Reclamation Construction for Rains Canyon Subsidence Project
Solicitation number
JH22-160
Issued by
Cache County, Utah

About this file

This is an Invitation for Bids (IFB) issued by the State of Utah Division of Purchasing and the Division of Oil, Gas and Mining for the Reclamation Construction for Rains Canyon Subsidence Project (Solicitation #JH22-160). The project involves filling one subsided mine opening in Carbon County, Utah, with a mandatory pre-bid site visit held on July 13, 2022. The contract is to be completed within 15 calendar days after notice to proceed, and no later than August 31, 2022. The bid opened on June 24, 2022, and closed on July 18, 2022, with The 5 Seventeen Company ultimately being awarded the contract as the lowest responsive and responsible bidder.

The engineer's project cost estimate is $85,000.00, and the successful bidder will be required to furnish a performance bond and payment bond each equal to 100% of the contract price within 14 days of the award. Bidders were required to have an E100 license, attend the mandatory site visit, and submit detailed bid documentation. The project does not require Davis-Bacon Act compliance, and additional funding may be added if the legislature provides extra resources. The contract allows for potential modifications to incorporate new technology or technological upgrades associated with the procurement item.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

26 July 2022

Awarded To: The 5 Seventeen Company Award JH22-160 to The 5 Seventeen Company as the low cost responsive and responsible bidder.

Reclamation Construction for Rains Canyon Subsidence Project Division of Oil, Gas and Mining. The work consists of filling one subsided mine opening in Carbon County, Utah.

Must attend Mandatory Site Visit.

26 July 2022

Open 6/24/2022 8:00 AM MDT Type Invitation for Bid Close 7/18/2022 2:00 PM MDT Number JH22-160 Currency US Dollar

Sealed Until 7/18/2022 2:00 PM MDT

Contacts Jeff Hammer jhammer@utah.gov

Commodity Codes Commodity Code Description 71100 Mining services including shaft mining and open pit mining

72140 Construction services including sewer maintenance and repair, roads and highways and excavation and backfill services, levee and dam construction and digging, ditching, road grading, rock stabilization, equipment rental or lease, and energy conservation

26 July 202226 July 202226 July 202226 July 202226 July 202226 July 202226 July 202226 July 202226 July 2022 mailto:jhammer@utah.gov

Issuing Procurement Unit State of Utah Division of Purchasing Conducting Procurement Unit State of Utah Division of Oil, Gas and Mining

INVITATION FOR BIDS

Reclamation Construction for Rains Canyon Subsidence Project

SOLICITATION #JH22-160

This Invitation for Bids "IFB" is issued in accordance with State of Utah Procurement Code and the Utah Administrative Code. If any provision of this IFB conflicts with the Utah Procurement Code or the Utah Administrative Code, then Utah Procurement Code and then Utah Administrative Code will take precedence.

Purpose of this Solicitation

The purpose of this IFB is to enter into a contract with the lowest responsive and responsible bidder to provide: the WORK consists of filling one subsided mine opening in Carbon County, Utah. Details of the WORK are contained in these Specifications. “OWNER” in these Specifications is defined as the Utah Division of Oil, Gas and Mining.

Closing date and time

The closing date and time for this sourcing event is as provided in this posting. If your time is different from that shown, your profile may be set to a different time zone. Please see the attachment titled "Changing Your Time Zone" in the Buyer Attachments section for directions on how to update your profile. It is your responsibility to make sure you submit your response by the date and time indicated above.

Bid Openings

The bid opening for this solicitation will NOT take place in person. “Unofficial Results” will be posted to the solicitation in SciQuest after the solicitation has closed. The Unofficial Results DO NOT constitute an award for the bid. Unofficial Results are being uploaded online in order to promote fairness to all vendors, regardless of physical geographic location.

This contract will result in one contract award (Purchase Order) to the lowest cost responsive and responsible bidder.

Engineers Project Cost Estimate:

Engineers Project Cost Estimate: $85,000.00

Length of the Contract

The WORK under this CONTRACT shall be commenced upon notice to proceed and shall be completed within 15 calendar days after the date of email delivery, date of hand delivery, or date marked on registered mail receipt of said Notice to Proceed, and no later than August 31, 2022. WORK delays caused by weather may, at the discretion of the OWNER, extend the completion date.

CONTRACTOR also agrees to the liquidated damages provisions of Article 12.

Davis-Bacon Act Compliance with the Davis-Bacon Act is not required for this project.

Issuing Procurement Unit, Conducting Procurement Unit, and Solicitation Number

The State of Utah Division of Purchasing is the issuing procurement unit and State of Utah Division of Oil, Gas and Mining is the conducting procurement unit for this IFB (referred to as “the State”). The reference number for this IFB is Solicitation #JH22-160.

This solicitation number must be referred to on all bids, correspondence, and documentation submitted to the State relating to this

IFB.

Additional Information

Mandatory Pre-Bid Meeting

Date/Time: Wednesday, July 13, 2022 at 9:00 a.m. MT

Description

Location: Meet at the junction of Rains Canyon and Spring Canyon Road approximately 7 miles west of the Shell Gas Station, Exit 232 on Hwy 6 in Helper. Bidders will walk from the junction to the subsidence opening Rains Canyon approximately 0.7 miles up the road.

Directions: Use the: PreBid Meet.kml file under Buyer Attachments to get the exact location where the Pre-Bid Meeting will start.

The meeting is expected to last two (2) hours and will involve hiking uphill on a two-track road. The meeting location is reached by a graded road. Four-wheel-drive vehicles are not necessary. Bidders are reminded to bring water. Per the Utah Procurement Rule R33- 1-13 Pre-Solicitation Conferences and Site Visits. Mandatory Pre-Bid meeting must be attended in person by an authorized representative of the person or vendor submitting a bid. The meeting will begin promptly at 9:00 a.m. MT. Any prospective bidder who arrives late to the meeting will not be allowed to continue with the site visit nor submit a bid. Failure to attend the site visit shall result in the disqualification of any bidder that does not have an authorized representative attend the entire duration of the mandatory site visit. This includes not taking calls/text during the site visit. Phones may be used to take pictures. All discussion not related to the site visit must be done after the site visit as to not be a disturbance during the site visit. An attendance log will be maintained including the name of each attendee, the entity the attendee is representing, and the attendee’s contact information, minutes of the site visit, and copies of any documents distributed by the conducting procurement unit to the attendees and shall be published as an addendum to the solicitation. Any verbal modifications made to any of the solicitation documents during the mandatory site visit shall be reduced to writing and will be published as an addendum to the solicitation. Bidders should supplement the pre-bid meeting by examining the project on their own time. Abandoned mine closure work is different from standard residential or commercial construction. It requires specialized work in unusual conditions and unique circumstances. Abandoned mines are hazardous. Do not enter the mines.

Bidders are prohibited from communications regarding this IFB with the conducting procurement unit staff, evaluation committee members, or other associated individuals EXCEPT the State of Utah Division of Purchasing procurement officer overseeing this IFB.

Wherever in this IFB an item is defined by using a trade name, brand name, or a manufacturer and/or model number, it is intended that the words, “or equivalent” apply; and invites the submission of equivalent products by the Bidders.

Bidders may be required to submit product samples to assist the chief procurement officer or head of a procurement unit with independent procurement authority in evaluating whether a procurement item meets the specifications and other requirements set forth in the invitation to bid. Product samples must be furnished free of charge unless otherwise stated in the invitation for bids, and if not destroyed by testing, will upon written request within any deadline stated in the invitation for bids, be returned at the bidder's expense.

Samples must be labeled or otherwise identified as specified in the invitation for bids by the procurement unit.

New Technology

Pursuant to Utah Administrative Rule R33-12-502 the awarded contract(s) may be modified to incorporate new technology or technological upgrades associated with the procurement item being solicited, including new or upgraded: (i) systems; (ii) apparatuses;

(iii) modules; (iv) components; and (v) other supplementary items. Further, a maintenance or service agreement associated with the procurement item under the resulting contract(s) may be modified to include any new technology or technological upgrades. Any contract modification incorporating new technology or technological upgrades will be specific to the procurement item being solicited and substantially within the scope of the original procurement or contract.

Legislative Appropriations

Additional funding may be added to the awarded contract(s) if additional funding is provided to the procurement unit for the purpose identified in the scope of work by the legislature.

Evaluation of Bids

Each bid received shall be evaluated for responsiveness in as outlined in the Utah Procurement Code. This IFB shall be evaluated by the objective criteria described in this IFB. Bids submitted must comply with the prerequisites and questions sections of this IFB. Any bid that does not comply with the prerequisite and questions sections will be deemed non-responsive and will be rejected.

Multiple or alternate bids will not be accepted, unless otherwise specifically required or allowed in the invitation for bids. If a bidder submits multiple or alternate bids that are not requested in this IFB, the chief procurement officer or head of a procurement unit with independent procurement authority will only accept the bidder's primary bid and will not accept any other bids constituting multiple or alternate bids.

Any exceptions to the content of this IFB, including the prerequisites, must be protested in writing to the Division of Purchasing prior to the closing date.

To be responsive and responsible Bidders must review and respond to the following sections of this IFB: Prerequisites, Buyer Attachments, Questions, and Items.

The Prerequisites Section contains the objective criteria that will be used to evaluate the bids, including the mandatory minimum requirements and general requirements that Bidders must certify that they have read, understand, and agree to in order to submit a bid.

The Buyer Attachments Section contains the required State of Utah Terms and Conditions of the IFB, which are non-negotiable, and other documents required for this IFB.

The Questions Section contains the questions that Bidders are required to answer in order to submit a bid.

The Items Section contains the detailed description of the procurement items being sought and allows the Bidders to provide their bids.

Bidders must review each section of this IFB carefully.

Required to View Event

Prerequisites Required to Enter Bid

26 July 2022

1. Bidders are encouraged to review this IFB prior to the deadline to submit a bid, even if a bid has been submitted, in case an addendum has been issued by the issuing procurement unit.

2. All questions must be submitted through SciQuest during the Question and Answer period.

3. A Bidder must guarantee its pricing for the period described in this IFB.

4. Bidders must accept the Standard Terms and Conditions that have been attached to this IFB. See Buyer Attachments Section.

5. The Scope of Work has been attached to this IFB. See Buyer Attachments section.

6. Any Bidder requesting that part of its bid be protected shall include with the bid a Claim of Business Confidentiality. See Questions Section for uploading a Claim of Business Confidentiality form.

7.

The mandatory minimum requirements are the objective criteria in which the conducting procurement unit will evaluate bids.

Bidders must upload a document which provides a point by point response to the mandatory minimums listed in this prerequisite.

8. The issuing procurement unit may not accept a bid after the time for submission of a bid has expired.

9. Bids must be submitted electronically, through SciQuest.

10. The cost for this IFB will be evaluated as described in this prerequisite.

11. Bids will be opened in accordance with Utah Code 63G-6a-604.

26 July 202226 July 202226 July 202226 July 202226 July 202226 July 202226 July 2022

Buyer Attachments

1. Claim of Business Confidentiality 12.7.20.pdf

2. Changing Your Time Zone 2022.pptx

3. Attachment A: Terms and Conditions for Services (Purchase Orders)

4. PreBid Meet.kml

5. 007951 Rains Construction Specs version 1.1.pdf

6. 007951_BidSchedule_1.1.xlsx

7. Chap5_Fillable_BidDocs_1.1.pdf

8. SH 1 - Rains Canyon.kml

9. Prebid signin.pdf

0. Question and Answer - Revised.pdf

1. Eratta sheet.pdf

26 July 202226 July 202226 July 202226 July 202226 July 202226 July 2022 https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1018185669Claim%20of%20Business%20Confidentiality%2012.7.20.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=WttKjksit8HnnNXfrsGnohsjYkw%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1196831224Changing%20Your%20Time%20Zone%202022.pptx?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=hEOoM98skw57kxknCe0NiV8%2BTQ4%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1067656560termsposervice-4152021_NH.docx?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=7Kc3UR1HXT7k4AAwfKbfLt2lD8Q%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1271885124PreBid%20Meet.kml?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=NgwpD3okSsjfk4E5H4y59uIq%2Bp8%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1281595582007951%20Rains%20Construction%20Specs%20version%201.1.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=xYxs7IoSKwpSyYHjWkyOwqlnzqk%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1281596272007951_BidSchedule_1.1.xlsx?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=qTS4SXrbe3jfxXbclW967WFUaqM%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1281596622Chap5_Fillable_BidDocs_1.1.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=%2FAyIq9KJ5LtdvsVhfAzx6xHhknU%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1271885712SH%201%20-%20Rains%20Canyon.kml?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=fz%2B6FAltg5Fr7tCiQtpd23u6leA%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1281600608Prebid%20signin.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=BulYN%2FcypjkINdUI6UXNEldA0GA%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1281822686Question%20and%20Answer%20-%20Revised.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=T3bTBuiwilmVnDaLRAp5X6iEu%2Bo%3D https://s3.amazonaws.com/solutions-selectsite-documents/Sourcingevent/1082943-1281600632Eratta%20sheet.pdf?AWSAccessKeyId=AKIAJ5HNJE5DFBZ5ONSA&Expires=1721912714&Signature=TCfhqZDrIS1MTkLPVueLhA2OFxw%3D

Questions Required Questions

Group 1: Acceptance of Prerequisites Instructions:

1.1

Offeror acknowledges that it is the offerors responsibility to upload any and all documents in responding to the solicitation. If the vendors fails to upload a document, uploads an incorrect document, uploads a blank document, or uploads any document incorrectly the State of Utah may not allow the vendor to make changes following the closing of the solicitation.

1.2 Offeror acknowledges that they do not have financial ties to individuals or entities on an OFAC sanctions list.

1.3 Is Bidder presently or has Bidder ever been debarred, suspended, proposed for debarment, or declared ineligible by any governmental department or agency, whether international, national, state, or local?

If yes, Bidder must provide a statement regarding its debarment or suspension.

1.4

In accordance with Utah Statute 63G-27-101, effective May 5, 2021, vendors contracting with the State to provide a good or service, including supplies, information technology, or construction services must certify they are not currently engaged in a boycott of the State of Israel and agrees not to engage in a boycott of the State of Israel for the duration of the contract (if awarded). Offeror is providing this certification in accordance with state law by selecting "Yes" to this question.

1.5

If Offeror has any information that is not already provided within its proposal that if known to the State would impact the State’s determination on offeror’s responsiveness for a contract award (i.e., legal action, recent turn-over in major personnel, loss of a major contract, any alleged violations of federal, state or local regulations, etc.), please mark “yes” to this question and upload such information in the space provided below.

Otherwise, please mark “no”. Please see UCA 63G-6a-120 & 902 for additional details.

1.6 Please upload information impacting Offeror’s responsiveness here.

1.7

Bidder acknowledges that it must acquire and maintain all applicable federal, state, and local licenses before the contract is entered into.

Licenses must be maintained throughout the entire contract period.

Persons doing business as an Individual, Association, Partnership, Corporation, or otherwise shall be registered with the Utah State Division of Corporations and Commercial Code. NOTE: Forms and information on registration may be obtained by calling (801) 530-4849 or toll free at 877-526-3994, or by accessing:

www.commerce.utah.gov.

1.8 Does Bidder have an outstanding tax lien in the State of Utah? If yes, Bidder must provide a statement regarding its debarment or suspension.

Group 2: Vendor Information Instructions:

2.1 Please provide your firm's legal company name.

2.2 Please provide your federal tax identification number? (If the vendor is sole proprietor please do not provide your social security number.)

2.3 Please provide your firm's contact information for this contract, including the name, phone number, and email address of your firm's authorized representative.

2.4 Please provide your ordering address and the remit to address. Please clearly identify each address.

2.5 Please provide your firm's State of Utah Sales Tax ID Number.

If you do not have a State of Utah Sales Tax ID Number, please write "N/A".

2.6 Identify your firm's type of business.

2.7 Is Offeror (owners, principles, partners) a retiree currently receiving benefits through the Utah Retirement Systems (URS)?

2.8 Is Bidder an employee of the State of Utah?

If yes, then Offeror must submit an external employment form signed by Offerors manager at the State of Utah.

Group 3: Vendor's Submission Instructions:

26 July 202226 July 202226 July 202226 July 202226 July 2022

3.1

Bidder understands and acknowledges that if Bidder accessed the "View as PDF" document available on the Utah Public Procurement Place Business Opportunities website and did not login to Bidder's account in the Utah Public Procurement Place system, that Bidder may not be viewing the entire the sourcing event and therefore may not be viewing the complete sourcing event requirements. Bidder acknowledges that Bidder has logged into Utah Public Procurement Place account and viewed the full sourcing event requirements including hyperlinks before submitting a response to a sourcing event.

3.2 Potential Conflicts of Interest. Offeror must identify any conflict, or potential conflict of interest, that might arise during the contract. If no conflicts are identified or expected, write “None” in this section.

3.3

Offeror affirms that yes that pursuant to the Code of Federal Regulations 2 CFR

200.216 - Prohibition on certain telecommunication and video surveillance services or equipment, that none of the goods (including component parts) or services offered within its proposal are from the entity Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities).

3.4

Vendor understands and acknowledges that its response, including all uploaded documents, will not be considered received by the State of Utah unless the Vendor clicks submit. Even if Vendor uploads all required documents and responds to all required questions its response will not be considered if it does not click submit. Offeror acknowledges that after completing the solicitation it must click on the link in the left hand menu bar labeled “Review & Submit”, then check the box under the “Certification” heading to certify their bid. Then click the blue box labeled “Submit Response” in order to submit their bid. Once the response has been submitted, Vendor will receive a confirmation that the response was successfully submitted. Vendors who fail to submit their response will not have their response reviewed and will be ineligible for further consideration under this solicitation.

Group 4: Mandatory Minimum Requirements Instructions:

4.1 Bidder attended the Mandatory Pre-Bid Site Visit held on Wendesday, July 13, 2022 at 9:00 a.m.

4.2 Bidder must upload a current E100 license clasification.

4.3

Bidder acknowledges the WORK under this CONTRACT shall be commenced upon notice to proceed and shall be completed within 15 calendar days after the date of email delivery, date of hand delivery, or date marked on registered mail receipt of said Notice to Proceed, and no later than August 31, 2022. WORK delays caused by weather may, at the discretion of the OWNER, extend the completion date.

4.4

Bidder acknowledges that the successful bidder, within 14 days after the award of contract, will be required to furnish a performance bond and a payment bond in an amount equal to one hundred percent (100%) of the contract price. Said bonds shall be secured from a company satisfactory to OWNER. The surety company must be a U.S.

Department of Treasury (Circular 570) listed company.

4.5 Bidder must upload a completed: 007951_BidSchedule_1.1 (Bidder must complete the Summary Bid Schedule Tab and the Detailed Bid Schedule Tab.)

4.6 Bidder must upload a completed Fillable: Chap5_Fillable_BidDocs_1.1

26 July 202226 July 202226 July 202226 July 202226 July 2022

Product Line Items Product Line Items

There are no Items added to this event.

26 July 202226 July 202226 July 202226 July 2022

Service Line Items Service Line Items

1.

# Item Name, Commodity Code, Description Allow

Alternates Qty. UOM Requested Service Delivery

S1 Project Total Cost 1 LS - Lump Sum

Input the Total Cost of the Project here.

26 July 202226 July 202226 July 2022