05 - AOB_Electrical.pdf
PDF 861 KB Posted
- Attached to
- AOB Restack Design State and local contract opportunity
- Solicitation number
- 202578511
- Issued by
- Denver County, Denver City, Colorado
About this file
The provided file is a comprehensive electrical floor plan document for the Denver International Airport's (DEN) Airport Office Building (AOB), detailing electrical infrastructure across multiple levels (floors 2-11). The document includes detailed electrical asset inventories, floor layouts, and one-line electrical distribution diagrams, with specific focus on electrical panels, transformers, lighting control panels, inverters, and switchgear across different building sections (2W and 2E). The drawings are dated September 18, 2024, and are marked "NOT FOR CONSTRUCTION" and "NOT FOR EXTERNAL USE OR DISTRIBUTION", indicating these are design/planning documents for internal review.
The electrical plans reveal a complex electrical distribution system with redundant power sources, including main switchgear (4-2ASG1), multiple transformers (including 2500KVA Xcel transformers), and emergency generators. The system appears designed with significant load flexibility, featuring numerous electrical panels on each floor, backup power capabilities, and carefully mapped electrical risers connecting different building levels. Notable technical details include 277/480V three-phase power configurations, short circuit ratings up to 65,000 AIC, and provisions for both normal and emergency power distribution. The documents also indicate ongoing and planned projects, such as an AGTS Server project on Level 10 with an anticipated completion date of 2025, suggesting the electrical infrastructure is part of a broader modernization and renovation effort at the airport.
View the file
Other files for this state and local contract opportunity
| File | Type | Posted |
|---|---|---|
| 11 - DEN_DesignStandardsManual.pdf | ||
| 12 - DEN_WorkplaceDesignGuidelines.pdf | ||
| RFP_FT_202578511-AOB Restack Design.pdf | ||
| AOB Revitalization PS-F- Fee Proposal - Professional Services.xlsx | XLSX spreadsheet | |
| 07 - AOB_Room_Plans.pdf | ||
| 09 - 2024-11-27 Feasibility Study.pdf | ||
| 06 - AOB_Mechanical.pdf | ||
| 08 - DEN_AOB Conceptual Layout Plans.pdf | ||
| 10 - DEN Design Principles.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AOB ELECTRICAL
1. close hidden windows
2. synchronize
MODEL INTEGRATION LOG
INTEGRATION
DATE MODEL PROJECT
MODEL
AUTHOR
MODEL
CONSTRUCTION
CONTRACT
MODEL
ACTIVATION
DATE
MODEL
GRADE
ELEMENT
COUNT
20230503 AOB ALS Reconfig: L09_1W RVG 22-044 20241231 33
20210630 AOB R22 REPLACEMENT PHASE 1R PKE 201628171 20210601 9 31
2019 9TH FLOOR OFFICE REALIGNMENT CEE 201717649 20170206 1 222
0 DEC <varies> <varies> 138
<varies> <varies> <varies> 1929
Model Groups Schedule
MODEL GROUP QTY
AOB_DEN-E_ALS Reconfig 1
Integration: This list shall include all integration from the last two calendar years
MODEL INTEGRATION LOG - FLOORS
INTEGRATION
DATE MODEL PROJECT
MODEL
AUTHOR
MODEL
CONSTRUCTION
CONTRACT
MODEL
ACTIVATION
DATE
MODEL
GRADE COUNT
MODEL INTEGRATION LOG - WALLS
INTEGRATION
DATE MODEL PROJECT
MODEL
AUTHOR
MODEL
CONSTRUCTIO
N CONTRACT
MODEL
ACTIVATION
DATE
MODEL
GRADE
ELEMEN
T COUNT
FIRE VALVE
TML_03_2E_030
BAGGAGE TUNNEL
TML_03_2E_026
MECHANICAL
TML_03_2E_018
CORRIDOR
TML_03_2E_CR17
HOIST WAY
TML_03_2E_036
ELEC
TML_03_2E_028 STAIR 15
TML_03_2E_ST15
BAGGAGE TUNNEL
TML_03_2E_026
ELECTRICAL
TML_03_2E_022
ELEC
TML_03_2E_020
CORRIDOR
TML_03_2E_CR06
ELEC
TML_03_2E_016
OFFICE
TML_03_2E_014
STO
TML_03_2W_028
STAIR 104
TML_03_2E_ST104
ELEV. LOBBY
TML_03_2E_012
FREIGHT ELEV. NTE-03
TML_03_2E_EL13
ELEVATOR MACHINE
ROOM NTE-03
TML_03_2E_004
AGTS TUNNEL
TML_03_2E_010
CORRIDOR
TML_03_2W_CR20 BAGGAGE TUNNEL
TML_03_2E_006
STAIR 13
TML_03_2E_ST13
PARKING
TML_03_2E_008
MECHANICAL
EQUIPMENT
TML_03_2E_042
MECHANICAL MEZZ.
TML_03_2E_038
STAIR 07
TML_03_2E_ST07
VESTIBULE
TML_03_2E_040
SWITCH EQUIP. ROOM
TML_03_2E_024
3-2BINV1
3-2BED1
3-2BLCC1
3-2BL1
3-2BT1
3-2BH1
3-2BD1
3-2BH3
3-2BH2
3-2BEH2
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:09:47 PM
1/8" = 1'-0"
LEVEL 03 MOD 2E
ELECTRICAL FLOOR
PLAN
AOB E03.2E
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
3-2BD1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BD1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BED1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BED1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BEH2 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BH1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BH2 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BH3 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2BL1 ELECTRICAL PANEL ELECTRICAL OPERATING
ELECTRICAL PANEL: 9
3-2BLCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING
LIGHTING CONTROL PANEL: 1
3-2BINV1 LIGHTING INVERTER ELECTRICAL OPERATING
LIGHTING INVERTER: 1
3-2BT1 TRANSFORMER ELECTRICAL OPERATING
TRANSFORMER: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
2W 2E
1/8" = 1'-0"AOB E03.2E
ELECTRICAL FLOOR PLAN LEVEL 03 - MOD 2E1
CORRIDOR
TML_03_2E_CR17
ELEC
TML_03_2E_028
BAGGAGE TUNNEL
TML_03_2E_026
OFFICE
TML_03_2E_014
STO
TML_03_2W_028
STAIR 104
TML_03_2E_ST104
ELEV. LOBBY
TML_03_2E_012
CORRIDOR
TML_03_2W_CR20
ELECTRIC VAULT
TML_03_2W_012
ELECTRIC ROOM
TML_03_2W_014
BAGGAGE TUNNEL
TML_03_2W_018
MECHANICAL ROOM
TML_03_2W_016
ELEC
TML_03_2W_020
ELEC
TML_03_2W_022
CORRIDOR
TML_03_2W_CR08
MECHANICAL
TML_03_2W_024
MECHANICAL ROOM
TML_03_2W_002
MECHANICAL MEZZ.
TML_03_2W_006
PARKING
TML_03_2W_036
BAGGAGE TUNNEL
TML_03_2W_038
SWITCH EQUIP. ROOM
TML_03_2E_024
MECH. ROOM
TML_03_2E_032
ELEC. ROOM
TML_03_2W_034
COMM. ROOM
TML_03_2W_026
AGTS TUNNEL
TML_03_2W_032
UNISEX RESTROOM
TML_03_2W_030
STAIR 13
TML_03_2W_ST13 CORRIDOR
TML_03_2W_CR02
STAIR 106
TML_03_2W_ST107
VESTIBULE
TML_03_2W_004
3-2AINV1
3-2AL1
3-2AT1
3-2AH1
3-2AL1A1
3-2ALCC1
3-2AT1A1
3-2AD1
3-2AED1
3-2AEH1
3-2AH3
3-2AH2
3-2AEH2
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:09:54 PM
1/8" = 1'-0"
LEVEL 03 MOD 2W
ELECTRICAL FLOOR
PLAN
AOB E03.2W
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
3-2AD1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AD1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AED1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AED1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AEH1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AEH2 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AH1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AH2 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AH3 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AL1 ELECTRICAL PANEL ELECTRICAL OPERATING
3-2AL1A1 ELECTRICAL PANEL ELECTRICAL OPERATING
ELECTRICAL PANEL: 11
3-2ALCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING
LIGHTING CONTROL PANEL: 1
3-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING
LIGHTING INVERTER: 1
3-2AT1 TRANSFORMER ELECTRICAL OPERATING
3-2AT1A1 TRANSFORMER ELECTRICAL OPERATING
TRANSFORMER: 2
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
2W 2E
1/8" = 1'-0"AOB E03.2W
ELECTRICAL FLOOR PLAN LEVEL 03 - MOD 2W1
UP
LOBBY
AOB_04_2E_013
ELEVATOR NTE-03
AOB_04_2E_EL03
REFUSE ROOM
AOB_04_2E_015
STAIR
AOB_04_2E_ST03
MECH. SHAFT
AOB_04_2E_MS03
LOADING DOCK B
AOB_04_2E_011
UPPER DOCK B
AOB_04_2E_016
STORAGE
AOB_04_2W_019
VESTIBULE
AOB_04_2E_001
ELECTRICAL
AOB_04_2E_014
4-2BINV1
4-2BLCC1
4-2BH2
4-2BEL1
4-2BET1
4-2BEH1
4-2BH1
4-2BT1
4-2BL1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:01 PM
1/8" = 1'-0"
LEVEL 04 MOD 2E
ELECTRICAL FLOOR
PLAN
AOB E04.2E
1/8" = 1'-0"AOB E04.2E
ELECTRICAL FLOOR PLAN LEVEL 04 - MOD 2E1
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
4-2BEH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014
4-2BEL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014
4-2BH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014
4-2BH2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014
4-2BL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2E_014
ELECTRICAL PANEL: 5
4-2BLCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING AOB_04_2E_014
LIGHTING CONTROL PANEL: 1
4-2BINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_04_2E_014
LIGHTING INVERTER: 1
4-2BET1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2E_014
4-2BT1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2E_014
TRANSFORMER: 2
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
2W 2E
G
S ST T
ELECTRICAL
AOB_04_2W_008
ELEVATOR LOBBY
AOB_04_2W_011
STORAGE
AOB_04_2W_007
LOADING DOCK A
AOB_04_2W_010ELEVATOR AOB-03
AOB_04_2W_EL03
LOADING DOCK A
AOB_04_2W_010
STORAGE
AOB_04_2W_019
4-2AINV1
4-2ALCC1
4-2AEL1
4-2AET1
4-2AEH1
4-2AH1
4-2AT1
4-2AL1
4-2AT2
4-2AL2
UNCLE
DONALD
SWITCH
874/990
TRANSFORMER
887/987
TRANSFORMER
902/987
SWITCH
914/990
4-2AL3
4-2AESG1 4-2ASG1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:09 PM
1/8" = 1'-0"
LEVEL 04 MOD 2W
ELECTRICAL FLOOR
PLAN
AOB E04.2W
1/8" = 1'-0"AOB E04.2W
ELECTRICAL FLOOR PLAN LEVEL 04 - MOD 2W1
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
4-2AEH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008
4-2AEL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008
4-2AH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008
4-2AL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008
4-2AL2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_04_2W_008
4-2AL3 ELECTRICAL PANEL ELECTRICAL OPERATING
ELECTRICAL PANEL: 6
UNCLE DONALD GENERATOR ELECTRICAL OPERATING
GENERATOR: 1
4-2ALCC1 LIGHTING CONTROL PANEL ELECTRICAL OPERATING AOB_04_2W_008
LIGHTING CONTROL PANEL: 1
4-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_04_2W_008
LIGHTING INVERTER: 1
4-2AESG1 SWITCHGEAR ELECTRICAL OPERATING
4-2ASG1 SWITCHGEAR ELECTRICAL OPERATING
SWITCHGEAR: 2
4-2AET1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2W_008
4-2AT1 TRANSFORMER ELECTRICAL OPERATING AOB_04_2W_008
4-2AT2 TRANSFORMER ELECTRICAL OPERATING AOB_04_2W_008
TRANSFORMER: 3
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
MOD 1 TEN RELOC: L01_11W, L04_5E,5W
FIRE PUMP REPLACEMENT: L04_2W 21-031 DEV - R. CASTLEMAN 20220701 2024 BER
N
DN
STAIR
AOB_05A_2E_ST03
FAN ROOM
AOB_05A_2E_003
PARKING GARAGE
AOB_05A_2E_011
ELECTRCIAL
AOB_05A_2E_014
LOBBY
AOB_05A_2E_013
COMM. EQUIPMENT
AOB_05A_2E_005
STAIR
AOB_05A_2E_ST04
ELEVATOR
AOB_05A_2E_EL04
FAN ROOM
AOB_05A_2E_007
CORRIDOR
AOB_05A_2E_CR01
MECH. SHAFT
AOB_05A_2E_MS05
PARKING GARAGE RAMP
AOB_05A_2E_001
VESTIBULE
AOB_04_2E_001
PARKING GARAGE
AOB_05A_2E_011
5A-2BINV
5A-2BH1
5A-2BT1
5A-2BH2
5A-2BL1
D-5A-2BH1
D-5A-2AATS
1000A
2B
RISER
5A-2BLCC1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:16 PM
1/8" = 1'-0"
LEVEL 05A MOD 2E
ELECTRICAL FLOOR
PLAN
AOB E05A.2E
1/8" = 1'-0"AOB E05A.2E
ELECTRICAL FLOOR PLAN LEVEL 05A - MOD 2E1
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
5A-2BH1 ELECTRICAL PANEL 010139 ELECTRICAL OPERATING AOB_05A_2E_014
5A-2BH2 ELECTRICAL PANEL 010138 ELECTRICAL OPERATING AOB_05A_2E_014
5A-2BL1 ELECTRICAL PANEL 010137 ELECTRICAL OPERATING AOB_05A_2E_014
ELECTRICAL PANEL: 3
5A-2BLCC1 LIGHTING CONTROL PANEL 006905 ELECTRICAL OPERATING AOB_05A_2E_014
LIGHTING CONTROL PANEL: 1
5A-2BINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05A_2E_014
LIGHTING INVERTER: 1
5A-2BT1 TRANSFORMER 017306 ELECTRICAL OPERATING AOB_05A_2E_014
TRANSFORMER: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
5A
A T
S
PARKING GARAGE
AOB_05A_2W_010
STAIR
AOB_05A_2W_ST01
MECH. SHAFT
AOB_05A_2W_MS01
CHASE
AOB_05A_2W_015
CHASE
AOB_05A_2W_016
ELECTRICAL
AOB_05A_2W_008
COMM. EQUIPMENT
AOB_05A_2W_004
LOBBY
AOB_05A_2W_009
STAIR
AOB_05A_2W_ST02
FAN ROOM
AOB_05A_2W_006
FAN ROOM
AOB_05A_2W_001
CORRIDOR
AOB_05A_2W_CR01
UPS ROOM
AOB_05A_2W_003
VESTIBULE
AOB_04_2W_001
EXTERIOR
AOB_04_2W_100
5A-2AINV
5A-2ALCC1
5A-2AH2
5A-2AT1
5A-2AH1
5A-2AL1
1000A 2A
RISER
D-5A-2AH1
5A-2AATS
5A-2AT2
5A-2AH3
5A-2AL2
5A-2AUPS
BATTERY
5A-2AUPS1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:23 PM
1/8" = 1'-0"
LEVEL 05A MOD 2W
ELECTRICAL FLOOR
PLAN
AOB E05A.2W
1/8" = 1'-0"AOB E05A.2W
ELECTRICAL FLOOR PLAN LEVEL 05A - MOD 2W1
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
5A-2AATS AUTOMATIC TRANSFER SWITCH 010443 ELECTRICAL OPERATING AOB_05A_2W_003
AUTOMATIC TRANSFER SWITCH: 1
5A-2AH1 ELECTRICAL PANEL 010141 ELECTRICAL OPERATING AOB_05A_2W_008
5A-2AH2 ELECTRICAL PANEL 010142 ELECTRICAL OPERATING AOB_05A_2W_008
5A-2AH3 ELECTRICAL PANEL 010136 ELECTRICAL OPERATING AOB_05A_2W_003
5A-2AL1 ELECTRICAL PANEL 010140 ELECTRICAL OPERATING AOB_05A_2W_008
5A-2AL2 ELECTRICAL PANEL 010135 ELECTRICAL OPERATING AOB_05A_2W_003
5A-2AUPS1 ELECTRICAL PANEL 010134 ELECTRICAL OPERATING AOB_05A_2W_003
ELECTRICAL PANEL: 6
5A-2ALCC1 LIGHTING CONTROL PANEL 006904 ELECTRICAL OPERATING AOB_05A_2W_008
LIGHTING CONTROL PANEL: 1
5A-2AINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05A_2W_008
5A-2AUPS LIGHTING INVERTER ELECTRICAL OPERATING AOB_05A_2W_003
LIGHTING INVERTER: 2
5A-2AT1 TRANSFORMER 017308 ELECTRICAL OPERATING AOB_05A_2W_008
5A-2AT2 TRANSFORMER 017307 ELECTRICAL OPERATING AOB_05A_2W_003
TRANSFORMER: 2
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
STAIR
AOB_05B_2E_ST03
STAIR
AOB_05B_2E_ST04
ELEVATOR
AOB_05b_2E_EL04
ELECTRCIAL
AOB_05B_2E_002
FAN ROOM
AOB_05B_2E_004
LOBBY
AOB_05B_2E_013
FAN ROOM
AOB_05B_2E_016
MECH. SHAFT
AOB_05b_2E_MS05
FAN ROOM
AOB_05B_2E_017
FAN ROOM
AOB_05B_2E_018
FAN ROOM
AOB_05B_2E_019
5B-2BINV
5B-2BH2
5B-2BT1
5B-2BH1
5B-2BL1 D-5B-2BH1
5B-2BLCC1
5B-2BEH1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:31 PM
1/8" = 1'-0"
LEVEL 05B MOD 2E
ELECTRICAL FLOOR
PLAN
AOB E05B.2E
1/8" = 1'-0"AOB E05B.2E
ELECTRICAL FLOOR PLAN LEVEL 05B - MOD 2E1
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
5B-2BEH1 ELECTRICAL PANEL 010444 ELECTRICAL OPERATING AOB_05B_2E_016
5B-2BH1 ELECTRICAL PANEL 010447 ELECTRICAL OPERATING AOB_05B_2E_002
5B-2BH2 ELECTRICAL PANEL 010445 ELECTRICAL OPERATING AOB_05B_2E_002
5B-2BL1 ELECTRICAL PANEL 010446 ELECTRICAL OPERATING AOB_05B_2E_002
ELECTRICAL PANEL: 4
5B-2BLCC1 LIGHTING CONTROL PANEL 006907 ELECTRICAL OPERATING AOB_05B_2E_002
LIGHTING CONTROL PANEL: 1
5B-2BINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05B_2E_002
LIGHTING INVERTER: 1
5B-2BT1 TRANSFORMER 017305 ELECTRICAL OPERATING AOB_05B_2E_002
TRANSFORMER: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
5B
STAIR
AOB_05B_2W_ST01
STAIR
AOB_05B_2W_ST02
ELECTRICAL
AOB_05B_2W_003
PARKING GARAGE
AOB_05B_2W_010
CHASE
AOB_05B_2W_012
CHASE
AOB_05B_2W_014
LOBBY
AOB_05B_2W_009
FAN ROOM
AOB_05B_2W_005
FAN ROOM
AOB_05B_2W_017
FAN ROOM
AOB_05B_2W_016
FAN ROOM
AOB_05B_2W_018
5B-2AINV
5B-2ALCC1
5B-2AH2
5B-2AT1
5B-2AL1
D-5B-2AH1
5B-2AEH1
5B-2AH1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:39 PM
1/8" = 1'-0"
LEVEL 05B MOD 2W
ELECTRICAL FLOOR
PLAN
AOB E05B.2W
1/8" = 1'-0"AOB E05B.2W
ELECTRICAL FLOOR PLAN LEVEL 05B - MOD 2W1
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
5B-2AEH1 ELECTRICAL PANEL 010448 ELECTRICAL OPERATING AOB_05B_2W_018
5B-2AH1 ELECTRICAL PANEL 010451 ELECTRICAL OPERATING AOB_05B_2W_003
5B-2AH2 ELECTRICAL PANEL 010450 ELECTRICAL OPERATING AOB_05B_2W_003
5B-2AL1 ELECTRICAL PANEL 010449 ELECTRICAL OPERATING AOB_05B_2W_003
ELECTRICAL PANEL: 4
5B-2ALCC1 LIGHTING CONTROL PANEL 006906 ELECTRICAL OPERATING AOB_05B_2W_003
LIGHTING CONTROL PANEL: 1
5B-2AINV LIGHTING INVERTER ELECTRICAL OPERATING AOB_05B_2W_003
LIGHTING INVERTER: 1
5B-2AT1 TRANSFORMER 017304 ELECTRICAL OPERATING AOB_05B_2W_003
TRANSFORMER: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
AOB_06_2W_ST01
STAIR
AOB_06_2W_ST02
STAIR CORRIDOR
AOB_06_2W_009
STAIR
AOB_06_2W_ST05
WOMEN
AOB_06_2W_007
CUSTODIAN
AOB_06_2W_006
MEN
AOB_06_2W_005
TELEPHONE
AOB_06_2W_013
ELECTRICAL
AOB_06_2W_002
LOBBY
AOB_06_2W_001
PASSAGE
AOB_06_2W_003
RECEPTION
AOB_06_2W_046
CORRIDOR
AOB_06_2W_047
COPY
AOB_06_2W_048
STORAGE
AOB_06_2W_049
OFFICE
AOB_06_2W_050
OFFICE
AOB_06_2W_051
CLOSET
AOB_06_2W_052
CLOSET
AOB_06_2W_053
OFFICE
AOB_06_2W_054
CORRIDOR
AOB_06_2W_055
CLOSET
AOB_06_2W_056
CELL
AOB_06_2W_057
CHASE
AOB_06_2W_058
CELL
AOB_06_2W_059
REPORT
AOB_06_2W_060
ROLL CALL
AOB_06_2W_061
OFFICE
AOB_06_2W_062
BREAK
AOB_06_2W_063
LOCKER
AOB_06_2W_064
WOMEN
AOB_06_2W_065
LOCKER
AOB_06_2W_067
MEN
AOB_06_2W_068
COMPUTER
AOB_06_2W_071
OFFICE
AOB_06_2W_072
OFFICE
AOB_06_2W_073
OFFICE
AOB_06_2W_074
OFFICE
AOB_06_2W_075
OPEN OFFICE
AOB_06_2W_076
OFFICE
AOB_06_2W_080
OFFICE
AOB_06_2W_081
BREAK ROOM
AOB_06_2W_078
TELECOMM
AOB_06_2W_079
CORRIDOR
AOB_06_2W_017
OPEN OFFICE
AOB_06_2W_018
NOISE CONTROL
AOB_06_2W_019
OFFICE
AOB_06_2W_020
STORAGE
AOB_06_2W_021
OPEN OFFICE
AOB_06_2W_022
STORAGE
AOB_06_2W_023
COMPUTER
AOB_06_2W_024
OFFICE
AOB_06_2W_025 OFFICE
AOB_06_2W_026
OFFICE
AOB_06_2W_027
OFFICE
AOB_06_2W_028
COPY
AOB_06_2W_029
CLOSE CIRCUIT
AOB_06_2W_030
OFFICE
AOB_06_2W_031
OFFICE
AOB_06_2W_032
COMPUTER
AOB_06_2W_033
AUDIT
AOB_06_2W_034
OPEN OFFICE
AOB_06_2W_035
OFFICE
AOB_06_2W_036
OFFICE
AOB_06_2W_037
STORAGE
AOB_06_2W_038
OFFICE
AOB_06_2W_040
OFFICE
AOB_06_2W_041 OFFICE
AOB_06_2W_042
OFFICE
AOB_06_2W_043
RECORDS
AOB_06_2W_044
CONFERENCE
AOB_06_2W_008
OFFICE
AOB_06_2W_010
OFFICE
AOB_06_2W_012
OPEN OFFICE
AOB_06_2W_004
RECEPTION WAITING
AOB_06_2W_045
ROOM
AOB_06_2W_077
OFFICE
AOB_06_2W_090 OFFICE
AOB_06_2W_091
6-2AINV1
6-2ALCC1
6-2AT1
6-2AL4
D-6-2AT1
6-2AH1
6-2AL1
D-6-2AH2
D-6-2AH1
6-2AL8
UPS
AOB-6B
UPS
AOB-6A
TSA BREAK ROOM
TML_06_2W_014
AIRPORT OFFICE
TML_06_2W_008
STAIR
TML_06_5W_014
AIRPORT OFFICE
TML_06_2W_008
Room
TML_06_2W_004
CART STORAGE
TML_06_2W_010
SECURITY SCREENING
TML_06_2E_002
ARRIVAL AREA
TML_06_2W_012
AIRPORT OFFICE
TML_06_2W_008
Room
TML_06_2W_004
Room
TML_06_2W_006
Room
TML_06_2W_003
CART STORAGE
TML_06_2W_010
DOMESTIC BRIDGE
TML_06_2W_016
6-2AH2
6-2AT2
6-2AL5
6-2AUPSL1
6-2AUPSL2
6-2AUPS
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:49 PM
1/8" = 1'-0"
LEVEL 06 OVERALL
ELECTRICAL FLOOR
PLAN
AOB E06.00
1/8" = 1'-0"AOB E06.00
ELECTRICAL FLOOR PLAN LEVEL 061
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
6-2AH1 ELECTRICAL PANEL 010455 ELECTRICAL OPERATING AOB_06_2W_002
6-2AH2 ELECTRICAL PANEL 017312 ELECTRICAL OPERATING AOB_06_2W_071
6-2AL1 ELECTRICAL PANEL 010452/01
ELECTRICAL OPERATING AOB_06_2W_002
6-2AL4 ELECTRICAL PANEL 010454 ELECTRICAL OPERATING AOB_06_2W_002
6-2AL5 ELECTRICAL PANEL 017313 ELECTRICAL OPERATING AOB_06_2W_071
6-2AL8 ELECTRICAL PANEL 010460 ELECTRICAL OPERATING AOB_06_2W_079
6-2AUPSL1 ELECTRICAL PANEL 017311 ELECTRICAL OPERATING AOB_06_2W_071
6-2AUPSL2 ELECTRICAL PANEL 017310 ELECTRICAL OPERATING AOB_06_2W_071
UPS AOB-6A ELECTRICAL PANEL 010461 ELECTRICAL OPERATING AOB_06_2W_079
UPS AOB-6B ELECTRICAL PANEL 010459 ELECTRICAL OPERATING AOB_06_2W_079
ELECTRICAL PANEL: 10
6-2ALCC1 LIGHTING CONTROL PANEL 006908 ELECTRICAL OPERATING AOB_06_2W_002
LIGHTING CONTROL PANEL: 1
6-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_06_2W_002
LIGHTING INVERTER: 1
6-2AT1 TRANSFORMER 017309 ELECTRICAL OPERATING AOB_06_2W_002
6-2AT2 TRANSFORMER 017314 ELECTRICAL OPERATING AOB_06_2W_071
TRANSFORMER: 2
6-2AUPS UPS ELECTRICAL OPERATING AOB_06_2W_071
UPS: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
KEY PLAN AOB
2W 2E
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
6-2AH1 ELECTRICAL PANEL 010455 ELECTRICAL OPERATING AOB_06_2W_002
6-2AH2 ELECTRICAL PANEL 017312 ELECTRICAL OPERATING AOB_06_2W_071
6-2AL1 ELECTRICAL PANEL 010452/01
ELECTRICAL OPERATING AOB_06_2W_002
6-2AL4 ELECTRICAL PANEL 010454 ELECTRICAL OPERATING AOB_06_2W_002
6-2AL5 ELECTRICAL PANEL 017313 ELECTRICAL OPERATING AOB_06_2W_071
6-2AL8 ELECTRICAL PANEL 010460 ELECTRICAL OPERATING AOB_06_2W_079
6-2AUPSL1 ELECTRICAL PANEL 017311 ELECTRICAL OPERATING AOB_06_2W_071
6-2AUPSL2 ELECTRICAL PANEL 017310 ELECTRICAL OPERATING AOB_06_2W_071
UPS AOB-6A ELECTRICAL PANEL 010461 ELECTRICAL OPERATING AOB_06_2W_079
UPS AOB-6B ELECTRICAL PANEL 010459 ELECTRICAL OPERATING AOB_06_2W_079
ELECTRICAL PANEL: 10
6-2ALCC1 LIGHTING CONTROL PANEL 006908 ELECTRICAL OPERATING AOB_06_2W_002
LIGHTING CONTROL PANEL: 1
6-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_06_2W_002
LIGHTING INVERTER: 1
6-2AT1 TRANSFORMER 017309 ELECTRICAL OPERATING AOB_06_2W_002
6-2AT2 TRANSFORMER 017314 ELECTRICAL OPERATING AOB_06_2W_071
TRANSFORMER: 2
6-2AUPS UPS ELECTRICAL OPERATING AOB_06_2W_071
UPS: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
AOB_07_2W_ST02
PASSAGE
AOB_07_2W_003
STAIR
AOB_07_2W_ST05
WOMEN
AOB_07_2W_007
CUSTODIAN
AOB_07_2W_006
MEN
AOB_07_2W_005
TELEPHONE
AOB_07_2W_011
ELECTRICAL
AOB_07_2W_002
RAMP TOWER OFFICE
AOB_07_2W_062
LOBBY
AOB_07_2W_001
STORAGE
AOB_07_2W_051
OFFICE
AOB_07_2W_052
OFFICE
AOB_07_2W_054
OFFICE
AOB_07_2W_055
OFFICE
AOB_07_2W_056
OFFICE
AOB_07_2W_057
OFFICE
AOB_07_2W_058
OFFICE
AOB_07_2W_059
OFFICE
AOB_07_2W_060
OFFICE
AOB_07_2W_064
OFFICE
AOB_07_2W_065
OFFICE
AOB_07_2W_066
OFFICE
AOB_07_2W_067
OFFICE
AOB_07_2W_068
OFFICE
AOB_07_2W_069
OFFICE
AOB_07_2W_070
OFFICE
AOB_07_2W_071
OFFICE
AOB_07_2W_072
OFFICE
AOB_07_2W_073
OFFICE
AOB_07_2W_074
OPEN OFFICE
AOB_07_2W_061
CONFERENCE #3
AOB_07_2W_076
CLOSET
AOB_07_2W_079
CLOSET
AOB_07_2W_077
BREAK
AOB_07_2W_078
CORRIDOR
AOB_07_2W_013
CORRIDOR
AOB_07_2W_015
CLOSET
AOB_07_2W_018
OFFICE
AOB_07_2W_019
OFFICE
AOB_07_2W_020
OFFICE
AOB_07_2W_021
OFFICE
AOB_07_2W_022
OFFICE
AOB_07_2W_023
OFFICE
AOB_07_2W_024
CONFERENCE #2
AOB_07_2W_016
OFFICE
AOB_07_2W_027
OFFICE
AOB_07_2W_028
OFFICE
AOB_07_2W_029
OFFICE
AOB_07_2W_030
OFFICE
AOB_07_2W_039
OFFICE
AOB_07_2W_040
OFFICE
AOB_07_2W_043
OFFICE
AOB_07_2W_044 OFFICE
AOB_07_2W_046
OFFICE
AOB_07_2W_047
OFFICE
AOB_07_2W_048CONFERENCE #1
AOB_07_2W_049
FILES
AOB_07_2W_053
PLOTTER
AOB_07_2W_050
CLOSET
AOB_07_2W_100
OPEN OFFICE
AOB_007_2W_045
7-2AINV1
7-2ALCC1
7-2AT1
D-7-2AH1
7-2AH1
7-2AL1
D-7-2AT1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:54 PM
1/8" = 1'-0"
LEVEL 07 OVERALL
ELECTRICAL FLOOR
PLAN
AOB E07.00
1/8" = 1'-0"AOB E07.00
ELECTRICAL FLOOR PLAN LEVEL 071
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
7-2AH1 ELECTRICAL PANEL 010464 ELECTRICAL OPERATING AOB_07_2W_002
7-2AL1 ELECTRICAL PANEL 010463/01
ELECTRICAL OPERATING AOB_07_2W_002
ELECTRICAL PANEL: 2
7-2ALCC1 LIGHTING CONTROL PANEL 006909 ELECTRICAL OPERATING AOB_07_2W_002
LIGHTING CONTROL PANEL: 1
7-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_07_2W_002
LIGHTING INVERTER: 1
7-2AT1 TRANSFORMER 017315 ELECTRICAL OPERATING AOB_07_2W_002
TRANSFORMER: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
AOB_08_2W_ST02
STAIR
AOB_08_2W_ST05
WOMEN
AOB_08_2W_002
CUSTODIAN
AOB_08_2W_004
MEN
AOB_08_2W_006
TELEPHONE
AOB_08_2W_007
ELECTRICAL
AOB_08_2W_010
CORRIDOR
AOB_08_2W_012
LOBBY
AOB_08_2W_001
OPEN OFFICE
AOB_08_2W_037
RECEPTION
AOB_08_2W_039
OFFICE
AOB_08_2W_040
OFFICE
AOB_08_2W_041
OFFICE
AOB_08_2W_042
OPEN OFFICE
AOB_08_2W_043
FILES
AOB_08_2W_038
OFFICE
AOB_08_2W_061
OFFICE
AOB_08_2W_062
OFFICE
AOB_08_2W_063
OFFICE
AOB_08_2W_064
OFFICE
AOB_08_2W_065
OFFICE
AOB_08_2W_066
CASHIER
AOB_08_2W_044
VAULT
AOB_08_2W_045
OFFICE
AOB_08_2W_048
OFFICE
AOB_08_2W_049
OFFICE
AOB_08_2W_050
OFFICE
AOB_08_2W_051
OFFICE
AOB_08_2W_052
OFFICE
AOB_08_2W_053
OFFICE
AOB_08_2W_054
OFFICE
AOB_08_2W_055
BREAK
AOB_08_2W_056
TELECOMM
AOB_08_2W_057
CONFERENCE ROOM
AOB_08_2W_017
OFFICE
AOB_08_2W_018
OFFICE
AOB_08_2W_019
OFFICE
AOB_08_2W_021
OFFICE
AOB_08_2W_022
OFFICE
AOB_08_2W_023
OFFICE
AOB_08_2W_029
OPEN OFFICE
AOB_08_2W_024
FILE/STORAGE
AOB_08_2W_025
FILE/STORAGE
AOB_08_2W_027
ELEC./STORAGE
AOB_08_2W_028
OFFICE
AOB_08_2W_069
OPEN OFFICE
AOB_08_2W_031
OFFICE
AOB_08_2W_032
OFFICE
AOB_08_2W_067
OPEN OFFICE
AOB_08_2W_033
OFFICE
AOB_08_2W_034
CONFERENCE
AOB_08_2W_036
SUPPORT
AOB_08_2W_035
OFFICE
AOB_08_2W_068
OFFICE
AOB_08_2W_030
OPEN OFFICE
AOB_08_2W_059
CLOSET
AOB_08_2W_008
CORRIDOR
AOB_08_2W_CR05
PASSAGE
AOB_08_2W_003
OPEN OFFICE
AOB_08_2W_060
8-2AINV1
8-2AT1
D-8-2AT1
8-2AH1
8-2AL1
D-8-2AH1
8-2AL2
8-2AL8
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:10:59 PM
1/8" = 1'-0"
LEVEL 08 OVERALL
ELECTRICAL FLOOR
PLAN
AOB E08.00
1/8" = 1'-0"AOB E08.00
ELECTRICAL FLOOR PLAN LEVEL 081
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
8-2AH1 ELECTRICAL PANEL 010465 ELECTRICAL OPERATING AOB_08_2W_010
8-2AL1 ELECTRICAL PANEL 010466/01
ELECTRICAL OPERATING AOB_08_2W_010
8-2AL2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_08_2W_028
8-2AL8 ELECTRICAL PANEL 017319 ELECTRICAL OPERATING AOB_08_2W_057
ELECTRICAL PANEL: 4
8-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_08_2W_010
LIGHTING INVERTER: 1
8-2AT1 TRANSFORMER 017316 ELECTRICAL OPERATING AOB_08_2W_010
TRANSFORMER: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
J
ELECTRICAL
AOB_09_2W_004
CONFERENCE ROOM
AOB_09_2W_048
LOBBY
AOB_09_2W_001
LOBBY
AOB_09_2W_023
OPEN OFFICE
AOB_09_2W_035
CORRIDOR
AOB_09_2W_014
CORRIDOR
AOB_09_2W_013
STAIR
AOB_09_2W_ST02
PASSAGE
AOB_09_2W_003
STAIR
AOB_09_2W_ST05
WOMEN
AOB_09_2W_005
CUSTODIAN
AOB_09_2W_006
MEN
AOB_09_2W_007
TELEPHONE
AOB_09_2W_002
OFFICE
AOB_09_2W_049
OFFICE
AOB_09_2W_050
OFFICE
AOB_09_2W_051
OFFICE
AOB_09_2W_052OFFICE
AOB_09_2W_053
OFFICE
AOB_09_2W_054
OFFICE
AOB_09_2W_055
OFFICE
AOB_09_2W_056
OFFICE
AOB_09_2W_057
OPEN OFFICE
AOB_09_2W_062
OFFICE
AOB_09_2W_063
OFFICE
AOB_09_2W_064
OFFICE
AOB_09_2W_069
OFFICE
AOB_09_2W_081
OFFICE
AOB_09_2W_082
OFFICE
AOB_09_2W_066
OFFICE
AOB_09_2W_067
OPEN OFFICE
AOB_09_2W_084
FILES
AOB_09_2W_085
CORRIDOR
AOB_09_2W_086
OFFICE
AOB_09_2W_087
OFFICE
AOB_09_2W_068
OFFICE
AOB_09_2W_070
OFFICE
AOB_09_2W_071OFFICE
AOB_09_2W_088
OFFICE
AOB_09_2W_073
OFFICE
AOB_09_2W_075
OFFICE
AOB_09_2W_076
CORRIDOR
AOB_09_2W_089
OFFICE
AOB_09_2W_090
OFFICE
AOB_09_2W_091
OFFICE
AOB_09_2W_092
OFFICE
AOB_09_2W_093
OPEN OFFICE
AOB_09_2W_016
BREAK
AOB_09_2W_059
TELECOMM
AOB_09_2W_078
OPEN OFFICE
AOB_09_2W_017
OFFICE
AOB_09_2W_022
OFFICE
AOB_09_2W_045
FILE ROOM
AOB_09_2W_025
CLOSET
AOB_09_2W_033
FILE/STORAGE
AOB_09_2W_032
BREAK RM
AOB_09_2W_028
CONFERENCE ROOM
AOB_09_2W_031
OFFICE
AOB_09_2W_019
OFFICE
AOB_09_2W_026
OFFICE
AOB_09_2W_027
OFFICE
AOB_09_2W_030
OFFICE
AOB_09_2W_021
OFFICE
AOB_09_2W_018
CORRIDOR
AOB_09_2W_020
CONFERENCE
AOB_09_2W_024
OFFICE
AOB_09_2W_074
OFFICE
AOB_09_2W_072
CORRIDOR
AOB_09_2W_015
9-2AINV1
9-2ALCC1
9-2AT1
UPS
AOB-9
D-9-2AT1
9-2AH1
9-2AL1
D-9-2AH1
9-2AL3
9-2AT3
9-2AL2
9-2AL8
OFFICE
AOB_09_2W_114
OFFICE
AOB_09_2W_061
OFFICE
AOB_09_2W_116
OFFICE
AOB_09_2W_117
OFFICE SUPPLY/COPIER
AOB_09_2W_113
OFFICE
AOB_09_2W_110
OFFICE
AOB_09_2W_111
STORAGE
AOB_09_2W_083
OFFICE
AOB_09_2W_112
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:11:04 PM
1/8" = 1'-0"
LEVEL 09 OVERALL
ELECTRICAL FLOOR
PLAN
AOB E09.00
1/8" = 1'-0"AOB E09.00
ELECTRICAL FLOOR PLAN LEVEL 091
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
9-2AH1 ELECTRICAL PANEL 010470 ELECTRICAL OPERATING AOB_09_2W_004
9-2AL1 ELECTRICAL PANEL 010468/01
ELECTRICAL OPERATING AOB_09_2W_004
9-2AL2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_09_2W_085
9-2AL3 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_09_2W_002
9-2AL8 ELECTRICAL PANEL 010472 ELECTRICAL OPERATING AOB_09_2W_078
UPS AOB-9 ELECTRICAL PANEL 010471 ELECTRICAL OPERATING AOB_09_2W_078
ELECTRICAL PANEL: 6
9-2ALCC1 LIGHTING CONTROL PANEL 006910 ELECTRICAL OPERATING AOB_09_2W_004
LIGHTING CONTROL PANEL: 1
9-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_09_2W_004
LIGHTING INVERTER: 1
9-2AT1 TRANSFORMER 017318 ELECTRICAL OPERATING AOB_09_2W_004
9-2AT3 TRANSFORMER ELECTRICAL OPERATING AOB_09_2W_002
TRANSFORMER: 2
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
EQUIPMENT
AOB_10_2W_020
EMERGENCY
OPERATIONS CENTER
AOB_10_2W_019
OPERATION EQUIPMENT
AOB_10_2W_022
COMMUNICATIONS
CENTER
AOB_10_2W_021
MAINTENENCE CONTROL
CENTER
AOB_10_2W_017
OFFICE
AOB_10_2W_014
AGTS EQUIP.
AOB_10_2W_013
BREAK RM
AOB_10_2W_011
WAITING
AOB_10_2W_046
PASSAGE
AOB_10_2W_003 LOBBY
AOB_10_2W_001
ELECTRICAL
AOB_10_2W_002
CONFERENCE ROOM
AOB_10_2W_012
OFFICE
AOB_10_2W_066
OFFICE
AOB_10_2W_064
CORRIDOR
AOB_10_2W_065
STORAGE
AOB_10_2W_063
STORAGE
AOB_10_2W_059
OFFICE
AOB_10_2W_047
OFFICE
AOB_10_2W_048
OFFICE
AOB_10_2W_049
OFFICE
AOB_10_2W_051
OFFICE
AOB_10_2W_055
OFFICE
AOB_10_2W_056
OFFICE
AOB_10_2W_060
OFFICE
AOB_10_2W_061
COFFEE
AOB_10_2W_053
COPY
AOB_10_2W_054
CORRIDOR
AOB_10_2W_052
CORRIDOR
AOB_10_2W_024
10-2AINV1
10-2ALCC1
10-2AT1
10-2AL6
D-10-2AH1
10-2AH1
10-2AL1
D-10-2AT1
D-10-2AT2
10-2AT2
10-2AL5
D-UPS3 D-UPS4
10-2AUPSL3 10-2AUPSL4
10-2AUPSL1
10-2AUPSL2
10-2AINV1
10-2AD1
BATTERY
UPS1
AGTS EQUIP.
AOB_10_2W_015
CORRIDOR
AOB_10_2W_018
TELEPHONE
AOB_10_2W_004
CUSTODIAN
AOB_10_2W_007
WOMEN
AOB_10_2W_008
MEN
AOB_10_2W_006
STAIR
AOB_10_2W_ST02
STAIR
AOB_10_2W_ST05
CORRIDOR
AOB_10_2W_057
BREAK
AOB_10_2W_030
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:11:05 PM
1/8" = 1'-0"
LEVEL 10 OVERALL
ELECTRICAL FLOOR
PLAN
AOB E10.00
1/8" = 1'-0"AOB E10.00
ELECTRICAL FLOOR PLAN LEVEL 101
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
10-2AD1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_10_2W_020
10-2AH1 ELECTRICAL PANEL 010475 ELECTRICAL OPERATING AOB_10_2W_002
10-2AL1 ELECTRICAL PANEL 010476/01
ELECTRICAL OPERATING AOB_10_2W_002
10-2AL5 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_10_2W_063
10-2AL6 ELECTRICAL PANEL 017343 ELECTRICAL OPERATING AOB_10_2W_030
10-2AUPSL1 ELECTRICAL PANEL 010478 ELECTRICAL OPERATING AOB_10_2W_015
10-2AUPSL2 ELECTRICAL PANEL 010479 ELECTRICAL OPERATING AOB_10_2W_015
10-2AUPSL3 ELECTRICAL PANEL 026440 ELECTRICAL OPERATING AOB_10_2W_022
10-2AUPSL4 ELECTRICAL PANEL 017342 ELECTRICAL OPERATING AOB_10_2W_022
ELECTRICAL PANEL: 9
10-2ALCC1 LIGHTING CONTROL PANEL 006911 ELECTRICAL OPERATING AOB_10_2W_002
LIGHTING CONTROL PANEL: 1
10-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_10_2W_002
10-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_10_2W_020
LIGHTING INVERTER: 2
10-2AT1 TRANSFORMER 017320 ELECTRICAL OPERATING AOB_10_2W_002
10-2AT2 TRANSFORMER ELECTRICAL OPERATING AOB_10_2W_063
TRANSFORMER: 2
UPS1 UPS ELECTRICAL OPERATING AOB_10_2W_020
UPS: 1
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
AGTS SERVER: L10_2W 23-035 DEV - C. CARDENAS 20240515 2025 DFA
N
AOB_11_2W_ST02
PASSAGE
AOB_11_2W_002 ELEVATOR MACHINE
ROOM
AOB_11_2W_001
MECHANICAL FAN ROOM
AOB_11_2W_004
MECHANICAL
AOB_11_2W_005
ROOF
AOB_11_2W_RF04
ROOF
AOB_11_2W_RF02
11-2AINV1
11-2AL1
11-2AT1
11-2AEH1
11-2AH1
11-2AEL1
11-2AET1
11-2AEH2
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:11:05 PM
1/8" = 1'-0"
LEVEL 11 OVERALL
ELECTRICAL FLOOR
PLAN
AOB E11.00
1/8" = 1'-0"AOB E11.00
ELECTRICAL FLOOR PLAN LEVEL 111
ASSETS
MARK TYPE TAG FUNC AREA STATUS LOCATION
11-2AEH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_004
11-2AEH2 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_001
11-2AEL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_001
11-2AH1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_004
11-2AL1 ELECTRICAL PANEL ELECTRICAL OPERATING AOB_11_2W_004
ELECTRICAL PANEL: 5
11-2AINV1 LIGHTING INVERTER ELECTRICAL OPERATING AOB_11_2W_004
LIGHTING INVERTER: 1
11-2AET1 TRANSFORMER ELECTRICAL OPERATING AOB_11_2W_001
11-2AT1 TRANSFORMER ELECTRICAL OPERATING AOB_11_2W_004
TRANSFORMER: 2
CURRENT PROJECTS - CONSTRUCTION
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
CURRENT PROJECTS - DESIGN
PROJECT NAME & AREA OF WORK PROJECT # PROJECT MANAGER SLICE DATE
ANTICIPATED
COMPLETION DFI CONTACT
N
WH
EO EO
GS
P
A C
E
SPACE SPACE
S P
A C
E
WH
SPACE SPACE
M
M
AEM
M
M
SPACE
T
SPACE
MM
T
SPARESPARESPARESPARESPARE
T
T
T
SPARESPARESPARESPARESPARE
T T
T
T
T
T
T
T
T
T
T
T
UPS
UPS
SPARE SPARE
T
T
SPD
T
TTTT
902/987
CT
1600AF
1000AT
MAIN SWITCHGEAR "4-2ASG1"
CT
4000A
MAIN
XCEL METER
GROUND BUS
ELECTRICAL INTERLOCK
1600AF
1000AT
800AF
800AT
1600AF
1000AT
M1
XCEL METER
CT
M2
800.41000.4
4000.X
#4/0 CU
CT
4000.X
LEVEL 4
LEVEL 3
4000A. MAIN BUS 277/480V., 3Ø,
4W. 65,000 A.I.C.
277/480V., 3Ø, 4W. Isc=60,200A.
2500KVA XCEL TRANSFORMER "T2"
277/480V., 3Ø, 4W. Isc=60,200A.
887/987
2500KVA XCEL TRANSFORMER "T1"
1600AF
1600AT
1000A
"3-2AD1"
1600A. MCB. 277/480V, 3Ø, 4W,
65,000 A.I.C.
225A 400A
400.4225.4
#8 CU
3-2AT1
50S.4
3-2AL1
1600.4
10-2AUPSL1
1000.4
4000A
MAIN
"3-2BD1"
1600A. MCB. 277/480V, 3Ø, 4W,
65,000 A.I.C.
1000A 100A
100.4
225A
225.4
1000.4
TO "4-2AESG1 M1"
(SEE SHEET E501.1)
TO "4-2AESG1 M2"
(SEE SHEET E501.1)
4000.X 4000.X
1600AF
1000AT
1000.4
TO GENERATOR TAP BOX
(SEE SHEET E501.1)
CT CT
TO "3-2BH4ATS"
(SEE SHEET E501.1)
3-2AH3
100.4
3-2AH2
50.4
3-2AH1
100A50A
#8 CU
3-2AT1A1
50S.4
3-2AL1A1
30.3
30.3
250A250A100A100A100A50A
50.3
EF-11
400A
400.4
100A
100.4
100A
100.4
225A
225.4
5B-2AH2
5A-2AH2
#8 CU
4-2AT2
50S.4
4-2AL2
4-2AH1
#8 CU
4-2AT1
50S.4
4-2AL1
30.3
30.3
50.3
4-2AL3
11-2AH1
LEVEL 5A
#8 CU
3-2BT1
50S.4
3-2BL1
30.3
3-2BH1
3-2BH2
600A
600.4
3-2BH3
250A250A100A100A100A
#8 CU
4-2BT1
150S.4
4-2BL1
4-2BH1
70.3
#8 CU
4-5AT1
150S.4
4-5AL1
4-2BH2
70.3
100A
100.4
225A
225.4
TO "4-5AATS1-N"
(SEE SHEET E501.1)
TO "4-5BATS1-N"
(SEE SHEET E501.1)
100A
100.4
100A
100.4
400A
400.4
5B-2BH2
5A-2BH2
CAFM #16312A01
TAP BOX "2A RISER"
LEVEL 5B
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
ROOF
100A
5A-2AH1
#8 CU
5A-2AT1
50S.4
5A-2AL1
30.3 100.4
100A
5B-2AH1
#8 CU
5B-2AT1
50S.4
5B-2AL1
30.3 100.4
100A
6-2AL4
#2 CU
6-2AT1
250S.4
6-2AL1
110.3
100A
6-2AH1
100.4
60.4
100A
#2 CU
7-2AT1
250S.4
7-2AL1
110.3
100A
7-2AH1
100.4
100A
8-2AL2
#2 CU
8-2AT1
250S.4
8-2AL1
110.3
100A
8-2AH1
100.4
100.4
100A
9-2AL2
#2 CU
9-2AT1
250S.4
9-2AL1
110.3
100A
9-2AH1
100.4
80.4
100A
10-2AL6
#2 CU
10-2AT1
250S.4
10-2AL1
110.3
100A
10-2AH1
100.4
60.4
1000A BUS RISER
100.3
#6 CU
9-2AT3
150S.4
9-2AL3
60A
#6 CU
10-2AT2
125.4
10-2AL5
60.3
"10-2AD1"
800A. MLO. 277/480V, 3Ø, 4W,
65,000 A.I.C.
60A
225A
6-2AH2
#6 CU
6-2AT2
150S.4
6-2AL5
70.3225.4
6-2AUPS
70.3
6-2AUPSL1 UPS AOB-6B UPS AOB-6A
175.3 175.3
175.3
UPS1
70.3
80.4
10-2AUPSL3
80.4
10-2AUPSL4
80.4
110A
110.3
UNKNOWN
LOAD
110A
110.3
UNKNOWN
LOAD
15A
20.3
ROOF
15A
20.3
ROOF
15A
20.3
ROOF
20A
20.3
UNKNOWN
LOAD
40A 80A (x3)
400A
"11-2BTH2"
400A. MCB. 277/480V, 3Ø, 4W,
65,000 A.I.C.
60A 20A
20.2
RECEPTACLE
100.4
100A
CAFM #16312A01
TAP BOX "2B RISER"
1000A BUS RISER
100A
5B-2BH1
#8 CU
5B-2BT1
50S.4
5B-2BL1
30.3100.4
100A
5A-2BH1
#8 CU
5A-2BT1
50S.4
5A-2BL1
30.3100.4
200A
200.4
TO "5A-2AATS-N"
(SEE SHEET E501.1)
#8 CU
11-2AT1
50S.4
11-2AL1
30.3
#4 CU
11-2BTL4-X
175S.4
11-2BTL4
100.4
100A
#4 CU
11-2BTL3-X
175S.4
11-2BTL3
100.4
100A
#4 CU
11-2BTL2-X
175S.4
11-2BTL2
100.4
100A
#4 CU
11-2BTL1-X
175S.4
11-2BTL1
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:09:40 PM
12" = 1'-0"
AOB AREA 2A/B
HOUSE ONE LINE
E501
1L COPPER FEEDER SCHEDULE
TAG FEEDER SIZE
20.2 2#12, 1#12G, 3/4"C
20.3 3#12, 1#12G, 3/4"C
30.3 3#10, 1#10G, 3/4"C
50.3 3#6, 1#10G, 1"C
50.4 4#6, 1#10G, 1"C
50S.4 4#6, 1#8G, 1"C
60.3 3#4, 1#10G, 1"C
60.4 4#4, 1#10G, 1-1/4"C
70.3 3#4, 1#8G, 1-1/4"C
80.4 4#3, 1#8G, 1-1/4"C
100.3 3#1, 1#8G, 1-1/2"C
100.4 4#1, 1#8G, 1-1/2"C
110.3 3#2, 1#6G, 1-1/4"C
125.4 4#1, 1#6G, 1-1/2"C
150S.4 4#1/0, 1#6G, 2"C
175.3 3#2/0, 1#6G, 2"C
175S.4 4#2/0, 1#4G, 2"C
200.4 4#3/0, 1#6G, 2"C
225.4 4#4/0, 1#4G, 2-1/2"C
250S.4 4-250KCMIL, 1#2G, 3"C
400.4 2 SETS, EACH: 4#3/0, 1#3G, 2-1/2"C
600.4 2 SETS, EACH: 4-350KCMIL, 1#1G, 3"C
800.4 3 SETS, EACH: 4-300KCMIL, 1#1/0G, 3"C
1000.4 3 SETS, EACH: 4-400KCMIL, 1#2/0G, 3"C
1600.4 4 SETS, EACH: 4-600KCMIL, 1#4/0G, 4"C
4000.X 10 SETS, EACH: 4-600KCMIL, 4"C
1L DISTRIBUTION CONNECTION VALUES
EQUIPMENT NAME
AVAILABLE
FAULT
CURRENT (A)
SHORT
CIRCUIT
RATING (AIC)
VOLTAGE
DROP (%)
PEAK
DEMAND
"3-2AD1" 65,000 AIC 0 kW
"3-2BD1" 65,000 AIC 0 kW
"10-2AD1" 65,000 AIC 0 kW
"11-2BTH2" 65,000 AIC 0 kW
2500KVA XCEL TRANSFORMER "T1" 60,200A 0 kW
2500KVA XCEL TRANSFORMER "T2" 60,200A 0 kW
MAIN SWITCHGEAR "4-2ASG1" 65,000 AIC 0 kW
TAP BOX "2A RISER" 0 kW
TAP BOX "2B RISER" 0 kW
1L PANEL CONNECTION VALUES
EQUIPMENT
NAME
MCB RATING
(A) MAINS (A)
EQUIPMENT
RATING (KVA)
AVAILABLE
FAULT
CURRENT (A)
SHORT
CIRCUIT
RATING (AIC)
VOLTAGE
DROP (%)
3-2AH1 50 100 0
3-2AH2 100 0
3-2AH3 225 0
3-2AL1 50 100 0
3-2AL1A1 50 100 0
3-2BH1 100 0
3-2BH2 225 0
3-2BH3 600 0
3-2BL1 50 100 0
4-2AH1 50 100 0
4-2AL1 50 100 0
4-2AL2 50 100 0
4-2AL3 50 100 0
4-2BH1 100 0
4-2BH2 225 0
4-2BL1 150 0
4-5AL1 150 0
5A-2AH1 100 0
5A-2AH2 100 0
5A-2AL1 50 100 0
5A-2BH1 100 0
5A-2BH2 100 0
5A-2BL1 50 100 0
5B-2AH1 100 0
5B-2AH2 250 0
5B-2AL1 50 100 0
5B-2BH1 100 0
5B-2BH2 250 0
5B-2BL1 50 100 0
6-2AH1 100 0
6-2AH2 225 0
6-2AL1 250 0
6-2AL4 100 0
6-2AL5 150 0
6-2AUPSL1 150 0
7-2AH1 100 0
7-2AL1 250 0
8-2AH1 100 0
8-2AL1 250 0
8-2AL2 100 0
9-2AH1 100 0
9-2AL1 250 0
9-2AL2 100 0
9-2AL3 150 0
10-2AH1 100 0
10-2AL1 250 0
10-2AL5 125 0
10-2AL6 60 100 0
10-2AUPSL1 100 0
10-2AUPSL3 100 0
10-2AUPSL4 100 0
11-2AH1 400 0
11-2AL1 50 100 0
11-2BTL1 175 0
11-2BTL2 175 0
11-2BTL3 175 0
11-2BTL4 175 0
UPS AOB-6A 150 0
UPS AOB-6B 150 0
3-2AT1 0 0 15
3-2AT1A1 0 0 15
3-2BT1 0 0 15
4-2AT1 0 0 15
4-2AT2 0 0 15
4-2BT1 0 0 45
4-5AT1 0 0 45
5A-2AT1 0 0 15
5A-2BT1 0 0 15
5B-2AT1 0 0 15
5B-2BT1 0 0 15
6-2AT1 0 0 75
6-2AT2 0 0 45
7-2AT1 0 0 75
8-2AT1 0 0 75
9-2AT1 0 0 75
9-2AT3 0 0 45
10-2AT1 0 0 75
10-2AT2 0 0 45
11-2AT1 0 0 15
11-2BTL1-X 0 0 50
11-2BTL2-X 0 0 50
11-2BTL3-X 0 0 50
11-2BTL4-X 0 0 50
6-2AUPS 0 0 50
UPS1 0 0 20
WH
EO EO
GS
P
A C
E
SPACE SPACE
S P
A C
E
WH
M
M
AEM
M
M
SPACE
MM
SPARESPARESPARESPARESPARESPARE SPARESPARESPARESPARESPARE
T
T
SPARE
T
UPS
T
T
T
UPS
T
N
E
B
P
N
E
B
P
N
E
B
P
N
E
B
P
N
E
B
P
CT
"4-2AESG1"
CT
2000A
MAIN
XCEL METER
GROUND BUS
ELECTRICAL INTERLOCK
1600AF
1000AT
1600AF
1600AT
1600AF
1000AT
M1
XCEL METER
CT
M2
1600.4
4000.X
#4/0 CU
CT
4000.X
LEVEL 4
LEVEL 3
4000A. MAIN BUS 277/480V., 3Ø,
4W. 65,000 A.I.C.
1000A
"3-2AED1"
1600A. MCB. 277/480V, 3Ø, 4W,
65,000 A.I.C.
100A
100.4
1000.4
2000A
MAIN
"3-2BED1"
1600A. MCB. 277/480V, 3Ø, 4W,
65,000 A.I.C.
1000A 100A
100.4
1000.4
TO TRANSFORMER "T1"
(SEE SHEET E501)
TO TRANSFORMER "T2"
(SEE SHEET E501)
CT CT
TO "3-2AD1"
(SEE SHEET E501)
3-2AEH1
100.4
3-2AEH2
100A250A250A100A100A100A50A
60.4
225A
225.4
100A300A
300.4
100A
100.4
11-2AEH2
LEVEL 5A
3-2BEH1
100A
100.4
3-2BEH2
250A250A250A100A100A
#8 CU
4-2BET1
50S.4
4-2BEL1
4-2BEH1
30.3
60A
60.4
TO "4-2BH2"
(SEE SHEET E501)
TO "3-5AED2"
(SEE TERMINAL ONE-LINES)
225A
225.4
200A
200.4
5B-2BEH1
LEVEL 5B
LEVEL 6
LEVEL 7
LEVEL 8
LEVEL 9
LEVEL 10
ROOF
2000A
200.4
TO 200A CB, 2B RISER
(SEE SHEET E501)
#8 CU
11-2AET1
50S.4
11-2AEL1
30.3
GEN TAP BOX
1600.4
TO "4-2AESG1"
(SEE SHEET E501)
GENERATOR
1600KVA, 277/480V., 3Ø, 4W
2000.X
100A
5A-2AATS
200.4
5A-2AH3
#8 CU
5A-2AT2
100S.4
5A-2AL2
50.3
5A-2AUPS5A-2AUPS1
150.4300.4
6-2AUPSL2
150.4 60.4
6-2AL8
60.4
8-2AL8
60.4
9-2AL8
#8 CU
4-2AET1
50S.4
4-2AEL1
4-2AEH1
30.3
5B-2AEH1
3-2BH4ATS
400.4
GENERATOR (USWEST)
300KVA, 277/480V., 3Ø, 4W
400S.4
3-2BH4
400.4
#8 CU
3-2BT2
30.3
50S.4
3-2BL2 3-2BL3
50.4
11-2AEH1
4-5AATS1
175.4
175.4 175.3
TO "3-5AED2"
(SEE TERMINAL ONE-LINES)#1/0 CU
X-4-5BDL6
350S.4
4-5AL6 4-5AL7
150.4
4-5AL8
4-5BATS1
100.4
100.4
TO "4-2BH2"
(SEE SHEET E501)
4-5BATS1
EM
4-5BATS1
NORMAL
100A
100A100.4
4-5BUPS1
4-5BATS2
4-5BCB1
100ATO "3-5AED2"
(SEE TERMINAL ONE-LINES) 100.4
100.4
#2 CU
4-5BDL1-X
100.3
4-5BDL1
225A. MCB. 277/480V, 3Ø, 4W,
65,000 A.I.C.
150A
150.4
4-5BL7
100.4
4-5BL8
100A 225A
100.4
4-5BL9
100A
200A 225S.4225S.4
20.2
UPS AOB-9
DATE:
SCALE:
DENVER
INTERNATIONAL
AIRPORT
NOT FOR CONSTRUCTION
NOT FOR EXTERNAL USE
OR DISTRIBUTION
AREAS SHOWN IN RED ARE CURRENTLY IN DESIGN.
AREAS SHOWN IN HALFTONE ARE IN CONSTRUCTION
AND AWAITING AS-BUILT DELIVERY AND MAY NOT
REFLECT THE FINAL BUILT PROJECT.
9/18/2024 3:09:40 PM
12" = 1'-0"
AOB AREA 2A/B
EMERGENCY ONE
LINE
E501.1
1L COPPER FEEDER SCHEDULE
TAG FEEDER SIZE
20.2 2#12, 1#12G, 3/4"C
30.3 3#10, 1#10G, 3/4"C
50.3 3#6, 1#10G, 1"C
50.4 4#6, 1#10G, 1"C
50S.4 4#6, 1#8G, 1"C
60.4 4#4, 1#10G, 1-1/4"C
100.3 3#1, 1#8G, 1-1/2"C
100.4 4#1, 1#8G, 1-1/2"C
100S.4 4#1, 1#6G, 1-1/2"C
150.4 4#1/0, 1#6G, 2"C
175.3 3#2/0, 1#6G, 2"C
175.4 4#2/0, 1#6G, 2"C
200.4 4#3/0, 1#6G, 2"C
225.4 4#4/0, 1#4G, 2-1/2"C
225S.4 4#4/0, 1#2G, 2-1/2"C
300.4 4-350KCMIL, 1#4G, 3"C
350S.4 4-500KCMIL, 1#1/0G, 3-1/2"C
400.4 2 SETS, EACH: 4#3/0, 1#3G, 2-1/2"C
400S.4 2 SETS, EACH: 4#3/0, 1#1/0G, 2-1/2"C
1000.4 3 SETS, EACH: 4-400KCMIL, 1#2/0G, 3"C
1600.4 4 SETS, EACH: 4-600KCMIL, 1#4/0G, 4"C
2000.X 5 SETS, EACH: 4-600KCMIL, 1-350KCMIL, 4"C
4000.X 10 SETS, EACH: 4-600KCMIL, 4"C
1L DISTRIBUTION CONNECTION VALUES
EQUIPMENT NAME
AVAILABLE
FAULT
CURRENT (A)
SHORT
CIRCUIT
RATING (AIC)
VOLTAGE
DROP (%)
PEAK
DEMAND
"3-2AED1" 65,000 AIC 0 kW
"3-2BED1" 65,000 AIC 0 kW
"4-2AESG1" 65,000 AIC 0 kW
4-5BDL1 65,000 AIC 0 kW
GEN TAP BOX 0 kW
GENERATOR 0 kW
GENERATOR (USWEST) 0 kW
1L PANEL CONNECTION VALUES
EQUIPMENT
NAME
MCB RATING
(A) MAINS (A)
EQUIPMENT
RATING (KVA)
AVAILABLE
FAULT
CURRENT (A)
SHORT
CIRCUIT
RATING (AIC)
VOLTAGE
DROP (%)
3-2BH4ATS 0 400 0
4-5AATS1 0 200 0
4-5BATS1 0 100 0
4-5BATS2 0 100 0
5A-2AATS 0 200 0
3-2AEH1 100 0 65,000 AIC
3-2AEH2 100 0 65,000 AIC
3-2BEH1 100 0 65,000 AIC
3-2BEH2 100 0 65,000 AIC
3-2BH4 400 0 65,000 AIC
3-2BL2 50 100 0 65,000 AIC
3-2BL3 50 100 0 65,000 AIC
4-2AEH1 60 100 0 65,000 AIC
4-2AEL1 50 100 0
4-2BEH1 60 100 0 65,000 AIC
4-2BEL1 50 100 0
4-5AL6 350 400 0
4-5AL7 150 0
4-5AL8 150 0
4-5BL7 150 0
4-5BL8 100 0
4-5BL9 100 0
5A-2AH3 200 0
5A-2AL2 100 0
5A-2AUPS1 300 400 0
5B-2AEH1 225 0
5B-2BEH1 225 0
6-2AL8 60 100 0
6-2AUPSL2 150 0
8-2AL8 60 100 0
9-2AL8 60 100 0
11-2AEH1 100 0 65,000 AIC
11-2AEH2 300 0 65,000 AIC
11-2AEL1 50 100 0
UPS AOB-9 100 0
3-2BT2 0 0 15
4-2AET1 0 0 15
4-2BET1 0 0 15
4-5BDL1-X 0 0 75
5A-2AT2 0 0 15
11-2AET1 0 0 15
X-4-5BDL6 0 0 112.5
4-5BUPS1 0 0 80
5A-2AUPS 0 0 80
| Model Info |
| AOB E03.2E - LEVEL 03 MOD 2E ELECTRICAL FLOOR PLAN |
| AOB E03.2W - LEVEL 03 MOD 2W ELECTRICAL FLOOR PLAN |
| AOB E04.2E - LEVEL 04 MOD 2E ELECTRICAL FLOOR PLAN |
| AOB E04.2W - LEVEL 04 MOD 2W ELECTRICAL FLOOR PLAN |
| AOB E05A.2E - LEVEL 05A MOD 2E ELECTRICAL FLOOR PLAN |
| AOB E05A.2W - LEVEL 05A MOD 2W ELECTRICAL FLOOR PLAN |
| AOB E05B.2E - LEVEL 05B MOD 2E ELECTRICAL FLOOR PLAN |
| AOB E05B.2W - LEVEL 05B MOD 2W ELECTRICAL FLOOR PLAN |
| AOB E06.00 - LEVEL 06 OVERALL ELECTRICAL FLOOR PLAN |
| AOB E07.00 - LEVEL 07 OVERALL ELECTRICAL FLOOR PLAN |
| AOB E08.00 - LEVEL 08 OVERALL ELECTRICAL FLOOR PLAN |
| AOB E09.00 - LEVEL 09 OVERALL ELECTRICAL FLOOR PLAN |
| AOB E10.00 - LEVEL 10 OVERALL ELECTRICAL FLOOR PLAN |
| AOB E11.00 - LEVEL 11 OVERALL ELECTRICAL FLOOR PLAN |
| E501 - AOB AREA 2A/B HOUSE ONE LINE |
| E501.1 - AOB AREA 2A/B EMERGENCY ONE LINE |
File details come from the government source that posted it. Updated .