall be made horizontally or corrected to horizontal measurement unless otherwise specified. Measurements for geotextiles, netting and erosion control ... |
| 2. For excavation or embankment volumes, the average end area method shall be used to compute volumes. However, if in the judgment of the Contracting Officer (CO), the average end area method is impractical, measurement shall be made by three-dimensi... |
| 3. For Structures, they shall be measured according to neat lines shown on the drawings or as altered by the CO, in writing, to fit field conditions. |
| 4. For items that are measured by the linear foot, such as pipe, utilities, and underdrains, measurements shall be made parallel to the base or foundation upon which the structures are placed. |
| 5. For standard manufactured items (such as wire, pipe) identified by gauge, weight, section dimensions, and so forth, such identifications shall be considered the nominal weights or dimensions. Unless controlled by tolerances in cited specifications... |
| 1. Cubic Yard (CY): A measurement computed by one of the following methods: |
| 2. Each (EA): One complete unit, which may consist of one or more parts. |
| 3. Gallons (GAL): The quantity shall be measured by any of the following methods: |
| 4. Hour (HR): Measurement will be for the actual number of hours (or fraction thereof) ordered by the Contracting Officer and performed by the contractor. |
| 5. Linear Foot (LF): Measurement of work along its length from point-to-point; parallel to the base or foundation. Do not measure overlaps. |
| 6. Lump Sum (LS): One complete unit. |
| 7. Square Foot (SF): Measured on a plane parallel to the surface being measured. |
| 8. Square Yard (SY): Measured on a plane parallel to the surface being measured. |
| 1. ACTUAL QUANTITIES (AQ) - These quantities are determined from actual measurements of completed work. |
| 2. CONTRACT QUANTITIES (CQ) - These quantities denote the final number or units to be paid for under the terms of the contract. They are based upon the original design data available prior to advertising the project. Original design data include the... |
| 3. LUMP SUM QUANTITIES (LSQ) - These quantities denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. They shall not be measured. |
| 2. DEFINITION OF BID ITEMS |
| A-1. Mobilization/Demobilization |
| a. There will be no measurement for payment of Mobilization and Demobilization. These items shall include all bonds and miscellaneous items required for the project. |
| b. Payments shall be made at the lump sum price stated in the Bid Form for "Mobilization/Demobilization." |
| c. The mobilization lump sum will be paid as follows: |
| i. If applicable, bond premiums will be reimbursed according to FAR clause 52.232-5, Payment Under Fixed-Price Construction Contracts, after receipt of evidence of payment. |
| ii. Fifty percent of the lump sum, not to exceed 5 percent of the original contract amount, will be paid following completion of 5 percent of the original contract amount, not including mobilization. |
| iii. Payment of the remaining portion of the lump sum, up to 10 percent of the original contract amount, will be paid following completion of 10 percent of the original contract amount, not including mobilization. |
| iv. Any portion of the lump sum in excess of 10 percent of the original contract amount will be paid after final acceptance. |
| A-2. Erosion and Sediment Control |
| a. Measurement for payment of Erosion Control shall be measured on a lump sum basis and shall include all erosion control measures, monitoring of erosion control, replacement of the erosion control measures as necessary, removal of the erosion control... |
| b. Payment shall be made at the lump sum price stated in the Bid Form for "Erosion and Sediment Control." |
| A-3. Site Demolition and Clearing |
| a. Measurement for payment of the Site Demolition and Clearing item shall be measured on a lump sum basis and shall include but not be limited to the site preparation, removal of concrete barriers, removal of cast in place concrete ramp, platform and ... |
| b. |
| c. Payment shall be made at the unit price stated in the Bid Form for "Site demolition and clearing”. |
| A-4. Selective Demolition |
| a. Measurement for payment of the Selective Demolition shall be measured on a lump sum basis and shall include but not be limited to the removal of the existing stairs and elevator lift mechanism, by careful disassembly, so as to leave the items slate... |
| b. Payment shall be made at the lump sum price stated in the Bid Form for "Selective Demolition". |
| A-5. Chain Link Fencing and Gate |
| a. Measurement for payment of the chain Link Fencing and Gate shall be measured on a lump sum basis and shall include removal of existing fencing and gate, site preparation, supply and installation of new posts, fence, gate, and associated hardware an... |
| b. Payment shall be made at the lump price stated in the Bid Form for "Chain Link Fencing and Gate". |
| A-6. Steel Stairway Including Concrete Supports |
| a. Measurement for payment of the Steel Stairway Including Concrete Supports shall be measured on a lump sum bais and shall include clearing and grubbing, footing excavation, forming and placing of concrete and associated rebar and imbedded items, sup... |
| b. Payment shall be at the lump sum price stated in the Bid form for “Steel Stairway Including Concrete Supports”. |
| A-7. Excavation – Clearing Debris from Dock Slide |
| a. Measurement for Clearing Debris from Dock Slide shall be made on a CY basis at the Contract Quantity shown on the Bid Schedule. |
| b. Payment will be made at the Contract Quantity bid price stated in the Bid Form for "Clearing Debris from Dock Slide”. |
| A-8. Boat Dock Trolley System Rehabilitation and Adjustment |
| a. Measurement of “Boat Dock Trolley System Rehabilitation and Adjustment” shall be on a lump sum basis and shall include but not be limited to all disassembly, refurbishment, reconditioning, parts supply and replacement as needed, cleaning, adjustmen... |
| b. Payments shall be at the lump sum unit price stated in the bid form for “Boat Dock Trolley System Rehabilitation and Adjustment.” |
| A-9. Supply and Install Floating Dock |
| a. Measurement and payment for “Supply and Install Floating Dock” shall be made on a lump sum basis and shall include all work required to supply and install a floating dock assembly as shown on the plans and specifications. |
| b. Payment shall be at the lump sum price stated in the bid form for “Supply and Install Floating Dock”. |
| A-10. Gabion Wall -Selective Demolition and Replacement |
| a. Measurement and payment for the Gabion Wall – Selective Demolition and Replacement shall be made on a lump sum basis and shall include selective demolition, excavation, salvage of rock fill materials for re-use, supply gabion basket and rockfill ma... |
| b. Payment shall be made at the lump sum price stated in the Bid Form for “Gabion Wall – Selective Demolition and Replacement". |
| A-11. Riprap Placement, Boat Launch, Government Furnished Material |
| a. Measurement and payment for the Riprap Placement, Boat Launch, Government Furnished Material shall be made on a per ton basis at the Contract Quantity shown on the Bid Schedule. This items shall include sorting, grading, loading of Government furn... |
| b. Payment shall be made at the contract quantity bid price stated in the Bid Form for “Riprap Placement, Boat Launch, Government Furnished Material". |
| A-12. Concrete Grout under Existing Boat launch Concrete Ramp |
| a. Measurement and payment for Concrete Grout Under Existing Boat Launch Concrete Ramp shall be made on a lump sum basis and shall include underwater grading and base preparation including rock placement, supply and installation of turbidity curtain a... |
| b. Payment shall be made at the lump sum price stated in the Bid Form for “Concrete Grout under Existing Boat launch Concrete Ramp". |
A-13. Project Credit Sign
File details come from the government source that posted it. Updated .