RavenTrail_TrailLog_Draft.pdf
PDF 580 KB Posted
- Attached to
- Raven Trail Reconstruction Federal contract opportunity
- Solicitation number
- 12010919R0002
About this file
Draft Trail Log - Raven Trail
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12010919R0002_RavenTrail_Amendment02.pdf | ||
| 12010919R0002_RavenTrail_Amendment01.pdf | ||
| TrailLog_RavenTrlPh2_12112018_bhcj.pdf | ||
| J(F)_Drawings_RavenTrlPh2_02192019_cj.pdf | ||
| 12010919R0002RavenTrailPh2.pdf | ||
| SpProjSpecs_RavenTrailPh2.pdf | ||
| RavenTrail_Project_Map.pdf | ||
| Questions-Answers-1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY TO WORK ITEMS:
ABBREV. DESCRIPTION
AS AGGREGATE SURFACING
ASR AGGREGATE SURFACING WITH ROOTS
BA to AS BA to SP
BOULDER AREA
Trail passes through field of boulders that require moving or breaking.
Finished trail type to be AS or SP as specified in Trail Log.
BW-A BOARDWALK NO STEPS
BW-B STEP & RUN BOARDWALK
CS CONCRETE STEP
DD DRAIN DIP
MS METAL STAIRCASE
NW NO WORK
REST
AREA
REST AREA
SRR SOLID ROCK REMOVAL
SRS STONE RISER STEP
SS STEP STONE
WA WORK AREA BETWEEN NUMBERED STATIONS
GENERAL NOTES
1). The beginning of work areas are marked on the ground by wood stakes with the work area number written upon them. Leave all stakes in place until such time that the work is accepted by the Government. Should a stake be missing, notify the Government for replacement prior to the commencement of work in that area.
2). The work areas value shown is approximate feet from the beginning of the project or as referenced.
3). The Minimum Aggregate Surfacing Depth shown is the depth after placement and light compaction.
4). The quantities of steps/stones shown for Types SRS and CS are estimates given for the contractor's convenience only. Actual quantities may vary; the contractor is responsible for verifying actual quantities.
RAVEN TRAIL RECONSTRUCTION PHASE II
TRAIL LOG
DRAFT 11/01/2018
DRAFT
WORK
AREA
BEGIN
QUAN.
WORK
AREA
END
WORK
ITEMS
FINISHED
CL %
GRADE
AHEAD
NOTES
0 6 6 BW-A 0
0+00 located at point where existing trail transitions from 5' wide AS to 2x14 BW. BEGIN REROUTE at 0+00. Install BW-A to bridge water.
6 20 26 AS 15 Cut bench for trailbed into right side of skunk cabbage as marked.
26 6 32 BW-A 15 Span over drainage; follow left side of skunk cabbage.
32 24 56 AS 8 Follow left side of skunk cabbage. Cut approx. 24 LF ditch along right side.
56 20 76 BW-A 15
76 95 171 AS 20 Excavate hump at STA 1+68 for even grade.
171 3 177 CS 25 Follow left bank.
177 24 201 AS 20
201 7 208 AS 13
208 6 214 BW-A
214 24 238 AS 14 Cut trailbed into bank on left.
238 21 259 AS 10 Install drain dip near STA 2+47
259 33 292 AS 11
292 27 319 BW-A 14
319 13 332 BW-B 18
332 26 358 AS 16 Excavate trail for even grade.
358 88 446 BW-B Cut through knobs and remove small trees for even grade.
446 8 454 REST AREA 0 SEE DRAWINGS for REST AREA 1
454 35 489 BW-B Varies
489 25 553 BW-B Varies
553 12 565 BW-B Varies
565 103 668 AS 15
668 73 761 BW-A 2 to 8
761 52 813 AS 15 Cut through 2 logs, follow contour. Cut 2' off high point to create even grade.
813 32 845 AS 15 Note: new trail located adjacent to existing trail. END REROUTE at STA 8+45.
845 31 876 SP 22
Install ditch on uphill side of trail between STA 8+73 and 8+76. Install drain dip near STA 8+73;
ditch from outflow of DD to daylight, approx. 10 LF.
876 3 879 CS
879 34 913 AS 18
913 13 926 SP 27
926 5 934 CS
934 73 1007 AS 7 Shift CL to right into bank for even grade.
1007 20 1027 AS 15 Shift CL to right into bank for even grade. Install drain dip.
1027 60 1087 SP 44
1087 113 1200 AS Varies Cut through knob at STA 11+37 through 11+44
1200 87 1287 AS 6 BEGIN REROUTE; remove hump at beginning of Work Area (WA) to maintain even grade.
1287 37 1324 SP 24
Install SRW at various locations downslope from trail tread from this WA to STA 14+78 where SP is installed; approx. 15 LF total.
1324 10 1343 CS 60
1343 48 1391 AS 17
1391 26 1417 SP 26
1417 7 1428 CS 42
1428 50 1478 SP Varies Trail meanders around boulder as flagged.
1478 88 1566 BA to SP 22 Boulder removal: trail passes through field of boulders that require blasting or breaking and removal, or recycle into SP material.
1566 60 1626 BA to AS 5 Boulder removal
1626 36 1662 BA to SP 32 Boulder removal
1662 17 1643 SP 43 END REROUTE at STA 16+62; follow existing trail.
1643 20 1693 SRS Use stones on site for SRS material; clean moss from walking surface.
1693 25 1718 AS 8
BEGIN
QUAN.
WORK
AREA
END
WORK
ITEMS
FINISHED
CL %
GRADE
AHEAD
NOTES
1718 42 1760 BA to AS 14 BEGIN REROUTE at STA 17+18. Boulder removal.
1760 3 1763 AS 0 Landing for staircase
1763 27 1790 MS 73
1790 11 1819 SRS 48
1819 20 1839 AS 15 Shift centerline into side slope for even grade.
1839 2 1842 SRS
1842 29 1873 MS 70
1873 8 1900 SRS
1900 30 1930 MS 85 Remove duff for even grade between STA. Excavate to minize slope of stairs.
1930 4 1934 AS AS landing between staircases. Fill to level surface.
1934 27 1961 MS 45
1961 73 2034 AS 14 Cut through hump for level grade; install retaining log.
2034 28 2066 AS 21
2066 64 2130 SP 30
2130 62 2192 AS 12 Cross existing trail before STA 21+92.
2192 15 2207 SP 26
2207 12 2232 CS
2232 37 2269 AS 6
2269 21 2290 SP 40
2290 61 2351 AS 15 Cut through organic humps for level grade.
2351 83 2434 ASR Varies END REROUTE at STA 23+51; follow existing trail. At STA 24+15 install drain dip and 10 LF ditch to right.
2434 50 2484 SP 32
2484 36 2520 ASR 12
2520 8 2528 SRR 16 Cut 4 steps into existing rock.
2528 2 2531 CS
2531 34 2565 ASR 6 At STA 25+49 remove 10" dia. hemlock & roots to provide even grade.
2565 9 2574 SRR Cut 4 steps into existing rock.
2574 7 2581 AS
2581 12 2593 SRR Cut 8 steps into existing rock.
2593 6 2599 AS
2599 18 2617 SRS May be SRR; will know when grubbed out.
2617 17 2634 ASR 27 At STA 26+24 ditch 10 LF to daylight.
2634 9 2643 SRR Cut 5 steps in existing rock.
2643 17 2660 AS 25 Follow right hand fork in existing trail.
2660 2 2663 CS
2663 23 2686 ASR 31
2686 17 2703 ASR 20 Use root as step.
2703 5 2710 CS
2710 10 2720 ASR Steps in roots; excavate organics and pack aggregate into step treads between roots.
2720 22 2742 AS 10 BEGIN REROUTE to right.
2742 3 2745 CS Climbing turn to left.
2745 52 2797 AS 15
2797 17 2814 SP 40
2814 15 2829 AS 10
2829 20 2849 SP 30 Wind to right then left.
2849 82 2931 AS 15 END REROUTE at 29+31.
2931 45 2976 ASR Maintain existing trail grade.
2976 14 2990 MS 65
2990 33 3023 ASR Steps in roots; excavate organics and pack aggregate into step treads between roots.
3023 22 3045 AS 12 Fill and cut for even grade.
BEGIN
QUAN.
WORK
AREA
END
WORK
ITEMS
FINISHED
CL %
GRADE
AHEAD
NOTES
3045 16 3061 AS 22
BEGIN REROUTE at STA 30+45. Remove 16" hemlock & rootwad; locate trail CL just uphill from 16" hemlock that was removed. END REROUTE at STA 30+61.
3061 10 3071 ASR 25
3071 13 3098 CS 38
3098 20 3118 AS 15 Cut through organic hump to achieve width.
3118 6 3124 AS 0 AS with DD.
3124 6 3136 CS 30 Cut out roots to achieve finished grade.
3136 10 3146 AS 12
3146 6 3161 CS 30
3161 35 3196 AS 20 BEGIN REROUTE to right at STA 31+61
3196 15 3227 CS Varies
Where level grade exists between two CS staircases, set CS units as pavers to abut each other end to end. To prevent differential settling, support CS pavers on two 2x7 plank rails ripped from 2x14 recycled PT BW. Joints between 2x7 ends must fall in the middle of a CS paver so adjoining pavers settle as one unit. Embed 2x7 supporting planks in gravel bedding material. Install each CS so as to span both planks and to rest equally on surface of planks and surface of bedding material.
3227 148 3475 AS Varies
3475 0 3475 REST AREA
SEE DRAWINGS for REST AREA 2; Cut 13 hemlocks (ave 14" dia) and 1 larger spruce to improve view.
3475 190 3665 AS 15 END REROUTE at 36+65 at top of old corduroy section.
3665 19 3684 ASR 20
3684 16 3700 AS 9 Cut out roots 1/2-way through WA.
3700 7 3713 CS Varies
3713 6 3719 SRR Cut 5 steps in existing rock; leave root at top.
3719 20 3739 ASR 9
3739 3 3742 CS 25 Keep roots at top; BEGIN REROUTE to right.
3742 39 3781 AS 22
3781 12 3806 CS
3806 7 3816 CS 55
3816 47 3863 AS 18 END REROUTE at STA 38+63.
3863 38 3901 AS 6 Cut through knob at STA 38+69 for 5 LF.
3901 2 3903 CS
3903 23 3925 AS 5
3925 1 3927 CS
3927 19 3946 AS 4
3946 24 3970 BW-B 18
3970 20 4016 CS 28 Shift CL to right for last 10' to avoid drainage as flagged.
4016 20 4063 CS 40
4063 3 4066 ASR Follow existing grade.
4066 11 4077 AS Follow existing grade.
4077 6 4084 CS 45
4084 22 4106 ASR 25 Follow right fork in trail.
4106 7 4116 CS 42
4116 20 4136 AS 18
4136 13 4162 CS 35
4162 45 4207 ASR Varies
4207 3 4210 CS
4210 11 4221 AS Follow existing grade.
4221 5 4232 CS
4232 29 4266 ASR 18
4266 6 4280 CS
4280 15 4295 AS Follow existing grade.
4295 5 4304 CS 36
BEGIN
QUAN.
WORK
AREA
END
WORK
ITEMS
FINISHED
CL %
GRADE
AHEAD
NOTES
4304 54 4358 AS 10
4358 46 4404 ASR 18
4404 31 4435 AS 4
4435 40 4475 ASR 4
4475 23 4498 AS 2 BEGIN REROUTE to right at STA 44+75.
4498 7 4505 BW-A 0
4505 12 4517 AS 10
4517 5 4525 CS 10
4525 7 4532 AS Landing for MS staircase
4532 20 4550 MS 65 END REROUTE at 45+50. Cut out roots at top as needed for stairs and grade ahead.
4550 60 4610 ASR Follow existing grade; use roots as steps.
4610 5 4616 CS
4616 6 4622 AS 0
4622 12 4641 CS
4641 46 4687 ASR
4687 12 4699 ASR Follow existing grade.
4699 5 4709 CS
4709 13 4722 ASR 18
4722 5 4727 ASR
4727 18 4745 ASR 15
4745 9 4763 CS
4763 23 4786 AS 5
4786 18 4804 AS 25
4804 25 4829 AS 8
4829 7 4839 CS 48 Follow left side up. Remove 6" hemlock & roots.
4839 4 4843 ASR Follow existing slope.
4843 4 4846 CS Leave large root at top for step.
4846 9 4855 ASR Follow existing slope.
4855 13 4868 AS 0 18" depth of AS for grade.
4868 8 4876 ASR
Remove select roots to expose existing steps in bedrock; install aggregate between roots where bedrock is absent (approx. 1 LF).
4876 16 4892 AS Follow existing slope.
4892 14 4906 SRR 38
Cut 3 or 4 steps into bedrock; no work toward end of work area where bedrock tread shows between roots.
4906 53 4959 ASR 12
4959 6 4971 CS 32
4971 119 5090 SRR 15 Full bench into slope on left for 15% finished grade.
4971 119 5090 AS 15 Install AS where SRR does not result in acceptable tread.
5090 18 5108 AS Level Remove corduroy.
5108 23 5131 AS 14 Remove rock step midway through WA and level out for even grade.
5131 11 5142 AS Level Remove corduroy.
5142 20 5174 CS BEGIN REROUTE to left at STA 51+42.
5174 32 5206 AS 15 END REROUTE at STA 52+06.
5206 40 5246 SP 30
5246 10 5256 AS
5256 10 5266 SRR 15 Cut into bedrock on right to achieve grade.
5266 19 5285 AS 15
5285 3 5287 CS
5287 6 5293 NW Existing bedrock slope acceptable as-is.
5293 34 5327 AS 10
5327 19 5346 ASR 15
5346 51 5397 AS 8 Remove corduroy.
BEGIN
QUAN.
WORK
AREA
END
WORK
ITEMS
FINISHED
CL %
GRADE
AHEAD
NOTES
5397 5 5403 CS
5403 18 5421 ASR 28 BEGIN REROUTE to left at STA 54+03.
5421 10 5431 AS 15
5431 14 5466 CS 30 END REROUTE at STA 54+66.
5466 19 5485 AS 12
5485 4 5490 CS
5490 38 5528 AS 15
5528 4 5533 CS
5533 11 5544 AS Follow existing grade.
5544 3 5547 SRR Cut one step into middle of center boulder.
5547 2 5550 CS Keep root at top.
5550 10 5560 AS Remove corduroy. Follow existing slope.
5560 13 5573 ASR Follow existing slope.
5573 55 5628 AS Follow existing slope.
5628 4 5634 CS Follow existing slope.
5634 8 5642 AS Follow existing slope.
5642 3 5649 CS
5649 54 5703 AS 10
5703 3 5710 CS 30
5710 11 5721 AS 15
5721 25 5746 AS 25
5746 11 5757 AS 0
5757 3 5761 CS
5761 60 5821 AS 3
5821 10 5847 CS 31 BEGIN REROUTE to right at STA 58+21.
5847 86 5933 AS Varies Reroute to left side of existing trail at STA 58+47.
5933 8 5941 BW-A 0
5941 16 5957 AS 15 END REROUTE at STA 59+57.
5957 21 5978 AS 10
5978 8 5986 AS Fill hole.
5986 8 5994 AS Follow existing slope.
5994 3 5995 CS
5995 6 6003 AS Follow existing slope.
6003 3 6007 CS
6007 28 6035 AS Follow existing slope.
6035 18 6053 AS 25
6053 66 6119 AS 15 Install 25 LF ditch to right starting at STA 60+94; ditch to daylight.
6119 7 6131 CS 35
6131 4 6135 AS
6135 57 6242 CS 32
6242 7 6249 AS 8
6249 3 6254 CS
6254 20 6274 AS 10
6274 12 6299 CS 32 Follow stakes to right.
6299 22 6321 ASR 33
6321 13 6351 CS 42
6351 21 6372 AS 15
6372 52 6424 ASR 20
6424 130 6554 AS 18 max BEGIN REROUTE to left at STA 64+24. Cross existing BW trail at STA 64+98.
6554 21 6586 CS Varies
6586 13 6599 AS 15
BEGIN
QUAN.
WORK
AREA
END
WORK
ITEMS
FINISHED
CL %
GRADE
AHEAD
NOTES
6599 10 6618 CS 33
6618 71 6689 AS 14 END REROUTE at STA 66+89.
6689 120 6819 AS Varies
6819 73 6892 AS Varies BEGIN REROUTE to right at STA 68+19; END REROUTE at STA 68+92.
6892 54 6946 AS 5
6946 3 6949 CS
6949 5 6954 AS
6954 5 6961 CS
6961 12 6973 AS 18 BEGIN REROUTE to left at STA 69+73.
6973 207 7180 AS Varies Enter subalpine muskeg at STA 70+00. Cross existing trail at STA 71+59, elev. approx. 1,650 FT above sea level. New spur trail to right begins at STA 71+80.
0+00 66 66 AS 8 New spur trail to overlook.
66 0 66 REST AREA SEE DRAWINGS for REST AREA 3
7180 184 7364 AS Varies Cross to left side of existing trail at STA 71+95 and continue reroute. Leave open muskeg and enter into scrub at STA 72+40.
7364 20 7384 SP
7384 365 7749 AS Varies
7749 145 7991 SRR Full bench SRR estimated on 60% of WA.
7749 242 7991 AS AS estimated for entire length.
7991 136 8127 AS Varies END REROUTE at STA 81+27.
8127 48 8175 AS 0
8175 242 8175A AS Varies BEGIN REROUTE to right at STA 81+75. REMAINDER OF PROJECT ON REROUTE.
8175A 33 8224 CS 45
8224 12 8236 AS
8236 7 8250 CS
8250 90 8340 AS 15
8340 8 8350 CS
8350 18 8368 AS 15
8368 8 8376 CS
8376 40 8416 AS 15
8416 12 8441 CS 30
8441 66 8507 BW-B 6
8507 100 8607 AS 15
8607 19 8616 SRR Full bench.
8616 175 8791 AS 20 Cut through knob at STA 87+08 and at STA 87+29.
8791 10 8812 CS
8812 24 8836 AS 15
8836 6 8845 CS 30
8845 12 8857 AS Level
8857 16 8888 CS 40
8888 111 8999 AS
Varies; 25 max
8999 21 9020 BW-A 0
9020 140 9160 AS Varies
9160 14 9174 BW-A 0 9' span required for water crossing.
9174 68 9242 AS Varies
9242 1 9242 REST AREA REST AREA 4 to right of STA 92+42; SEE DRAWINGS.
9242 52 9294 AS Varies 30" finished trail width.
9294 15 9324 CS 30 End Of Project at base of stair leading up to future cabin deck.
DISTANCE
TOTAL:
9549 Distance given is approximate and to be used for estimation purposes only.
BEGIN
QUAN.
WORK
AREA
END
WORK
ITEMS
FINISHED
CL %
GRADE
AHEAD
NOTES
POND TRL 15 CS 15 CS
POND TRL 18 SS 18 - 2' Step Stones
POND TRL 50 BW-B 50 LF BW
POND TRL 250 AS 250 LF AS
POND TRL
TOTAL:
333 Distance approximate.
File details come from the government source that posted it.