12010919R0002_RavenTrail_Amendment02.pdf
PDF 221 KB Posted
- Attached to
- Raven Trail Reconstruction Federal contract opportunity
- Solicitation number
- 12010919R0002
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 12010919R0002_RavenTrail_Amendment01.pdf | ||
| TrailLog_RavenTrlPh2_12112018_bhcj.pdf | ||
| J(F)_Drawings_RavenTrlPh2_02192019_cj.pdf | ||
| 12010919R0002RavenTrailPh2.pdf | ||
| SpProjSpecs_RavenTrailPh2.pdf | ||
| RavenTrail_Project_Map.pdf | ||
| Questions-Answers-1.docx | DOCX document | |
| RavenTrail_TrailLog_Draft.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
12010919R0002 x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
JUNEAU AK 99801
709 WEST 9TH STREET
ALASKA REGIONAL OFFICE
03/27/20190002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
02/26/2019
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Raven Trail Reconstruction Phase II
This amendment extends the due date and time for receipt of proposals indefinitely. This amendment also replaces sheet 7 of the drawing package; the updated language is highlighted in yellow text.
Correct address for delivery of proposals are shown on page 2 of this amendment.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
MARI MEINERS
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 3
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
12010919R0002/0002
For US Postal Service delivery, send to:
US Forest Service
Attn: Mari Meiners
PO Box 21628
Juneau, AK 99801-1628
For FedEx/UPS/DHL/Hand Delivery, send to:
US Postal Service
Attn: Mari Meiners
709 W. 9th Street
5th Floor Mailroom
Juneau, AK 99801
Please note for hand delivery - visitors must pass through security in the lobby of the Federal
Building before being permitted entry to the building.
Period of Performance: 05/01/2019 to 11/01/2020
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
INSTALL RISER STONES WHERE
NEEDED TO MAKE GRADE�
RISER STONE
SET ELEVATION OF STONE PITCHING
TO PROVIDE
OUTSLOPE FOR
GARGOYLE, TYP. DRAINAGE
SECTION B
NOTTO SCALE
28" MIN WIDTH
SECTION A
NOTTO SCALE
NOTES:
- GARGOYLES ARE STONES WHICH PROTRUDE ABOVE THE
PLANE OF THE PITCHING TO FUNNEL USERS ONTO THE
STRUCTURE.
- INSTALL GARGOYLES AT ENDS OF PITCHING SECTIONS.
- WHERE STONE PITCHING 15 30 LINEAR FEET (CONTINUOUS)
OR LONGER, INSTALL GARGOYLES EVERY 15-20 FEET.
- � SOLICITATION AMENDMENT# , #/##/ I 9 CJ
r �
USDA FOREST SERVICE
TONGASS N.F.
, PETERSBURG RANGER DISTIRCT �
RAVEN TRAIL RECONSTRUCTION
PHASE 2
STONE PITCHING (SP)
DESIGNED:
DRAWN:
CHECKED:
BH
CJ
BH
PROVIDE 3" MIN. AGGREGATE
SURFACING BEDDING IF STONES
DO NOT BEAR ON MINERAL SOIL
SUBGRADE
BRUSH FINE ROCK OR MINERAL
SOIL INTO CRACKS TO COMPLETELY
FILL VOIDS AFTER SETTLEMENT
PLACE STONES TO BEAR
DIRECTLY AGAINST STONES
DOWNSLOPE AND TO BRIDGE
JOINTS AS SHOWN
RISER STONE, TYP.
ti GARGOYLE, TYr.
PLAN VIEW
NOTTO SCALE
DATE: 07/20 I 7
DATE: I 1/2018
DATE: I 1/2018
AUTOCAD FILENAME:
STONE PITCHING.DWG
( SHEET ..:Z.. OF 25
Amendment 2 12010919R0002 Raven Trail Reconstruction 27 March 2019 mmeiners Highlight
File details come from the government source that posted it.