12010918Q0078.pdf

PDF 590 KB Posted

Attached to
Yakutat Ranger House Remodel
Solicitation number
12010918Q0078
Issued by

About this file

RFQ - 12010918Q0078

View the file

Other files

File Type Posted
12010918Q0078_amend3.pdf PDF
12010918Q0078_amend2.pdf PDF
8Yakutat_Ranger_House_LBP_XRF_file.xls.csv CSV file
7Yakutat_Ranger_House_LBP.PDF PDF
12010918Q0078_amend1.pdf PDF
5Yakutat_Ranger_House_AsbestosMP.PDF PDF
3Modular_Units_Sketches.pdf PDF
4WageRate_AK180005.pdf PDF
1Photos.docx DOCX document
6EXPERIENCE_AND_CAPABILITY_QUESTIONNAIR1.docx DOCX document
2Floorplan_blg_1021_yakutatRD.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

6 8

12010918Q0078 Yakutat Ranger House Remodel

SECTION B – SCHEDULE

Supplies or Services and Prices/Costs

Schedule of Items

Item No. Supplies/Services QTY Unit Unit Price Amount

Ranger House Base Items

1 Bathroom Repair 1 LS $ $

2 Water Damage Repair 120 BF $ $

3 Electrical and Smoke Detector Improvements 1 LS $ $

4 Drywall Repairs 36 SF $ $

5 Roofing Repairs 1 LS $ $

6 Siding Repairs 1 LS $ $

7 Mobilization 1 LS $ $

Total $

Ranger House Option Items

A Asbestos Abatement 1 LS $ $

B Roof Maintenance 1 LS $ $

C Roof Modification – Front Gable Roof 1 LS $ $

D Roof Modification – Garage Roof 1 LS $ $

E Ranger House Access 1 LS $ $

F Lighting Improvements 1 LS $ $

G Insulation 30 SF $ $

H New Flooring – Vinyl 1 LS $ $

Modular Units Option Items

I Smoke and CO Detector Improvements 1 LS $ $

J Modular Home Repairs 1 LS $ $

Total Optional Items $

Total of all items.

This is the price the contractor agrees to complete all work described in this solicitation and resulting contract. All other work and resources, not identified on the schedule of items, are incidental to completing this work.

Abbreviations:

LS = Lump Sum, SF = Square Feet, BF = Board Feet

Additional terms:

1. The quoter must quote on all items.

2. Prospective quoters are encouraged to perform a site visit and to verify quantities prior to submitting quotes. Quantities provided throughout this contract are for estimating purposes only.

3. In the event of an error in extending the quote prices, unit prices will govern unless otherwise determined by the Contracting Officer in accordance with applicable regulations. Offers for quantities less than those listed in the numbered items may be rejected.

4. Asbestos is present in the floor tiles under the existing resilient flooring and in the textured ceiling paint in the ranger house.

Vendor Information

Point of Contact:

Phone:

Vendor Name:

Fax:

Email:

DUNS:

Notice to Offeror(s)/Supplier(s):

Funds are not presently available for this effort. No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation, either before or after the solicitation’s closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs incurred.

SECTION C – DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

Price Range The magnitude of construction is estimated to be:

Between $100,000 and $250,000 (Base items and all options)

C.1 Scope The intent of this contract is to provide for the complete construction of the project described in the contract.

Unless otherwise provided, the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies, and perform all work required to complete the project in accordance with drawings, specifications, and provisions of the contract. All appurtenances, fasteners, hardware, and connections to make a complete and useable system are considered incidental to the work items.

C.2 General Description Description: This project includes exterior and interior work to be done on a residential building known as the “Ranger House”. Base work includes bathroom flooring, bathtub, water closet, bathroom vanity, electrical improvements, ventilation improvements, smoke detector replacement, hydronic baseboard improvements, drywall repairs, roofing repairs, and siding repairs.

Optional item work includes roof modifications, insulation, lighting improvemnts, access improvements, and flooring replacement for the Ranger House. Optional item work for Modular units #4 & #5 includes smoke and CO detector improvements and various modular home repairs.

• The Yakutat Ranger House is a one-story residential building. It includes three bedrooms, kitchen, dining area, living area, one bathroom, utility area, closets, and garage.

• The Yakutat Modular Homes #4 and #5 are one-story residential buildings. The wanigans are small enclosed additions built onto the modular homes for extra living/storage space. These areas are insulated and unheated.

C.3 Project Location and Facilities The project is located at the Yakutat Ranger District at 712 Ocean Cape Road, Yakutat, Alaska 99689. The Ranger House is located on the U.S. Forest Service Yakutat Ranger District Administrative Compound in Yakutat, Alaska (868 Forest Service Road) approximately 0.5 miles northwest of the airport. Yakutat is accessible by commercial airlines, Alaska Marine Highway system, and commercial barge.

C.4 Period of Performance On-site work may commence after Notice to Proceed and may commence July 24, 2018. Base Items work shall be completed by September 8, 2018. If any or all Option Items are awarded, all contract items shall be completed by December 8, 2018.

C.5 Special Conditions

a. Material storage is allowed on-site during construction. Location(s) to be approved by Contracting Officer (CO).

b. Means of egress shall be maintained or provided at all times.

c. Design and construction will meet the current versions of federal, state, local ordinances, and model building codes.

d. Plumbing, Electrical, and Mechanical work shall be performed under an administrators license in the

State of Alaska.

e. Contractor will be responsible for daily removal and disposal of all construction debris, and for daily cleanup of tools, worksite, etc.

f. Drawings and dimensions included in contract are for reference only. Contractor is responsible to verify dimensions and quantities prior to ordering materials etc.

g. Existing installed construction and equipment to remain will be inspected prior to onsite work.

Contractor will protect this existing from damage during construction.

h. All material shall be delivered, stored, handled, and installed per manufacturer’s specifications and recommendations.

C.6 Submittals

The vendor shall submit product samples for CO approval prior to ordering materials for project.

Submittal Number Submittal Title Contract Reference Due Govt. Response

YRD-01 Vinyl Sheet Flooring 09 6500 – 1.02 Prior to Construction 15 days after receipt

YRD-02 Paint 09 9100- 1.02 Prior to Construction 15 days after receipt

YRD-03 Cabinets 12 3200 – 1.02 Prior to Construction 15 days after receipt

YRD-04 Plumbing Fixtures 22 4100 – 1.02 Prior to Construction 15 days after receipt

YRD-05 Ventilation – Air circulation 23 3400 – 1.02 Prior to Construction 15 days after receipt

YRD-06 Hydronic Baseboard Covers 23 3713 – 1.02 Prior to Construction 15 days after receipt

C.7 Work Items

RANGER HOUSE BASE ITEMS

ITEM 1 - BATHROOM REPAIR

Demolition: Remove all flooring, water closet, bathtub, sink and bathtub water fixtures, vanity, base cabinet, towel rack, shelving, ventilation fan, wall tiles, damaged drywall, baseboard heater covers, damaged floor joists and wall studs, damaged subfloor, and trim in bathroom. Modify existing plumbing, floor joists, wall studs and subfloor as needed to support new bathtub/shower insert and water closet.

Furniture and Fixtures:

1. Install new bathtub and shower insert, water closet, lavatory, vanity, base cabinet, faucets and towel racks. Install new bathtub/shower insert, water closet, and lavatory faucet with new supply lines and wax seal. Replace existing valves, plumbing and fixtures with new.

2. Install new horizontal slider bathroom window compliant with IRC Section R308 with privacy glass.

Electrical:

1. Remove and replace light/exhaust fan unit and vanity lighting.

2. Install a new GFI outlet where required by code.

3. Install new fan and light that comes with a programmable timer.

4. Install ductwork to exterior for exhaust fan unit.

Trim: Remove and replace all trim.

Flooring: Install vinyl floor system.

Paint: Replace damaged drywall where necessary. Paint all wall and ceiling surfaces, trim and painted doors or cabinets.

Hydronic baseboard heaters: Remove existing air bleeder auto vents at baseboard heaters. Install new float operated auto vent at baseboard heaters. Install new baseboard covers.

Finishes: See specification sections and submit for approval by COR before ordering. Submit all paint colors, counter texture and colors, other colored finishes, and flooring as one submittal to be coordinated for approval.

ITEM 2 - WATER DAMAGE REPAIR

Remove damaged or rotted floor joists, subfloor, and wall framing. Install new joists, studs, and subfloor.

Rot was not observed in the floor joists, but may be present, some damage was observed in the subfloor under the existing tub, and some damage to wall studs was observed.

ITEM 3 - ELECTRICAL and SMOKE DETECTOR IMPROVEMENTS Install four (4) new hardwired smoke detectors in ranger house and two (2) carbon monoxide detectors.

Enclose incandescent (keyless) lightbulbs in the garage as required by code.

ITEM 4 - DRYWALL REPAIRS

Remove damaged drywall behind washer and dryer. Repair any dry-rotted and damaged studs, joists, and subfloor. Install new drywall to match existing. Install new dryer vent duct.

ITEM 5 - ROOFING REPAIRS

Remove and replace flashing and drip edge where damaged or missing. Remove all remaining gutters and appurtenances. Repair damage to roofing, framing, and sheathing from gutters and damage from ice ripping gutters off as visible in Attachment #1 - Photos.

ITEM 6 - SIDING REPAIRS

Remove damaged siding at previously removed vent penetration. Replace siding and paint to match existing siding. Install new insulation where needed.

RANGER HOUSE OPTIONS

OPTION A - ASBESTOS ABATEMENT

Remediate 30 SF of asbestos white linoleum floor tile in the bathroom. See Attachment #3 - Yakutat Ranger House Asbestos Management Plan.

OPTION B - ROOF MAINTENANCE

Replace all fasteners and gaskets over entire Ranger House roof using components of the same metal as the roof panels. Seal each replacement fastener and panel seam with manufacturer recommended sealant.

OPTION C - ROOF MODIFICATION – Front Gable Roof Demolition: Remove existing concrete landing and steps. Remove roofing and roof framing as needed.

Gable Roof: Submit architect’s design for gable roof over front entry for approval by COR before beginning construction of gable roof. Install gable roof over front porch area using approved design. Gable roof to be minimum 8 feet wide by minimum 6 feet from exterior of house and extend over front door to provide area sheltered from rain and falling ice and snow. Construct new landing and stairs leading away from house.

Install gravel path 4 feet wide from end of stairs to driveway.

Finishes: See specification sections and submit for approval by COR before ordering. Submit all paint colors as one submittal to be coordinated for approval.

OPTION D - ROOF MODIFICATION – Garage Roof Demolition: Remove roofing and roof framing as needed.

Garage Roof: Submit architect’s design to extend garage eave roofline three feet in order to prevent snowmelt from entering under the garage door into the garage. Submit design for approval by COR before beginning construction of eave extension. Install extended garage eave roofline using approved design.

Construction shall include, but not limited to additional footings, columns, beams, rafters, sheathing, membrane, roofing and flashing.

Finishes: See specification sections and submit for approval by COR before ordering. Submit all paint colors as one submittal to be coordinated for approval.

OPTION E - RANGER HOUSE ACCESS

Remove and replace exterior man door in garage with pre-hung fiberglass door, existing door dimensions are 30” wide by 80” high. Match existing exterior color and trim. Replace steps to swing door between garage and living room with code compliant landing and staircase.

OPTION F - LIGHTING IMPROVEMENTS

Demolition: Remove existing light fixtures and smoke detectors in ranger house and modular houses.

Electrical: Install ceiling surface mounted 2-lamp light fixture with LED bulbs to replace existing light fixtures except install exterior LED wall mounted and pole mounted light fixtures on exterior. Replace light fixtures in living room, dining area, hallways, kitchen and utility areas, bedrooms, bathroom and garage.

Estimated number of new fixtures is seven (7). Replace two (2) ceiling mounted light fixtures in garage.

Replace four (4) exterior wall mounted light fixtures and exterior pole mounted light fixture at ranger house.

OPTION G - INSULATION

Install new insulation to match existing insulation in crawl space where missing or damaged. Estimated area of missing or damaged insulation is 30 square feet in floor and 10 lineal feet on the water lines.

OPTION H - NEW FLOORING - VINYL

Demolition: Remove all carpet pad and carpet and prepare floor per manufacturer recommendation.

Flooring: Replace any damaged subfloor with new ¾” plywood, or depth to match existing. Install vinyl plank floor system in bedrooms.

Trim: Remove and replace all baseboard trim with new trim at new flooring. Trim shall match existing.

Finishes: See specification sections and submit for approval by COR before ordering. Submit all paint colors, counter texture and colors, other colored finishes, and flooring as one submittal to be coordinated for approval.

MODULAR UNITS OPTIONS

OPTION I - SMOKE AND CO DETECTOR IMPROVEMENTS

Hardwire Smoke Alarm System for Modular Units #4 & #5: Remove all existing smoke detectors and install a new hardwired, interconnected smoke alarm and CO detector system on dedicated circuits according to code requirements.

Install new smoke and carbon monoxide detectors in modular houses. There are two (2) modular houses with seven (7) detectors each.

OPTION J - MODULAR HOME REPAIRS

Wanigans: For the four (4) total wanigans at units #4 & #5, temporarily support the wanigan, remove the post supports and excavate for the new supports. Install concrete pier supports, new posts, and adjustable post cap/beam leveler on new posts.

Handrails: At unit #4 & #5, replace handrails with code compliant graspable handrails two (2) for each unit.

Prepare surfaces and paint handrails at both modular homes to match existing. Reattach staircases on all porches with appropriate Simpson stainless steel mounting brackets.

Unit #5:

• Install and paint skirting to properly close in the crawl space under the wanigan. Install locking hinged access door on skirting to access crawlspace. Skirting to match existing.

• Install 30”x30” landing in front of water heater closet in carport.

• Replace exterior door at side wanigan (between wanigan and exterior stairs) after wanigan is underpinned and leveled.

C.8 Notification and Maintenance of Work Schedule At the pre-work meeting, provide a proposed schedule of work showing beginning and completion dates of salient work items for the Contracting Officer’s approval. Contractor shall maintain the schedule up to date, and provide it to the Contracting Officer Upon request. Also incorporated into this contract is FAR 52.236- 15, Schedules for Construction Contracts.

C.9 Specifications Index – By Division 01 33 00 Submittal Procedures 01 44 00 Requests for Information 02 41 00 Demolition 06 10 00 Rough Carpentry 06 22 00 Moldings, Trim 08 17 00 Doors and Hardware 08 53 13 Vinyl Windows 09 29 00 Interior Gypsum Board 09 65 00 Vinyl Flooring 09 91 00 Paint 12 32 00 Cabinets 22 41 00 Plumbing Fixtures 23 34 00 Ventilation – Air Circulation 23 37 13 Hydronic Baseboard Covers 26 51 00 Electrical

SECTION 01 33 00

SUBMITTAL PROCEDURES

PART 1 – GENERAL

1.01 DESCRIPTION

A. Reviewing, Certifying, Approving Authority: Contractor shall be responsible for reviewing and certifying that submittals are in compliance with contract requirements.

B. Scheduling: Allow review period, beginning with receipt by approving authority that includes at least 10 working days for submittals for contracting officer approval. Period of review for submittals with contracting officer approval begins when Government receives submittal from contractor. Period of review for each resubmittal is the same as for initial submittal.

C. Variations: Variations from contract requirements require Government approval pursuant to contract Clause entitled “FAR 52.236-21, Specifications and Drawings for Construction” and will be considered where advantageous to government.

D. All products identified in these specifications shall require approved submittals prior to installation.

E. Finishes: See specification sections and submit for approval by COR before ordering. Submit all paint colors, counter texture and colors, other colored finishes, and flooring as one submittal to be coordinated for approval.

SECTION 01 44 00

REQUESTS FOR INFORMATION (RFIs)

PART 1 – GENERAL

A. Immediately on discovery of the need for additional information or interpretation of the Contract

Documents, Contractor shall prepare and submit an RFI in the form specified.

a. Contracting Officer will return RFls submitted to Contracting Officer by other entities controlled by Contractor with no response.

b. Coordinate and submit RFls in a prompt manner so as to avoid delays in Contractor's work or work of subcontractors.

B. Include a detailed, legible description of item needing information or interpretation and the following:

a. Contract Name and Number

b. Date.

c. Name of Contractor.

d. RFI subject.

e. Specification Section number and title and related paragraphs, as appropriate.

f. Drawing number and detail references, as appropriate.

g. Field dimensions and conditions, as appropriate.

h. Contractor's suggested resolution. If Contractor's suggested resolution impacts the Contract

Time or the Contract Sum, Contractor shall state impact in the RFI.

i. Contractor's signature.

j. Attachments: Include sketches, descriptions, measurements, photos, Product Data, Shop

Drawings, coordination drawings, and other information necessary to fully describe items needing interpretation.

i. Include dimensions, thicknesses, structural grid references, and details of affected materials, assemblies, and attachments on attached sketches.

ii. Attachments shall be electronic files in Adobe Acrobat PDF format.

C. Contracting Officer will review each RFI, determine action required, and respond. Allow seven working days for Contracting Officer's response for each RFI. RFls received by Contracting Officer after 1:00 p.m. will be considered as received the following working day.

a. The following Contractor-generated RFls will be returned without action:

i. Requests for approval of submittals.

ii. Requests for approval of substitutions.

iii. Requests for approval of Contractor's means and methods.

iv. Requests for coordination information already indicated in the Contract Documents.

v. Requests for adjustments in the Contract Time or the Contract Sum.

vi. Requests for interpretation of Contracting Officer's actions on submittals.

vii. Incomplete RFls or inaccurately prepared RFls.

b. Contracting Officer's action may include a request for additional information, in which case Contracting Officer's time for response will date from time of receipt of additional information.

c. If Contractor believes the RFI response warrants change in the Contract Time or the Contract Sum, notify Contracting Officer in writing within 10 days of receipt of the RFI response.

D. Prepare and maintain a tabular log of RFls organized by the RFI number. Submit log. Include the following:

a. Contract name and number.

b. Name and address of Contractor.

c. RFI number including RFls that were returned without action or withdrawn.

d. RFI description.

e. Date the RFI was submitted.

f. Date Contracting Officer's response was received.

E. On receipt of Contracting Officer's action, update the RFI log and immediately distribute the RFI response to affected parties. Review response and notify Contracting Officer within seven days if Contractor disagrees with response.

SECTION 02 41 00

DEMOLITION

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required to partially or entirely remove and/or demolish those items identified in this contract and restore any disturbed areas or components impacted by demolition.

1.02 JOB CONDITIONS

A. Protection: Ensure safe passage of persons around area of demolition. Conduct operations to prevent injury to adjacent buildings, structures, and persons.

B. Egress: Maintain two paths of egress to any occupied apartment.

C. Damages: Promptly repair damages caused to adjacent structures by demolition operations at no cost to the Owner.

PART 2 - PRODUCTS Not applicable.

PART 3 - EXECUTION

3.01 DISPOSAL OF DEMOLISHED MATERIALS

A. All debris, rubbish, and other materials resulting from demolition operations and not identified as salvageable by the Owner’s Representative shall be removed and transported to a Contractor-furnished disposal site. All items removed shall become the property of the Contractor.

B. Burning of removed materials will not be permitted on site.

SECTION 06 10 00

ROUGH CARPENTRY

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for general carpentry related work.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Wood Products, General

a. All lumber shall be grade #2 or better.

b. Provide lumber graded by an agency certified by the ALSC Board of Review.

c. Preservative Treatment by Pressure Process: AWPA C2.

d. Plywood shall be T&G structural rated plywood per current International Residential Code.

Plywood shall be glued and screwed to joists.

B. Fasteners

a. Where rough carpentry is exposed to weather, in ground contact, pressure- preservative treated, or in area of high relative humidity, provide coated, exterior rated or stainless steel fasteners.

PART 3 - EXECUTION

3.01 INSTALLATION

A. Set rough carpentry to required levels and lines, with members plumb, true to line, cut, and fitted.

Fit rough carpentry to other construction; scribe and cope as needed for accurate fit.

B. Wood members that will have permanent contact with concrete or earth shall be pressure treated.

C. Framing practices for exterior facing walls will include bottom plate and top plates, intermediate studs, sheathing, housewrap, and siding finish or other in kind protective product.

D. Provide blocking and framing as indicated and as required to support facing materials, fixtures, specialty items, and trim.

a. Provide metal clips for fastening gypsum board or lath at corners and intersections where framing or blocking does not provide a surface for fastening edges of panels. Space clips not more than 16 inches o.c.

E. Frame the window rough opening in accordance with the latest edition of the International Building Code.

F. Install sill sealer gasket to form continuous seal between sill plates and foundation walls.

G. Do not splice structural members between supports unless otherwise indicated.

H. Provide fire blocking in furred spaces, stud spaces and other concealed cavities similar to existing.

3.02 WALL AND PARTITION FRAMING INSTALLATION

A. General: Provide single bottom plate and double top plates using member of 2-inch nominal thickness whose widths equal that of studs, except single top plate may be used for non-load-bearing partitions.

Fasten plates to supporting construction unless otherwise indicated.

1. For exterior walls, provide wood studs spaced sized same as existing or in accordance with the latest edition of the IBC, whichever is stricter.

2. Provide continuous horizontal blocking at midheight of partitions more than 96 inches high, using member of 2-inch nominal thickness and of same width as wall or partitions.

B. Construct corners and intersections with three or more studs, except that two studs may be used for interior non-load-bearing partitions.

C. Frame openings with multiple studs and headers, Provide nailed header members of thickness equal to width of studs. Support headers on jamb studs.

1. For non-load-bearing partitions, provide double-jamb studs and headers not less than 4-inch nominal depth for openings 48 inches and less in width, 6-inch nominal depth for openings 48-72 inches in width.

2. For load-bearing walls, provide double-jamb studs for openings 60 inches and less in width, and triple-jamb studs for wider openings. Provide headers of depth indicated.

SECTION 06 22 00

MOLDINGS, TRIM

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the installation of finished trim.

A. Trim materials to match existing trim or at the approval of the COR to be the following or approved other;

a. 1”x4” stained or painted oak

b. Rubber cove base

B. Fasteners

a. Use finish nails designed for the fastening of trim or fasten in accordance with manufacturer recommendation.

PART 3 - EXECUTION

3.01 INSTALLATION

A. All new trim is to be primed and painted or stained. Any scuffs in paint from installation are to be repainted.

B. Trim is to be fastened using mechanical means. Pneumatic or manual applications are acceptable means of applying finish nails to trim.

C. Nail heads are to be driven so that the nail heads are flush with the trim surface.

D. Nail heads are to be painted over after installation.

E. Trim splices are to be made with angled joints.

SECTION 08 17 00

DOORS AND HARDWARE

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the installation of prefabricated exterior prehung door and associated hardware.

B. The contractor is responsible to measure and verify all door openings for proper fit.

2.01 MATERIALS – doors

A. Exterior doors

a. Doors shall be fiberglass, prehung, and insulated.

b. Half glass door with tempered low E glass. Glass to be privacy or frosted type.

c. U-Factor: 0.16

B. Hardware

a. Provide all new satin nickel or chrome. Lever to be decorative style.

b. Submit manufacturer literature to CO for approval prior to ordering.

c. Exterior doors shall have combination deadbolt with un-keyed interior side and lockable entry lever. Lever style to match interior door hardware.

d. By-pass doors shall have recessed pulls on both edges of each panel. Match finish with interior door hardware.

e. Acceptable manufacturer: Schlage or better.

PART 3 - EXECUTION

A. Measure and verify existing door size to ensure proper replacement fit.

B. All doors are to be primed and painted white. Any scuffs in paint from installation are to be repainted.

C. Trim is to be fastened using mechanical means. Pneumatic or manual applications are acceptable means of fastening the door systems. Match existing paint color.

D. Install door per manufacturer’s instructions.

E. Insulate and seal frames of exterior doors.

F. Keying shall allow one key to operate deadbolt and entry lever.

SECTION 08 53 13

VINYL WINDOWS

PART 1 – GENERAL

1.1 SUMMARY

A. Section Includes:

1. Horizontal Slider

1.2 DELIVERY, STORAGE and HANDLING

A. Comply with Manufacturer’s/Dealer’s ordering instructions and lead time requirements to avoid construction delays.

B. Delivery: Deliver materials in Manufacturer’s standard packaging for protection of product.

C. Storage & Protection: Store products away from exposure to environmental conditions that may be harmful to materials.

D. Store materials off ground in an upright position. Provide cover from weather and construction activity.

E. Follow Manufacturer’s instructions on label applied to units.

1.3 WARRANTY

A. Commercial Warranty:

1. 10 Year Warranty.

2. Guarantee windows against defects in materials and workmanship including costs for replacement parts and labor.

Part 2 - PRODUCTS

2.1 MANUFACTURER

A. Products supplied by the following manufacturer or approved equal:

Milgard Manufacturing, Inc.

1010 54th Avenue East Tacoma, WA 98424 (800)-Milgard (645-4273) milgard.com

B. Window Series: Milgard Tuscany® Series C. Substitutions: Reference Section 01 25 13 - Product Substitution Procedures

2.2 MATERIALS

A. Integral color PVC compound containing impact-resistant solid plasticizer, titanium dioxide

UV inhibitor, and surface and color stabilizers.

B. Weatherstripping:

1. Vinyl compression bulb seal

2.3 WINDOW TYPE

A. Horizontal Slider –

1. Frame: 3-1/4” minimum depth. Multi-chambered vinyl profile.

2. Sash: 1-1/4” minimum depth. Multi-chambered vinyl profile, includes vent stops located in fixed sash.

3. Sightlines: Equal for operating and fixed sash.

4. Structural Class:

a. 71-1/2” X 59-1/2” and smaller: HS-C40.

5. Hardware:

a. SmartTouch® direct action locking mechanism.

b. Nylon rollers with stainless steel axles, extruded vinyl snap-on monorail roller track.

c. Dual pull rails.

6. Weatherstripping: Fin seal polypropylene pile.

2.4 GLAZING SYSTEM

A. Manufacturer’s standard factory-glazing system that produces weathertight seal.

2.5 INSECT SCREENS: Provide tight fitting screen (with hardware) for operating windows

A. Screen Frame:

1. Rolled Formed Aluminum Frame – Standard

B. Screen Mesh:

1. PureView® High Visibility Fiberglass Mesh - Standard.

2.6 FABRICATION

A. Fabricate frames and sash with mitered and fusion welded corners and joints.

B. Trim and finish corners and welds to match adjacent surfaces.

C. Provide concealed metal reinforcements in sash frame for attachment of lock mechanism.

D. Factory interior glaze with snap-on mitered PVC glazing stops matching bevels on the sash and frame. Insulated glass units shall be reglazable without dismantling sash framing.

http://www.milgard.com/

2.7 FINISH

A. Frame Color:

1. Exterior: Match existing

2. Interior matched to exterior on White, Clay and Tan only. All other exterior finish colors have white interior.

B. Screen Frame Color:

1. Matched to exterior frame color

2.8 SOURCE QUALITY CONTROL:

A. Inspect windows in accordance with Manufacturer's Quality Control Program as required by

AAMA Gold Label Certification.

PART 3- EXECUTION

3.1 EXAMINATION

A. Examine openings in which windows will be installed.

1. Verify that framing complies with AAMA 2400 (Mounting Flange Installation) &

AAMA 2410 (Flush Fin Installation).

2. Verify rough opening dimensions, levelness of sill plate, and operational clearances.

3. Verify that fasteners in framed walls are fully driven and will not interfere with window installation.

4. Examine wall flashings, vapor retarders, water and weather barriers, and other built-in components to ensure weathertight window installation B. Coordinate with responsible entity to correct unsatisfactory conditions.

C. Commencement of work by installer is acceptance of substrate conditions.

3.2 INSTALLATION

A. Install windows in framed walls in accordance with AAMA 2400 (“Mounting Flange

Installation”) and/or AAMA 2410 (“Flush Fin Installation”).

B. Install windows level, plumb, square, true to line, without distortion, anchored securely in place to structural support, and in proper relation to wall flashing and other adjacent construction to produce weathertight construction.

C. Do not remove temporary labels.

D. Install insect screens on operable windows.

3.3 CLEANING AND FINISHING

A. Remove temporary labels and retain for Closeout Submittals.

B. Clean soiled painted surfaces and glass using a mild detergent and warm water solution with soft, clean cloths.

SECTION 09 29 00

INTERIOR GYPSUM BOARD

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the installation of gypsum board to include taping, texturing, and painting.

A. Wall Type

a. Thickness: 5/8 inch or match existing thickness for patches.

b. Type X

c. Long Edges: Tapered

B. Ceiling Type: manufactured to have more sag resistance than regular-type gypsum board.

a. Thickness: ½ inch – unless truss spacing requires thicker board.

b. Long Edges: Tapered

C. Moisture and Mold Resistant Type: With moisture and mold resistant core and surfaces.

a. Core: 5/8 inch, Type X

b. Long Edges: Tapered

PART 3 - EXECUTION

3.01 INSTALLATION

A. Install per manufactures instructions and in compliance with the current edition of the International Residential Code or other governing codes.

B. Tape and texture surfaces to match existing.

SECTION 09 65 00

RESILIENT FLOORING - VINYL SHEET FLOORING

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the installation of vinyl flooring. Incidental work includes preparation of substrate to receive vinyl flooring system.

1.02 SUBMITTAL

A. Submit product samples for CO approval prior to ordering materials for project. Submit with other paint and interior color samples.

PART 2 - PRODUCTS

2.01 MATERIALS

A. Flooring

a. Vinyl flooring: Mannington Luxury Vinyl Sheet, or approved equal. Platinum performance level. Pattern shall be Penny Lane or Parthenon. Color: quartzite with granite or pumice or similar texture and color.

B. Underlayment

a. APA Underlayment rated plywood or approved equal.

C. Molding, Trim and Accessories

a. Nails: ring shanked underlayment nails

b. Supply all accessories needed for installation to comply with manufacturer’s instructions and code compliance. Molding sections shall be from the same manufacturer as the flooring.

PART 3 - EXECUTION

3.01 INSTALLATION

A. Install flooring system in compliance with the manufacturer’s specifications. Provide any underlayments, adhesives, or other to provide a complete system per the manufacturer’s instructions.

B. Remove existing flooring and prepare existing subfloor for new vinyl installation.

C. Install plywood underlayment under vinyl plank flooring where existing floor is damaged.

D. Install moisture barrier under first floor installation.

E. Cover all flooring edges, seams and transitions with appropriate trim and molding sections.

F. Provide transition strips at doorways, hall openings, and similar locations.

SECTION 09 91 00

PAINT

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the preparation and/or painting of interior walls and ceilings, and exterior surfaces.

1.02 SUBMITTAL

A. Submit color samples for CO approval prior to ordering materials for project. Submit with other finish samples.

PART 2 – PRODUCTS

A. Interior Paint

a. Paint is to be 100% lead free

b. Acrylic

c. Satin finish on vertical surfaces. Eggshell finish on ceiling.

B. Exterior Paint

a. Paint is to be 100% lead free

b. Oil base or acrylic

c. Approved by manufacturer for outdoor use.

3.01 EXTERIOR WASHING

A. All existing exterior surfaces, excluding windows and doors, shall be thoroughly cleaned by pressure washing, including roof, walls, decks and stairs. Windows shall be hand washed with mild detergent, sponge and squeegee after pressure washing of other surfaces.

B. Remove all downspouts, gutters, and related hangers. Proceed with washing, starting from roof and working downward. Remove all visible signs of vegetation, dirt and mold.

C. Protect utilities or other items secured to wall or roof surfaces from damage from spray. Do not allow pressure spray to penetrate laps of vinyl siding or trim, attic vents, wall vents, or any other openings. Use only fan pattern pressure washer on any surface. Do not allow spray to damage any surface or leave visible patterns.

3.02 APPLICATION

A. Paint is to be applied by rollers or sprayer. Brushes are only to be used for touch up work.

B. Exterior surfaces shall be pressure washed. All bare wood shall receive one prime coat and two finish coats.

C. New interior surfaces, including gypsum board, doors, trim and shelving, shall receive one prime coat and two finish coats.

D. Kitchen and bathroom walls shall be washed with degreasing detergent prior to painting.

E. Finished product will be uniform, free of runs, and not allow transparency to existing surface colors.

F. Existing interior surfaces shall receive two coats new paint. Apply additional coats as necessary for complete cover of existing surface colors.

G. New and refinished trim will receive one coat of primer and two coats of finish paint.

H. Perform painting after all feasible demolition and repair work is complete to eliminate potential damage to the newly painted surfaces.

I. All new doors, trim, etc. shall be painted prior to installation.

SECTION 12 32 00

CABINETS

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the installation of bathroom base cabinet.

1.02 SUBMITTALS

A. Submit product samples and literature for CO approval prior to ordering materials for project.

A. Bathroom Base Cabinet

a. Cabinet shall be of plywood or solid wood construction.

b. Surfaces shall be of light brown wood material and protected with a stain finish or painted white.

c. Cabinets shall occupy the same footprint as the existing cabinets.

d. Cabinets must consist of at least one door, but may be accompanied with drawers.

B. Vanity countertop

a. Countertop shall include an integral backsplash.

b. Material shall be scratch and stain resistant.

c. Provide end trim and end splashes as required for a finished appearance.

d. Countertop material shall be stain resistant marble in off white or grey/white.

A. Install per manufacturers specifications.

B. Cabinet tops shall be installed level.

C. Height with countertop installed is not to exceed 34” high per ABA.

SECTION 22 41 00

PLUMBING FIXTURES

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the installation of the water closet and bathtub.

1.02 SUBMITTALS

A. Submit product data and samples including trim, fittings, accessories, appliances, appurtenances, equipment and supports for CO approval prior to ordering materials for project. Documentation indicating flow and water consumption requirements.

A. Water Closets

a. Floor-mounted, floor-outlet, close-coupled (gravity tank), elongated toilet with polished trap

b. White vitreous china

c. 1.28 to 1.6 Gallons per flush

d. Include wax ring

e. Include seat at 17 to 19 inches above floor level.

B. Bathtub/shower

a. Minimum dimensions: 60”x30”x74” (contractor to verify dimensions prior to ordering materials)

b. To accomplish the minimum coverings of the bath/shower install, wall coverings may be independent pieces from the tub.

i. Example; panels, tile, etc.

ii. If a wall covering material will be used that differs from the tub, the material and fastening system must be approved for use in showers.

c. Tub and wall panels (if used) are to be constructed of solid vikrell material (by Sterling Plumbing) or approved equivalent with a white finish.

d. Grab bars: provide minimum two grab bars in tub shower area. For panel installations, bars shall be molded into the panel. For tile installations, bars shall be backed with 2x lumber

e. Delta classic monitor 17 series mixing valve/faucet/showerhead combo with low flow head (2.5 gpm maximum) or approved equal

C. Lavatory

a. Self-rimming bathroom sink, 19” minimum width of bowl. Alternate: vanity top to have integral sink.

b. Slightly lifted drip free edge to contain excess water.

c. Dimensions shall match existing vanity.

d. Faucet hole layout to be coordinated with faucet selection.

e. FAUCET: one of the following models or approved equal.

i. Delta Windmere 2-handle centerset, brushed nickel finish

ii. Moen Eva, 2-handle, brushed nickel finish

iii. Koehler Forte 2-handle, brushed chrome finish

A. Install per manufacturers specifications B. NSF Standard: Comply with NSF/ANSI 61, "Drinking Water System Components - Health

Effects," for faucet materials that will be in contact with potable water.

C. Shower grab bars shall be located with the approval of the CO.

D. Countertop shall be installed level.

E. Any water supply lines or drain waste vent alterations required for proper install are incidental to the installation of all bathroom fixtures.

F. PEX piping shall be used to plumb the water from the main water supply in the crawl space to the fixture.

G. PEX piping shall be thermally protected by insulation full length of piping.

SECTION 23 34 00

VENTILATION – AIR CIRCULATION

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the installation of bathroom and utility room light/fan exhaust fan units.

A. Submit product samples for CO approval prior to ordering materials for project.

A. Light/exhaust fan

a. 50 CFM minimum

b. Ball bearing design

c. Energy star compliant

d. Fan sound level of 8 sone or less

e. Include light bulbs

B. Ductwork

a. Use ducting of sheet metal minimum 0.016 inch thickness that complies with exhaust fan manufactures specifications and the mechanical code.

C. Vent Hood

a. Use a vent hood that complies with exhaust duct manufactures specifications and the mechanical code.

b. Vent hood shall be constructed of stainless steel or aluminum.

D. Acceptable Manufacturers, or approved equal

a. NuTone

b. Broan

c. Panasonic

A. Install per manufacturers specifications B. Exhaust all vents to the exterior, provide a tight seal between building envelope and venting components using caulking or other approved materials.

C. Any wiring, drywall repairs, painting, etc necessary for successful installation with a finished look is considered incidental to the work.

SECTION 23 37 13

HYDRONIC BASEBOARD COVERS

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the removal and installation of hydronic baseboard covers.

A. Submit product samples for CO approval prior to ordering materials for project.

E. Hydronic baseboard covers

a. Covers shall be constructed of galvanized steel, with white powder coat or baked enamel finish.

b. Covers shall be perforated for air circulation (no moving parts), and match existing baseboard covers.

c. Matching end caps, corner brackets, and connectors from the same manufacturer.

F. Hydronic baseboard auto vent

a. Auto vent shall be float-operated vent designed for systems with pressures up to 50 psi.

Vent to include an automatic shut-off that stops the flow of water automatically when the vent is removed. Maid-O-Mist® No. 67 auto vent with No. 9AS shortstop automatic shut off, or approved equal.

b. Estimated number of existing auto vents is 2.

A. Install per manufacturers specifications B. All sections of covers shall have the appropriate end cap, corner bracket or connector on both ends of the section.

C. Use the longest cover section possible to minimize the use of connectors mid-span.

SECTION 26 51 00

ELECTRICAL

PART 1 - GENERAL

1.01 DESCRIPTION

A. This section covers the furnishing of materials, labor, and equipment required for the wiring of the lighting installation, outlet replacements, switch replacement, and other miscellaneous electrical work. All electrical work shall be performed by licensed electrician.

2.01 MATERIALS - GENERAL

A. Wiring/cables

a. Use solid or stranded copper

b. Wire thickness to comply with NEC codes and regulations

B. Connections

a. Use bronze grounding clamps and connectors

b. Use wire nuts ok in NEC acceptable locations

C. Lighting (all UL listed)

a. Ceiling mounted, decorative flush mounted, round (9” to 18” diameter) domes with external fasteners (i.e. nipple), 2 bulb LED energy star rated. Finish brushed nickel.

b. Vanity Light: install 3- or 4-bulb vanity light with frosted glass shade. Finish brushed nickel.

c. Outdoor light: install exterior rated, LED pole mounted light.

d. Garage light: install 8-ft long LED wraparound fixture, with 4-ft long bulbs, electronic ballasts, and LED lamps with 3500K color temperature and color rendering index of 80 or above.

D. GFCI outlets and switches

a. Cover plates to match outlet

b. Leviton SmartLock Pro GFCI Monochromatic Receptacle, phase 7 design NEMA 5-15R.

20 Amp-125 volt @ Receptacle, 20 Amp-125 Volt Feed-Through. Wall plate and screws included, back and side wired, less grounding clip. Match existing color

c. 15 Amp, 120 Volt, Toggle Framed Single-Pole AC Quiet Switch, Grounding, Quickwire Push-In & Side Wired. Match existing color

3.01 INSTALLATION – GENERAL

A. Install per manufacturers specifications and current National Electrical Codes.

B. Exterior outlets shall be installed in housing approved for outside use.

C. All wiring, mounting, hardware, connections, drywall repair, etc. is considered incidental to the work.

SECTION D-PACKAGING AND MARKING

D.1 Project Labeling for Official Correspondence The Government singularly identifies each project with a contract number at time of award. The contract number is a unique identifier to purposely and permanently represent an awarded project. The Government issued contract number is to be referenced on all official communication starting upon notice of award.

SECTION E-INSPECTION AND ACCEPTANCE

FAR 52.252-2 Clauses Incorporated by Reference (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this address:

FAR: www.acquisition.gov/far/ http://www.arnet.gov/far/

FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES

Clause Number Title Date

52.246-12 Inspection of Construction AUG 1996

AGAR 452.246-70 Inspection and Acceptance (FEB 1988)

a) The Contracting Officer or the Contracting Officer's duly authorized representative will inspect and accept the supplies and/or services to be provided under this contract.

b) Inspection and acceptance will be performed at the project site.

AGAR 452.211.72 Statement of Work/Specifications (FEB 1988) The Contractor shall furnish the necessary personnel, material, equipment, services and facilities (except as otherwise specified), to perform the Statement of Work/Specifications referenced in Section J.

http://www.platt.com/platt-electric-supply/Residential-Switches-15-Amp-Toggle/Leviton/1451-2I/product.aspx?zpid=34404 http://www.platt.com/platt-electric-supply/Residential-Switches-15-Amp-Toggle/Leviton/1451-2I/product.aspx?zpid=34404 http://www.acquisition.gov/far/ http://www.arnet.gov/far/

AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988) The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION F-DELIVERIES OR PERFORMANCE

FAR 52.242-14 Suspension of Work (APR 1984)

FAR 52.211-10 Commencement, Prosecution, and Completion of Work (APR 1984) The Contractor shall be required to (a) commence work under this contract within 15 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 60 day after start work date. The time stated for completion shall include final cleanup of the premises.

SECTION G-CONTRACT ADMINISTRATION DATA

AGAR 452.215-73 Post Award Conference (NOV 1996) A post award or pre-work conference with the successful offeror is required. It will be scheduled and held within a reasonable time after award and prior to the issuing of a Notice to Proceed.

Electronic Invoicing and Payment Requirements – Invoice Processing Platform (IPP)

(a) Payment requests must be submitted electronically through the U. S. Department of the Treasury's Invoice Processing Platform (IPP).

"Payment request" means any request for contract financing payment or invoice payment by the Contractor. To constitute a proper invoice, the payment request must comply with the requirements identified in the applicable Prompt Payment clause included in the contract. The IPP website address is: https://www.ipp.gov

The Contractor must use the IPP website to register, access and use IPP for submitting requests for payment. Contractor assistance with enrollment can be obtained by contacting the IPP Production Helpdesk via email IPPCustomerSupport@fms.treas.gov or phone (866) 973-3131.

(b) Final Payment. The final invoice must be accompanied by a release of claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically accepted from the operation of the release. Final payment will not be approved without a properly executed Contract Release, Form 6300-16.

(c) In addition, when submitting the invoice, the Contractor shall submit payrolls, subcontractor payment information and a spreadsheet detailing the payment breakdown in accordance with the Pay Items in the Schedule of Items, Section B.1 (either electronically in IPP, hard copy, or via fax) to the Contracting Officer (see FAR 52.232-5 Payments Under Fixed Price Construction Contracts).

https://www.ipp.gov/ mailto:IPPCustomerSupport@fms.treas.gov

Contract Administration – This contract will be administered by the Contracting Officer located at:

Alaska Region Attn: CO/Stacy Doutt sdoutt@fs.fed.us

All matters related to the performance of this contract shall be coordinated through the Contracting Officer.

Designation of Contracting Officer's Representative

The Contracting Officer designates the Contracting Officer's Representative(s) (COR). The COR is responsible for administering the performance of work under this contract. In no event, however, will any understanding, agreement, modification, change order, or other matter deviating from the terms of this contract be effective or binding upon the Government unless formalized by proper contractual documents executed by the Contracting Officer prior to completion of the contract.

The Contracting Officer should be informed as soon as possible of any actions or inactions by the Contractor or the Government which will change the required delivery or completion times stated in the contract, and the contract will be modified accordingly. (This does not apply to individual task assignments which were issued by the COR provided they do not affect the delivery schedule or performance period stated in the contract.)

On all matters that pertain to the contract terms, the Contractor must communicate with the Contracting Officer. Whenever, in the opinion of the Contractor, the COR requests effort outside the scope of the contract, the Contractor should so advise the COR. If the COR persists and there still exists a disagreement as to proper contractual coverage, the Contracting Officer should be notified immediately, preferably in writing if time permits. Proceeding with work without proper contractual coverage could result in nonpayment or necessitate submittal of a contract claim.

Contractor’s Designated Representative It is required that the Contractor have a designated representative available on the project during the…