05 - AOB_Electrical.pdf

PDF 861 KB Posted

Attached to
AOB Restack Design State and local contract opportunity
Solicitation number
202578511
Issued by
Denver County, Denver City, Colorado

About this file

The provided file is a comprehensive electrical floor plan document for the Denver International Airport's (DEN) Airport Office Building (AOB), detailing electrical infrastructure across multiple levels (floors 2-11). The document includes detailed electrical asset inventories, floor layouts, and one-line electrical distribution diagrams, with specific focus on electrical panels, transformers, lighting control panels, inverters, and switchgear across different building sections (2W and 2E). The drawings are dated September 18, 2024, and are marked "NOT FOR CONSTRUCTION" and "NOT FOR EXTERNAL USE OR DISTRIBUTION", indicating these are design/planning documents for internal review.

The electrical plans reveal a complex electrical distribution system with redundant power sources, including main switchgear (4-2ASG1), multiple transformers (including 2500KVA Xcel transformers), and emergency generators. The system appears designed with significant load flexibility, featuring numerous electrical panels on each floor, backup power capabilities, and carefully mapped electrical risers connecting different building levels. Notable technical details include 277/480V three-phase power configurations, short circuit ratings up to 65,000 AIC, and provisions for both normal and emergency power distribution. The documents also indicate ongoing and planned projects, such as an AGTS Server project on Level 10 with an anticipated completion date of 2025, suggesting the electrical infrastructure is part of a broader modernization and renovation effort at the airport.

View the file

Other files for this state and local contract opportunity

Other files attached to AOB Restack Design, newest first.
File Type Posted
11 - DEN_DesignStandardsManual.pdf PDF
12 - DEN_WorkplaceDesignGuidelines.pdf PDF
RFP_FT_202578511-AOB Restack Design.pdf PDF
AOB Revitalization PS-F- Fee Proposal - Professional Services.xlsx XLSX spreadsheet
07 - AOB_Room_Plans.pdf PDF
09 - 2024-11-27 Feasibility Study.pdf PDF
06 - AOB_Mechanical.pdf PDF
08 - DEN_AOB Conceptual Layout Plans.pdf PDF
10 - DEN Design Principles.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AOB ELECTRICAL

1. close hidden windows

2. synchronize

MODEL INTEGRATION LOG

INTEGRATION

DATE MODEL PROJECT

MODEL

AUTHOR

MODEL

CONSTRUCTION

CONTRACT

MODEL

ACTIVATION

DATE

MODEL

GRADE

ELEMENT

COUNT

20230503 AOB ALS Reconfig: L09_1W RVG 22-044 20241231 33

20210630 AOB R22 REPLACEMENT PHASE 1R PKE 201628171 20210601 9 31

2019 9TH FLOOR OFFICE REALIGNMENT CEE 201717649 20170206 1 222

0 DEC <varies> <varies> 138

<varies> <varies> <varies> 1929

Model Groups Schedule

MODEL GROUP QTY

AOB_DEN-E_ALS Reconfig 1

Integration: This list shall include all integration from the last two calendar years

MODEL INTEGRATION LOG - FLOORS

INTEGRATION

DATE MODEL PROJECT

MODEL

AUTHOR

MODEL

CONSTRUCTION

CONTRACT

MODEL

ACTIVATION

DATE

MODEL

GRADE COUNT

MODEL INTEGRATION LOG - WALLS

INTEGRATION

DATE MODEL PROJECT

MODEL

AUTHOR

MODEL

CONSTRUCTIO

N CONTRACT

MODEL

ACTIVATION

DATE

MODEL

GRADE

ELEMEN

T COUNT

FIRE VALVE

TML_03_2E_030

BAGGAGE TUNNEL

TML_03_2E_026

MECHANICAL

TML_03_2E_018

CORRIDOR

TML_03_2E_CR17

HOIST WAY

TML_03_2E_036

ELEC

TML_03_2E_028 STAIR 15

TML_03_2E_ST15

BAGGAGE TUNNEL

TML_03_2E_026

ELECTRICAL

TML_03_2E_022

ELEC

TML_03_2E_020

CORRIDOR

TML_03_2E_CR06

ELEC

TML_03_2E_016

OFFICE

TML_03_2E_014

STO

TML_03_2W_028

STAIR 104

TML_03_2E_ST104

ELEV. LOBBY

TML_03_2E_012

FREIGHT ELEV. NTE-03

TML_03_2E_EL13

ELEVATOR MACHINE

ROOM NTE-03

TML_03_2E_004

AGTS TUNNEL

TML_03_2E_010

CORRIDOR

TML_03_2W_CR20 BAGGAGE TUNNEL

TML_03_2E_006

STAIR 13

TML_03_2E_ST13

PARKING

TML_03_2E_008

MECHANICAL

EQUIPMENT

TML_03_2E_042

MECHANICAL MEZZ.

TML_03_2E_038

STAIR 07

TML_03_2E_ST07

VESTIBULE

TML_03_2E_040

SWITCH EQUIP. ROOM

TML_03_2E_024

3-2BINV1

3-2BED1

3-2BLCC1

3-2BL1

3-2BT1

3-2BH1

3-2BD1

3-2BH3

3-2BH2

3-2BEH2

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:09:47 PM

1/8" = 1'-0"

LEVEL 03 MOD 2E

ELECTRICAL FLOOR

PLAN

AOB E03.2E

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

3-2BD1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BD1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BED1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BED1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BEH2 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BH1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BH2 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BH3 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2BL1 ELECTRICAL PANEL ELECTRICAL OPERATING

ELECTRICAL PANEL: 9

3-2BLCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING

LIGHTING CONTROL PANEL: 1

3-2BINV1 LIGHTING INVERTER ELECTRICAL OPERATING

LIGHTING INVERTER: 1

3-2BT1 TRANSFORMER ELECTRICAL OPERATING

TRANSFORMER: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

2W 2E

1/8" = 1'-0"AOB E03.2E

ELECTRICAL FLOOR PLAN LEVEL 03 - MOD 2E1

CORRIDOR

TML_03_2E_CR17

ELEC

TML_03_2E_028

BAGGAGE TUNNEL

TML_03_2E_026

OFFICE

TML_03_2E_014

STO

TML_03_2W_028

STAIR 104

TML_03_2E_ST104

ELEV. LOBBY

TML_03_2E_012

CORRIDOR

TML_03_2W_CR20

ELECTRIC VAULT

TML_03_2W_012

ELECTRIC ROOM

TML_03_2W_014

BAGGAGE TUNNEL

TML_03_2W_018

MECHANICAL ROOM

TML_03_2W_016

ELEC

TML_03_2W_020

ELEC

TML_03_2W_022

CORRIDOR

TML_03_2W_CR08

MECHANICAL

TML_03_2W_024

MECHANICAL ROOM

TML_03_2W_002

MECHANICAL MEZZ.

TML_03_2W_006

PARKING

TML_03_2W_036

BAGGAGE TUNNEL

TML_03_2W_038

SWITCH EQUIP. ROOM

TML_03_2E_024

MECH. ROOM

TML_03_2E_032

ELEC. ROOM

TML_03_2W_034

COMM. ROOM

TML_03_2W_026

AGTS TUNNEL

TML_03_2W_032

UNISEX RESTROOM

TML_03_2W_030

STAIR 13

TML_03_2W_ST13 CORRIDOR

TML_03_2W_CR02

STAIR 106

TML_03_2W_ST107

VESTIBULE

TML_03_2W_004

3-2AINV1

3-2AL1

3-2AT1

3-2AH1

3-2AL1A1

3-2ALCC1

3-2AT1A1

3-2AD1

3-2AED1

3-2AEH1

3-2AH3

3-2AH2

3-2AEH2

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:09:54 PM

1/8" = 1'-0"

LEVEL 03 MOD 2W

ELECTRICAL FLOOR

PLAN

AOB E03.2W

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

3-2AD1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AD1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AED1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AED1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AEH1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AEH2 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AH1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AH2 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AH3 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AL1 ELECTRICAL PANEL ELECTRICAL OPERATING

3-2AL1A1 ELECTRICAL PANEL ELECTRICAL OPERATING

ELECTRICAL PANEL: 11

3-2ALCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING

LIGHTING CONTROL PANEL: 1

3-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING

LIGHTING INVERTER: 1

3-2AT1 TRANSFORMER ELECTRICAL OPERATING

3-2AT1A1 TRANSFORMER ELECTRICAL OPERATING

TRANSFORMER: 2

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

2W 2E

1/8" = 1'-0"AOB E03.2W

ELECTRICAL FLOOR PLAN LEVEL 03 - MOD 2W1

UP

LOBBY

AOB_04_2E_013

ELEVATOR NTE-03

AOB_04_2E_EL03

REFUSE ROOM

AOB_04_2E_015

STAIR

AOB_04_2E_ST03

MECH. SHAFT

AOB_04_2E_MS03

LOADING DOCK B

AOB_04_2E_011

UPPER DOCK B

AOB_04_2E_016

STORAGE

AOB_04_2W_019

VESTIBULE

AOB_04_2E_001

ELECTRICAL

AOB_04_2E_014

4-2BINV1

4-2BLCC1

4-2BH2

4-2BEL1

4-2BET1

4-2BEH1

4-2BH1

4-2BT1

4-2BL1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:01 PM

1/8" = 1'-0"

LEVEL 04 MOD 2E

ELECTRICAL FLOOR

PLAN

AOB E04.2E

1/8" = 1'-0"AOB E04.2E

ELECTRICAL FLOOR PLAN LEVEL 04 - MOD 2E1

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

4-2BEH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014

4-2BEL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014

4-2BH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014

4-2BH2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014

4-2BL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014

ELECTRICAL PANEL: 5

4-2BLCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING AOB_04_2E_014

LIGHTING CONTROL PANEL: 1

4-2BINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_04_2E_014

LIGHTING INVERTER: 1

4-2BET1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2E_014

4-2BT1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2E_014

TRANSFORMER: 2

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

2W 2E

G

S ST T

ELECTRICAL

AOB_04_2W_008

ELEVATOR LOBBY

AOB_04_2W_011

STORAGE

AOB_04_2W_007

LOADING DOCK A

AOB_04_2W_010ELEVATOR AOB-03

AOB_04_2W_EL03

LOADING DOCK A

AOB_04_2W_010

STORAGE

AOB_04_2W_019

4-2AINV1

4-2ALCC1

4-2AEL1

4-2AET1

4-2AEH1

4-2AH1

4-2AT1

4-2AL1

4-2AT2

4-2AL2

UNCLE

DONALD

SWITCH

874/990

TRANSFORMER

887/987

TRANSFORMER

902/987

SWITCH

914/990

4-2AL3

4-2AESG1 4-2ASG1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:09 PM

1/8" = 1'-0"

LEVEL 04 MOD 2W

ELECTRICAL FLOOR

PLAN

AOB E04.2W

1/8" = 1'-0"AOB E04.2W

ELECTRICAL FLOOR PLAN LEVEL 04 - MOD 2W1

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

4-2AEH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008

4-2AEL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008

4-2AH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008

4-2AL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008

4-2AL2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008

4-2AL3 ELECTRICAL PANEL ELECTRICAL OPERATING

ELECTRICAL PANEL: 6

UNCLE DONALD GENERATOR ELECTRICAL OPERATING

GENERATOR: 1

4-2ALCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING AOB_04_2W_008

LIGHTING CONTROL PANEL: 1

4-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_04_2W_008

LIGHTING INVERTER: 1

4-2AESG1 SWITCHGEAR ELECTRICAL OPERATING

4-2ASG1 SWITCHGEAR ELECTRICAL OPERATING

SWITCHGEAR: 2

4-2AET1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2W_008

4-2AT1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2W_008

4-2AT2 TRANSFORMER ELECTRICAL OPERATING AOB_04_2W_008

TRANSFORMER: 3

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

MOD 1 TEN RELOC: L01_11W, L04_5E,5W

FIRE PUMP REPLACEMENT: L04_2W 21-031 DEV - R. CASTLEMAN 20220701 2024 BER

N

DN

STAIR

AOB_05A_2E_ST03

FAN ROOM

AOB_05A_2E_003

PARKING GARAGE

AOB_05A_2E_011

ELECTRCIAL

AOB_05A_2E_014

LOBBY

AOB_05A_2E_013

COMM. EQUIPMENT

AOB_05A_2E_005

STAIR

AOB_05A_2E_ST04

ELEVATOR

AOB_05A_2E_EL04

FAN ROOM

AOB_05A_2E_007

CORRIDOR

AOB_05A_2E_CR01

MECH. SHAFT

AOB_05A_2E_MS05

PARKING GARAGE RAMP

AOB_05A_2E_001

VESTIBULE

AOB_04_2E_001

PARKING GARAGE

AOB_05A_2E_011

5A-2BINV

5A-2BH1

5A-2BT1

5A-2BH2

5A-2BL1

D-5A-2BH1

D-5A-2AATS

1000A

2B

RISER

5A-2BLCC1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:16 PM

1/8" = 1'-0"

LEVEL 05A MOD 2E

ELECTRICAL FLOOR

PLAN

AOB E05A.2E

1/8" = 1'-0"AOB E05A.2E

ELECTRICAL FLOOR PLAN LEVEL 05A - MOD 2E1

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

5A-2BH1 ELECTRICAL PANEL 010139 ELECTRICAL OPERATING AOB_05A_2E_014

5A-2BH2 ELECTRICAL PANEL 010138 ELECTRICAL OPERATING AOB_05A_2E_014

5A-2BL1 ELECTRICAL PANEL 010137 ELECTRICAL OPERATING AOB_05A_2E_014

ELECTRICAL PANEL: 3

5A-2BLCC1 LIGHTING CONTROL PANEL 006905 ELECTRICAL OPERATING AOB_05A_2E_014

LIGHTING CONTROL PANEL: 1

5A-2BINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05A_2E_014

LIGHTING INVERTER: 1

5A-2BT1 TRANSFORMER 017306 ELECTRICAL OPERATING AOB_05A_2E_014

TRANSFORMER: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

5A

A T

S

PARKING GARAGE

AOB_05A_2W_010

STAIR

AOB_05A_2W_ST01

MECH. SHAFT

AOB_05A_2W_MS01

CHASE

AOB_05A_2W_015

CHASE

AOB_05A_2W_016

ELECTRICAL

AOB_05A_2W_008

COMM. EQUIPMENT

AOB_05A_2W_004

LOBBY

AOB_05A_2W_009

STAIR

AOB_05A_2W_ST02

FAN ROOM

AOB_05A_2W_006

FAN ROOM

AOB_05A_2W_001

CORRIDOR

AOB_05A_2W_CR01

UPS ROOM

AOB_05A_2W_003

VESTIBULE

AOB_04_2W_001

EXTERIOR

AOB_04_2W_100

5A-2AINV

5A-2ALCC1

5A-2AH2

5A-2AT1

5A-2AH1

5A-2AL1

1000A 2A

RISER

D-5A-2AH1

5A-2AATS

5A-2AT2

5A-2AH3

5A-2AL2

5A-2AUPS

BATTERY

5A-2AUPS1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:23 PM

1/8" = 1'-0"

LEVEL 05A MOD 2W

ELECTRICAL FLOOR

PLAN

AOB E05A.2W

1/8" = 1'-0"AOB E05A.2W

ELECTRICAL FLOOR PLAN LEVEL 05A - MOD 2W1

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

5A-2AATS AUTOMATIC TRANSFER SWITCH 010443 ELECTRICAL OPERATING AOB_05A_2W_003

AUTOMATIC TRANSFER SWITCH: 1

5A-2AH1 ELECTRICAL PANEL 010141 ELECTRICAL OPERATING AOB_05A_2W_008

5A-2AH2 ELECTRICAL PANEL 010142 ELECTRICAL OPERATING AOB_05A_2W_008

5A-2AH3 ELECTRICAL PANEL 010136 ELECTRICAL OPERATING AOB_05A_2W_003

5A-2AL1 ELECTRICAL PANEL 010140 ELECTRICAL OPERATING AOB_05A_2W_008

5A-2AL2 ELECTRICAL PANEL 010135 ELECTRICAL OPERATING AOB_05A_2W_003

5A-2AUPS1 ELECTRICAL PANEL 010134 ELECTRICAL OPERATING AOB_05A_2W_003

ELECTRICAL PANEL: 6

5A-2ALCC1 LIGHTING CONTROL PANEL 006904 ELECTRICAL OPERATING AOB_05A_2W_008

LIGHTING CONTROL PANEL: 1

5A-2AINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05A_2W_008

5A-2AUPS LIGHTING INVERTER ELECTRICAL OPERATING AOB_05A_2W_003

LIGHTING INVERTER: 2

5A-2AT1 TRANSFORMER 017308 ELECTRICAL OPERATING AOB_05A_2W_008

5A-2AT2 TRANSFORMER 017307 ELECTRICAL OPERATING AOB_05A_2W_003

TRANSFORMER: 2

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

STAIR

AOB_05B_2E_ST03

STAIR

AOB_05B_2E_ST04

ELEVATOR

AOB_05b_2E_EL04

ELECTRCIAL

AOB_05B_2E_002

FAN ROOM

AOB_05B_2E_004

LOBBY

AOB_05B_2E_013

FAN ROOM

AOB_05B_2E_016

MECH. SHAFT

AOB_05b_2E_MS05

FAN ROOM

AOB_05B_2E_017

FAN ROOM

AOB_05B_2E_018

FAN ROOM

AOB_05B_2E_019

5B-2BINV

5B-2BH2

5B-2BT1

5B-2BH1

5B-2BL1 D-5B-2BH1

5B-2BLCC1

5B-2BEH1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:31 PM

1/8" = 1'-0"

LEVEL 05B MOD 2E

ELECTRICAL FLOOR

PLAN

AOB E05B.2E

1/8" = 1'-0"AOB E05B.2E

ELECTRICAL FLOOR PLAN LEVEL 05B - MOD 2E1

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

5B-2BEH1 ELECTRICAL PANEL 010444 ELECTRICAL OPERATING AOB_05B_2E_016

5B-2BH1 ELECTRICAL PANEL 010447 ELECTRICAL OPERATING AOB_05B_2E_002

5B-2BH2 ELECTRICAL PANEL 010445 ELECTRICAL OPERATING AOB_05B_2E_002

5B-2BL1 ELECTRICAL PANEL 010446 ELECTRICAL OPERATING AOB_05B_2E_002

ELECTRICAL PANEL: 4

5B-2BLCC1 LIGHTING CONTROL PANEL 006907 ELECTRICAL OPERATING AOB_05B_2E_002

LIGHTING CONTROL PANEL: 1

5B-2BINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05B_2E_002

LIGHTING INVERTER: 1

5B-2BT1 TRANSFORMER 017305 ELECTRICAL OPERATING AOB_05B_2E_002

TRANSFORMER: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

5B

STAIR

AOB_05B_2W_ST01

STAIR

AOB_05B_2W_ST02

ELECTRICAL

AOB_05B_2W_003

PARKING GARAGE

AOB_05B_2W_010

CHASE

AOB_05B_2W_012

CHASE

AOB_05B_2W_014

LOBBY

AOB_05B_2W_009

FAN ROOM

AOB_05B_2W_005

FAN ROOM

AOB_05B_2W_017

FAN ROOM

AOB_05B_2W_016

FAN ROOM

AOB_05B_2W_018

5B-2AINV

5B-2ALCC1

5B-2AH2

5B-2AT1

5B-2AL1

D-5B-2AH1

5B-2AEH1

5B-2AH1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:39 PM

1/8" = 1'-0"

LEVEL 05B MOD 2W

ELECTRICAL FLOOR

PLAN

AOB E05B.2W

1/8" = 1'-0"AOB E05B.2W

ELECTRICAL FLOOR PLAN LEVEL 05B - MOD 2W1

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

5B-2AEH1 ELECTRICAL PANEL 010448 ELECTRICAL OPERATING AOB_05B_2W_018

5B-2AH1 ELECTRICAL PANEL 010451 ELECTRICAL OPERATING AOB_05B_2W_003

5B-2AH2 ELECTRICAL PANEL 010450 ELECTRICAL OPERATING AOB_05B_2W_003

5B-2AL1 ELECTRICAL PANEL 010449 ELECTRICAL OPERATING AOB_05B_2W_003

ELECTRICAL PANEL: 4

5B-2ALCC1 LIGHTING CONTROL PANEL 006906 ELECTRICAL OPERATING AOB_05B_2W_003

LIGHTING CONTROL PANEL: 1

5B-2AINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05B_2W_003

LIGHTING INVERTER: 1

5B-2AT1 TRANSFORMER 017304 ELECTRICAL OPERATING AOB_05B_2W_003

TRANSFORMER: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

AOB_06_2W_ST01

STAIR

AOB_06_2W_ST02

STAIR CORRIDOR

AOB_06_2W_009

STAIR

AOB_06_2W_ST05

WOMEN

AOB_06_2W_007

CUSTODIAN

AOB_06_2W_006

MEN

AOB_06_2W_005

TELEPHONE

AOB_06_2W_013

ELECTRICAL

AOB_06_2W_002

LOBBY

AOB_06_2W_001

PASSAGE

AOB_06_2W_003

RECEPTION

AOB_06_2W_046

CORRIDOR

AOB_06_2W_047

COPY

AOB_06_2W_048

STORAGE

AOB_06_2W_049

OFFICE

AOB_06_2W_050

OFFICE

AOB_06_2W_051

CLOSET

AOB_06_2W_052

CLOSET

AOB_06_2W_053

OFFICE

AOB_06_2W_054

CORRIDOR

AOB_06_2W_055

CLOSET

AOB_06_2W_056

CELL

AOB_06_2W_057

CHASE

AOB_06_2W_058

CELL

AOB_06_2W_059

REPORT

AOB_06_2W_060

ROLL CALL

AOB_06_2W_061

OFFICE

AOB_06_2W_062

BREAK

AOB_06_2W_063

LOCKER

AOB_06_2W_064

WOMEN

AOB_06_2W_065

LOCKER

AOB_06_2W_067

MEN

AOB_06_2W_068

COMPUTER

AOB_06_2W_071

OFFICE

AOB_06_2W_072

OFFICE

AOB_06_2W_073

OFFICE

AOB_06_2W_074

OFFICE

AOB_06_2W_075

OPEN OFFICE

AOB_06_2W_076

OFFICE

AOB_06_2W_080

OFFICE

AOB_06_2W_081

BREAK ROOM

AOB_06_2W_078

TELECOMM

AOB_06_2W_079

CORRIDOR

AOB_06_2W_017

OPEN OFFICE

AOB_06_2W_018

NOISE CONTROL

AOB_06_2W_019

OFFICE

AOB_06_2W_020

STORAGE

AOB_06_2W_021

OPEN OFFICE

AOB_06_2W_022

STORAGE

AOB_06_2W_023

COMPUTER

AOB_06_2W_024

OFFICE

AOB_06_2W_025 OFFICE

AOB_06_2W_026

OFFICE

AOB_06_2W_027

OFFICE

AOB_06_2W_028

COPY

AOB_06_2W_029

CLOSE CIRCUIT

AOB_06_2W_030

OFFICE

AOB_06_2W_031

OFFICE

AOB_06_2W_032

COMPUTER

AOB_06_2W_033

AUDIT

AOB_06_2W_034

OPEN OFFICE

AOB_06_2W_035

OFFICE

AOB_06_2W_036

OFFICE

AOB_06_2W_037

STORAGE

AOB_06_2W_038

OFFICE

AOB_06_2W_040

OFFICE

AOB_06_2W_041 OFFICE

AOB_06_2W_042

OFFICE

AOB_06_2W_043

RECORDS

AOB_06_2W_044

CONFERENCE

AOB_06_2W_008

OFFICE

AOB_06_2W_010

OFFICE

AOB_06_2W_012

OPEN OFFICE

AOB_06_2W_004

RECEPTION WAITING

AOB_06_2W_045

ROOM

AOB_06_2W_077

OFFICE

AOB_06_2W_090 OFFICE

AOB_06_2W_091

6-2AINV1

6-2ALCC1

6-2AT1

6-2AL4

D-6-2AT1

6-2AH1

6-2AL1

D-6-2AH2

D-6-2AH1

6-2AL8

UPS

AOB-6B

UPS

AOB-6A

TSA BREAK ROOM

TML_06_2W_014

AIRPORT OFFICE

TML_06_2W_008

STAIR

TML_06_5W_014

AIRPORT OFFICE

TML_06_2W_008

Room

TML_06_2W_004

CART STORAGE

TML_06_2W_010

SECURITY SCREENING

TML_06_2E_002

ARRIVAL AREA

TML_06_2W_012

AIRPORT OFFICE

TML_06_2W_008

Room

TML_06_2W_004

Room

TML_06_2W_006

Room

TML_06_2W_003

CART STORAGE

TML_06_2W_010

DOMESTIC BRIDGE

TML_06_2W_016

6-2AH2

6-2AT2

6-2AL5

6-2AUPSL1

6-2AUPSL2

6-2AUPS

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:49 PM

1/8" = 1'-0"

LEVEL 06 OVERALL

ELECTRICAL FLOOR

PLAN

AOB E06.00

1/8" = 1'-0"AOB E06.00

ELECTRICAL FLOOR PLAN LEVEL 061

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

6-2AH1 ELECTRICAL PANEL 010455 ELECTRICAL OPERATING AOB_06_2W_002

6-2AH2 ELECTRICAL PANEL 017312 ELECTRICAL OPERATING AOB_06_2W_071

6-2AL1 ELECTRICAL PANEL 010452/01

ELECTRICAL OPERATING AOB_06_2W_002

6-2AL4 ELECTRICAL PANEL 010454 ELECTRICAL OPERATING AOB_06_2W_002

6-2AL5 ELECTRICAL PANEL 017313 ELECTRICAL OPERATING AOB_06_2W_071

6-2AL8 ELECTRICAL PANEL 010460 ELECTRICAL OPERATING AOB_06_2W_079

6-2AUPSL1 ELECTRICAL PANEL 017311 ELECTRICAL OPERATING AOB_06_2W_071

6-2AUPSL2 ELECTRICAL PANEL 017310 ELECTRICAL OPERATING AOB_06_2W_071

UPS AOB-6A ELECTRICAL PANEL 010461 ELECTRICAL OPERATING AOB_06_2W_079

UPS AOB-6B ELECTRICAL PANEL 010459 ELECTRICAL OPERATING AOB_06_2W_079

ELECTRICAL PANEL: 10

6-2ALCC1 LIGHTING CONTROL PANEL 006908 ELECTRICAL OPERATING AOB_06_2W_002

LIGHTING CONTROL PANEL: 1

6-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_06_2W_002

LIGHTING INVERTER: 1

6-2AT1 TRANSFORMER 017309 ELECTRICAL OPERATING AOB_06_2W_002

6-2AT2 TRANSFORMER 017314 ELECTRICAL OPERATING AOB_06_2W_071

TRANSFORMER: 2

6-2AUPS UPS ELECTRICAL OPERATING AOB_06_2W_071

UPS: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

KEY PLAN AOB

2W 2E

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

6-2AH1 ELECTRICAL PANEL 010455 ELECTRICAL OPERATING AOB_06_2W_002

6-2AH2 ELECTRICAL PANEL 017312 ELECTRICAL OPERATING AOB_06_2W_071

6-2AL1 ELECTRICAL PANEL 010452/01

ELECTRICAL OPERATING AOB_06_2W_002

6-2AL4 ELECTRICAL PANEL 010454 ELECTRICAL OPERATING AOB_06_2W_002

6-2AL5 ELECTRICAL PANEL 017313 ELECTRICAL OPERATING AOB_06_2W_071

6-2AL8 ELECTRICAL PANEL 010460 ELECTRICAL OPERATING AOB_06_2W_079

6-2AUPSL1 ELECTRICAL PANEL 017311 ELECTRICAL OPERATING AOB_06_2W_071

6-2AUPSL2 ELECTRICAL PANEL 017310 ELECTRICAL OPERATING AOB_06_2W_071

UPS AOB-6A ELECTRICAL PANEL 010461 ELECTRICAL OPERATING AOB_06_2W_079

UPS AOB-6B ELECTRICAL PANEL 010459 ELECTRICAL OPERATING AOB_06_2W_079

ELECTRICAL PANEL: 10

6-2ALCC1 LIGHTING CONTROL PANEL 006908 ELECTRICAL OPERATING AOB_06_2W_002

LIGHTING CONTROL PANEL: 1

6-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_06_2W_002

LIGHTING INVERTER: 1

6-2AT1 TRANSFORMER 017309 ELECTRICAL OPERATING AOB_06_2W_002

6-2AT2 TRANSFORMER 017314 ELECTRICAL OPERATING AOB_06_2W_071

TRANSFORMER: 2

6-2AUPS UPS ELECTRICAL OPERATING AOB_06_2W_071

UPS: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

AOB_07_2W_ST02

PASSAGE

AOB_07_2W_003

STAIR

AOB_07_2W_ST05

WOMEN

AOB_07_2W_007

CUSTODIAN

AOB_07_2W_006

MEN

AOB_07_2W_005

TELEPHONE

AOB_07_2W_011

ELECTRICAL

AOB_07_2W_002

RAMP TOWER OFFICE

AOB_07_2W_062

LOBBY

AOB_07_2W_001

STORAGE

AOB_07_2W_051

OFFICE

AOB_07_2W_052

OFFICE

AOB_07_2W_054

OFFICE

AOB_07_2W_055

OFFICE

AOB_07_2W_056

OFFICE

AOB_07_2W_057

OFFICE

AOB_07_2W_058

OFFICE

AOB_07_2W_059

OFFICE

AOB_07_2W_060

OFFICE

AOB_07_2W_064

OFFICE

AOB_07_2W_065

OFFICE

AOB_07_2W_066

OFFICE

AOB_07_2W_067

OFFICE

AOB_07_2W_068

OFFICE

AOB_07_2W_069

OFFICE

AOB_07_2W_070

OFFICE

AOB_07_2W_071

OFFICE

AOB_07_2W_072

OFFICE

AOB_07_2W_073

OFFICE

AOB_07_2W_074

OPEN OFFICE

AOB_07_2W_061

CONFERENCE #3

AOB_07_2W_076

CLOSET

AOB_07_2W_079

CLOSET

AOB_07_2W_077

BREAK

AOB_07_2W_078

CORRIDOR

AOB_07_2W_013

CORRIDOR

AOB_07_2W_015

CLOSET

AOB_07_2W_018

OFFICE

AOB_07_2W_019

OFFICE

AOB_07_2W_020

OFFICE

AOB_07_2W_021

OFFICE

AOB_07_2W_022

OFFICE

AOB_07_2W_023

OFFICE

AOB_07_2W_024

CONFERENCE #2

AOB_07_2W_016

OFFICE

AOB_07_2W_027

OFFICE

AOB_07_2W_028

OFFICE

AOB_07_2W_029

OFFICE

AOB_07_2W_030

OFFICE

AOB_07_2W_039

OFFICE

AOB_07_2W_040

OFFICE

AOB_07_2W_043

OFFICE

AOB_07_2W_044 OFFICE

AOB_07_2W_046

OFFICE

AOB_07_2W_047

OFFICE

AOB_07_2W_048CONFERENCE #1

AOB_07_2W_049

FILES

AOB_07_2W_053

PLOTTER

AOB_07_2W_050

CLOSET

AOB_07_2W_100

OPEN OFFICE

AOB_007_2W_045

7-2AINV1

7-2ALCC1

7-2AT1

D-7-2AH1

7-2AH1

7-2AL1

D-7-2AT1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:54 PM

1/8" = 1'-0"

LEVEL 07 OVERALL

ELECTRICAL FLOOR

PLAN

AOB E07.00

1/8" = 1'-0"AOB E07.00

ELECTRICAL FLOOR PLAN LEVEL 071

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

7-2AH1 ELECTRICAL PANEL 010464 ELECTRICAL OPERATING AOB_07_2W_002

7-2AL1 ELECTRICAL PANEL 010463/01

ELECTRICAL OPERATING AOB_07_2W_002

ELECTRICAL PANEL: 2

7-2ALCC1 LIGHTING CONTROL PANEL 006909 ELECTRICAL OPERATING AOB_07_2W_002

LIGHTING CONTROL PANEL: 1

7-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_07_2W_002

LIGHTING INVERTER: 1

7-2AT1 TRANSFORMER 017315 ELECTRICAL OPERATING AOB_07_2W_002

TRANSFORMER: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

AOB_08_2W_ST02

STAIR

AOB_08_2W_ST05

WOMEN

AOB_08_2W_002

CUSTODIAN

AOB_08_2W_004

MEN

AOB_08_2W_006

TELEPHONE

AOB_08_2W_007

ELECTRICAL

AOB_08_2W_010

CORRIDOR

AOB_08_2W_012

LOBBY

AOB_08_2W_001

OPEN OFFICE

AOB_08_2W_037

RECEPTION

AOB_08_2W_039

OFFICE

AOB_08_2W_040

OFFICE

AOB_08_2W_041

OFFICE

AOB_08_2W_042

OPEN OFFICE

AOB_08_2W_043

FILES

AOB_08_2W_038

OFFICE

AOB_08_2W_061

OFFICE

AOB_08_2W_062

OFFICE

AOB_08_2W_063

OFFICE

AOB_08_2W_064

OFFICE

AOB_08_2W_065

OFFICE

AOB_08_2W_066

CASHIER

AOB_08_2W_044

VAULT

AOB_08_2W_045

OFFICE

AOB_08_2W_048

OFFICE

AOB_08_2W_049

OFFICE

AOB_08_2W_050

OFFICE

AOB_08_2W_051

OFFICE

AOB_08_2W_052

OFFICE

AOB_08_2W_053

OFFICE

AOB_08_2W_054

OFFICE

AOB_08_2W_055

BREAK

AOB_08_2W_056

TELECOMM

AOB_08_2W_057

CONFERENCE ROOM

AOB_08_2W_017

OFFICE

AOB_08_2W_018

OFFICE

AOB_08_2W_019

OFFICE

AOB_08_2W_021

OFFICE

AOB_08_2W_022

OFFICE

AOB_08_2W_023

OFFICE

AOB_08_2W_029

OPEN OFFICE

AOB_08_2W_024

FILE/STORAGE

AOB_08_2W_025

FILE/STORAGE

AOB_08_2W_027

ELEC./STORAGE

AOB_08_2W_028

OFFICE

AOB_08_2W_069

OPEN OFFICE

AOB_08_2W_031

OFFICE

AOB_08_2W_032

OFFICE

AOB_08_2W_067

OPEN OFFICE

AOB_08_2W_033

OFFICE

AOB_08_2W_034

CONFERENCE

AOB_08_2W_036

SUPPORT

AOB_08_2W_035

OFFICE

AOB_08_2W_068

OFFICE

AOB_08_2W_030

OPEN OFFICE

AOB_08_2W_059

CLOSET

AOB_08_2W_008

CORRIDOR

AOB_08_2W_CR05

PASSAGE

AOB_08_2W_003

OPEN OFFICE

AOB_08_2W_060

8-2AINV1

8-2AT1

D-8-2AT1

8-2AH1

8-2AL1

D-8-2AH1

8-2AL2

8-2AL8

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:10:59 PM

1/8" = 1'-0"

LEVEL 08 OVERALL

ELECTRICAL FLOOR

PLAN

AOB E08.00

1/8" = 1'-0"AOB E08.00

ELECTRICAL FLOOR PLAN LEVEL 081

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

8-2AH1 ELECTRICAL PANEL 010465 ELECTRICAL OPERATING AOB_08_2W_010

8-2AL1 ELECTRICAL PANEL 010466/01

ELECTRICAL OPERATING AOB_08_2W_010

8-2AL2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_08_2W_028

8-2AL8 ELECTRICAL PANEL 017319 ELECTRICAL OPERATING AOB_08_2W_057

ELECTRICAL PANEL: 4

8-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_08_2W_010

LIGHTING INVERTER: 1

8-2AT1 TRANSFORMER 017316 ELECTRICAL OPERATING AOB_08_2W_010

TRANSFORMER: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

J

ELECTRICAL

AOB_09_2W_004

CONFERENCE ROOM

AOB_09_2W_048

LOBBY

AOB_09_2W_001

LOBBY

AOB_09_2W_023

OPEN OFFICE

AOB_09_2W_035

CORRIDOR

AOB_09_2W_014

CORRIDOR

AOB_09_2W_013

STAIR

AOB_09_2W_ST02

PASSAGE

AOB_09_2W_003

STAIR

AOB_09_2W_ST05

WOMEN

AOB_09_2W_005

CUSTODIAN

AOB_09_2W_006

MEN

AOB_09_2W_007

TELEPHONE

AOB_09_2W_002

OFFICE

AOB_09_2W_049

OFFICE

AOB_09_2W_050

OFFICE

AOB_09_2W_051

OFFICE

AOB_09_2W_052OFFICE

AOB_09_2W_053

OFFICE

AOB_09_2W_054

OFFICE

AOB_09_2W_055

OFFICE

AOB_09_2W_056

OFFICE

AOB_09_2W_057

OPEN OFFICE

AOB_09_2W_062

OFFICE

AOB_09_2W_063

OFFICE

AOB_09_2W_064

OFFICE

AOB_09_2W_069

OFFICE

AOB_09_2W_081

OFFICE

AOB_09_2W_082

OFFICE

AOB_09_2W_066

OFFICE

AOB_09_2W_067

OPEN OFFICE

AOB_09_2W_084

FILES

AOB_09_2W_085

CORRIDOR

AOB_09_2W_086

OFFICE

AOB_09_2W_087

OFFICE

AOB_09_2W_068

OFFICE

AOB_09_2W_070

OFFICE

AOB_09_2W_071OFFICE

AOB_09_2W_088

OFFICE

AOB_09_2W_073

OFFICE

AOB_09_2W_075

OFFICE

AOB_09_2W_076

CORRIDOR

AOB_09_2W_089

OFFICE

AOB_09_2W_090

OFFICE

AOB_09_2W_091

OFFICE

AOB_09_2W_092

OFFICE

AOB_09_2W_093

OPEN OFFICE

AOB_09_2W_016

BREAK

AOB_09_2W_059

TELECOMM

AOB_09_2W_078

OPEN OFFICE

AOB_09_2W_017

OFFICE

AOB_09_2W_022

OFFICE

AOB_09_2W_045

FILE ROOM

AOB_09_2W_025

CLOSET

AOB_09_2W_033

FILE/STORAGE

AOB_09_2W_032

BREAK RM

AOB_09_2W_028

CONFERENCE ROOM

AOB_09_2W_031

OFFICE

AOB_09_2W_019

OFFICE

AOB_09_2W_026

OFFICE

AOB_09_2W_027

OFFICE

AOB_09_2W_030

OFFICE

AOB_09_2W_021

OFFICE

AOB_09_2W_018

CORRIDOR

AOB_09_2W_020

CONFERENCE

AOB_09_2W_024

OFFICE

AOB_09_2W_074

OFFICE

AOB_09_2W_072

CORRIDOR

AOB_09_2W_015

9-2AINV1

9-2ALCC1

9-2AT1

UPS

AOB-9

D-9-2AT1

9-2AH1

9-2AL1

D-9-2AH1

9-2AL3

9-2AT3

9-2AL2

9-2AL8

OFFICE

AOB_09_2W_114

OFFICE

AOB_09_2W_061

OFFICE

AOB_09_2W_116

OFFICE

AOB_09_2W_117

OFFICE SUPPLY/COPIER

AOB_09_2W_113

OFFICE

AOB_09_2W_110

OFFICE

AOB_09_2W_111

STORAGE

AOB_09_2W_083

OFFICE

AOB_09_2W_112

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:11:04 PM

1/8" = 1'-0"

LEVEL 09 OVERALL

ELECTRICAL FLOOR

PLAN

AOB E09.00

1/8" = 1'-0"AOB E09.00

ELECTRICAL FLOOR PLAN LEVEL 091

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

9-2AH1 ELECTRICAL PANEL 010470 ELECTRICAL OPERATING AOB_09_2W_004

9-2AL1 ELECTRICAL PANEL 010468/01

ELECTRICAL OPERATING AOB_09_2W_004

9-2AL2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_09_2W_085

9-2AL3 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_09_2W_002

9-2AL8 ELECTRICAL PANEL 010472 ELECTRICAL OPERATING AOB_09_2W_078

UPS AOB-9 ELECTRICAL PANEL 010471 ELECTRICAL OPERATING AOB_09_2W_078

ELECTRICAL PANEL: 6

9-2ALCC1 LIGHTING CONTROL PANEL 006910 ELECTRICAL OPERATING AOB_09_2W_004

LIGHTING CONTROL PANEL: 1

9-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_09_2W_004

LIGHTING INVERTER: 1

9-2AT1 TRANSFORMER 017318 ELECTRICAL OPERATING AOB_09_2W_004

9-2AT3 TRANSFORMER ELECTRICAL OPERATING AOB_09_2W_002

TRANSFORMER: 2

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

EQUIPMENT

AOB_10_2W_020

EMERGENCY

OPERATIONS CENTER

AOB_10_2W_019

OPERATION EQUIPMENT

AOB_10_2W_022

COMMUNICATIONS

CENTER

AOB_10_2W_021

MAINTENENCE CONTROL

CENTER

AOB_10_2W_017

OFFICE

AOB_10_2W_014

AGTS EQUIP.

AOB_10_2W_013

BREAK RM

AOB_10_2W_011

WAITING

AOB_10_2W_046

PASSAGE

AOB_10_2W_003 LOBBY

AOB_10_2W_001

ELECTRICAL

AOB_10_2W_002

CONFERENCE ROOM

AOB_10_2W_012

OFFICE

AOB_10_2W_066

OFFICE

AOB_10_2W_064

CORRIDOR

AOB_10_2W_065

STORAGE

AOB_10_2W_063

STORAGE

AOB_10_2W_059

OFFICE

AOB_10_2W_047

OFFICE

AOB_10_2W_048

OFFICE

AOB_10_2W_049

OFFICE

AOB_10_2W_051

OFFICE

AOB_10_2W_055

OFFICE

AOB_10_2W_056

OFFICE

AOB_10_2W_060

OFFICE

AOB_10_2W_061

COFFEE

AOB_10_2W_053

COPY

AOB_10_2W_054

CORRIDOR

AOB_10_2W_052

CORRIDOR

AOB_10_2W_024

10-2AINV1

10-2ALCC1

10-2AT1

10-2AL6

D-10-2AH1

10-2AH1

10-2AL1

D-10-2AT1

D-10-2AT2

10-2AT2

10-2AL5

D-UPS3 D-UPS4

10-2AUPSL3 10-2AUPSL4

10-2AUPSL1

10-2AUPSL2

10-2AINV1

10-2AD1

BATTERY

UPS1

AGTS EQUIP.

AOB_10_2W_015

CORRIDOR

AOB_10_2W_018

TELEPHONE

AOB_10_2W_004

CUSTODIAN

AOB_10_2W_007

WOMEN

AOB_10_2W_008

MEN

AOB_10_2W_006

STAIR

AOB_10_2W_ST02

STAIR

AOB_10_2W_ST05

CORRIDOR

AOB_10_2W_057

BREAK

AOB_10_2W_030

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:11:05 PM

1/8" = 1'-0"

LEVEL 10 OVERALL

ELECTRICAL FLOOR

PLAN

AOB E10.00

1/8" = 1'-0"AOB E10.00

ELECTRICAL FLOOR PLAN LEVEL 101

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

10-2AD1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_10_2W_020

10-2AH1 ELECTRICAL PANEL 010475 ELECTRICAL OPERATING AOB_10_2W_002

10-2AL1 ELECTRICAL PANEL 010476/01

ELECTRICAL OPERATING AOB_10_2W_002

10-2AL5 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_10_2W_063

10-2AL6 ELECTRICAL PANEL 017343 ELECTRICAL OPERATING AOB_10_2W_030

10-2AUPSL1 ELECTRICAL PANEL 010478 ELECTRICAL OPERATING AOB_10_2W_015

10-2AUPSL2 ELECTRICAL PANEL 010479 ELECTRICAL OPERATING AOB_10_2W_015

10-2AUPSL3 ELECTRICAL PANEL 026440 ELECTRICAL OPERATING AOB_10_2W_022

10-2AUPSL4 ELECTRICAL PANEL 017342 ELECTRICAL OPERATING AOB_10_2W_022

ELECTRICAL PANEL: 9

10-2ALCC1 LIGHTING CONTROL PANEL 006911 ELECTRICAL OPERATING AOB_10_2W_002

LIGHTING CONTROL PANEL: 1

10-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_10_2W_002

10-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_10_2W_020

LIGHTING INVERTER: 2

10-2AT1 TRANSFORMER 017320 ELECTRICAL OPERATING AOB_10_2W_002

10-2AT2 TRANSFORMER ELECTRICAL OPERATING AOB_10_2W_063

TRANSFORMER: 2

UPS1 UPS ELECTRICAL OPERATING AOB_10_2W_020

UPS: 1

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

AGTS SERVER: L10_2W 23-035 DEV - C. CARDENAS 20240515 2025 DFA

N

AOB_11_2W_ST02

PASSAGE

AOB_11_2W_002 ELEVATOR MACHINE

ROOM

AOB_11_2W_001

MECHANICAL FAN ROOM

AOB_11_2W_004

MECHANICAL

AOB_11_2W_005

ROOF

AOB_11_2W_RF04

ROOF

AOB_11_2W_RF02

11-2AINV1

11-2AL1

11-2AT1

11-2AEH1

11-2AH1

11-2AEL1

11-2AET1

11-2AEH2

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:11:05 PM

1/8" = 1'-0"

LEVEL 11 OVERALL

ELECTRICAL FLOOR

PLAN

AOB E11.00

1/8" = 1'-0"AOB E11.00

ELECTRICAL FLOOR PLAN LEVEL 111

ASSETS

MARK TYPE TAG FUNC AREA STATUS LOCATION

11-2AEH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_004

11-2AEH2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_001

11-2AEL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_001

11-2AH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_004

11-2AL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_004

ELECTRICAL PANEL: 5

11-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_11_2W_004

LIGHTING INVERTER: 1

11-2AET1 TRANSFORMER ELECTRICAL OPERATING AOB_11_2W_001

11-2AT1 TRANSFORMER ELECTRICAL OPERATING AOB_11_2W_004

TRANSFORMER: 2

CURRENT PROJECTS - CONSTRUCTION

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

CURRENT PROJECTS - DESIGN

PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE

ANTICIPATED

COMPLETION DFI CONTACT

N

WH

EO EO

GS

P

A C

E

SPACE SPACE

S P

A C

E

WH

SPACE SPACE

M

M

AEM

M

M

SPACE

T

SPACE

MM

T

SPARESPARESPARESPARESPARE

T

T

T

SPARESPARESPARESPARESPARE

T T

T

T

T

T

T

T

T

T

T

T

UPS

UPS

SPARE SPARE

T

T

SPD

T

TTTT

902/987

CT

1600AF

1000AT

MAIN SWITCHGEAR "4-2ASG1"

CT

4000A

MAIN

XCEL METER

GROUND BUS

ELECTRICAL INTERLOCK

1600AF

1000AT

800AF

800AT

1600AF

1000AT

M1

XCEL METER

CT

M2

800.41000.4

4000.X

#4/0 CU

CT

4000.X

LEVEL 4

LEVEL 3

4000A. MAIN BUS 277/480V., 3Ø,

4W. 65,000 A.I.C.

277/480V., 3Ø, 4W. Isc=60,200A.

2500KVA XCEL TRANSFORMER "T2"

277/480V., 3Ø, 4W. Isc=60,200A.

887/987

2500KVA XCEL TRANSFORMER "T1"

1600AF

1600AT

1000A

"3-2AD1"

1600A. MCB. 277/480V, 3Ø, 4W,

65,000 A.I.C.

225A 400A

400.4225.4

#8 CU

3-2AT1

50S.4

3-2AL1

1600.4

10-2AUPSL1

1000.4

4000A

MAIN

"3-2BD1"

1600A. MCB. 277/480V, 3Ø, 4W,

65,000 A.I.C.

1000A 100A

100.4

225A

225.4

1000.4

TO "4-2AESG1 M1"

(SEE SHEET E501.1)

TO "4-2AESG1 M2"

(SEE SHEET E501.1)

4000.X 4000.X

1600AF

1000AT

1000.4

TO GENERATOR TAP BOX

(SEE SHEET E501.1)

CT CT

TO "3-2BH4ATS"

(SEE SHEET E501.1)

3-2AH3

100.4

3-2AH2

50.4

3-2AH1

100A50A

#8 CU

3-2AT1A1

50S.4

3-2AL1A1

30.3

30.3

250A250A100A100A100A50A

50.3

EF-11

400A

400.4

100A

100.4

100A

100.4

225A

225.4

5B-2AH2

5A-2AH2

#8 CU

4-2AT2

50S.4

4-2AL2

4-2AH1

#8 CU

4-2AT1

50S.4

4-2AL1

30.3

30.3

50.3

4-2AL3

11-2AH1

LEVEL 5A

#8 CU

3-2BT1

50S.4

3-2BL1

30.3

3-2BH1

3-2BH2

600A

600.4

3-2BH3

250A250A100A100A100A

#8 CU

4-2BT1

150S.4

4-2BL1

4-2BH1

70.3

#8 CU

4-5AT1

150S.4

4-5AL1

4-2BH2

70.3

100A

100.4

225A

225.4

TO "4-5AATS1-N"

(SEE SHEET E501.1)

TO "4-5BATS1-N"

(SEE SHEET E501.1)

100A

100.4

100A

100.4

400A

400.4

5B-2BH2

5A-2BH2

CAFM #16312A01

TAP BOX "2A RISER"

LEVEL 5B

LEVEL 6

LEVEL 7

LEVEL 8

LEVEL 9

LEVEL 10

ROOF

100A

5A-2AH1

#8 CU

5A-2AT1

50S.4

5A-2AL1

30.3 100.4

100A

5B-2AH1

#8 CU

5B-2AT1

50S.4

5B-2AL1

30.3 100.4

100A

6-2AL4

#2 CU

6-2AT1

250S.4

6-2AL1

110.3

100A

6-2AH1

100.4

60.4

100A

#2 CU

7-2AT1

250S.4

7-2AL1

110.3

100A

7-2AH1

100.4

100A

8-2AL2

#2 CU

8-2AT1

250S.4

8-2AL1

110.3

100A

8-2AH1

100.4

100.4

100A

9-2AL2

#2 CU

9-2AT1

250S.4

9-2AL1

110.3

100A

9-2AH1

100.4

80.4

100A

10-2AL6

#2 CU

10-2AT1

250S.4

10-2AL1

110.3

100A

10-2AH1

100.4

60.4

1000A BUS RISER

100.3

#6 CU

9-2AT3

150S.4

9-2AL3

60A

#6 CU

10-2AT2

125.4

10-2AL5

60.3

"10-2AD1"

800A. MLO. 277/480V, 3Ø, 4W,

65,000 A.I.C.

60A

225A

6-2AH2

#6 CU

6-2AT2

150S.4

6-2AL5

70.3225.4

6-2AUPS

70.3

6-2AUPSL1 UPS AOB-6B UPS AOB-6A

175.3 175.3

175.3

UPS1

70.3

80.4

10-2AUPSL3

80.4

10-2AUPSL4

80.4

110A

110.3

UNKNOWN

LOAD

110A

110.3

UNKNOWN

LOAD

15A

20.3

ROOF

15A

20.3

ROOF

15A

20.3

ROOF

20A

20.3

UNKNOWN

LOAD

40A 80A (x3)

400A

"11-2BTH2"

400A. MCB. 277/480V, 3Ø, 4W,

65,000 A.I.C.

60A 20A

20.2

RECEPTACLE

100.4

100A

CAFM #16312A01

TAP BOX "2B RISER"

1000A BUS RISER

100A

5B-2BH1

#8 CU

5B-2BT1

50S.4

5B-2BL1

30.3100.4

100A

5A-2BH1

#8 CU

5A-2BT1

50S.4

5A-2BL1

30.3100.4

200A

200.4

TO "5A-2AATS-N"

(SEE SHEET E501.1)

#8 CU

11-2AT1

50S.4

11-2AL1

30.3

#4 CU

11-2BTL4-X

175S.4

11-2BTL4

100.4

100A

#4 CU

11-2BTL3-X

175S.4

11-2BTL3

100.4

100A

#4 CU

11-2BTL2-X

175S.4

11-2BTL2

100.4

100A

#4 CU

11-2BTL1-X

175S.4

11-2BTL1

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:09:40 PM

12" = 1'-0"

AOB AREA 2A/B

HOUSE ONE LINE

E501

1L COPPER FEEDER SCHEDULE

TAG FEEDER SIZE

20.2 2#12, 1#12G, 3/4"C

20.3 3#12, 1#12G, 3/4"C

30.3 3#10, 1#10G, 3/4"C

50.3 3#6, 1#10G, 1"C

50.4 4#6, 1#10G, 1"C

50S.4 4#6, 1#8G, 1"C

60.3 3#4, 1#10G, 1"C

60.4 4#4, 1#10G, 1-1/4"C

70.3 3#4, 1#8G, 1-1/4"C

80.4 4#3, 1#8G, 1-1/4"C

100.3 3#1, 1#8G, 1-1/2"C

100.4 4#1, 1#8G, 1-1/2"C

110.3 3#2, 1#6G, 1-1/4"C

125.4 4#1, 1#6G, 1-1/2"C

150S.4 4#1/0, 1#6G, 2"C

175.3 3#2/0, 1#6G, 2"C

175S.4 4#2/0, 1#4G, 2"C

200.4 4#3/0, 1#6G, 2"C

225.4 4#4/0, 1#4G, 2-1/2"C

250S.4 4-250KCMIL, 1#2G, 3"C

400.4 2 SETS, EACH: 4#3/0, 1#3G, 2-1/2"C

600.4 2 SETS, EACH: 4-350KCMIL, 1#1G, 3"C

800.4 3 SETS, EACH: 4-300KCMIL, 1#1/0G, 3"C

1000.4 3 SETS, EACH: 4-400KCMIL, 1#2/0G, 3"C

1600.4 4 SETS, EACH: 4-600KCMIL, 1#4/0G, 4"C

4000.X 10 SETS, EACH: 4-600KCMIL, 4"C

1L DISTRIBUTION CONNECTION VALUES

EQUIPMENT NAME

AVAILABLE

FAULT

CURRENT (A)

SHORT

CIRCUIT

RATING (AIC)

VOLTAGE

DROP (%)

PEAK

DEMAND

"3-2AD1" 65,000 AIC 0 kW

"3-2BD1" 65,000 AIC 0 kW

"10-2AD1" 65,000 AIC 0 kW

"11-2BTH2" 65,000 AIC 0 kW

2500KVA XCEL TRANSFORMER "T1" 60,200A 0 kW

2500KVA XCEL TRANSFORMER "T2" 60,200A 0 kW

MAIN SWITCHGEAR "4-2ASG1" 65,000 AIC 0 kW

TAP BOX "2A RISER" 0 kW

TAP BOX "2B RISER" 0 kW

1L PANEL CONNECTION VALUES

EQUIPMENT

NAME

MCB RATING

(A) MAINS (A)

EQUIPMENT

RATING (KVA)

AVAILABLE

FAULT

CURRENT (A)

SHORT

CIRCUIT

RATING (AIC)

VOLTAGE

DROP (%)

3-2AH1 50 100 0

3-2AH2 100 0

3-2AH3 225 0

3-2AL1 50 100 0

3-2AL1A1 50 100 0

3-2BH1 100 0

3-2BH2 225 0

3-2BH3 600 0

3-2BL1 50 100 0

4-2AH1 50 100 0

4-2AL1 50 100 0

4-2AL2 50 100 0

4-2AL3 50 100 0

4-2BH1 100 0

4-2BH2 225 0

4-2BL1 150 0

4-5AL1 150 0

5A-2AH1 100 0

5A-2AH2 100 0

5A-2AL1 50 100 0

5A-2BH1 100 0

5A-2BH2 100 0

5A-2BL1 50 100 0

5B-2AH1 100 0

5B-2AH2 250 0

5B-2AL1 50 100 0

5B-2BH1 100 0

5B-2BH2 250 0

5B-2BL1 50 100 0

6-2AH1 100 0

6-2AH2 225 0

6-2AL1 250 0

6-2AL4 100 0

6-2AL5 150 0

6-2AUPSL1 150 0

7-2AH1 100 0

7-2AL1 250 0

8-2AH1 100 0

8-2AL1 250 0

8-2AL2 100 0

9-2AH1 100 0

9-2AL1 250 0

9-2AL2 100 0

9-2AL3 150 0

10-2AH1 100 0

10-2AL1 250 0

10-2AL5 125 0

10-2AL6 60 100 0

10-2AUPSL1 100 0

10-2AUPSL3 100 0

10-2AUPSL4 100 0

11-2AH1 400 0

11-2AL1 50 100 0

11-2BTL1 175 0

11-2BTL2 175 0

11-2BTL3 175 0

11-2BTL4 175 0

UPS AOB-6A 150 0

UPS AOB-6B 150 0

3-2AT1 0 0 15

3-2AT1A1 0 0 15

3-2BT1 0 0 15

4-2AT1 0 0 15

4-2AT2 0 0 15

4-2BT1 0 0 45

4-5AT1 0 0 45

5A-2AT1 0 0 15

5A-2BT1 0 0 15

5B-2AT1 0 0 15

5B-2BT1 0 0 15

6-2AT1 0 0 75

6-2AT2 0 0 45

7-2AT1 0 0 75

8-2AT1 0 0 75

9-2AT1 0 0 75

9-2AT3 0 0 45

10-2AT1 0 0 75

10-2AT2 0 0 45

11-2AT1 0 0 15

11-2BTL1-X 0 0 50

11-2BTL2-X 0 0 50

11-2BTL3-X 0 0 50

11-2BTL4-X 0 0 50

6-2AUPS 0 0 50

UPS1 0 0 20

WH

EO EO

GS

P

A C

E

SPACE SPACE

S P

A C

E

WH

M

M

AEM

M

M

SPACE

MM

SPARESPARESPARESPARESPARESPARE SPARESPARESPARESPARESPARE

T

T

SPARE

T

UPS

T

T

T

UPS

T

N

E

B

P

N

E

B

P

N

E

B

P

N

E

B

P

N

E

B

P

CT

"4-2AESG1"

CT

2000A

MAIN

XCEL METER

GROUND BUS

ELECTRICAL INTERLOCK

1600AF

1000AT

1600AF

1600AT

1600AF

1000AT

M1

XCEL METER

CT

M2

1600.4

4000.X

#4/0 CU

CT

4000.X

LEVEL 4

LEVEL 3

4000A. MAIN BUS 277/480V., 3Ø,

4W. 65,000 A.I.C.

1000A

"3-2AED1"

1600A. MCB. 277/480V, 3Ø, 4W,

65,000 A.I.C.

100A

100.4

1000.4

2000A

MAIN

"3-2BED1"

1600A. MCB. 277/480V, 3Ø, 4W,

65,000 A.I.C.

1000A 100A

100.4

1000.4

TO TRANSFORMER "T1"

(SEE SHEET E501)

TO TRANSFORMER "T2"

(SEE SHEET E501)

CT CT

TO "3-2AD1"

(SEE SHEET E501)

3-2AEH1

100.4

3-2AEH2

100A250A250A100A100A100A50A

60.4

225A

225.4

100A300A

300.4

100A

100.4

11-2AEH2

LEVEL 5A

3-2BEH1

100A

100.4

3-2BEH2

250A250A250A100A100A

#8 CU

4-2BET1

50S.4

4-2BEL1

4-2BEH1

30.3

60A

60.4

TO "4-2BH2"

(SEE SHEET E501)

TO "3-5AED2"

(SEE TERMINAL ONE-LINES)

225A

225.4

200A

200.4

5B-2BEH1

LEVEL 5B

LEVEL 6

LEVEL 7

LEVEL 8

LEVEL 9

LEVEL 10

ROOF

2000A

200.4

TO 200A CB, 2B RISER

(SEE SHEET E501)

#8 CU

11-2AET1

50S.4

11-2AEL1

30.3

GEN TAP BOX

1600.4

TO "4-2AESG1"

(SEE SHEET E501)

GENERATOR

1600KVA, 277/480V., 3Ø, 4W

2000.X

100A

5A-2AATS

200.4

5A-2AH3

#8 CU

5A-2AT2

100S.4

5A-2AL2

50.3

5A-2AUPS5A-2AUPS1

150.4300.4

6-2AUPSL2

150.4 60.4

6-2AL8

60.4

8-2AL8

60.4

9-2AL8

#8 CU

4-2AET1

50S.4

4-2AEL1

4-2AEH1

30.3

5B-2AEH1

3-2BH4ATS

400.4

GENERATOR (USWEST)

300KVA, 277/480V., 3Ø, 4W

400S.4

3-2BH4

400.4

#8 CU

3-2BT2

30.3

50S.4

3-2BL2 3-2BL3

50.4

11-2AEH1

4-5AATS1

175.4

175.4 175.3

TO "3-5AED2"

(SEE TERMINAL ONE-LINES)#1/0 CU

X-4-5BDL6

350S.4

4-5AL6 4-5AL7

150.4

4-5AL8

4-5BATS1

100.4

100.4

TO "4-2BH2"

(SEE SHEET E501)

4-5BATS1

EM

4-5BATS1

NORMAL

100A

100A100.4

4-5BUPS1

4-5BATS2

4-5BCB1

100ATO "3-5AED2"

(SEE TERMINAL ONE-LINES) 100.4

100.4

#2 CU

4-5BDL1-X

100.3

4-5BDL1

225A. MCB. 277/480V, 3Ø, 4W,

65,000 A.I.C.

150A

150.4

4-5BL7

100.4

4-5BL8

100A 225A

100.4

4-5BL9

100A

200A 225S.4225S.4

20.2

UPS AOB-9

DATE:

SCALE:

DENVER

INTERNATIONAL

AIRPORT

NOT FOR CONSTRUCTION

NOT FOR EXTERNAL USE

OR DISTRIBUTION

AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.

AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION

AND AWAITING AS-BUILT DELIVERY AND MAY NOT

REFLECT THE FINAL BUILT PROJECT.

9/18/2024 3:09:40 PM

12" = 1'-0"

AOB AREA 2A/B

EMERGENCY ONE

LINE

E501.1

1L COPPER FEEDER SCHEDULE

TAG FEEDER SIZE

20.2 2#12, 1#12G, 3/4"C

30.3 3#10, 1#10G, 3/4"C

50.3 3#6, 1#10G, 1"C

50.4 4#6, 1#10G, 1"C

50S.4 4#6, 1#8G, 1"C

60.4 4#4, 1#10G, 1-1/4"C

100.3 3#1, 1#8G, 1-1/2"C

100.4 4#1, 1#8G, 1-1/2"C

100S.4 4#1, 1#6G, 1-1/2"C

150.4 4#1/0, 1#6G, 2"C

175.3 3#2/0, 1#6G, 2"C

175.4 4#2/0, 1#6G, 2"C

200.4 4#3/0, 1#6G, 2"C

225.4 4#4/0, 1#4G, 2-1/2"C

225S.4 4#4/0, 1#2G, 2-1/2"C

300.4 4-350KCMIL, 1#4G, 3"C

350S.4 4-500KCMIL, 1#1/0G, 3-1/2"C

400.4 2 SETS, EACH: 4#3/0, 1#3G, 2-1/2"C

400S.4 2 SETS, EACH: 4#3/0, 1#1/0G, 2-1/2"C

1000.4 3 SETS, EACH: 4-400KCMIL, 1#2/0G, 3"C

1600.4 4 SETS, EACH: 4-600KCMIL, 1#4/0G, 4"C

2000.X 5 SETS, EACH: 4-600KCMIL, 1-350KCMIL, 4"C

4000.X 10 SETS, EACH: 4-600KCMIL, 4"C

1L DISTRIBUTION CONNECTION VALUES

EQUIPMENT NAME

AVAILABLE

FAULT

CURRENT (A)

SHORT

CIRCUIT

RATING (AIC)

VOLTAGE

DROP (%)

PEAK

DEMAND

"3-2AED1" 65,000 AIC 0 kW

"3-2BED1" 65,000 AIC 0 kW

"4-2AESG1" 65,000 AIC 0 kW

4-5BDL1 65,000 AIC 0 kW

GEN TAP BOX 0 kW

GENERATOR 0 kW

GENERATOR (USWEST) 0 kW

1L PANEL CONNECTION VALUES

EQUIPMENT

NAME

MCB RATING

(A) MAINS (A)

EQUIPMENT

RATING (KVA)

AVAILABLE

FAULT

CURRENT (A)

SHORT

CIRCUIT

RATING (AIC)

VOLTAGE

DROP (%)

3-2BH4ATS 0 400 0

4-5AATS1 0 200 0

4-5BATS1 0 100 0

4-5BATS2 0 100 0

5A-2AATS 0 200 0

3-2AEH1 100 0 65,000 AIC

3-2AEH2 100 0 65,000 AIC

3-2BEH1 100 0 65,000 AIC

3-2BEH2 100 0 65,000 AIC

3-2BH4 400 0 65,000 AIC

3-2BL2 50 100 0 65,000 AIC

3-2BL3 50 100 0 65,000 AIC

4-2AEH1 60 100 0 65,000 AIC

4-2AEL1 50 100 0

4-2BEH1 60 100 0 65,000 AIC

4-2BEL1 50 100 0

4-5AL6 350 400 0

4-5AL7 150 0

4-5AL8 150 0

4-5BL7 150 0

4-5BL8 100 0

4-5BL9 100 0

5A-2AH3 200 0

5A-2AL2 100 0

5A-2AUPS1 300 400 0

5B-2AEH1 225 0

5B-2BEH1 225 0

6-2AL8 60 100 0

6-2AUPSL2 150 0

8-2AL8 60 100 0

9-2AL8 60 100 0

11-2AEH1 100 0 65,000 AIC

11-2AEH2 300 0 65,000 AIC

11-2AEL1 50 100 0

UPS AOB-9 100 0

3-2BT2 0 0 15

4-2AET1 0 0 15

4-2BET1 0 0 15

4-5BDL1-X 0 0 75

5A-2AT2 0 0 15

11-2AET1 0 0 15

X-4-5BDL6 0 0 112.5

4-5BUPS1 0 0 80

5A-2AUPS 0 0 80

Model Info
AOB E03.2E - LEVEL 03 MOD 2E ELECTRICAL FLOOR PLAN
AOB E03.2W - LEVEL 03 MOD 2W ELECTRICAL FLOOR PLAN
AOB E04.2E - LEVEL 04 MOD 2E ELECTRICAL FLOOR PLAN
AOB E04.2W - LEVEL 04 MOD 2W ELECTRICAL FLOOR PLAN
AOB E05A.2E - LEVEL 05A MOD 2E ELECTRICAL FLOOR PLAN
AOB E05A.2W - LEVEL 05A MOD 2W ELECTRICAL FLOOR PLAN
AOB E05B.2E - LEVEL 05B MOD 2E ELECTRICAL FLOOR PLAN
AOB E05B.2W - LEVEL 05B MOD 2W ELECTRICAL FLOOR PLAN
AOB E06.00 - LEVEL 06 OVERALL ELECTRICAL FLOOR PLAN
AOB E07.00 - LEVEL 07 OVERALL ELECTRICAL FLOOR PLAN
AOB E08.00 - LEVEL 08 OVERALL ELECTRICAL FLOOR PLAN
AOB E09.00 - LEVEL 09 OVERALL ELECTRICAL FLOOR PLAN
AOB E10.00 - LEVEL 10 OVERALL ELECTRICAL FLOOR PLAN
AOB E11.00 - LEVEL 11 OVERALL ELECTRICAL FLOOR PLAN
E501 - AOB AREA 2A/B HOUSE ONE LINE
E501.1 - AOB AREA 2A/B EMERGENCY ONE LINE