This document provides project specifications for temporary controls on a USDA Forest Service project. The specifications require signage and barricades to control site access and direct the public away from work areas. Waste materials must be promptly removed from the site and disposed of legally outside of Forest Service property. Erosion control fencing and other measures are required to prevent pollution of air, water, and waterways from construction materials and equipment. The contractor must keep the project area neat, orderly, and safe at all times. The related federal contract opportunity is for boat launch construction at Hell Canyon Dam and is solicited by the USDA Forest Service Pacific Northwest Region.

View the file

Other files for this federal contract opportunity

Other files attached to Hell Canyon Dam Boat Launch, newest first.
File Type Posted
Final Amendment02.pdf PDF
Amendment01.pdf PDF
Final Solicitation HC Boat Launch.pdf PDF
024113-SELECTIVE-DEMO.pdf PDF
003010-BID-DESC.pdf PDF
FireProtectionandSuppressionr6_fS_6300_52.pdf PDF
IFC Dwgs 170331.pdf PDF
IFC Specs 170331.pdf PDF
Work Limits Plan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA Forest Service Project Specifications

June, 20 Project Name 01 57 00.00 - 1

SECTION 01 57 00

TEMPORARY CONTROLS

1. PART 1 GENERAL

1.01 DESCRIPTION

A. The work of this section consists of providing temporary controls as needed to control site access, eliminate litter and waste from the site, and protect the public. No measurement and payment is made for this work; rather it is incidental to the work items it is a part of.

2. PART 2 PRODUCTS NOT USED

3. PART 3 EXECUTION

3.01 SITE ACCESS CONTROLS

A. Provide signage and barricades to control public use of roads designated closed for construction.

B. Provide fencing, barricades, signage and other controls as required to direct public away from and restrict access to work areas.

C. Maintain controls continuously, including nights and weekends and during work performance.

3.02 HOUSEKEEPING

A. Keep project neat, orderly, and in a safe condition at all times.

B. Do not store rubbish or volatile waste on-site. Dispose of all waste materials as specified or according to State requirements.

3.03 DISPOSAL

A. Promptly remove and dispose of demolition, excavation and waste materials (including rocks and boulders) that are not intended for incorporation into the work.

B. Unless otherwise specified, all waste material becomes the property of the Contractor and shall be disposed of off Government property.

C. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the Forest Service property. Do not burn or bury refuse.

3.04 AIR AND WATER POLLUTION CONTROL

A. Provide and install all erosion control fencing and other measures as necessary.

B. All water used in construction shall have all contaminants removed, including dirt, cement, and oils prior to discharging to any storm drainage or natural waterways. All discharges of water of any type from this project shall be approved by the Contracting Officer.

C. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.

USDA Forest Service Project Specifications

June, 20 Project Name 01 57 00.00 - 2

D. Do not allow waste materials to be washed into streams or bodies of water.

END OF SECTION

4.

1. PART 1 GENERAL
1.01 DESCRIPTION
A. The work of this section consists of providing temporary controls as needed to control site access, eliminate litter and waste from the site, and protect the public. No measurement and payment is made for this work; rather it is incidental to the ...
2. PART 2 PRODUCTS NOT USED
3. PART 3 EXECUTION
3.01 Site Access Controls
A. Provide signage and barricades to control public use of roads designated closed for construction.
B. Provide fencing, barricades, signage and other controls as required to direct public away from and restrict access to work areas.
C. Maintain controls continuously, including nights and weekends and during work performance.
3.02 HOUSEKEEPING
A. Keep project neat, orderly, and in a safe condition at all times.
B. Do not store rubbish or volatile waste on-site. Dispose of all waste materials as specified or according to State requirements.
3.03 DISPOSAL
A. Promptly remove and dispose of demolition, excavation and waste materials (including rocks and boulders) that are not intended for incorporation into the work.
B. Unless otherwise specified, all waste material becomes the property of the Contractor and shall be disposed of off Government property.
C. Immediately remove hazardous rubbish from project site. Place other construction debris in refuse containers at least daily. Dispose of refuse at least weekly, in a legal manner, at public or private dumping areas outside the Forest Service propert...
3.04 AIR AND WATER POLLUTION CONTROL
A. Provide and install all erosion control fencing and other measures as necessary.
B. All water used in construction shall have all contaminants removed, including dirt, cement, and oils prior to discharging to any storm drainage or natural waterways. All discharges of water of any type from this project shall be approved by the Con...
C. Take all necessary reasonable measures to reduce air and water pollution by any material or equipment used during construction.
D. Do not allow waste materials to be washed into streams or bodies of water.

4.