10 Elevator - Mech DWGs.pdf
PDF 7 MB Posted
- Solicitation number
- 36C24420R0067
About this file
This is a solicitation for design-build services to replace ten elevators across ten buildings at a Department of Veterans Affairs medical center. The scope of work includes evaluating existing conditions; removing and replacing the elevators and related systems; renovating or providing alternative elevator machine rooms; installing new controls, circuits, and auxiliary devices; ensuring ADA compliance; and patching and finishing work. Construction must be phased to allow for continued hospital operations, with buildings divided into three phases and a possible fourth building. Offerors must be verified SDVOSB contractors registered in SAM, compliant with VAAR requirements, and meeting OSHA and EPA standards. The contract type is firm-fixed-price for a period of 880 calendar days from notice to proceed, with a maximum value of $10 million. The solicitation and drawings will be available on SAM.gov on or around January 25, 2021, with the offer due date provided in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI Q_A 1.docx | DOCX document | |
| 36C24420R0067 0002.docx | DOCX document | |
| 36C24420R0067 0001.docx | DOCX document | |
| Updated Coatesville_VAMC_Map_Directory 2-17-21.pdf | ||
| Updated Pre-proposal walk-through instructions 2-17-21.docx | DOCX document | |
| 36C24420R0067.docx | DOCX document | |
| 10 Elevators - Specification.pdf | ||
| 10 Elevator- ME NARRATIVES.pdf | ||
| 10 Elevator - ARCH DRWG Binder.pdf | ||
| 10 Elevator - Electrical Drawings.pdf | ||
| Pre-proposal walk-through instructions.docx | DOCX document | |
| 10 Elevator - Elevator Drawing Binder.pdf | ||
| Coatesville VAMC Map_Parking F Locator_5-20-2020.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M-501
A
26-SF 3
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
GENERAL NOTES AND SPECIFICATIONS
1. ALL WORK SHALL CONFORM TO ALL LOCAL, STATE, AND NATIONAL CODES ALONG WITH ALL VA STANDARDS.
EQUIPMENT SHALL BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
2. ALL MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK UNDER THE CONTRACT SHALL
BE NEW, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED, AND TO THE EXTENT POSSIBLE, STANDARD
PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR
PERFORMANCE FEATURES ARE CALLED FOR.
3. ANY EQUIPMENT OR MATERIAL DEVIATIONS FROM THAT SPECIFIED OR DETAILED ON THIS DRAWING SHALL
BE SUBJECT TO THE APPROVAL OF THE ARCHITECT/ENGINEER. ALL PROPOSED EQUIPMENT DEVIATIONS
SUBMITTED SHALL BE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED.
4. ALL MECHANICAL EQUIPMENT SHALL BE LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
5. THE MECHANICAL CONTRACTOR SHALL INSTALL EQUIPMENT AS SHOWN ON THE DRAWINGS ALLOWING FOR
SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS AND REPLACEMENT.
PROVIDE PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS.
INSTALL ALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH
MANUFACTURER'S WRITTEN RECOMMENDATIONS AND/OR WITH ALL APPLICABLE CODES AND STANDARDS.
6. THE MECHANICAL CONTRACTOR SHALL COORDINATE THE INSTALLATION AND ROUTING OF ALL PROPOSED
DUCTWORK, PIPING AND EQUIPMENT WITHIN THE BUILDING STRUCTURE. PROVIDE COORDINATED SHEET
METAL SHOP DRAWINGS TO THE ENGINEER FOR REVIEW AND APPROVAL.
7. THE MECHANICAL CONTRACTOR SHALL TAKE THE LEAD IN PREPARATION OF COORDINATION DRAWINGS.
SUCH DRAWINGS SHALL BE COMPLETED WITH COORDINATION FROM THE GENERAL CONTRACTOR AND ALL
OTHER MAJOR AND MINOR SUBCONTRACTORS. PROVIDE PLAN VIEWS, SECTIONS AND ELEVATIONS, AS
REQUIRED, TO FULLY COORDINATE ALL NEW WORK WITH ITSELF AND EXISTING CONDITIONS. DRAWINGS
SHALL SHOW, ALL DUCTWORK, AIR DISTRIBUTION, MECHANICAL EQUIPMENT, MECHANICAL PIPING, FIRE
PROTECTION PIPING, PLUMBING PIPING, CABLE TRAYS, LIGHTING FIXTURES, CEILING GRID AND HEIGHT, BEAMS AND JOISTS (WITH ELEVATIONS MARKED), ELECTRICAL CONDUIT LARGER THAN 2 INCHES IN
DIAMETER AND ANY OTHER CEILING MOUNT DEVICES OR EQUIPMENT THAT PROTRUDE INTO THE CEILING
CAVITY. IF THERE ARE ANY OUTSTANDING ISSUES THAT CANNOT BE RESOLVED, CONSULT WITH ARCHITECT
AND/OR ENGINEER (THROUGH THE VA COR) FOR GUIDANCE AND MAKE CORRECTIONS IN ACCORDANCE WITH
DIRECTIONS GIVEN. DO NOT BEGIN FABRICATION UNTIL COORDINATION DRAWINGS HAVE BEEN APPROVED.
ANY INSTALLATION COMMENCED PRIOR TO APPROVAL IS TAKEN AT THE CONTRACTORS OWN RISK AND MAY
HAVE TO BE MODIFIED, MOVED AND/OR RECONFIGURED AT CONTRACTORS COST.
8. THE MECHANICAL CONTRACTOR SHALL PROVIDE AND INSTALL HIS OWN SUPPORT EQUIPMENT. LOCATIONS
SHALL BE COORDINATED WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
9. THE ELECTRICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL POWER CONNECTIONS TO THE
EQUIPMENT PROVIDED UNDER THIS CONTRACT.
10. THE MECHANICAL CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONTROL WIRING FOR HIS EQUIPMENT.
11. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS.
EXACT ROUTING OF DUCTWORK AND PIPING MUST BE DETERMINED IN THE FIELD. ALL DIMENSIONS SHALL
BE FIELD VERIFIED BY THE CONTRACTOR BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING
OR FABRICATING ANY DUCTWORK, PIPING OR EQUIPMENT. ANY DISCREPANCIES BETWEEN THE
REQUIREMENTS OF THE CONTRACT DOCUMENTS AND THE EXISTING CONDITIONS OR DIMENSIONS SHALL BE
REPORTED TO THE A/E AND VMAC COR BEFORE THE PERFORMANCE OF ANY WORK. FAILURE TO VERIFY
AND REPORT SHALL CONSTITUTE THE CONTRACTOR'S ACCEPTANCE OF THE EXISTING CONDITIONS AS FIT
FOR THE PROPER EXECUTION OF HIS WORK. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF
CEILING INSTALLED.
12. DUCTWORK AND PIPING SHALL BE KEPT AS CLOSE AND HIGH AS POSSIBLE TO THE BUILDING WALLS, CEILING
AND FLOOR AND ROOF STRUCTURE IN ORDER THAT THE MAXIMUM AMOUNT OF SPACE IS AVAILABLE.
ADDITIONAL OFFSETS, FITTINGS, ETC. NOT SHOWN BUT REQUIRED TO MAINTAIN MAXIMUM CLEARANCE
SHALL BE PROVIDED AT NO ADDITIONAL COST,
13. PATCH, PAINT, AND CLEAN SURFACES DISTURBED BY MECHANICAL WORK.
14. PROVIDE A COMPLETE 1-YEAR WARRANTY ON ALL LABOR AND MATERIALS.
15. CONTRACTOR SHALL FURNISH A BOUND SET OF OPERATING AND MAINTENANCE INSTRUCTIONS FOR ALL
EQUIPMENT TO THE OWNER UPON COMPLETION OF PROJECT.
16. INSTALL ESCUTCHEONS IN ALL PLACES WHERE PIPING PENETRATES A WALL IN AN EXPOSED LOCATION.
17. THE MECHANICAL CONTRACTOR SHALL MAKE A COMPLETE REVIEW OF THE MECHANICAL PLANS, INCLUDING
THE SCHEDULES AND DETAILS PRIOR TO INSTALLATION OF ANY MECHANICAL SYSTEMS AND SHALL RESOLVE
ANY CONFLICTS WITH THE ENGINEER.
18. CONTRACTOR SHALL TAKE POSSESSION OF AND MANAGE ALL EXISTING MATERIALS AND EQUIPMENT BEING
DEMOLISHED AND/OR REMOVED IN ACCORDANCE WITH SPECIFICATION SECTION 01 74 19, CONSTRUCTION
WASTE MANAGEMENT.
19. INSTALL SHUTOFF-DUTY VALVES AT EACH BRANCH CONNECTION TO SUPPLY MAINS, AND AT SUPPLY
CONNECTION TO EACH PIECE OF EQUIPMENT. INSTALL CHECK VALVES AT EACH PUMP DISCHARGE AND
ELSEWHERE AS REQUIRED TO CONTROL FLOW DIRECTION.
20. DRAWING PLANS, SCHEMATICS, AND DIAGRAMS INDICATE GENERAL LOCATION AND ARRANGEMENT OF
PIPING SYSTEMS. INSTALL PIPING INDICATED TO BE EXPOSED AND PIPING IN EQUIPMENT ROOMS AND
SERVICE AREAS AT RIGHT ANGLES OR PARALLEL TO BUILDING WALLS. DIAGONAL RUNS ARE PROHIBITED
UNLESS SPECIFICALLY INDICATED OTHERWISE. INSTALL PIPING FREE OF SAGS AND BENDS. INSTALL PIPING
TO ALLOW APPLICATION OF INSULATION WHERE REQUIRED.
21. REAM ENDS OF PIPES AND TUBES AND REMOVE BURRS. BEVEL PLAIN ENDS OF STEEL PIPE. REMOVE
SCALE, SLAG, DIRT, AND DEBRIS FROM INSIDE AND OUTSIDE OF PIPE AND FITTINGS BEFORE ASSEMBLY.
22. THREADED JOINTS: THREAD PIPE WITH TAPERED PIPE THREADS ACCORDING TO ASME B1.20.1. CUT
THREADS FULL AND CLEAN USING SHARP DIES. REAM THREADED PIPE ENDS TO REMOVE BURRS AND
RESTORE FULL ID. JOIN PIPE FITTINGS AND VALVES AS FOLLOWS: APPLY APPROPRIATE TAPE OR THREAD
COMPOUND TO EXTERNAL PIPE THREADS UNLESS DRY SEAL THREADING IS SPECIFIED. DAMAGED THREADS:
DO NOT USE PIPE OR PIPE FITTINGS WITH THREADS THAT ARE CORRODED OR DAMAGED. DO NOT USE PIPE
SECTIONS THAT HAVE CRACKED OR OPEN WELDS.
23. CUT INSULATION IN A MANNER TO AVOID COMPRESSING INSULATION TO LESS THAN 75 PERCENT OF ITS
NOMINAL THICKNESS. FINISH INSTALLATION WITH SYSTEMS AT OPERATING CONDITIONS. REPAIR JOINT
SEPARATIONS AND CRACKING DUE TO THERMAL MOVEMENT. REPAIR DAMAGED INSULATION FACINGS BY
APPLYING SAME FACING MATERIAL OVER DAMAGED AREAS. EXTEND PATCHES AT LEAST 4 INCHES BEYOND
DAMAGED AREAS. ADHERE, STAPLE, AND SEAL PATCHES SIMILAR TO BUTT JOINTS.
24. INSULATE INSTRUMENT CONNECTIONS FOR THERMOMETERS, PRESSURE GAGES, PRESSURE TEMPERATURE
TAPS, TEST CONNECTIONS, FLOW METERS, SENSORS, SWITCHES, AND TRANSMITTERS ON INSULATED PIPES, VESSELS, AND EQUIPMENT. SHAPE INSULATION AT THESE CONNECTIONS BY TAPERING IT TO AND AROUND
THE CONNECTION WITH INSULATING CEMENT AND FINISH WITH FINISHING CEMENT, MASTIC, AND FLASHING
SEALANT.
25. THIS SET OF DRAWINGS INCORPORATES THE LATEST ARCHITECTURAL BASE PLAN. BUILD OFF OF COORDINATION
DRAWINGS FOR ALL DUCTWORK, PIPING, AND ELECTRICAL CONDUIT ROUTING. ANY DISCREPANCY SHOULD BE
CLARIFIED WITH THE COR AND/OR ENGINEER.
26. FIRE PROTECTION PIPING AND HEAD LOCATIONS SHOWN ON THESE DRAWINGS ARE DIAGRAMMATIC IN
NATURE. HOWEVER SPRINKLER HEAD TYPES AND APPROXIMATE LOCATIONS HAVE BEEN ESTABLISHED. THE
FIRE PROTECTION LAYOUT INDICATED IS FOR REFERENCE ONLY. FINAL SYSTEM LAYOUT AND PIPE ROUTING
SHALL BE DETERMINED BY THE FIRE PROTECTION CONTRACTOR AND SHALL TAKE INTO CONSIDERATION
THE BUILDING STRUCTURE, ARCHITECTURAL FEATURES AND SHALL BE COORDINATED WITH THE WORK OF
OTHER TRADES.
27. ALL FIRE PROTECTION WORK SHALL BE CONDUCTED IN ACCORDANCE WITH NFPA 13-2013 AND ALL OTHER
APPLICABLE CODES AND STANDARDS.
DRAWING SYMBOLS
DRAWING INDEX
MECHANICAL
M-001 MECHANICAL COVER SHEET
M-002 MECHANICAL SYMBOLS
MH101 BUILDING 2 MECHANICAL PLANS
MH102 BUILDING 4 MECHANICAL PLANS
MH103 BUILDING 5 MECHANICAL PLANS
MH104 BUILDING 6 MECHANICAL PLANS
MH105 BUILDING 7 MECHANICAL PLANS
MH106 BUILDING 8 MECHANICAL PLANS
MH107 BUILDING 38 MECHANICAL PLANS
MH108 BUILDING 39 MECHANICAL PLANS
MH109 BUILDING 57 MECHANICAL PLANS
MH110 BUILDING 58 MECHANICAL PLANS
M-501 MECHANICAL DETAILS
M-502 MECHANICAL DETAILS
M-601 MECHANICAL SCHEDULES
ABBREVIATIONS
A/E ARCHITECT / ENGINEER
ACHP AIR-COOLED HEAT PUMP
ADJ ADJUSTABLE
AF AIR FILTER
AI ANALOG INPUT
AO ANALOG OUTPUT
ASME AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AV ANALOG VALUE
BAS BUILDING AUTOMATION SYSTEM
BHP BRAKE HORSEPOWER
BI BINARY INPUT
BLDG BUILDING
BO BINARY OUTPUT
BTUH BRITISH THERMAL UNIT PER HOUR
BV BINARY VALUE
C CENTIGRADE (CELSIUS)
CFM CUBIC FEET PER MINUTE
CMU CONCRETE MASONRY UNIT
COMP COMPRESSOR UNIT
COND CONDENSATE
COR CONTRACTING OFFICERS REPRESENTATIVE
Db DRY-BULB (TEMPERATURE)
DIA DIAMETER
DX DIRECT EXPANSION
E EXISTING TO REMAIN
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EFF EFFICIENCY
ELEV. ELEVATOR
ESP ELEVATOR SUMP PUMP
ESP EXTERNAL STATIC PRESSURE
EXT EXTERNAL
F FAHRENHEIT
FCP FIRE CONTROL PANEL
FCU FAN COIL UNIT
GPM GALLONS PER MINUTE
HP HORSEPOWER
HSPF HEATING SEASONAL PERFORMANCE FACTOR
ID INSIDE DIAMETER
IN INCHES
IN WC INCHES OF WATER COLUMN
kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/S LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
MAX MAXIMUM
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MEZZ MEZZANINE
MIN MINIMUM
mm MILLIMETER
MOP MAXIMUM OVER-CURRENT PROTECTION (AMPERES)
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NEMA NATIONAL ELECTRIC MANUFACTURERS ASSOCIATION
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NO NUMBER
NOM NOMINAL
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OSA OUTSIDE AIR
PA PASCAL
PCF POUNDS PER CUBIC FOOT (FEET)
QTY QUANTITY
RA RETURN AIR
REF REFRIGERANT
RL REFRIGERANT LIQUID LINE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
SA SUPPLY AIR
SCHED SCHEDULE
SEN SENSIBLE HEAT
SP GR SPECIFIC GRAVITY
SS STAINLESS STEEL
TEMP TEMPERATURE
THRU THROUGH
TSP TOTAL STATIC PRESSURE
TYP TYPICAL
UL UNDERWRITERS LABORATORY
VA VETERANS AFFAIRS
VENT VENTILATION
VMAC VA MEDICAL CENTER
W WATTS
Wb WET-BULB (TEMPERATURE)
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
97 8654321
SD SMOKE DETECTOR
HS
ZC
LC
LT
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
T ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
TT TEMPERATURE TRANSMITTER
M ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL MOUNT
HT HUMIDITY TRANSMITTER
SD SMOKE DETECTOR (BY FIRE ALARM CONTRACTOR)
HS HAND SWITCH (HAND-OFF-AUTO SWITCH)
ZC VALVE OR DAMPER POSITION CONTROLLER
LC LEVEL CONTROLLER
LT LEVEL TRANSMITTER
MOTOR STARTER
M ELECTRIC OPERATED CONTROL DAMPER/OR VALVE
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PIPE UP
PIPE DOWN
COLD WATER (CITY WATER)
HOT WATER
VENT LINE
REFRIGERANT SUCTION
REFRIGERANT LIQUID
DRAIN LINE
EXISTING PIPE TO BE REMOVED
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE
FLEXIBLE CONNECTION
MODULATING CONTROL BUTTERFLY VALVE
AND QUICK-COUPLE HOSE CONNECTOR
WYE STRAINER WITH VALVED DRAIN
WATER LEVEL CONTROLLER
LC
PIPING SYMBOLS
MECHANICAL SYMBOLS
LIMIT OF DEMOLITION
(WALL TYPE)
(WALL TYPE)
DN
DN
UP
UP
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM REGISTER OR GRILLE
EXHAUST OR RETURN REGISTER OR TOP GRILLE
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
DNUP
RETURN DUCT (UP & DOWN)
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SQUARE 1-WAY CEILING DIFFUSERS
BACK DRAFT DAMPER
BDD
SECTION.)
FC
10x8
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL
FIRE DAMPER
FD
VD
DUCT WITH SOUND LINING
FLEXIBLE DUCTWORK (INSULATED)
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
DUCT MOUNTED COIL
DUCT MOUNTED COIL (HOT WATER OR STEAM COIL)
SUPPLY
RETURN
45°
RETURN, NO SPLITTER (45° TAP)
STANDARD BRANCH SUPPLY OR
45°
N
COMBINATION FIRE/SMOKE DAMPER
(ELECTRIC)
F/S DPR
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
UNIT HEATER (VERTICAL)
UNIT HEATER (HORIZONTAL)
CONVECTOR OR RADIATOR (RECESSED)
LETTER INDICATES UNIT SIZE.
WALL MOUNTED FAN COIL UNIT.
RADIATOR (FLOOR MOUNT)
FCU
A
CONTROLS SYMBOLS
& HOSE CONNECTION)
PIPING AND VALVE SYMBOLSFIRE SPRINKLER SYMBOLS
PIPE WORK:
SPRINKLER HEAD:
MAIN PIPING ABOVE FINISHED FLOOR - NEW
MAIN PIPING ABOVE FINISHED FLOOR - EXISTING
RISE OR DROP IN PIPE
PIPE DOWN
PIPE UP
UPRIGHT
SIDEWALL
PENDANT
MAIN PIPING ABOVE FINISHED FLOOR - TO BE DEMOLISHED
BRANCH PIPING ABOVE FINISHED FLOOR - NEW
BRANCH PIPING ABOVE FINISHED FLOOR - EXISTING
BRANCH PIPING ABOVE FINISHED FLOOR - TO BE DEMOLISHED
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
FLEXIBLE CONNECTION, EQUIPMENT,
VIBRATION, OR SEISMIC
HW
CW
V
RL
RS
D
X
PIPE SLEEVE
PIPE CONTINUATION
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
E. 1"
E. 2"
ATTIC FLOOR LEVEL
PLATFORM FLOOR LEVEL
ATTIC FLOOR LEVEL
PLATFORM FLOOR LEVEL
E. 2"
W
W
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOMS AND OUT TO NEW
SPLASH BLOCK OUTSIDE. VERIFY EXACT ROUTING
TO AVOID RUNNING OVER ELECTRICAL CABINETS,
ETC. REFER TO DETAILS #1/M-502 AND #4/M-601
FOR FURTHER INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON FLAT ROOF ABOVE. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #6/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. RUN REFRIGERANT LINES UP THRU ROOF.
PROVIDE ROOF PENETRATION BOX AT PIPING
PENETRATION THRU ROOF PER DETAIL #3/M-501.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SEE DETAIL #6/M-501 FOR FURTHER INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 EXHAUST DUCT TO NEW EXHAUST FAN.
VERIFY EXACT DUCT CONNECTION SIZES.
CONNECT TO EXISTING CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
AND #3/M-601 FOR FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. DISCHARGE DRAIN THRU WALL UNDER BEAM TO
ROOF SIMILAR TO DETAIL #6/M-501, BUT NO
SPLASH BLOCK. REFERENCE THIS DETAIL FOR
FURTHER INFORMATION.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO LOUVER WITH FIRE RATED DUCT
INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
EXISTING DUCT ACCESS PANEL FOR DAMPER
ACTUATOR ACCESS.
KEYED NOTES
ATTIC FLOOR
SHAFT LID SHAFT LID
ATTIC FLOOR
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOM AND OUT TO NEW
SPLASH BLOCK OUTSIDE. REFER TO DETAILS
#1/M-502 AND #4/M-601 FOR FURTHER
INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON NEW HOUSEKEEPING PAD. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #3/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. REMOVE 24x8 EXHAUST DUCT BACK TO ACTIVE
MAIN AND CAP AT MAIN. PATCH AND REPAIR CMU
BLOCK WALL.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SIMILAR TO DETAIL #6/M-501 FOR FURTHER
INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 EXHAUST DUCT TO NEW EXHAUST FAN.
VERIFY EXACT DUCT CONNECTION SIZES.
CONNECT TO EXISTING CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
(SIMILAR BUT HORIZONTAL) AND #3/M-601 FOR
FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. RELOCATE OR ENCLOSE AND SEPARATE FROM
MACHINE ROOM ANY PIPING AND DUCTWORK NOT
DIRECTLY SERVING THE MACHINE ROOM.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
EXISTING DUCT ACCESS PANEL FOR DAMPER
ATTIC FLOOR LEVEL ATTIC FLOOR LEVEL
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
1. REPLACE EXISTING ELEVATOR SUMP PUMP
SYSTEM WITH NEW IN EXISTING PIT. PROVIDE OIL
DETECTION AND HIGH WATER ALARMS. ROUTE
NEW DRAIN PIPING THRU EXISTING ADJACENT
ROOM AND OUT TO NEW SPLASH BLOCK OUTSIDE.
VERIFY EXACT ROUTING TO AVOID RUNNING OVER
ELECTRICAL CABINETS, ETC. REFER TO DETAILS
#1/M-502 AND #4/M-601 FOR FURTHER
INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON FLAT ROOF ABOVE. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #6/M-502, AND #2/M-601 FOR
FURTHER INFORMATION.
3. RUN REFRIGERANT LINES UP THRU ROOF.
PROVIDE ROOF PENETRATION BOX AT PIPING
PENETRATION THRU ROOF PER DETAIL #3/M-501.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SEE DETAIL #6/M-501 FOR FURTHER INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. PROVIDE NEW SHAFT EXHAUST FAN CONNECTED
TO EXISTING DUCTWORK, PART OF WHICH SHALL
REMAIN AS INDICATED. PROVIDE NEW DAMPER
AND ACTUATOR IN DUCTWORK. PROVIDE NEW
DUCT TRANSITIONS WITH FLEXIBLE CONNECTIONS
FROM EXISTING 24X24 EXHAUST DUCT TO NEW
EXHAUST FAN. VERIFY EXACT DUCT CONNECTION
SIZES. PROVIDE NEW FAN CONTROLS AND TIE
INTO EXISTING DAMPER CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
(SIMILAR BUT HORIZONTAL) AND #3/M-601 FOR
FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. REMOVE EXISTING LAVATORY AND CAP COLD
WATER AND HOT WATER PIPING AT ACTIVE MAIN
TAKE-OFFS. EXISTING WASTE TRAP, WASTE
PIPING, AND VENT PIPING TO REMAIN FOR
CONDENSATE FROM NEW FAN COIL UNIT.
9. REMOVE EXHAUST GRILLE AND RELATED DUCT
WORK AND CAP DUCT ABOVE CEILING.
10. REMOVE EXISTING PLUMBING FIXTURE AND CAP
COLD WATER, HOT WATER, WASTE, AND/OR VENT
PIPING AT ACTIVE MAIN TAKE-OFF.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO LOUVER WITH FIRE RATED DUCT
INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
EXISTING DUCT ACCESS PANEL FOR DAMPER
ACTUATOR ACCESS.
14. DISCHARGE 3/4" DRAIN TO EXISTING 1-1/4" TRAP
ARM ON WALL. PROVIDE A FIXED AIR GAP FITTING
FOR CONNECTION TO TRAP ARM.
MEZZ. FLOOR LEVEL MEZZ. FLOOR LEVEL
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
KEYED NOTES
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOMS AND OUT TO NEW
SPLASH BLOCK OUTSIDE. VERIFY EXACT ROUTING
TO AVOID RUNNING OVER ELECTRICAL CABINETS,
ETC. REFER TO DETAILS #1/M-502 AND #4/M-601
FOR FURTHER INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON FLAT ROOF ABOVE. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #6/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. RUN REFRIGERANT LINES UP THRU ROOF.
PROVIDE ROOF PENETRATION BOX AT PIPING
PENETRATION THRU ROOF PER DETAIL #3/M-501.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SEE DETAIL #6/M-501 FOR FURTHER INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 EXHAUST DUCT TO NEW EXHAUST FAN.
VERIFY EXACT DUCT CONNECTION SIZES.
CONNECT TO EXISTING CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
AND #3/M-601 FOR FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. DISCHARGE DRAIN THRU WALL UNDER BEAM TO
ROOF SIMILAR TO DETAIL #6/M-501, BUT NO
SPLASH BLOCK. REFERENCE THIS DETAIL FOR
FURTHER INFORMATION.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
EXISTING DUCT ACCESS PANEL FOR DAMPER
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOM AND OUT TO NEW
SPLASH BLOCK OUTSIDE. REFER TO DETAILS
#1/M-502 AND #4/M-601 FOR FURTHER
INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON NEW HOUSEKEEPING PAD. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #3/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. REMOVE EXISTING FAN COIL UNIT LOCATED IN
CEILING PLENUM INCLUDING WALL MOUNTED
THERMOSTAT, CONTROL WIRING, ASSOCIATED
DUCTWORK AND AIR DEVICE. REMOVE CHILLED
WATER BRANCH PIPING BACK TO MAIN AND CAP.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SIMILAR TO DETAIL #6/M-501 FOR FURTHER
INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 AND 12x30 EXHAUST DUCTS TO NEW
EXHAUST FAN. VERIFY EXACT DUCT CONNECTION
SIZES. CONNECT TO EXISTING CONTROLS AND
NEW SHAFT SMOKE DETECTOR. SEE DETAILS
#4/M-502 AND #3/M-601 FOR FURTHER
INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. RELOCATE OR ENCLOSE AND SEPARATE FROM
MACHINE ROOM ANY PIPING AND DUCTWORK NOT
DIRECTLY SERVING THE MACHINE ROOM.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
EXISTING DUCT ACCESS PANEL FOR DAMPER
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
KEYED NOTES
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOMS AND OUT TO NEW
SPLASH BLOCK OUTSIDE. VERIFY EXACT ROUTING
TO AVOID RUNNING OVER ELECTRICAL CABINETS,
ETC. REFER TO DETAILS #1/M-502 AND #4/M-601
FOR FURTHER INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON FLAT ROOF ABOVE. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #6/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. RUN REFRIGERANT LINES UP THRU ROOF.
PROVIDE ROOF PENETRATION BOX AT PIPING
PENETRATION THRU ROOF PER DETAIL #3/M-501.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SEE DETAIL #6/M-501 FOR FURTHER INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 EXHAUST DUCT TO NEW EXHAUST FAN.
VERIFY EXACT DUCT CONNECTION SIZES.
CONNECT TO EXISTING CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
AND #3/M-601 FOR FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. DISCHARGE DRAIN THRU WALL UNDER BEAM TO
ROOF SIMILAR TO DETAIL #6/M-501, BUT NO
SPLASH BLOCK. REFERENCE THIS DETAIL FOR
FURTHER INFORMATION.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
KEYED NOTES
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOMS AND OUT TO NEW
SPLASH BLOCK OUTSIDE. VERIFY EXACT ROUTING.
REFER TO DETAILS #1/M-502 AND #4/M-601 FOR
FURTHER INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON FLAT ROOF ABOVE. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #6/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. RUN REFRIGERANT LINES UP THRU ROOF.
PROVIDE ROOF PENETRATION BOX AT PIPING
PENETRATION THRU ROOF PER DETAIL #3/M-501.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SEE DETAIL #6/M-501 FOR FURTHER INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 EXHAUST DUCT TO NEW EXHAUST FAN.
VERIFY EXACT DUCT CONNECTION SIZES.
CONNECT TO EXISTING CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
AND #3/M-601 FOR FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. DISCHARGE DRAIN THRU WALL UNDER BEAM TO
ROOF SIMILAR TO DETAIL #6/M-501, BUT NO
SPLASH BLOCK. REFERENCE THIS DETAIL FOR
FURTHER INFORMATION.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
KEYED NOTES
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOMS AND OUT TO NEW
SPLASH BLOCK OUTSIDE. VERIFY EXACT ROUTING.
REFER TO DETAILS #1/M-502 AND #4/M-601 FOR
FURTHER INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON FLAT ROOF ABOVE. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #6/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. RUN REFRIGERANT LINES UP THRU ROOF.
PROVIDE ROOF PENETRATION BOX AT PIPING
PENETRATION THRU ROOF PER DETAIL #3/M-501.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SEE DETAIL #6/M-501 FOR FURTHER INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 EXHAUST DUCT TO NEW EXHAUST FAN.
VERIFY EXACT DUCT CONNECTION SIZES.
CONNECT TO EXISTING CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
AND #3/M-601 FOR FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. DISCHARGE DRAIN THRU WALL UNDER BEAM TO
ROOF SIMILAR TO DETAIL #6/M-501, BUT NO
SPLASH BLOCK. REFERENCE THIS DETAIL FOR
FURTHER INFORMATION.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
EXISTING DUCT ACCESS PANEL FOR DAMPER
ACTUATOR ACCESS.
14. REMOVE EXISTING EXHAUST FAN, THERMOSTAT,
LOUVERS, DAMPERS AND DAMPER ACTUATORS.
E. 16x4
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
E. 16x4
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
KEYED NOTES
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOM AND OUT TO NEW
SPLASH BLOCK OUTSIDE. REFER TO DETAILS
#1/M-502 AND #4/M-601 FOR FURTHER
INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON NEW HOUSEKEEPING PAD. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #3/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. REMOVE EXISTING EXHAUST GRILLE AND DUCT AS
INDICATED. CAP EXISTING DUCT TO REMAIN. FILL
IN EXISTING WALL PENETRATION PER
ARCHITECTURAL REQUIREMENTS.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SIMILAR TO DETAIL #6/M-501 FOR FURTHER
INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 AND 24X18 EXHAUST DUCTS TO NEW
EXHAUST FAN. VERIFY EXACT DUCT CONNECTION
SIZES. CONNECT TO EXISTING CONTROLS AND
NEW SHAFT SMOKE DETECTOR. SEE DETAILS
#4/M-502 AND #3/M-601 FOR FURTHER
INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. RELOCATE OR ENCLOSE AND SEPARATE FROM
MACHINE ROOM ANY PIPING AND DUCTWORK NOT
DIRECTLY SERVING THE MACHINE ROOM.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
MEZZ. FLOOR LEVEL
ATTIC FLOOR LEVEL
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
SITE KEY PLAN
BUILDING KEY PLAN
KEYED NOTES
1. PROVIDE ELEVATOR SUMP PUMP SYSTEM IN NEW
PIT. PROVIDE OIL DETECTION AND HIGH WATER
ALARMS. ROUTE NEW DRAIN PIPING THRU
EXISTING ADJACENT ROOM AND OUT TO NEW
SPLASH BLOCK OUTSIDE. REFER TO DETAILS
#1/M-502 AND #4/M-601 FOR FURTHER
INFORMATION.
2. SPLIT SYSTEM HEAT PUMP WITH INDOOR UNIT FAN
COIL MOUNTED HIGH ON WALL AND OUTDOOR UNIT
MOUNTED ON NEW HOUSEKEEPING PAD. PROVIDE
MANUFACTURER'S CLEARANCE REQUIRED
AROUND INDOOR AND OUTDOOR UNITS. SEE
DETAILS #2/M-502, #3/M-502, #1/M-601, AND #2/M-601
FOR FURTHER INFORMATION.
3. REMOVE EXISTING FAN COIL UNIT LOCATED IN
CEILING PLENUM INCLUDING WALL MOUNTED
THERMOSTAT, CONTROL WIRING, ASSOCIATED
DUCTWORK AND AIR DEVICE. REMOVE CHILLED
WATER BRANCH PIPING BACK TO MAIN AND CAP.
4. DISCHARGE DRAIN TO SPLASH BLOCK OUTSIDE
SIMILAR TO DETAIL #6/M-501 FOR FURTHER
INFORMATION.
5. VERIFY SPRINKLER SYSTEM COMPLIANCE WITH
CURRENT CODES. PROVIDE NEW SPRINKLERS AND
PIPING WHERE REQUIRED.
6. REPLACE EXISTING SHAFT EXHAUST FAN WITH
NEW FAN IN SIMILAR LOCATION. EXISTING
DUCTWORK SHALL REMAIN AS INDICATED.
PROVIDE NEW DAMPER AND ACTUATOR IN
DUCTWORK. PROVIDE NEW DUCT TRANSITIONS
WITH FLEXIBLE CONNECTIONS FROM EXISTING
24X24 EXHAUST DUCT TO NEW EXHAUST FAN.
VERIFY EXACT DUCT CONNECTION SIZES.
CONNECT TO EXISTING CONTROLS AND NEW
SHAFT SMOKE DETECTOR. SEE DETAILS #4/M-502
AND #3/M-601 FOR FURTHER INFORMATION.
7. PROVIDE WATER-TIGHT SLEEVE FOR PIPING
PENETRATION THROUGH WALL STRUCTURE. SEE
DETAIL #5/M-501 FOR FURTHER INFORMATION.
8. RELOCATE OR ENCLOSE AND SEPARATE FROM
MACHINE ROOM ANY PIPING AND DUCTWORK NOT
DIRECTLY SERVING THE MACHINE ROOM.
9. REMOVE EXISTING FIRE SPRINKLER HEAD AND
ASSOCIATED PIPING AND REPLACE WITH NEW
HEAD IN NEW CEILING AT LOCATION INDICATED.
EXTEND PIPING AS REQUIRED. CENTER IN CEILING
TILE WHEN PRESENT.
10. REMOVE EXISTING CEILING DIFFUSER OR GRILLE
AND RELOCATE IN NEW CEILING IN LOCATION
INDICATED. CLEAN DIFFUSER OR GRILLE PRIOR TO
REINSTALLATION. EXTEND EXISTING DUCTWORK
AS REQUIRED FOR RELOCATION. CENTER IN
CEILING TILE WHEN PRESENT.
11. MANUFACTURER PROVIDED HEAT PUMP WALL
THERMOSTAT CONTROLLER. THIS THERMOSTAT
TO INTERFACE WITH BAS TO PROVIDE ALL INPUTS
AND CONTROL THE HEAT PUMP SPLIT SYSTEM PER
THE CONTROLS SCHEMATIC. SEE SCHEMATIC
#2/M-601 FOR FURTHER INFORMATION.
12. BAS ROOM SENSOR(S) TO MONITOR ROOM
TEMPERATURE AND HUMIDITY ON WALL NEXT TO
HEAT PUMP SYSTEM THERMOSTAT CONTROLLER.
SEE DETAIL #1/M-601 FOR FURTHER INFORMATION.
13. WRAP EXISTING AND NEW EXHAUST DUCT FROM
ELEVATOR SHAFT TO EXHAUST FAN AND FROM
FAN TO ROOF PENETRATION WITH FIRE RATED
DUCT INSULATION TO PROVIDE A 2-HOUR RATED
SYSTEM. PROVIDE RATED ACCESS PANEL OVER
5 FT
THRU [20]
6 8 10
[32][25] [40]
[65]
[50]
[75]
1312 14
[125][100]
[150]
[250]
[200]
[300]
[400]
[350]
[450]
[600]
[500]
20 241814 16128 1064 532 2 1/2
1 1/2 1 1 1/4
[9100] [9600][8500] [7600] [8200][7000][5800] [6700]
[5200][4100] [4900][3700][3000] [3400][2700]
[2100]
[4900]
[4100][3700] [4000]
[3000][2400][1800] [1500]
THRU 3/4
[2100] [2100]
[2100]
[2700]
[2400]
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000
LB. [453KG] UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1
ADJUSTABLE CLEVIS HANGER TYPE 43
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" [200mm] MIN. LENGTH)
BAND
1-5/8" [43mm] 12 GAUGE CHANNEL OR 2"x2"x1/4"
[50x50x6.4mm] ANGLE
1/2" [15mm] DIA. HANGER RODS WITH 36" [900mm] MAX.
SPACING ON EACH CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (3 PCF
MIN. DENSITY) UNDER
INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
MAXIMUM PIPE/TUBING SUPPORT SPACING
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
NOM. SIZE
PIPE
TUBING
IN.
[mm]
FT.
[mm]
FT.
[mm] m m
M
A X
STEEL EXPANSION SHIELD FOR EXISTING
CONSTRUCTION AND INSERTS FOR NEW
CONSTRICTION THIS TYPE SHALL BE USED ONLY
IN SLABS OR BEAMS OF 4" [100mm] MIN DEPTH
3/8" [10mm] MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND INSERTS
FOR NEW CONSTRUCTION
CONCRETE FLOOR SLAB
CLIP ANGLE
NUTS & WASHERS
3/8" [10mm] MIN DIA
HANGER RODS
FOR PIPES UNDER 2" [50mm] IN SIZE USE 1 1/2"x1
1/2"x1/4" [40x40x6.4mm] ANGLE. ALL PIPES 2" [50mm] &
LARGER USE 3"x3"x1/4" [75x75x6.4mm] ANGLE
TURNBUCKLE
3/8" [10mm] MIN DIA
HANGER RODS
3/8" [10mm] MIN DIA
INSERTS NEW
CONSTRUCTION ONLY.
WALL - BORE SMOOTH HOLE
PIPE COLLAR USED IN FINISHED
CONSTRUCTION FOR INSULATED
OR NON-INSULATED PIPE (CHROME
IN EXPOSED LOCATIONS)
PIPE SLEEVE SIZE TO SUIT
INSULATION WHERE PRESENT. CUT
FLUSH AT WALL
TUBING, PIPING
OR CONDUIT
PIPE INSULATION AS
SPECIFIED WHERE
PRESENT
NOTE:
UNLESS OTHERWISE INDICATED ON PLANS, MAXIMUM ANGLES SHOWN SHALL APPLY.
E Q
U I P
M E
N T
AIR
FLOW
AIR
FLOW
TYPICAL DUCTWORK TRANSITIONS
PLAN OR SIDE VIEW
TYPICAL DUCTWORK TRANSITION WITH
EQUIPMENT MOUNTED IN DUCT
PLAN OR SIDE VIEW
SEAL BETWEEN PIPE OR
INSULATION AND SLEEVE WITH
APPROVED FIRE SAFING MATERIAL.
CAULK AIRTIGHT AT EACH END A
MINIMUM OF 1" DEPTH
CEMENT GROUT - TROWEL SMOOTH
AT ROUGH CUT WALL OPENING
NOTE:
ANY NON-INSULATED PIPE PASSING THROUGH SMOKE AND/OR FIR PARTITIONS MUST BE
SEALED BETWEEN PIPE AND SLEEVE WITH APPROVED FIRE SAFING MATERIAL. CAULK AIRTIGHT
AT EACH END A MINIMUM OF 1" DEPTH.
CONC. SPLASH BLOCK
S.S. PIPE COLLAR
EXTERIOR WALL
GRADE / PAVEMENT
PIPE SLEEVE SIZE TO SUIT
INSULATION WHERE PRESENT.
CUT FLUSH AT WALL. SEE
SPECIFICATION FOR SLEEVE
CRITERIA.
SEAL BETWEEN PIPE OR
INSULATION AND SLEEVE WITH
APPROVED FIRE SAFING MATERIAL.
CAULK AIRTIGHT AT EACH END A
MINIMUM OF 1" DEPTH.
CEMENT GROUT - TROWEL SMOOTH
AT ROUGH CUT WALL OPENING.
INSULATION, TYP.
TYPICAL PIPING OR UTILITY
DRILL AND SEAL IN FIELD
CURB AND FLASHING
ROOF MEMBRANE
ROOF DECK
ANCHOR TO ROOF DECK
6" MIN.
NAILER
AIR
FLOW
AIR
FLOW
AIR
FLOW
AIR
FLOW
Revisions Date o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM 08-6231, OCT 1978
1 2 3 4 5 6 87 9
F
E
D
C
B
GATE VALVE
CHECK VALVE
ARRANGE PIPING TO AVOID ELEVATOR
UNION, TYP.
FRAME AND GRATE
PUMPED DISCHARGE. ROUTE TO EXTERIOR
GRADE. SLOPE TO DRAIN TO EXTERIOR AT
1/8" PER FOOT. REFER TO DETAIL #6/M-501
FOR FURTHER INFORMATION
SUMP PUMP CONTROL PANEL WITH AUDIBLE
AND VISUAL ALARM. LOCATED IN ADJACENT
ELEVATOR MACHINE ROOM, MECHANICAL ROOM,
OR AS INDICATED. CONNECT TO BUILDING
MANAGEMENT SYSTEM (SEE ELECTRICAL
DRAWINGS FOR ELECTRICAL REQUIREMENTS)
FINISHED GROUND FLOOR
SUMP PUMP PIT - MIN. 24" DIA. x 36" DEEP -
SECURE AND SEAL WATER TIGHT TO
FLOOR
ELEVATOR PIT FLOOR
SUMP PUMP WITH OIL SENSOR SWITCH
HANGER RODS
EXHAUST FAN
MOUNTING BRACKETS
WHERE HUNG FROM
STRUCTURE
LOCATE FAN MOTOR TO
ALLOW FOR MAINTENANCE
ACCESS
COMBINATION SPRING DOUBLE DEFLECTION
NEOPRENE VIBRATION ISOLATOR
RECTANGULAR DUCTWORK
FLEXIBLE CONNECTORS
ROUND FLEXIBLE CONNECTION
RECTANGULAR FLEXIBLE CONNECTION
FLANGED CONNECTION
ON FAN SIDE
WASHER
1-1/2" MIN. TO 3" MAX. INSTALLED. 6" NOMINAL
WITH MATERIAL TAUT
FLEXIBLE
MATERIAL AS
SPECIFIED
1"x1/8" DRAW BAND
1"x1/8" BAND IRON
BOLT ON 4" CENTERS
5/16" FLANGE
DUCT
SHEET METAL SCREWS ON 12" [300mm] CENTERS
RIVET ON 4"
CENTERS
SHEET METAL AS
SPECIFIED FOR
DUCTWORK.
1"x1/8" BAND IRON
BOLT ON 4" CENTERS
1" FLANGE & HEMALTERNATE
POSITION
OF BOLT
1 1/2" POCKET SLIP
DUCT
SHEET METAL AS SPECIFIED FOR DUCTWORK.
1 1/2" MIN. TO 3" MAX. INSTALLED. 6" NOMINAL WITH MATERIAL TAUT
FLANGED
CONNECTION
ON FAN SIDE
WASHER
FLEXIBLE
MATERIAL AS
SPECIFIED
DENOTES CLEARANCES
MINIMUMS (TYP.)
F
L
O
O
R
CONDENSATE DRAIN LINE, SLOPE AT
" PER 1 FT.
SIZE PER MANUFACTURER'S SPECIFICATIONS.
REFRIGERANT SUCTION AND LIQUID LINES TO OUTDOOR UNIT.
SIZE PER MANUFACTURER'S SPECIFICATIONS.
SPLIT SYSTEM FAN COIL
W
A
L
L
ROUND TRANSITION
36"
4"
12"
E
X
T
E
R
I
O
R
W
L
L
P
R
A
P
E
T
FLASHING PER ROOFING
MANUFACTURER'S
REQUIREMENTS
4"
4"
12"
DENOTES
MINIMUM
CLEARANCES (TYP.)
R
O
O
F
REFRIGERANT LIQUID AND SUCTION
LINES INTO BUILDING. ONLY 1
PENETRATION THROUGH THE
EXTERIOR WALL SHALL EXIST FOR
EACH GROUPING OF OUTDOOR UNITS.
18" TALL ROOF CURB.
INSTALL UNIT PER
MANUFACTURER'S
RECOMMENDATIONS.
ELECTRICAL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .