11_Price_Schedule.pdf

PDF 105 KB Posted

Attached to
Multi-Bridge Repair at Seney NWR
Solicitation number
140F0821R0008
Issued by

About this file

This document contains a price schedule for bridge repair work at multiple locations within Seney National Wildlife Refuge. The schedule provides unit pricing for various repair items including mobilization, site work, concrete patching, polymer cement treatments, and epoxy resin injection. Repair work is broken into separate line items for four locations labeled WCS C-B, WCS E-C, WCS E-D, and WCS F-E. The price schedule requests pricing for estimated repair quantities and notes that payment will be made based on actual work quantities. The total price should be provided and award will be made in accordance with the evaluation and award criteria defined in Section M, Clause M-1 of the solicitation.

View the file

Other files

File Type Posted
Sol_140F0821R0008_Amd_0002.pdf PDF
Question_and_Answer_Document_AE_0002.pdf PDF
Sol_140F0821R0008_Amd_0001.pdf PDF
7_Plans_C-B.pdf PDF
3_Plans_F-E.pdf PDF
1_Plans_BidPct_WCS_E-D.pdf PDF
Sol_140F0821R0008.pdf PDF
9_General_Location_Maps.pdf PDF
6_Specs_E-C.pdf PDF
4_Specs_F-E.pdf PDF
2_Specs_BidPct_WCS_E-D.pdf PDF
8_Specs_C-B.pdf PDF
10_Wage_Rates.pdf PDF
5_Plans_E-C.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Name of Offeror:____________________________________________________

DUNS Number: _____________________________________________________

Furnish all labor, tools, equipment, materials, superintendence and transportation necessary to construct the project described in Block 10 of Page A1, Solicitation, Offer, and Award, Standard Form 1442 in accordance with the

Technical Specifications, Drawings, and terms and conditions contained herein as follows:

Item No. Description Unit Quantity Unit Price Total Amount

WCS C-B (Base Pricing)

CB-1 Mobilization and Demobilization L.S. 1 $ $

CB-2 Site Work and Control of Water L.S. 1 $ $

CB-3 Site Construction L.S. 1 $ $

CB-4 Bridge and Wall Repair/Replacement L.S. 1 $ $

CB-5 Concrete Patch (Thick Patch) SF 167 $ $

CB-6 Polymer-Cement Mortar Patch (Thin Patch) SF 222 $ $

CB-7 Polymer-Cement Mortar Coat SF 444 $ $

CB-8 Epoxy-Resin Injection SF 222 $ $

Sub-Total for WCS C-B $

WCS E-C (Base Pricing)

EC-1 Mobilization and Demobilization L.S. 1 $ $

EC-2 Site Work and Control of Water L.S. 1 $ $

EC-3 Site Construction L.S. 1 $ $

EC-4 Bridge and Wall Repair/Replacement L.S. 1 $ $

EC-5 Concrete Patch (Thick Patch) SF 182 $ $

EC-6 Polymer-Cement Mortar Patch (Thin Patch) SF 243 $ $

EC-7 Polymer-Cement Mortar Coat SF 486 $ $

EC-8 Epoxy-Resin Injection SF 243 $ $

Sub-Total for WCS E-C $

Item No. Description Unit Quantity Unit Price Total Amount

WCS E-D (Base Pricing)

ED-1 Mobilization and Demobilization L.S. 1 $ $

ED-2 Site Work and Control of Water L.S. 1 $ $

ED-3 Site Construction L.S. 1 $ $

ED-4 Bridge and Wall Repair/Replacement L.S. 1 $ $

ED-5 Concrete Patch (Thick Patch) SF 95 $ $

ED-6 Polymer-Cement Mortar Patch (Thin Patch) SF 126 $ $

ED-7 Polymer-Cement Mortar Coat SF 252 $ $

ED-8 Epoxy-Resin Injection SF 126 $ $

Sub-Total for WCS E-D $

WCS F-E (Price Alternate No. 1)

FE-1 Mobilization and Demobilization L.S. 1 $ $

FE-2 Site Work and Control of Water L.S. 1 $ $

FE-3 Site Construction L.S. 1 $ $

FE-4 Bridge and Wall Repair/Replacement L.S. 1 $ $

FE-5 Concrete Patch (Thick Patch) SF 95 $ $

FE-6 Polymer-Cement Mortar Patch (Thin Patch) SF 126 $ $

FE-7 Polymer-Cement Mortar Coat SF 252 $ $

FE-8 Epoxy-Resin Injection SF 126 $ $

Sub-Total for WCS F-E $

GRAND TOTAL $

Award of contract will be made in accordance with Section M, Clause M-1 “Evaluation and Award.” Incomplete bids will be considered non-responsive. If estimated quantities are listed, offerors must only submit pricing for estimated quantities listed. These quantities indicated are Estimated Quantities representing the Government’s best estimate of actual quantities needed to complete the work. Payment will be made for actual amount of work done on the basis of unit or lump sum prices listed. The Government retains the right to limit any additional work proposed by the Construction Contractor (e.g. additional concrete repairs proposed by the Contractor’s Independent Third Party Test Agency/Inspector that may be included in their Concrete Condition Survey/Concrete Repair Plan, etc.)

under the unit price items, or elsewhere in the plans/specifications, contained in the project.

File details come from the government source that posted it. Updated .