About this file
The document is the Denver International Airport (DEN) Design Standards Manual, a comprehensive guidelines document published by the City and County of Denver for consultants, architects, engineers, and contractors working on projects at the airport. This manual provides detailed requirements and standards for design phases, document preparation, drawing requirements, technical specifications, submittal processes, quality control, and various engineering disciplines including civil, architectural, structural, mechanical, electrical, communications, and specialty systems. The manual covers every aspect of design from initial programming through final construction documents, record documents, and project closeout, with specific instructions for each design phase and submittal level.
The manual serves as a definitive reference to ensure consistency, quality, and operational compatibility across all DEN projects, emphasizing coordination between disciplines, compliance with building codes and FAA regulations, and alignment with the airport's operational needs. It includes technical requirements for everything from site surveys and structural calculations to signage, communications systems, and environmental considerations. The document is designed to guide consultants in producing complete, coordinated design documents that meet DEN's stringent standards, with a focus on functional design, safety, maintenance efficiency, and adherence to local and federal regulatory requirements. The manual is periodically updated, with the current version dated Q4 2024, reflecting ongoing refinements to design and construction practices at Denver International Airport.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 07 - AOB_Room_Plans.pdf | ||
| 09 - 2024-11-27 Feasibility Study.pdf | ||
| 12 - DEN_WorkplaceDesignGuidelines.pdf | ||
| RFP_FT_202578511-AOB Restack Design.pdf | ||
| AOB Revitalization PS-F- Fee Proposal - Professional Services.xlsx | XLSX spreadsheet | |
| 05 - AOB_Electrical.pdf | ||
| 06 - AOB_Mechanical.pdf | ||
| 08 - DEN_AOB Conceptual Layout Plans.pdf | ||
| 10 - DEN Design Principles.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DENVER INTERNATIONAL AIRPORT
DESIGN STANDARDS MANUAL
Standards & Criteria Design, Engineering and Construction Revised: Q4 2024
Copyright ©1989-2024 by City and County of Denver, Denver International Airport
Content has been reviewed and edited by Design, Engineering and Construction.
While the City provides the information in this document to anyone, the City retains copyright on all text, graphic images and other content. This means that user may not: (1) distribute the text or graphics to others without the express written permission of the City and County of Denver; (2) mirror or copy this information to another document without permission; or (3) modify or re-use the text graphics in this document. Users may print copies of the information for personal and reference for their own documents. Commercial use of the materials is prohibited without the written permission of the City. In all copies of this information, users must retain this notice and any other copyright notices originally included.
Denver International Airport reserves all other rights.
Printed in the United States of America
Standards & Criteria Design Standards Manual Table of Contents
Table of Contents Summary of Revisions xxv Purpose of Design Standards Manuals xxvii Chapter 1 - Administration 29
1.0 Administration 29
1.0.1 References 29
1.0.2 Purpose 29
1.0.3 Scope 29
1.0.4 Format 29
1.0.5 Procedures 29
1.0.6 Exclusions 29
1.0.7 ORAT Requirements 29
1.1 Compliance with Codes and Regulations 30
1.2 Variance and Interpretation 30
1.2.1 Request Submittals 30
1.2.2 Request Format 30
1.2.3 Consultant Notification 31
1.3 Pre-work Meeting 31
1.3.1 Notice of Meeting 31
1.3.2 Meeting Agenda 31
1.4 Progress Meeting 32
1.5 Work Schedule 32
1.5.1 Preliminary Schedule 32
1.5.2 Final Work Schedule Submittal 32
1.5.3 Schedule Revisions 32
1.5.4 Schedule Update 32
1.5.5 Other Schedule Requirements 32
1.6 Meeting Locations 32
1.6.1 Meetings at DEN 33
1.7 Coordination and Administration 33
1.7.1 Procedures 33
1.7.2 Coordination 33
1.7.3 Design Standards 33
1.7.4 Communications with the Consultant 33
1.7.5 Budget Control 33
1.7.6 Design Review Committee 33
1.7.7 Design Project Closeout 34
Chapter 2 - Design Phases 35
2.0 Design Phases 35
2.0.1 General 35
2.1 Civil/Infrastructure Phases 35
2.1.1 Design Analysis Programming Phase 35
2.1.1.1 Charrette Facilitation 35
2.1.2 Preliminary Design Phase 35
2.1.2.1 Preliminary Design Drawings and Technical Specifications 36
2.1.2.2 Preliminary Design Analysis Report 36
2.1.2.3 Preliminary BIM Review 36
2.1.3 Contract Documents Phase 36
Q4 2024 iii Denver International Airport
2.1.4 Bid Phase 36
2.1.5 Construction Phase 37
2.2 Architectural, Signage, and Landscape Architecture Phases 37
2.2.1 Programming Design Analysis Phase 37
2.2.1.1 Charrette Facilitation 37
2.2.2 Schematic Design Phase 37
2.2.3 Design Development Phase 37
2.2.4 Contract Documents Phase 38
2.2.5 Bid and Proposal Evaluation Phase 38
2.2.6 City Plan Review Phase 39
2.2.7 Construction Phase 39
Chapter 3 - Design Analysis Report 41
3.0 Design Analysis Report 41
3.0.1 Summary of Work 41
3.0.2 Quality Control 41
3.1 Submittals of Design Analysis Report 41
3.1.1 Submittal 41
3.1.2 Submittal Format Requirements 41
3.1.3 Table of Contents 41
3.1.4 Sheet Sizes 41
3.1.5 Submittal Quantity 42
3.2 Submittals During Design Phases 42
3.2.1 Overview 42
3.2.2 Programming Submittal of Design Analysis Report 42
3.2.3 Programming/Schematic Design Analysis Report 42
3.2.4 Design Development Design Analysis Report 42
3.2.5 Final Design Analysis 42
3.3 Contents and Organization of the Design Analysis Report 43
3.3.1 Foreword 43
3.3.1.1 Cover Sheet 43
3.3.1.2 Certification of Compliance 43
3.3.1.3 Program Statement 43
3.3.1.4 Logic Programs, Decision Matrices, Associative Diagrams, Functional Diagrams 43
3.3.1.5 Interviews and Meetings 43
3.3.1.6 Description of Services 43
3.3.1.7 Limits of Consultant Work 43
3.3.1.8 Project Limits 43
3.3.1.9 Design and Construction Schedule 44
3.3.1.10 Summary of Actions 44
3.3.1.11 Bid and Procurement Packaging 44
3.3.2 Design Requirements 44
3.3.2.1 General Description 44
3.3.2.2 Design Criteria 44
3.3.2.3 Planning Study 44
3.3.2.4 Statistical Summary 45
3.3.2.5 Major Components 45
3.3.2.6 Code Analysis 45
3.3.2.7 Life Safety, Security, and Communications Systems 45
3.3.2.8 Systems Load Requirements 45
Q4 2024 iv Denver International Airport
3.3.2.9 Design Alternatives 45
3.3.2.10 Costs and Budget 46
3.3.2.11 Value Engineering 46
3.3.2.12 Operations and Maintenance (O&M) Criteria 46
3.3.2.13 List of Equipment and Long Lead Items 46
3.3.2.14 Required Spare Parts 46
3.3.2.15 Critical Construction/Request for Proposal Activities 46
3.3.2.16 Independent Testing Laboratory Report 46
3.3.2.17 Contract Data Submittal Report 47
3.3.2.18 Cut Sheets 47
3.3.2.19 Soils Report 47
3.3.2.20 Property Loss Prevention 47
3.3.2.21 DEN Environmental Review 47
3.3.2.22 Leadership in Energy and Environmental Design (LEED) 48
3.3.2.23 Executive Order 123 Compliance 48
3.3.2.24 Quality Control Checklist 48
3.3.3 Calculations 48
3.3.3.1 Load Capacity Identification 48
3.3.3.2 Calculation Submittals 48
3.3.4 Design Calculations 49
3.3.4.1 Database 49
3.3.4.2 General 49
3.3.4.3 Scope 49
3.3.5 Instructions 50
3.3.6 Consultant Quality Control of Calculations 51
3.3.6.1 Revisions to Calculations 51
3.4 Appendices 52
3.5 FAA 52
3.5.1 Design Analysis 52
3.5.2 Cost Estimates 53
3.5.3 Project Schedule 53
Chapter 4 - Schematic Design Phase 55
4.0 Schematic Design Phase 55
4.1 Engineering Surveys and Soils Investigations 55
4.1.1 Site Survey 55
4.1.2 Soils Investigations 55
4.2 Design and Construction Alternatives 55
4.2.1 Cost Estimates 55
4.3 Schematic Design Documents 55
4.3.1 Schematic Design Drawings 55
4.3.2 Minimum Requirements 55
4.3.3 Initial Schematic Design Submittal 56
4.3.4 Final Schematic Design Submittal 56
4.3.5 Basis of Design 57
4.3.6 Design Analysis 57
4.4 Study Models and Perspectives 57
4.5 Submittal Requirements 57
Chapter 5 - Design Development 59
5.0 Design Development 59
Q4 2024 v Denver International Airport
5.1 Design Development Drawings/BIM Models 59
5.1.1 Plans 59
5.1.2 Civil and Infrastructure 61
5.1.3 Structural Drawings 61
5.1.4 Systems Drawings 61
5.1.5 Alternatives 62
5.1.6 Security 62
5.1.7 Signage and Graphics 62
5.1.8 Interface Drawings 62
5.1.9 Standard Drawings 62
5.1.10 Demolition 62
5.1.11 Envelope 63
5.1.12 Art Program 63
5.2 Preliminary Technical Specifications 63
5.3 Design Development Design Analysis Report 63
5.4 Submittal Requirements 63
Chapter 6 - Contract Documents 65
6.0 Contract Documents 65
6.0.1 Intent 65
6.0.2 Referenced Standards 65
6.0.3 Precedence of Contract Documents 65
6.0.3.1 Special Conditions 65
6.0.3.2 General Contract Conditions 65
6.0.3.3 DEN Standard Technical Specifications 65
6.0.3.4 Larger Scale Drawings 66
6.0.3.5 Conflict or Inconsistency 66
6.0.4 Scope of Work 66
6.0.4.1 Part I – Scope of Work Contract Documents 66
6.0.4.2 Part II: Technical Specifications 66
6.0.4.3 Geotechnical Study 67
6.1 Trademarks, Copyrights and Patented Devices, Materials, and Processes 67
6.1.1 Notification by Consultant 67
6.1.2 Disclosure 67
6.1.3 Liability 67
6.2 Contract Documents, Technical Specifications, and Technical Reports 67
6.2.1 Construction Documents 67
6.3 Submittal Requirements 67
6.4 System Compatibility 67
Chapter 7 - Bid and Proposal Evaluation 69
7.0 Bid and Proposal Evaluation 69
7.0.1 Advertisement 69
7.0.2 Distribution of Documents 69
7.0.3 Approval 69
7.1 Interpretation of Bid Documents 69
7.1.1 Interpretation Requests 69
7.1.2 Control of Information 69
7.2 Substitutions 69
7.2.1 Materials and Substitutions 69
7.2.2 Substitution Form 70
Q4 2024 vi Denver International Airport
7.2.3 Acceptance 70
7.3 Addenda 70
7.3.1 Preparation 70
7.3.1.1 Written Description of the Change 70
7.3.1.2 Bid Document Changes 71
7.3.2 Addenda Numbering 71
7.3.3 Addenda Cost and Schedule Impacts 71
7.4 Addenda Submittal and Review 71
7.4.1 Electronic Documents 71
7.4.2 Review 71
7.4.3 Approval 71
7.4.4 Distribution of Addenda 71
7.5 Pre-Bid/ Proposal Meeting and Site Visits 71
7.5.1 Consultant Attendance 71
7.5.2 Contractor Site Visit 72
7.6 Opening of Bids 72
7.6.1 Bid Opening 72
7.6.2 Consideration of Bids 72
7.6.3 Basis of Selecting the Apparent Low Bidder 72
7.7 Bid and Proposal Evaluation 72
7.7.1 Consultant Review 72
7.7.2 Consultant Cost Estimate vs. Low Responsive Bid 72
7.8 Notice to Apparent Low Bidder - Execution of Contract 73
7.8.1 Notice to Apparent Low Bidder 73
7.8.2 Conformed Documents (Incorporation of Addenda) 73
7.8.2.1 Specifications 73
7.8.2.2 Drawings 73
7.8.3 Delivery 73
7.8.4 Consultant Certification 73
7.8.5 Second Party Signature 73
7.8.6 Award of Construction Contract 73
7.8.6.1 Contract Values less than $5,000,000 73
7.8.6.2 Contract Values greater than $5,000,000 73
7.8.7 Construction Notice to Proceed 74
Chapter 8 - Construction and Administration 75
8.0 Construction and Administration 75
8.0.1 Notice to Proceed 75
8.1 Inconsistencies in Documents 75
8.1.1 Notification 75
8.2 Construction and Procurement Meetings 75
8.2.1 Pre-construction Conference 75
8.2.2 Pre-work Meetings 75
8.2.3 Weekly Meetings 75
8.2.4 Written Communications with the Contractor 75
8.2.5 Consultant Authority 76
8.3 Construction Observation 76
8.3.1 Site Visits 76
8.3.2 Fabrication and Assembly 76
8.4 Contractor/Manufacturer Inspection and Acceptance Reviews 76
Q4 2024 vii Denver International Airport
8.4.1 Preliminary and Completion Observations 76
8.4.2 Punch Lists 76
8.4.3 Final Inspection and Certifications 76
8.4.4 Warranties 76
8.5 Observation Reports 77
8.5.1 Reports 77
8.5.2 Protection 77
8.6 Review of Contractor/Procurement Submittals 77
8.6.1 Submittal Review Process 77
8.6.2 Consultant Review of Submittals 77
8.6.3 Consultant Review Stamp 78
8.6.3.1 Accepted 78
8.6.3.2 Accepted as Noted 78
8.6.3.3 Revise and Resubmit 78
8.6.3.4 Rejected 78
8.6.3.5 For Information Only 78
8.6.4 Review 78
8.7 Interpretation of Contract Documents 79
8.7.1 Consultant Review and Response 79
8.7.2 Request for Information 79
8.7.3 Consultant Timely Notification 79
8.7.4 Time Extensions or Changes in Construction Contract Amount 79
8.8 Changes in the Construction Work - Administrative Vehicles 79
8.8.1 Issue of Changes to the Work 79
8.8.2 Contractor Performance of Changes 79
8.8.3 Change Notice 79
8.8.4 Change Order 80
8.8.4.1 Change Order Execution 80
8.8.5 Contractor Change Request 80
8.9 Changes in the Work - Consultant Requirements 80
8.9.1 Change Request 80
8.9.2 Review and Negotiation of Changes 81
8.9.3 Design Alternatives 81
8.9.4 Code Agency Submittal 81
8.9.5 Change Analysis 81
8.9.6 Written Recommendations 81
8.10 Contractor Substitutions 81
8.10.1 Substitution Requirements 81
8.11 Miscellaneous Services 82
8.11.1 Written Opinions 82
8.11.2 Contractor Claims 82
8.11.3 Certifications 82
8.11.4 Product Records 82
8.11.5 Additional Services 82
8.12 Change Order/Directive Tracking 82
8.12.1 Errors and Omissions Change Order/Directive 83
8.12.2 Submittal 83
Chapter 9 - Record Documents 85
9.0 Record Documents 85
Q4 2024 viii Denver International Airport
9.0.1 Record Drawings 85
9.0.2 Specifications 85
9.0.3 Final Design Analysis Report (Conformed) 85
9.0.4 Certification 85
9.0.5 Submittal 85
Chapter 10 - Design Contract Closeout/Task Closeout 87
10.0 Design Contract Closeout/Task Closeout 87
10.0.1 Document Inspection 87
10.0.2 Final Review 87
10.0.3 City Review 87
10.0.4 Final Adjustment of Accounts 87
10.0.5 Retainage Release 88
Chapter 11 - Specification Requirements 89
11.0 Specification Requirements 89
11.0.1 Consultant Requirements 89
11.0.2 Compliance 89
11.0.3 Location 89
11.0.4 Consultant Preparation 89
Table 11-1: Part II Specifications 89
11.0.5 DEN Technical Requirements 92
11.0.6 Coversheet, Index and Certification Page 92
11.1 Format 92
11.1.1 Style 92
11.1.2 Construction Specification Institute Divisions 92
11.2 Standard Text Elements 92
11.2.1 General 92
11.2.2 Margins 92
11.2.3 Typeface and Line Spacing 93
11.2.4 Tab Set 93
11.2.5 Header 93
Table 11-2: Technical Specification Header Layout 93
11.2.6 Footer 93
Table 11-3: Technical Specifications Footer Layout 93
11.3 Table of Contents Page and Paragraph Numbering System 94
11.3.1 Location 94
11.3.2 Line Spacing 94
11.3.3 Line Numbering 94
11.3.4 Page Numbers 94
11.3.5 Section Title 94
11.4 Text Pages 94
11.4.1 Exceptions 94
Figure 11-1: Technical Specification General Format 95
11.5 Table and Figure Indexes 95
11.5.1 Location 95
11.5.2 Titles 95
11.5.3 Format 95
11.6 Tables and Charts 95
11.6.1 Location 95
11.6.2 Numbering 96
Q4 2024 ix Denver International Airport
11.6.3 Title 96
11.6.4 Typeface 96
11.7 Nomenclature 96
11.7.1 Terminology 96
11.7.2 Abbreviations 96
11.7.3 Generic Terms 96
11.8 Bidding Requirements 96
11.9 Detail Specifications 96
11.9.1 General Requirements 96
11.9.2 DEN Standard Technical Specifications 97
Table 11-4: DEN Standard Specifications: Division 02-33 97
11.9.3 DEN Technical Requirements 98
11.9.4 Products and Materials 99
11.9.5 Specifying and Reviewing Products and Material Submittals 99
11.9.6 Redundancy 99
11.9.7 Reference 99
11.9.8 Industry Codes and Standards 99
11.9.9 Design Standards 99
11.9.10 FAA Requirements 99
11.9.11 Redline DEN Standard Technical Specifications 100
11.9.12 Submittal Register 100
11.9.13 Overstock Materials 100
Chapter 12 - General Drawing Requirements 101
12.0 General Drawing Requirements 101
12.1 Intelligibility and Legibility 101
12.2 Legacy Projects 101
Chapter 13 - Phasing and Staging Drawings 103
13.0 Phasing and Staging Drawings 103
13.0.1 Airport Layout Plan 103
13.0.2 Site Access 103
13.0.3 Haul Routes 103
13.0.4 Trailer Site and Employee Parking 103
13.1 Staging Plan - Vertical Elements and Lighting Restrictions 103
13.1.1 General 103
13.2 Staging Plan - General 103
13.2.1 Utility Access 103
13.2.2 Environmental Controls 103
13.2.3 Temporary Facilities 103
13.2.4 Temporary Traffic Control 104
13.2.5 Preliminary Plans 104
13.2.6 Hazard Locations 104
13.3 Sequencing Plans 104
13.3.1 General 104
13.3.2 Traffic Control 104
13.3.3 Operating Facility 104
13.3.4 Analysis 104
13.4 Demolition and Site Preparations 104
13.4.1 General 104
13.4.2 Civil Drawings 104
Q4 2024 x Denver International Airport
13.4.3 Structural and Architectural 105
13.4.4 Systems Drawings 105
Chapter 14 - Civil Drawings 107
14.0 Civil Drawings 107
14.0.1 General 107
14.0.2 Design Requirement Categories 107
14.0.3 Bridge Drawings 107
14.0.4 Sequence 107
14.1 Runway, Taxiway, and Roadway Alignment 108
14.1.1 Scale 108
14.1.2 Stationing 108
Table 14-1: Stationing Scale 108
14.1.3 Legend 108
14.1.4 Roadways 108
14.1.5 Utilities 108
14.1.6 Match Lines 108
14.1.7 Profile Grid 109
14.1.8 Runway and Roadway Profiles 109
14.1.9 Profile Match Line 109
14.1.10 Alignment Data 109
Figure 14-1: Alignment Data 109
14.1.11 Roadway and Runway Sections 109
14.1.11.1 Nomenclature 109
14.1.11.2 Identifying Symbols and Titles 110
14.1.11.3 Orientation 110
14.1.11.4 Typical Cross-Sections 110
14.1.11.5 Special Cross-Sections 110
14.1.12 Typical Details 110
14.1.13 Drainage 110
14.1.14 Utility Lines 110
14.1.15 Drainage Details 110
Chapter 15 - Landscape Drawings 111
15.0 Landscape Drawings 111
15.0.1 Contents 111
15.1 Sequence 111
15.1.1 Numbering 111
15.2 Plans 111
15.2.1 Landscape Plans 111
15.2.2 Irrigation Plans 112
15.2.3 Irrigation Schedule 112
15.2.4 Key Symbols 112
15.2.5 Sections 112
15.2.6 Details 113
15.2.7 Continuation 113
15.2.8 Demolition and Site Preparation 113
Chapter 16 - Architectural Drawing 115
16.0 Architectural Drawings 115
16.0.1 Contents 115
16.0.2 Design Requirements 115
Q4 2024 xi Denver International Airport
16.0.3 Sequence 115
16.1 Plans 115
16.1.1 Floor Plans 115
16.1.2 Reflected Ceiling Plans 115
16.1.3 Large Scale Plans 115
16.1.4 Precedence 116
16.1.5 Roof Plans 116
16.2 Sections 116
16.2.1 Precedence 116
16.2.2 Sections 116
16.3 Elevations 116
16.3.1 Exterior Elevations 116
16.3.2 Interior Elevations 116
16.3.3 Material Definition 116
16.4 Demolition Drawings 116
16.4.1 General 116
16.5 Composite Drawings 117
16.5.1 Egress Plans 117
Chapter 17 - Structural Drawings 119
17.0 Structural Drawings 119
17.0.1 Definition 119
17.0.2 Sequence 119
17.1 Foundation Plans 119
17.2 Floor Plans 119
17.2.1 Structural Steel Framing 119
17.2.2 Floor Plans 119
17.2.3 Roof Plans 119
17.3 Elevations and Wall Sections 120
17.3.1 General 120
17.4 Standard Drawings, Schedules, Tables, and Details 120
17.4.1 Drawings 120
17.4.1.1 General Notes and Details 120
17.4.1.2 Column Schedules 120
17.4.1.3 Bracing Connections 120
17.4.1.4 Standard Beam and Joist End Connections 120
17.4.1.5 Non-standard Connections 120
17.4.1.6 Stair Details 120
17.4.1.7 Girt Details 120
17.4.1.8 Miscellaneous Details 121
Chapter 18 - Mechanical Drawings 123
18.0 Mechanical Drawings 123
18.0.1 Definitions 123
18.0.2 General Requirements 123
18.0.3 Design Requirements 123
18.1 Sequence 123
18.1.1 Numbering 123
18.1.2 Demolition 123
18.2 Flow Diagrams 123
18.2.1 Schematic Illustrations 123
Q4 2024 xii Denver International Airport
18.2.2 Key Drawings 123
18.2.3 Flow Diagrams 124
18.3 Flow and Control Diagram Requirements 124
18.3.1 General Requirements 124
18.3.2 Flow Direction 124
18.3.3 Limits of Construction 124
18.3.4 Instruments and Controls 124
18.3.5 Set Points 124
18.3.6 Logic/Control 125
18.3.7 Operating Controls 125
18.3.8 Identification Tags 125
18.3.9 Existing System Tie-in 125
18.3.10 Symbols 125
18.3.11 Gravity Drainage 125
18.3.12 Space Pressurization Diagrams 125
18.4 Drawings for Mechanical Systems 126
18.4.1 General 126
18.4.2 Flow Diagrams 126
18.4.3 Enlarged Plans 126
18.4.4 Drawing Delineation 126
Figure 18-1: Air Distribution Device Identification 127 Figure 18-2: Exhaust Air Callout Diagram 128 Figure 18-3: Mechanical Piping Abbreviations and Line Types 128
18.4.5 Demolition Drawings 128
18.4.6 Mechanical Details 129
18.5 Update of Standard Diagrams 129
18.6 Heating, Ventilating, Air Conditioning 129
18.6.1 General 129
18.6.2 Combined Drawings 129
18.6.3 Drawing Delineation 129
18.7 Mechanical Design Submittal Requirements 130
18.7.1 General 130
Table 18-1: Submittal Requirements 131 Chapter 19 - Plumbing Drawings 135
19.0 Plumbing Drawings 135
19.0.1 Definitions 135
19.0.2 General Requirements 135
19.0.3 Design Requirements 135
19.1 Sequence 135
19.1.1 Numbering 135
19.1.2 Demolition 135
19.2 Flow Diagrams 135
19.2.1 Schematic Illustrations 135
19.2.2 Key Drawings 135
19.2.3 Requirements 136
19.3 Flow Diagram Requirements 136
19.3.1 General 136
19.3.2 Flow 136
19.3.3 Limits of Construction 136
Q4 2024 xiii Denver International Airport
19.3.4 Instruments 136
19.3.5 Set Points 136
19.3.6 Controls 136
19.3.7 Operating Conditions 137
19.3.8 Identification Tags 137
19.3.9 Exiting System Tie-in 137
19.3.10 Symbols 137
19.3.11 Gravity Drainage 137
19.4 Drawings for Piping 137
19.4.1 General 137
19.4.2 Flow Diagrams 137
19.4.3 Drawing Delineation 137
19.4.4 Plumbing Details 138
19.5 Plumbing 138
19.5.1 General 138
19.5.2 Detailing Requirements 138
Figure 19-1: Plumbing Piping Abbreviations and Line Types 140
19.5.3 Demolition Drawings 140
19.5.4 Service Diagrams 140
19.6 Update of Standard Diagrams 140
19.7 Plumbing Design Submittal Requirements 141
19.7.1 General 141
Table 19-1: Submittals 141
Chapter 20 - Fire Protection Drawings 145
20.0 Fire Protection Drawings 145
20.0.1 Definitions 145
20.0.2 Design Requirements 145
20.1 Sequence 145
20.1.1 General 145
20.2 Flow Diagrams 145
20.2.1 Schematic 145
20.2.2 Key Drawings 145
20.2.3 Requirements 145
20.3 Flow Diagram Requirements 146
20.4 Drawings for Piping 146
20.4.1 General 146
20.4.2 One-line Diagrams 146
20.4.3 Demolition 146
20.4.4 Existing System Tie-In 146
20.4.5 Delineation 146
20.4.6 Detailing 147
20.5 Update of Standard Diagrams 147
20.6 Life Safety Design Submittal Requirements 148
20.6.1 Sprinkler Systems 148
20.6.1.1 A/E 30% Drawings 148
20.6.1.2 A/E 60% Drawings 148
20.6.1.3 A/E 90% Drawings 148
20.6.2 Fire Alarm Systems 148
20.6.2.1 A/E 30% Drawings 148
Q4 2024 xiv Denver International Airport
20.6.2.2 A/E 60% Drawings 148
20.6.2.3 A/E 90% Drawings 148
20.6.3 Emergency Communication System 149
20.6.3.1 A/E 30% Drawings 149
20.6.3.2 A/E 60% Drawings 149
20.6.3.3 A/E 90% Drawings 149
Chapter 21 - Electrical Drawings 151
21.0 Electrical Drawings 151
21.0.1 General Information and Requirements 151
21.0.2 Definition 151
21.0.3 Design Requirements 151
21.0.4 Completeness 151
21.0.5 Sequence 151
21.0.6 Electrical and Electronic Symbols 151
21.0.7 Symbols for Other Functional Disciplines 151
21.0.8 Functional Designations 151
21.0.9 Delineation Types 152
21.0.10 Delineation Drawings 152
21.0.11 Legend 152
21.0.12 Specification Relationship 152
21.1 Electrical Plans 153
21.1.1 Definition 153
21.1.2 Symbols 153
21.1.3 Marking 153
21.1.4 Future Space 153
21.1.5 Spares 153
21.1.6 Cross-reference 154
21.1.7 Arrows on Wires 154
21.1.8 Completeness 154
21.1.9 Load Balancing 154
21.1.10 Special Requirements 154
21.1.11 Views 154
21.1.12 Details 154
21.1.13 Devices 154
21.1.14 Scale 154
21.2 Facility Electrical Power Distribution Plans 155
21.2.1 Definition 155
21.2.2 Primary Supply 155
21.2.3 Secondary Circuits 155
21.2.4 Panelboard Schedules 155
21.2.5 Panelboard Drawings 155
21.2.6 Delineation 155
21.2.7 Grounding 155
21.2.8 Raceways 155
21.2.9 Equipment 155
21.2.10 Emergency Power 156
21.2.11 Transformers 156
21.2.12 Receptacles 156
21.3 Facility Lighting Plans 156
Q4 2024 xv Denver International Airport
21.3.1 Definition 156
21.3.2 Circuits 156
21.3.3 Delineation 156
21.3.4 Panels 156
21.3.5 Symbols 156
21.3.6 Layout and Location 156
21.3.7 Emergency Lighting 157
21.4 Facility Communications Plans 157
21.4.1 Definition 157
21.4.2 Locations 157
21.5 Diagrams - General 157
21.5.1 Definition 157
21.5.2 Layout 157
21.6 Block Diagrams 158
21.6.1 Definition 158
21.6.2 Requirements 158
21.6.2.1 Diagrams 158
21.6.2.2 Connecting Lines 159
21.7 One-Line Diagrams 159
21.7.1 Definition 159
21.7.2 Requirements 159
21.8 Schematic Diagrams 161
21.8.1 Definition 161
21.8.2 Symbols 161
21.9 Connection Diagrams 162
21.9.1 Definition 162
21.9.2 Common Requirements 163
21.9.3 Requirements for Line-Type Connection Diagram 163
Table 21-1: Wire Color Abbreviations 164
21.9.4 Requirements for Highway Line-Type Connection Diagram 164
21.9.5 Requirements for Lineless-Type Connection Diagram 164
21.10 Function Designations 165
21.10.1 Definitions 165
21.10.2 General Requirements 165
21.10.3 Switchgear Designations 165
21.10.4 Control Device Designations 165
21.11 Symbols for Electrical Drawings 166
21.11.1 Definition 166
21.11.2 Symbols 166
21.11.3 Labels 166
21.12 Electrical Design Submittal Requirements 166
21.12.1 General 166
21.12.2 30% Submittal Requirements 166
21.12.2.1 General Electrical Notes 166
21.12.2.2 Symbols Legend 166
21.12.2.3 Demo and Phasing Plans 167
21.12.2.4 Site Plan 167
21.12.2.5 Floor Plans 167
21.12.2.6 Equipment Placement 167
Q4 2024 xvi Denver International Airport
21.12.2.7 Electrical Single Line Diagram 167
21.12.2.8 Emergency and Backup Power 167
21.12.2.9 Grounding 167
21.12.2.10 Power and Telecommunication 167
21.12.2.11 Lighting 167
21.12.2.12 Load Calculations 167
21.12.2.13 Panel Schedules 168
21.12.2.14 Enlarged Plans 168
21.12.2.15 Equipment Schedules 168
21.12.2.16 Lightning Protection 168
21.12.2.17 Specifications 168
21.12.3 60% Submittal Requirements 168
21.12.3.1 General Electrical Notes 168
21.12.3.2 Symbols Legend 168
21.12.3.3 Demo Plans 168
21.12.3.4 Site Plan 168
21.12.3.5 Floor Plans 168
21.12.3.6 Electrical Single Line Diagram 169
21.12.3.7 Emergency and Backup Power 169
21.12.3.8 Grounding 169
21.12.3.9 Power and Telecommunication 169
21.12.3.10 Lighting 169
21.12.3.11 Load Calculations 169
21.12.3.12 Panel Schedules 169
21.12.3.13 Enlarged Plans 169
21.12.3.14 Equipment Schedules 169
21.12.3.15 Lightning Protection 170
21.12.3.16 Specifications 170
21.12.4 90% Submittal Requirements 170
21.12.4.1 General Electrical Notes 170
21.12.4.2 Symbols Legend 170
21.12.4.3 Demo Plans 170
21.12.4.4 Site Plan 170
21.12.4.5 Floor Plans 170
21.12.4.6 Electrical Single Line Diagram 170
21.12.4.7 Emergency and Backup Power 170
21.12.4.8 Power and Telecommunication 171
21.12.4.9 Lighting 171
21.12.4.10 Load Calculations 171
21.12.4.11 Panel Schedules 171
21.12.4.12 Enlarged Plans 171
21.12.4.13 Equipment Schedules 171
21.12.4.14 Electrical Diagrams 171
21.12.4.15 Lightning protection 171
21.12.4.16 Specifications 171
21.12.5 100% Submittal Requirements 171
21.12.5.1 General Electrical Notes 171
21.12.5.2 Symbols Legend 172
21.12.5.3 Demo Plans 172
Q4 2024 xvii Denver International Airport
21.12.5.4 Site Plan 172
21.12.5.5 Floor Plans 172
21.12.5.6 Electrical Single Line Diagram 172
21.12.5.7 Emergency and Backup Power 172
21.12.5.8 Power and Telecommunication 172
21.12.5.9 Lighting 172
21.12.5.10 Load Calculations 172
21.12.5.11 Panel Schedules 172
21.12.5.12 Enlarged Plans 173
21.12.5.13 Equipment Schedules 173
21.12.5.14 Electrical Diagrams 173
21.12.5.15 Lightning Protection 173
21.12.5.16 Specifications 173
Chapter 22 - Communications/Electronic Systems 175
22.0 Communications/Electronic Systems 175
22.0.1 General Information and Requirements 175
22.1 Drawings 175
22.1.1 Drawings 175
22.1.2 Definition 175
22.1.3 Completeness 175
22.1.4 Drawing Sequence 176
22.1.5 General Notes, Drawing Index, Symbols, and Abbreviations 176
22.1.6 Site Plan 176
22.1.7 Floor Plans/Roof Plans 176
22.1.8 Equipment Rooms Layouts and Elevations 176
22.1.9 Functional Block Interconnection Diagrams 177
22.1.9.1 Diagrams 177
22.1.9.2 Connecting Lines 177
22.1.10 Point-to-Point Wiring Diagrams 177
22.1.11 Systems Riser Diagrams 178
22.1.12 Conduit/Cable Tray Riser Diagrams 178
22.1.13 System Details 179
22.1.14 Communications and Electronic Systems Symbols 179
22.1.15 Symbols for Other Functional Disciplines 179
22.1.16 Functional Designations 179
22.1.17 Drawing Delineation Types 179
22.1.18 Delineation Drawings 179
22.1.19 Specification Relationship 180
Chapter 23 - Signage and Graphics Drawings 181
23.0 Signage and Graphics Drawings 181
23.0.1 General Design Requirements 181
23.0.1.1 Public Area Signage 181
23.0.1.2 Non-Public Area Signage 181
23.0.1.3 Regulatory Signage 181
23.0.2 Sign Construction 181
23.0.3 Flexibility 181
23.1 Drawings 181
23.1.1 Content 181
23.1.2 Static and Dynamic 182
Q4 2024 xviii Denver International Airport
23.1.3 Static Signage Drawings 182
23.1.4 Dynamic Signage Drawings 182
23.1.5 Minimum Requirements 182
23.1.6 Sections and Interior Elevations 182
23.1.7 Details 182
23.1.8 Continuation 182
23.2 Structural Requirements 182
23.3 Mechanical Requirements 183
23.4 Electrical Requirements 183
23.4.1 Building/Structure (Exterior) Numbering 183
Chapter 24 - Specialty Systems 185
24.0 Specialty Systems 185
24.1 Baggage and Material Handling Systems 185
24.2 Aircraft Support Systems – Passenger Loading Bridges, PC Air, 400 Hertz 185
24.3 People Movers - Trains 185
Chapter 25 - GIS/CADD Requirements 187
25.0 GIS/CADD Requirements 187
25.1 Legacy Projects 187
Chapter 26 - Surveys 189
26.0 Surveys 189
26.0.1 General 189
26.0.2 Notice of Survey 189
26.1 Field Measurements 189
26.1.1 Field Verification of Horizontal Work 189
26.2 Site Work Design Surveys 190
26.2.1 Survey Deliverables 190
26.2.1.1 Survey Statement of Work (SSOW) 190
26.2.1.2 Survey and Quality Control Plan 190
26.2.2 Site Work Design Survey Requirements 191
26.3 Survey Control Points 192
26.3.1 Survey Control Points 192
26.3.2 Temporary Survey Control Point Establishment 193
26.3.3 Protection 194
26.3.4 Damaged or Destroyed Survey Control Points and Section Corners 194
26.4 Design Surveys 195
26.4.1 Design Surveys 195
26.4.2 Field Notes 195
26.5 Surveying Accuracies and Tolerances in Design Surveys 195
26.6 Optional Survey Responsibilities and Specifications 196
Figure 26-1: Optional Survey Responsibilities and Specifications 197
Chapter 27 - Testing Agency Reports 201
27.0 Testing Agency Reports 201
27.0.1 Testing Requirements 201
27.0.2 Testing Agency 201
27.1 Testing Agency 201
27.1.1 General 201
27.1.2 Control of Measuring and Test Equipment 202
27.1.3 Surveillance of Inspections 202
27.1.4 Retain Tested Materials and Data 202
Q4 2024 xix Denver International Airport
27.2 Soils Testing Precautions 202
27.2.1 General 202
27.2.2 Protection of Property and Work in Progress 202
27.2.3 Protection of Municipal and Public Service System 202
27.2.4 Protection of Drainage Ways 203
27.2.5 Protection of the Environment 203
27.2.6 Hazardous and Explosive Materials 203
27.2.7 Archeological and Historical Discoveries 203
27.3 Documentation 203
27.3.1 Submittal 203
27.3.2 Document Control 203
27.3.3 Test Results 204
27.3.4 Records 204
Chapter 28 - Planning Study 205
28.0 Planning Study 205
28.0.1 Purpose 205
28.0.2 FAA Contact and Coordination 205
28.0.3 FAA Review and Acceptance 205
28.0.4 FAA Review Period 205
28.1 Database and Resources 205
28.1.1 Airport Layout Plan 205
28.1.2 DEN Datum Base and Stationing 205
28.1.3 Stationing within Project Limits 205
28.2 Submittal Requirements 206
28.2.1 General 206
28.2.2 Submittal Content 206
28.2.2.1 Summary Statement 206
28.2.2.2 Plan Drawings of Constructed Work 206
28.2.2.3 Plan Drawings of Constructed Work Lighting 206
28.2.2.4 Plan Drawings of Constructed Work Emissions 207
28.2.2.5 Plan Drawings of Constructed Work Traffic Impact 207
28.2.2.6 Plan Drawings of Construction Phasing 207
28.2.2.7 Elevation Drawings 207
28.2.2.8 Operations Phasing Drawings 207
28.2.2.9 Utility Location Plans and Protection 207
28.2.2.10 Calculations 207
28.2.2.11 BIM Model Contained in The Submittal 207
28.3 Submittal Format 207
28.3.1 Binding 207
28.3.2 Organization 208
28.3.3 Drawings 208
28.3.4 Quantity 208
28.4 Supporting Studies 208
28.5 Incorporation into Bid and Construction Documents 208
Chapter 29 - Codes and Compliance 209
29.0 Codes and Compliance 209
29.0.1 Consultant Responsibility 209
29.0.2 Compliance 209
29.0.3 Variances 209
Q4 2024 xx Denver International Airport
29.1 Agencies 209
29.1.1 Building Code 209
29.1.2 Denver Fire Department 209
29.1.3 Department of Health and Hospitals 210
29.1.4 Wastewater Management Division 210
29.1.5 Denver Zoning Administration 210
29.1.6 FAA Requirements 210
29.1.7 United States Customs Service 211
29.1.8 Immigration and Naturalization Service 211
29.1.9 Public Health Service 211
29.1.10 Animal and Plant Health Inspection Service 211
Chapter 30 - Construction Cost Estimates 213
30.0 Construction Cost Estimates 213
30.1 Schedule of Values 213
30.2 Preliminary Cost Estimate 213
30.3 Schematic Design Estimate 213
30.4 Design Development 214
30.5 Construction Document Estimate 214
30.6 Change and Substitution Cost Estimates 214
30.7 Submittal Format 214
Chapter 31 - Construction Schedule 215
31.0 Construction Schedule 215
31.1 Schedule Requirements 215
31.2 Submittal Format 215
Chapter 32 - Submittals 217
32.0 Submittals 217
32.0.1 General Information and Requirements 217
32.0.2 Submittal Certification 217
32.0.3 Consultant Design Quality Control Program 217
32.0.3.1 City Review 217
32.0.3.2 Consultant Design Standards Monitoring 217
32.0.4 Review by DEN 217
32.0.5 Schedule of Review of Submittals by DEN 218
32.0.6 DEN Review Format 218
32.0.7 Consultant Response to Reviews 218
32.0.8 Submittal to Code Agencies 218
32.1 Typed Submittals – Specifications, Tables, Estimates, Design Analysis 218
32.1.1 Format 218
32.1.2 Specifications 218
32.1.3 Data and Product Cut Sheets 219
32.2 Submittal Format - Drawings 219
32.3 Building Information Management/Revit 219
32.3.1 Submittal Schedule 219
32.3.2 Labeling of Media 219
32.4 PDF Submittal Requirements 219
32.4.1 Specifications 219
32.4.2 Drawings 219
Figure 32-1: Drawing Bookmark 220
32.4.3 Reports 220
Q4 2024 xxi Denver International Airport
32.4.4 Calculations 220
32.5 Design Analysis/Programming Phase 220
32.5.1 General 220
32.5.2 Minimum Submittal Requirements and Quantities 221
32.6 Schematic Design Phase 221
32.6.1 General 221
32.6.2 Review by DEN 221
32.6.3 Minimum Submittal Requirements and Quantities 221
32.6.4 Schematic Design Submittal 221
32.6.4.1 Drawings 222
32.6.4.2 Specifications 222
32.6.4.3 Cost Estimates 222
32.6.4.4 Calculations 222
32.6.4.5 Design Report 222
32.6.4.6 Schedule 222
32.7 Design Development 223
32.7.1 Design Development 223
32.7.2 Review by DEN 223
32.7.3 Minimum Submittal Requirements and Quantities 223
32.8 Contract Documents Phase, 30% Submittal 223
32.8.1 General 223
32.8.2 30% Submittal 224
32.8.3 Minimum Submittal Requirements and Quantities 224
32.8.4 Construction Documents 30% Submittal 224
32.8.4.1 Drawings 224
32.8.4.2 Specifications 225
32.8.4.3 Cost Estimate 226
32.8.4.4 Calculations 226
32.8.4.5 Design Analysis Report 226
32.8.4.6 Schedule 226
32.9 Contract Documents Phase, 60% Submittal 226
32.9.1 General 226
32.9.2 Review by DEN 226
32.9.3 Minimum Submittal Requirements and Quantities 226
32.9.4 Construction Documents 60% Submittal 227
32.9.4.1 Drawings 227
32.9.4.2 Specifications 227
32.9.4.3 Cost Estimate 227
32.9.4.4 Calculations 227
32.9.4.5 Design Analysis Report 228
32.9.4.6 Schedule 228
32.9.4.7 Spare Parts and Long Lead Items List 228
32.10 Contract Documents Phase, 90% Submittal 228
32.10.1 General 228
32.10.2 Review by DEN 228
32.10.3 Minimum Submittal Requirements and Quantities 229
32.10.4 Construction Documents 90% Submittal 229
32.10.4.1 Drawings 229
32.10.4.2 Specifications 229
Q4 2024 xxii Denver International Airport
32.10.4.3 Cost Estimate at the 90% Submittal 229
32.10.4.4 Calculations 229
32.10.4.5 Design Analysis Report 230
32.10.4.6 Schedule 230
32.10.4.7 Spare Parts and Long Lead Items List 230
32.11 Contract Documents Phase 100% Final Submittal 230
32.11.1 General 230
32.11.2 Review by DEN – Final Review Meeting 230
32.11.2.1 Certification 230
32.11.2.2 Documents 230
32.11.2.3 Specifications 231
32.11.2.4 Final Bid Items 231
32.11.2.5 Soils Reports 231
32.11.3 Construction Documents, 100% Submittal 231
32.11.4 Final Construction Documents 231
32.11.5 Certification Requirements 232
32.12 Submittals Concurrent to Final Contract Document Submittal 232
32.12.1 Agency and Utilities, Applications, and Permits 232
32.13 Other In-Progress Submittals 232
32.14 Building Department Document Review Submittal 233
32.14.1 Building Department Review 233
32.15 Bid or RFP Document Submittal 233
32.15.1 Bid and RFP Document Submittal 233
32.15.2 Minimum Submittal Requirements and Quantities 233
32.16 Issue for Construction Submittals 233
32.16.1 General 233
32.16.2 Minimum Submittal Requirements and Quantities 233
32.17 Record Document Submittal 234
32.17.1 General 234
32.17.2 Minimum Submittal Requirements and Quantities 234
Table 32-1: Minimum Submittal Requirements and Quantities 235 Chapter 33 - Quality Control Plan 237
33.0 General 237
33.0.1 General Information and Requirements 237
33.1 Quality Control Plan 237
33.1.1 General 237
33.1.2 Quality Control Checklist 238
Q4 2024 xxiii Denver International Airport
This page is intentionally blank.
Q4 2024 xxiv Denver International Airport
Standards & Criteria Design Standards Manual Summary of Revisions
Summary of Revisions The following tables list the revisions made in the page year to the Standards and Criteria DSM.
2024 Revisions
Reference Revision Description
Throughout Accessibility improvements
1.0.7 ORAT Requirements New ORAT Requirements section
2.1.1.1 Charrette Facilitation Added new section
2.2.1.1 Charrette Facilitation Added new section
18.4.1 General Added drawing requirements
Table 18-1: Submittal Requirements Added specifications
19.4.1 General Added drawing requirements
Fourth Quarter
Reference Revision Description
Throughout Minor punctuation and grammar changes
11.05 DEN Technical Requirements
Updated information to include where to get copies of the technical requirements
11.9.3 DEN Technical Requirements
Updated information to include where to get copies of the technical requirements
21.7.2 Requirements Updated requirements
21.12.2.7 Electrical Single Line Diagram
Updated information on DEN standard Revit one-lines
21.12.3.6 Electrical Single Line Diagram
Updated information on DEN standard Revit one-lines
21.12.4.6 Electrical Single Line Diagram
Updated information on DEN standard Revit one-lines
Second Quarter
Q4 2024 xxv Denver International Airport
Standards & Criteria Design Standards Manual Summary of Revisions
21.12.5.6 Electrical Single Line Diagram
Updated information on DEN standard Revit one-lines
2023 Revisions
References Revision Description
20.2.3 Requirements Added one-line diagrams requirements
20.6 Life Safety Design Submittal
Requirements
Added section
21.2.4 Panelboard Schedules
Added information on noting panelboard schedules as new or existing
21.12.2.11 Lighting
21.12.3.10 Lighting
21.12.4.9 Lighting
21.12.5.9 Lighting
Added sequence of operations information
Fourth Quarter
1.2.2 Request Format Added DSM Variance Request information
11.10 Specifications Requirement Checklist Removed section
Second Quarter
Revision Notation: Revisions made to this Manual during this revision cycle are annotated as shown in the example below:
A vertical line in the left-hand margin is used to annotate paragraphs that have been added or revised in the current publication. Revisions may include items such as new requirements, clarification of existing requirements, or removal of requirements that no longer apply to projects. Revision annotation is applied to each publication individually; revisions made in past publications are not annotated in subsequent publications.
Q4 2024 xxvi Denver International Airport
Standards & Criteria Design Standards Manual Purpose of this Document
Purpose of Design Standards Manuals The DEN Design Standards have been developed to ensure a unified and consistent approach to the thematic and technical design for DEN. These standards are for use and strict implementation by all consultants under contract to DEN, to tenants, and all other consultants under contract to any other entity for the design of projects at DEN.
The Standards Manuals are working documents, which will be revised and updated, as required, to address the general, conceptual, design, and technical standards for all areas of design for DEN.
This Design Standards Manuals (DSM) for DEN has been prepared for use by competent, professionally licensed architectural and engineering consultants under the direction of DEN Maintenance and Engineering or tenants of
DEN.
The Design Standards shall not be quoted, copied, or referenced in any bidding or construction contract doc-uments. Content contained in this Manual shall not be copied in any bidding or construction documents, except where specifically instructed to do so. All information contained in these standards must be fully explained and shown in all bidding and contract documents.
The Design Standards Manuals are intended to be used as a whole, as each manual is complimentary to the other DSMs. To understand the overall thematic and design standards for DEN, the applicable manuals must be utilized together and not separated from the Design Standards Manuals.
The Consultant shall not reproduce, duplicate in any manner, transmit to other consultants or other entities, or use in conjunction with other projects without the express written consent of DEN.
NOTE: This document is optimized for duplex (double-sided) printing.
VARIANCE FROM DEN DESIGN STANDARDS MANUALS
Requests for non-conformance or variance from DEN Design Standards manuals, for any DEN or Tenant Projects, must be formally submitted using the online DSM Variance Request form at the following website:
DEN DSM Variance Request Form
Variance requests may or may not be approved by DEN and response will be communicated to the requestor.
Q4 2024 xxvii Denver International Airport https://forms.office.com/Pages/ResponsePage.aspx?id=YiHGeV64DkuoY-vngXrXDcIlDphi_A9HkF-eQV6D3XBURElKQ0ZLSEg1TldRS1ZXS1MzWFdZMzNESyQlQCN0PWcu
Standards & Criteria Design Standards Manual Purpose of this Document
Q4 2024 xxviii Denver International Airport
Standards & Criteria Design Standards Manual Chapter 1-Administration
Chapter 1 - Administration
1.0 Administration
1.0.1 References
The DEN Design Standards may be cited as such and are referred to herein as the Standards. The Design Standards Manuals are referred herein as DSMs.
City and County of Denver is referred to herein as the City or CCD.
Denver International Airport is referred to herein as DEN.
DEN is operated by the Department of Aviation of the City and County of Denver. More information about the organization and administration of DEN can be found at:
Denver International Airport
Denver Government Website
1.0.2 Purpose
The DSMs define a precise architectural and engineering vocabulary that serves as a basis for making decisions throughout the design and construction process. The DSMs provide direction without limiting the creative abilities of those who are governed by them.
1.0.3 Scope
The provisions of the DSMs apply to the design of any building, structure, infrastructure, or improvement on DEN property.
1.0.4 Format
Where specific formats are provided or referenced, those formats shall be used by the consultant.
1.0.5 Procedures
The procedural guidelines contained in these manuals are intended to supplement existing consultants’ pro-cedures and to establish a uniform basis for program control for DEN. Where the manuals are silent on a pro-cedural matter, it is incumbent on the consultant to request specific direction from the DEN Project Manager. If no guideline is available, the consultant shall propose its existing corporate guidelines.
1.0.6 Exclusions
The DSMs are not all-inclusive, and there are areas of the DSMs that do not address design requirements. In these instances, the consultant shall use professional design judgment and expertise in preparing a proposed system design for those areas within the consultant's Scope of Work (SOW).
1.0.7 ORAT Requirements
The Operational Readiness, Activation, and Transition (ORAT) team at DEN plays a critical role in ensuring that DEN’s Design Standards Manuals integrate operational requirements throughout the design and construction phases. By collaborating closely with project teams, architects, and engineers, ORAT ensures that the DSMs align with the airport’s functional and operational needs. This alignment is achieved by gathering feedback based on operational expertise, identifying potential challenges in facility layouts, and ensuring that the final design
Q4 2024 29 Denver International Airport https://www.flydenver.com/ https://denvergov.org/Home facilitates a seamless transition to full-scale operations. Program and project design teams are expected to be familiar with the DEN ORAT Standards Manual (OSM) and actively participate in ORAT-led meetings, charrettes, workshops, trials, and testing at the request of the DEN Project Manager.
1.1 Compliance with Codes and Regulations
The DSMs are not to be used in lieu of codes or regulations that may be applicable to design or construction work.
The user of the DSMs shall be solely responsible for the design product compliance with all codes and regulations.
In some cases, the DSMs contain requirements that are more stringent than codes or regulations. The user shall comply with the more stringent requirement unless the requirement conflicts with any code requirements.
1.2 Variance and Interpretation
It is recognized that these DSMs may not always contain the newest developments in technology. While airport construction is not to serve as an experiment for new, untested systems and technologies, the consultant should present to DEN any proven new developments in systems and alternate methods of technology which the con-sultant thinks are worthy and beneficial for consideration.
1.2.1 Request Submittals
Variance and interpretation requests must meet at least one of the following criteria:
A. Improvement to design B. Improvement to public safety C. Improvement to construction schedule D. Construction cost savings E. Operation and maintenance cost savings F. Resolution of conflict of established standards G. Design condition not covered by the DSMs H. Lifecycle cost-benefit
Consultant shall submit the appropriate form to the Project Manager for approval. Consultant shall not proceed with any variance in design without written approval from DEN.
1.2.2 Request Format
Variance requests shall be submitted for stakeholder review using the DSM Variance Request form accessible from the link below
DEN DSM Variance Request Form
Approved DSM variances shall be submitted to DEN using the RFI process in Unifier, the current DEN Project Man-agement Information Systems (PMIS). Requests shall include evidence of the stakeholder approval, such as an email record and shall contain the following information:
A. Project title and description B. Applicable Design Standards by reference to manual, volume, part or chapter, section, subsection, and exhibit.
C. Description of requested variance, including any applicable drawings and calculations to fully develop variance in question.
D. Budget impact of proposed variance E. Schedule impact of proposed variance F. Other pertinent factors
Q4 2024 30 Denver International Airport https://forms.office.com/Pages/ResponsePage.aspx?id=YiHGeV64DkuoY-vngXrXDcIlDphi_A9HkF-eQV6D3XBURElKQ0ZLSEg1TldRS1ZXS1MzWFdZMzNESyQlQCN0PWcu
G. Impact of variance on Design SOW
1.2.3 Consultant Notification
Variance requests shall be reviewed by DEN Design, Engineering, and Construction (DEC). The consultant shall allow a minimum of 14-day review time by DEC. The consultant shall be notified in writing of interpretations and/or the acceptance/non-acceptance of the submittal.
1.3 Pre-work Meeting
A pre-work meeting will be scheduled by DEN after issuing the consultant’s Notice to Proceed (NTP). The purpose of this meeting is to introduce DEN's Representatives to their counterparts in the consultant's organization, estab-lish lines of communication between these representatives, and outline some contract requirements. The con-sultant's Project Manager and Division of Small Business Opportunity (DSBO) shall attend this meeting.
1.3.1 Notice of Meeting
The Project Manager will distribute a notice of this meeting, along with an agenda of the subjects to be addressed.
Meeting minutes shall be prepared and distributed by the Project Manager.
1.3.2 Meeting Agenda
The consultant will introduce consultant's representatives and briefly describe each person's responsibilities. The consultant shall provide the following:
A. List of all subconsultants, design disciplines, and a schedule for the first 90 days of work activities unless tasks have not been assigned.
B. Office locations, telephone numbers, and e-mail addresses.
C. Names of the Building Information Model (BIM) Project Execution Plan (BPXP), Leadership in Energy and
Environmental Design (LEED), Commissioning Agent (CXa), and Design Analysis Report (DAR) coordinators.
D. Design administration methods and correspondence control.
E. Quality Control Plan F. Project Phasing Plan G. Procedures to coordinate the consultant’s work with the work of other contractors and the procedures for sharing access to the worksite.
The DEN Project Manager will explain and discuss the responsibilities and authorities of the DEN organization. The DEN Project Manager will provide highlights of the following information at the meeting, as applicable to the pro-ject or task:
A. Communications control.
B. Security procedures, Sensitive Security Information (SSI), and access control/badging.
C. DSBO requirements.
D. Business Management Services (BMS) - Payment procedures, monthly pay estimate cutoff dates.
E. Authorizations and work submittal procedures.
F. Scheduling and coordination requirements.
G. Quality control/assurance procedures.
H. Environmental requirements and permits, protection of property and work in progress, protection of municipal and public service systems, protection of streets and roads, protection of drainage ways, protection of the environment, hazardous and explosive materials, archaeological and historical discoveries, and buried utilities.
Explanations provided by DEN will not amend, supersede, or alter the terms or meaning of any contract doc-ument, and the consultant shall not claim reliance on such explanations as a defense to any breach or failure by the consultant to perform as specified in the contract.
Q4 2024 31 Denver International Airport
1.4 Progress Meeting
Progress meetings will be scheduled weekly or as deemed necessary by the DEN Project Manager to promote the competent and timely execution of the contract. The meetings will be held at DEN and will be chaired by the DEN Project Manager. The consultant shall be available in person at DEN or, subject to the approval of the DEN Project Manager, be available via telephone and/or web conference. The consultant, critical personnel, and/or sub-consultants shall be present to assure timely transfer of information. The Project Manager will be responsible for publishing minutes of the meetings within three (3) days.
1.5 Work Schedule
1.5.1 Preliminary Schedule
The consultant shall prepare for each project or task a work schedule in Precedence Diagram Method (PDM), bar chart, or other media as required by the contract or task assignment. The schedule shall describe the consultant's plan and budget for completing the work and providing the necessary coordination with outside agencies, con-sultants, construction/ procurement contracts, tenants, and DEN. The SOW shall be delineated by project or task phase, task, and activity. Project or task budget elements and labor shall be assigned to activities and summarized by task and phase for program status reporting and invoice calculations. Consultant shall establish deliverable format with the Project Manager at the pre-work meeting. Consultant preliminary schedule shall be submitted within 14 days after NTP.
1.5.2 Final Work Schedule Submittal
The consultant, for each project, shall be required to submit a detailed schedule for design, construction, testing, and occupancy in a format that is consistent with the consultant’s contract requirements. Upon acceptance by DEN, the consultant's schedule shall be used by the consultant and DEN to monitor progress. From the final work schedule, the consultant shall also identify labor utilization, drawing, specification, production operation, cash flow requirements, and DSBO goal status. The consultant will also track variances in the original plan and changes to the work. Consultant shall establish the deliverable format with the Project Manager at the pre-work meeting.
1.5.3 Schedule Revisions
Schedule revisions shall be required when changes are made to the consultant's SOW, work plan, or schedule logic. Each schedule revision shall be submitted by written request, clearly showing the requested changes. The consultant shall not implement the revision until written authorization is received from the DEN Project Manager.
1.5.4 Schedule Update
The…