101_Schaumburg_Court.pdf
PDF 2 MB Posted
- Solicitation number
- 2026-IFB-040
- Issued by
- Cook County, Illinois
About this file
This document is a set of architectural furniture plans for the New Village Hall project located at 101 Schaumburg Court in Schaumburg, Illinois, prepared by Williams Associates Architects LTD. The plans consist of three floor-level furniture layouts—basement, ground floor, and upper floor—that illustrate the placement and specifications of furniture and fixtures throughout the facility. The basement plan designates areas for mechanical systems, file storage, receiving, elevator access, and utility infrastructure including a water heater and boilers room. The ground floor plan organizes administrative, financial, and community development departments across numerous offices, conference rooms, open office spaces, and support areas. The upper floor plan houses executive management offices, the mayor's suite, board and community meeting spaces, human resources, information technology, and administrative support functions. Furniture specifications include desk types and dimensions (such as 8x7.5-RH and 6x7-LH configurations), modular work stations, filing systems, and seating arrangements, with detailed measurements provided throughout the plans. The document is marked as "For Construction" and dated October 10, 2025, with reference notation CAK 2024-028.
The furniture plans serve as construction documentation for the Village of Schaumburg's new administrative facility, designed to accommodate the consolidation and reorganization of municipal departments into a single building. The plans include comprehensive room numbering systems and designations for specific departmental functions, including finance services, community development, transportation, economic development, information technology, human resources, and municipal governance operations. The document references additional architectural sheets including floor plans, reflected ceiling plans, building elevations, wall sections, interior elevations, door schedules, site plans, and interior finish plans, indicating this furniture plan is part of a complete construction document set for the project.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP
H20/SPRINKLER RISER
VAULT FILES/ HIGH DENSITY
RELOCATION
RECEIVING
ELEVATOR 2
IT DISPOSAL
STAIR 3
ELECTRICAL
MECHANICAL
TLT
MECH/WATER HEATER & BOILERS
CORRIDOR
CORRIDOR
EXIT ACCESS STAIR
FILE DISPOSAL
JANITOR/SUPPLY STOR
DMARC
FUTURE USE
CORRIDOR
CORRIDOR
MDF/PHONE/IDF
PUMP
TLT
STO
DAY PORTER
FACILITIES + ATTIC STOCK
GRAPHIC NORTH
Copyright © 2025 Williams
Associates Architects LTD.
Williams-Architects.com
Date
DWR
CHK
WA No.
Issue
/1
/2
:2
:4
A M
F1.0
BASEMENT -
FURNITURE PLAN
N E
W V
I L L A
G E
H A
L L
V I L L A
G E
O F S
C H
A U
M B
U R
G
S
C H
A U
M B U
R G
C T
S C H
A U
M B U
R G
IL
CAK
2024-028
10 OCT 2025
FOR CONSTRUCTION
PLAN
SCALE: 1/8" = 1'-0"
BASEMENT - FURNITURE PLAN
R E
V I S
I O
N S
N O
D
A T
E D
E S
C R
I P
T I O
N
D W
UP
UP UP
LA
R
K
IN
LARKIN
TB
-54
TB
-5
TB
-5
TB
-54
TB
-5
TB
-5
HLEG-30
POST
7.5X8-LH
DIR-LH
D
IR
-L H
MOD-RH
MOD-LH
7.5X8-RH
7X8-RH
7X8-LH 7X8-RH
DIR-RH
DIR-LH DIR-RH
DIR-LH
MOD-RH MOD-RH MOD-RH
DIR-LH
M O
D -R
H M
O D
-R H
M O
D -R
H M
O D
-R H
M O
D -L
H
3'-71/4"
4'-73/4"4'-73/4"
3 / 4
4'-61/2"4'-61/2"
3 / 4
4'-8"4'-81/4"
3'-91/4"
1 / 2
1 / 4
4'-21/2"4'-21/4"
4'-7" 4'-0"
1 / 2
3 / 4
2'-101/2" 2'-111/4"
4'-91/2"
1 / 4
3 / 4
1 / 4
9'-11/2" 8'-31/4"
3'-83/4"
5'-1"
38'-1"
5'-1"
3'-31/2"
1 / 4
FINANCE SERV MANAGER
CUST SUPPORT SUPER
WORK ROOM
PERMIT SUPERVISOR
STORAGE
STAIR 2
ASST DIR
FNC DIR
ACT MGR
PAYROLL COORD
CONF RM
VESTIBULE
DIR OF TRANSPORT
CONF RM
PRGM MGR
LOCKERS
STAIR 3
FITNESS
BREAK ROOM
CONF RM
OFFICE SUPER
STAFF PATIO
CODE ENF SUPER
E C
O N
D E
V R
E C
E P
T
IO
N
PURCH SUPER
TRAINING ROOM
BICYCLE STORAGE
WOMENS
MENS
CONF RM
PLANNING MANAGER
HEALTH SUPER
CD DIR
WORK RM
ASST DIR / PLAN MGR
ECO DEV MGR
DIR. OF ECO. DEV.
STORAGE
ENGINEERING SUPER
TLT
TLT
SHWR
SHWR
SHWR
SHWR
NURSING
ELEVATOR 2
FILE STOR
INSPT EQUIP STR
JC
PUBLIC MEETING
IDF
CONF RM
STORAGE
FINANCE OPEN OFFICE
COMM DEV OPEN OFFICE
WORK ROOM
4 PLAN EXAMINERS
WORK ROOM
TRANSPORTATION OPEN OFFICE
COMM DEV OPEN OFFICE
SEATING
CORRIDOR
ECON DEV OPEN OFFICE
CORRIDOR
TRANS RECEP
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
SEATING
COMM. DEV. OPEN OFFICE
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
TLT
TLT
IDF
STAIR 1
ELEVATOR 1
EXIT ACCESS STAIR
CORRIDOR
ELEC
ELEC
LOBBY
WAITING
C O
M M
D E
V R
E C
E P
WAITING
CONF RM
F
IN
A N
C E
R E
C E
P T
IO
N
STORAGE & A/V
CONF RM
WAITING
BLDG OFFICAL
STORAGE
X
.5
-L H
X
.5
-R H
X
.5
-L H
X
.5
-R H 8
X .5
-L H
X
.5
-R H
X
.5
-L H
8X7.5-LH 8X7.5-RH
8X7.5-LH 8X7.5-RH
8X7.5-LH 8X7.5-RH
8X7.5-LH 8X7.5-RH
8X7.5-LH 8X7.5-RH 8X7.5-LH 8X7.5-RH
X
.5
-R H
X
.5
-R H
X
.5
-R H
X
.5
-R H 8
X .5
-L H
8X7.5-LH
X
.5
-L H
X
.5
-L H
8X7.5-LH
8X7.5-LH
TYP-RH
TYP-RH
T Y
P -R
H
6X7-LH
6X7-RH6X7-LH
6X7-RH
6X7-RH6X7-LH
6X7-LH
6X7-RH6X7-LH
6X7-RH
6X7-LH
6X7-RH
6X7-RH
6X7-LH
6X7-RH
6X7-LH
6X7-RH
6X7-LH
6X7-LH
6X7-RH
X
.5
-L H
X
.5
-R H
X
-L
H X
-R
H
X
-R
H
X
.5
-R H
X
.5
-L H
X
.5
-L H
X
.5
-R H
AREA
WELL
LINE OF
BALCONY
ABOVE
LINE OF
BALCONY
ABOVE
DF
DF
F A
F A
F168A
F190A
F B
F155A
154A
F A
F A
F143A
F184B
F B
F A
F A
F A
F A
F A
F A
F A
F151A
F152A
F153A
F A
F A
F A
GRAPHIC NORTH
Copyright © 2025 Williams
Associates Architects LTD.
Williams-Architects.com
Date
DWR
CHK
WA No.
Issue
/1
/2
:2
:5
A M
F1.1
GROUND FLOOR -
FURNITURE PLAN
N E
W V
I L L A
G E
H A
L L
V I L L A
G E
O F S
C H
A U
M B
U R
G
S
C H
A U
M B U
R G
C T
S C H
A U
M B U
R G
IL
CAK
2024-028
10 OCT 2025
FOR CONSTRUCTION
R E
V I S
I O
N S
N O
D
A T
E D
E S
C R
I P
T I O
N
FOR REFERENCE ONLY
Mark Rysavy Text Box 108A
Mark Rysavy Text Box 108B
Mark Rysavy Text Box 108C
Mark Rysavy Text Box 108D
Mark Rysavy Text Box 108E
Mark Rysavy Text Box 108F
Mark Rysavy Text Box 108G
Mark Rysavy Text Box 108H
Mark Rysavy Text Box 108J
Mark Rysavy Text Box 108K
Mark Rysavy Text Box 108L
Mark Rysavy Text Box 108M
Mark Rysavy Text Box 113A
Mark Rysavy Text Box 113B
Mark Rysavy Text Box 113C
Mark Rysavy Text Box 108A
Mark Rysavy Text Box 108A
Mark Rysavy Text Box 171A
Mark Rysavy Text Box 171E
Mark Rysavy Text Box 171D
Mark Rysavy Text Box 171C
Mark Rysavy Text Box 171B
Mark Rysavy Text Box 171F
Mark Rysavy Text Box 172A
Mark Rysavy Text Box 172C
Mark Rysavy Text Box 172B
Mark Rysavy Text Box 172D
Mark Rysavy Text Box 181A
Mark Rysavy Text Box 181B
Mark Rysavy Text Box 181C
Mark Rysavy Text Box 181D
Mark Rysavy Text Box 181E
Mark Rysavy Text Box 181F
Mark Rysavy Text Box 181G
Mark Rysavy Text Box 181H
Mark Rysavy Text Box 157A
Mark Rysavy Text Box 157B
Mark Rysavy Text Box 188A
Mark Rysavy Text Box 188B
Mark Rysavy Text Box 188C
Mark Rysavy Text Box 188D
Mark Rysavy Text Box 185B
Mark Rysavy Text Box 185A
Mark Rysavy Text Box 189A
Mark Rysavy Text Box 189B
Mark Rysavy Text Box 189F
Mark Rysavy Text Box 189G
Mark Rysavy Text Box 189L
Mark Rysavy Text Box 189R
Mark Rysavy Text Box 189M
Mark Rysavy Text Box 189S
Mark Rysavy Text Box 189N
Mark Rysavy Text Box 189T
Mark Rysavy Text Box 189P
Mark Rysavy Text Box 189Q
Mark Rysavy Text Box 189U
Mark Rysavy Text Box 189V
Mark Rysavy Text Box 189H
Mark Rysavy Text Box 189C
Mark Rysavy Text Box 189J
Mark Rysavy Text Box 189K
Mark Rysavy Text Box 189D
Mark Rysavy Text Box 189E
Mark Rysavy Text Box 157C
DWREF
UPUP
H
H
H
U
LV
L-
-S
2S
LN
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C 1810-C 1810-C
1810-C 1810-C 1810-C 1810-C
TB-54
TB
-54
TB
-54
TB-54
PNL BRK
8X7.5-RH
D
IR
-R H
T Y
P -L
H
TYP-LH
TYP-LH
DIR-LH
D
IR
-R H
D
IR
-R H
M O
D -R
H M
O D
-R H
M O
D -R
H
MOD-LH
DIR-RH
D
IR
-R H
M O
D
IF
IE
D
S H
O R
T E
R
M O
D -L
H
MOD-RH
X
.5
-L H
M O
D -R
H
3 / 4
4'-3" 4'-3"
4'-61/4"
5'-0"
1 / 2
3'-11"3'-11"
3'-71/4" 4'-0"
3 / 4
1 / 4
5'-111/2"
5'-7" 5'-31/2"
4'-83/4"
3 / 4
3 / 4
1 / 2
3 / 4
4'-111/4" 4'-111/4"
6'-11"
6'-5"
7'-41/2"
1 / 2
3'-5"
3 / 4
1 / 2
4'-73/4"
1 / 2
3 / 4
1 / 2
1 / 2
4'-21/4" 4'-51/4" 4'-21/4"
6'-33/4"6'-33/4"
1 / 4
3'-41/4"
3'-7"
1 / 4
1 / 4
7'-31/2" 7'-31/2"
1 / 4
4'-0"
3'-73/4"
X
.5
-L H
X
.5
-R H
X
.5
-L H
X
.5
-R H
X
.5
-L H
X
.5
-R H
X
.5
-L H
8X7.5-RH8X7.5-LH
X
.5
-L H8
X .5
-R H
T Y
P -R
H
TYP-RH
TYP-RH
X
.5
-R H
X
.5
-R H
8X7.5-LH
8X7.5-LH
8X7.5-RH
X
.5
-L H
X
.5
-R H
311 SUPERVISOR
GIS MGR
TECH SOL MGR
IT DIR
ASST DIR IT
TECH SRV MGR
LAB/ HARDWARE WORK AREA
SERVER/ IDF
SECURE HARDWARE STO
ELEVATOR 2
294STAIR 3
ACTIVE FILE/STORAGE
WAITING AREA
BEN & RSK ANL
BEN & RSK MGR
COMMUNITY ROOM
KITCHENETTE
AV CONTROL
TLT
TLT
EXEC SESSION
STAIR 1
DIR OF COMM & OUTREACH
CONF RM
CONF RM
CONF RM
BOARD / COMMUNITY /
ADJUDICATION ROOM
ATTORNEY OFFICE
FILE STORAGE
FUTURE OFFICE
CONF RM
VILLAGE MANAGER
MAYOR
TLT
SECRETARY
CLERK
CONF RM
DEPUTY VILLAGE MANAGER
IDF
COMMUNITY BALCONY
K
IT
C H
E N
E T
T E
WORK ROOM
PERSONAL RECORD STOR
HUMAN RESOURCE DIRECTOR
ASSISTANT DIRECTOR OF HR
HR GENERALIST
TALENT & COMP MGR
TALENT AQ ANL
BFPC SEC
WORK ROOM
STORAGE
MAYOR'S CONF
WAITING
SEATING
CORRIDOR
BALCONY
NETWORK ADMIN.
HR OPEN OFFICE
IT OPEN OFFICE
SEATING
IT WAITING
CORRIDOR
COATS
COMM. OPEN OFFICE
STAIR 2
FILE STORAGE
WORK ROOM
WOMENS
285 WOMENS
ELEVATOR 1
JC
MENS
MENS
311 TRAINING
TLT
EXEC SEC
ADMIN SEC
CORRIDOR
CORRIDOR
MGMT ANALYST
FILES/STOR
MAYOR'S OFFICE SUITE
ELEC
ELEC
UPPER LOBBY
OPEN CONF
FUTURE
ASST TO VILLAGE MANAGER
OPEN TO BELOW
SLOPE DN
ROOF BELOW
DF DF
DF
F B
F A
F A
F229A
F233A
F290A
F A
F A
F257A
F256A
F273A
F A
F272A
F264A
F263A
F262A
F261A
F259A
F A
F A
F A
F A
F A
F A
F A
F244A
F222A
F A
F A
F260A
GRAPHIC NORTH
Copyright © 2025 Williams
Associates Architects LTD.
Williams-Architects.com
Date
DWR
CHK
WA No.
Issue
/1
/2
:2
:5
A M
F1.2
UPPER FLOOR -
FURNITURE PLAN
N E
W V
I L L A
G E
H A
L L
V I L L A
G E
O F S
C H
A U
M B
U R
G
S
C H
A U
M B U
R G
C T
S C H
A U
M B U
R G
IL
CAK
2024-028
10 OCT 2025
FOR CONSTRUCTION
R E
V I S
I O
N S
N O
D
A T
E D
E S
C R
I P
T I O
N
FOR REFERENCE ONLY
Mark Rysavy Text Box
Mark Rysavy Text Box
Mark Rysavy Text Box
Mark Rysavy Text Box 247A
Mark Rysavy Text Box 247B
Mark Rysavy Text Box
Mark Rysavy Text Box 247D
Mark Rysavy Text Box 280A
Mark Rysavy Text Box 280B
Mark Rysavy Text Box 267A
Mark Rysavy Text Box 267B
Mark Rysavy Text Box 250A
Mark Rysavy Text Box 250B
Mark Rysavy Text Box 250C
Mark Rysavy Text Box 250D
Mark Rysavy Text Box 250E
Mark Rysavy Text Box 250F
Mark Rysavy Text Box 250G
Mark Rysavy Text Box 250H
Mark Rysavy Text Box 256A
Mark Rysavy Text Box 256B
Mark Rysavy Text Box 247C
Mark Rysavy Text Box
Mark Rysavy Text Box
Mark Rysavy Text Box
Mark Rysavy Text Box
Mark Rysavy Text Box
Mark Rysavy Text Box
Mark Rysavy Text Box
| Sheets |
| A1.0 - BASEMENT FLOOR PLAN |
| A1.1 - GROUND FLOOR PLAN |
| A1.2 - UPPER FLOOR PLAN |
| A1.3 - CLERESTORY/ROOF PLAN |
| A1.4 - UPPER ROOF PLAN |
| A2.0 - BASEMENT REFLECTED CEILING PLAN |
| A2.1 - GROUND REFLECTED CEILING PLAN |
| A2.2 - UPPER REFLECTED CEILING PLAN |
| A2.3 - CLERESTORY REFLECTED CEILING PLAN |
| A2.4 - CEILING DETAILS |
| A3.1 - ROOF DETAILS |
| A4.1 - BUILDING ELEVATIONS |
| A4.2 - BUILDING ELEVATIONS |
| A4.3 - PARTIAL BUILDING ELEVATIONS & MATERIAL SCHED. |
| A4.4 - WINDOW ELEVATIONS & SCHEDULES |
| A4.5 - WINDOW ELEVATIONS & SCHEDULES |
| A4.6 - INTERIOR WINDOW ELEVATIONS & SCHEDULES |
| A4.7 - WINDOW DETAILS |
| A5.1 - BUILDING SECTIONS |
| A5.2 - BUILDING SECTIONS |
| A5.3 - BUILDING SECTIONS |
| A5.4 - WALL SECTIONS |
| A5.5 - WALL SECTIONS |
| A5.6 - WALL SECTIONS |
| A5.7 - WALL SECTIONS |
| A5.8 - WALL SECTIONS |
| A5.9 - WALL SECTIONS |
| A5.10 - WALL SECTIONS |
| A5.11 - WALL SECTIONS |
| A5.12 - WALL SECTIONS |
| A5.13 - WALL SECTIONS |
| A5.14 - WALL SECTIONS |
| A6.1 - SECTION DETAILS - EXTERIOR |
| A6.2 - SECTION DETAILS - EXTERIOR |
| A6.3 - SECTION DETAILS - EXTERIOR |
| A6.4 - SECTION DETAILS - INTERIOR |
| A6.5 - SECTION DETAILS - INTERIOR |
| A6.6 - PLAN DETAILS |
| A6.7 - PLAN DETAILS |
| A7.1 - LARGE SCALE PLANS |
| A7.2 - LARGE SCALE PLANS |
| A7.3 - LARGE SCALE PLANS |
| A7.4 - LARGE SCALE GRAND STAIR VIEWS & DETAILS |
| A7.5 - LARGE SCALE STAIR VIEWS |
| A7.6 - LARGE SCALE STAIR / ELEVATOR VIEWS |
| A7.7 - LARGE SCALE STAIR VIEWS |
| A7.8 - STAIR DETAILS |
| A8.1 - INTERIOR ELEVATIONS |
| A8.2 - INTERIOR ELEVATIONS |
| A8.3 - INTERIOR ELEVATIONS |
| A8.4 - INTERIOR ELEVATIONS |
| A8.5 - INTERIOR ELEVATIONS |
| A8.6 - MILLWORK |
| A8.7 - MILLWORK |
| A8.8 - MILLWORK DETAILS |
| A8.9 - DAIS MILLWORK |
| A9.1 - DOOR SCHEDULE |
| A9.2 - DOOR DETAILS |
| AS0.1 - SITE PLAN |
| AS1.1 - ENLARGED SITE VIEWS |
| AS1.2 - ENLARGED SITE VIEWS |
| AS1.3 - ENLARGED SITE VIEWS |
| AS1.4 - ENLARGED SITE VIEWS |
| ASD0.1 - SITE DEMOLITION PLAN |
| F1.0 - BASEMENT - FURNITURE PLAN |
| F1.1 - GROUND FLOOR - FURNITURE PLAN |
| F1.2 - UPPER FLOOR - FURNITURE PLAN |
| G1.1 - TITLE SHEET |
| G1.2 - CODE DATA |
| G1.3 - OCCUPANT LOAD CALCULATIONS |
| G1.4 - LIFE SAFETY PLANS |
| G1.5 - SIGNAGE SCHEDULE |
| G1.6 - GENERAL NOTES AND WALL TYPES |
| G1.7 - PARKING CALCULATION PLANS |
| ID0.1 - INTERIOR GENERAL NOTES |
| ID1.0 - FLOOR FINISH PLANS - BASEMENT FLOOR |
| ID1.1 - FLOOR FINISH PLANS - GROUND FLOOR |
| ID1.2 - FLOOR FINISH PLANS - UPPER FLOOR |
| ID1.3 - FLOOR FINISH PATTERNS- GROUND FLOOR |
| ID1.4 - FLOOR FINISH PATTERNS- UPPER FLOOR |
| ID2.0 - WALL FINISH PLANS - BASEMENT FLOOR |
| ID2.1 - WALL FINISH PLANS - GROUND FLOOR |
| ID2.2 - WALL FINISH PLANS - UPPER FLOOR |
File details come from the government source that posted it. Updated .