Storm Drainage and Infiltration Improvement Project - Bid Documents
This bid document package is issued by the North Summit School District in Utah for construction of a storm drainage and infiltration improvement project on District property. The project scope includes installation of a 12-inch storm drain line, construction of an approximately 4-foot diameter by 8-foot deep upper precast concrete manhole, installation of an approximately 4-foot diameter by 6-foot tall infiltration sump/manhole in the skate park area with perforations and drain rock, excavation, trench protection, bedding, dewatering if necessary, backfill, compaction, grading, surface restoration, and delivery of a complete functioning drainage system. Bidders must submit sealed or electronic bids as a complete lump-sum bid by September 8, 2026 at 3:00 PM to msargent@nsummit.org, with questions due by September 1, 2026. Bid opening and review is scheduled for September 9, 2026. Bidders are required to inspect the project site and verify field conditions, access, approximate quantities, elevations, existing improvements, and potential utility conflicts before submitting proposals. The contract will be awarded based on price, qualifications, schedule, proposed materials, past performance, responsiveness, and overall value to the District.
Bids shall be submitted as lump-sum prices with itemized breakdown in the provided Bid Schedule covering mobilization, excavation, pipe installation, manholes, drain rock, backfill, surface restoration, traffic control, and other items. Unit prices for authorized changes are optional but should be provided for additional storm drain pipe, excavation/backfill, drain rock, and restoration work. The bidder must identify the proposed pipe material, all assumptions, exclusions, alternates, recommended infiltration details, anticipated start date, and estimated working days to completion. Bidders must provide contractor license information, insurance information, and three comparable project references. The contractor is responsible for determining permits, inspections, utility locating, trench safety, and other applicable requirements. No change in contract price or time shall be made without written authorization from the District. The successful contractor shall warrant workmanship and installed materials for at least one year after final acceptance and shall coordinate work with the District to minimize disruption to school, parking, pedestrian, and skate park activities. Bid security, payment bonds, and performance bonds are not stated as requirements unless added by District addendum.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3-School SD.pdf | ||
| 2-REQUEST FOR PROPOSALS.pdf | ||
| 4-Sheet 11.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NORTH SUMMIT SCHOOL DISTRICT | STORM DRAINAGE & INFILTRATION PROJECT
Bid Documents | North Summit School District
NORTH SUMMIT SCHOOL DISTRICT
STORM DRAINAGE AND INFILTRATION
IMPROVEMENT PROJECT
BID DOCUMENTS
Project generally includes a 12-inch storm drain line, an approximately 4-foot diameter x 8-foot deep upper manhole, and an approximately 4-foot diameter x 6-foot tall infiltration sump/manhole in the skate park area.
ISSUED BY:
North Summit School District
Bid Due Date: September 8. 2026 Time: 3:00PM Bid Opening/Review: September 9, 2026
District Contact: Dalton Ross Phone/Email: 435-515-5540, dross@nsummit.org
TABLE OF CONTENTS
Section 1 - Invitation to Bid
Section 2 - Instructions to Bidders
Section 3 - Scope of Work and Technical Requirements
Section 4 - Bid Form
Section 5 - Bid Schedule
Section 6 - Bidder Qualifications and References
Section 7 - Contractor Certifications
Section 8 - Proposed Agreement Terms
Section 9 - Project Closeout and Warranty
Exhibit A - Conceptual Aerial Drainage Layout
Exhibit B - Typical Manhole Detail
SECTION 1 - INVITATION TO BID
North Summit School District (District) invites sealed or electronic bids from qualified contractors for construction of a storm drainage and infiltration improvement project on District property.
The work generally consists of connecting to an existing sump/drainage collection area; installing a 12-inch storm drain line along the conceptual route; constructing an approximately 4-foot diameter, 8-foot-deep manhole near the top of the hill; continuing the 12-inch line toward the skate park; and constructing an approximately 4-foot diameter, 6-foot-tall infiltration sump/manhole with openings in the lower section and drain rock around the infiltration area.
Bid Information Bid Due Date: September 8, 2026
Bid Due Time: 3:00PM
Submission Location / Email: msargent@nsummit.org
District Contact: Marci Sargent
Questions Due: September 1,2026
The District reserves the right to reject any or all bids, waive minor informalities, request clarification, and award the contract in the best interest of the District.
SECTION 2 - INSTRUCTIONS TO BIDDERS
1. Review all bid documents and exhibits before submitting a bid.
2. Inspect the project site and verify field conditions, access, approximate quantities, elevations, existing improvements, and potential utility conflicts. The conceptual aerial alignment is not a surveyed construction alignment.
3. Submit a complete lump-sum bid using the Bid Form and Bid Schedule included in these documents.
4. Identify all assumptions, exclusions, alternates, proposed pipe material, and recommended infiltration details.
5. Include anticipated start date and number of working days required for completion.
6. Include contractor license information, insurance information, and references for comparable work.
7. The successful bidder shall coordinate work with the District to minimize disruption to school, parking, pedestrian, and skate park activities.
8. No change in contract price or time shall be made without written authorization from the District.
9. The bidder is responsible for determining permits, inspections, utility locating, trench safety, and other requirements applicable to its work.
10. The District may consider price, qualifications, schedule, proposed materials, past performance, responsiveness, and overall value in making an award.
Bid Security / Bonds Unless the District adds a specific requirement by addendum, bid security, payment bonds, and performance bonds are not stated as requirements in the project information provided for preparation of these bid documents.
Bidders should identify any bonding cost separately if requested by the District before award.
Questions and Addenda Questions shall be submitted to the District contact by the deadline shown in the Invitation to Bid. Any material clarification or change issued by the District should be documented by written addendum.
SECTION 3 - SCOPE OF WORK AND TECHNICAL REQUIREMENTS
3.1 General Scope
• Mobilization, site preparation, layout, and protection of existing improvements.
• Utility locating and coordination before excavation.
• Connection to the existing sump/drainage collection area.
• Installation of 12-inch storm drain pipe along the general route shown on Exhibit A.
• Installation of an approximately 4-foot diameter x 8-foot-deep precast concrete upper manhole.
• Continuation of the 12-inch storm drain pipe from the upper manhole toward the skate park.
• Installation of an approximately 4-foot diameter x 6-foot-tall precast concrete infiltration sump/manhole in or adjacent to the skate park.
• Openings/perforations in the lower section of the infiltration sump/manhole and clean drain rock around the infiltration portion.
• Excavation, trench protection, bedding, dewatering if necessary, backfill, compaction, grading, and disposal of excess material.
• Restoration of disturbed asphalt, concrete, landscaping, aggregate, or other surfaces.
• Cleanup, testing/inspection as applicable, and delivery of a complete functioning drainage system.
3.2 Pipe
The project is anticipated to use 12-inch storm drainage pipe. The bidder shall state the proposed pipe material and include all fittings, couplings, connections, bedding, and incidental materials required for a complete installation. Pipe shall be suitable for buried storm drainage service and installed in accordance with manufacturer recommendations and applicable requirements.
3.3 Elevations and Drainage
The contractor shall field verify elevations and establish the pipe slope necessary for positive drainage before installation. If site conditions prevent the proposed concept from functioning as intended, the contractor shall notify the District before proceeding with the affected work.
3.4 Upper Manhole
• Approximately 4-foot diameter and 8-foot deep.
• Precast concrete construction unless an approved equivalent is accepted by the District.
• Include base/foundation, pipe penetrations and connections, frame and cover, adjustment as required, bedding, backfill, compaction, and surface restoration.
• Final rim elevation shall be coordinated with existing/proposed grade.
3.5 Skate Park Infiltration Sump
• Approximately 4-foot diameter and 6-foot tall.
• Lower portion to function as an infiltration sump.
• Provide appropriately sized and spaced openings/perforations in the lower portion.
• Provide clean drain rock or approved aggregate around the infiltration area.
• Bidder shall describe recommended opening size/spacing, aggregate size and envelope, and filter/separation fabric if recommended.
• Final infiltration configuration is subject to District approval before construction.
3.6 Typical Manhole Reference
Exhibit B is a typical manhole/local drain detail supplied as a reference. It depicts typical precast concrete manhole construction, foundation/backfill, drainage connections, and related components. It is not represented in the source material as a project-specific engineered design. The contractor shall field verify applicability.
3.7 Site Protection and Safety
The contractor shall protect buildings, pavement, utilities, landscaping, fences, sidewalks, drainage improvements, and public areas. The contractor is responsible for construction means, methods, sequencing, excavation safety, traffic/pedestrian control, and compliance with applicable safety requirements.
SECTION 4 - BID FORM
To: North Summit School District
The undersigned bidder, having reviewed the bid documents and project exhibits and having had the opportunity to inspect the site, proposes to furnish all labor, materials, equipment, supervision, and incidentals necessary to complete the Storm Drainage and Infiltration Improvement Project.
Bidder / Company: ________________________________________
Address: ________________________________________
City, State, ZIP: ________________________________________
Contact Person: ________________________________________
Phone: ________________________________________
Email: ________________________________________
Utah Contractor License No. (if applicable): ________________________________________
TOTAL LUMP-SUM BID: $____________________________
Amount Written in Words: ________________________________________
Earliest Available Start Date: ________________________________________
Estimated Working Days: ________________________________________
Bid Acknowledgments
• Bid includes all work reasonably necessary for a complete installation except exclusions expressly listed below.
• Bidder has identified assumptions and proposed materials.
• Bidder will not proceed with extra work without written authorization from the District.
• Bidder will coordinate scheduling and site access with the District.
Exclusions / Clarifications
Addenda Acknowledgment Addendum No. ______ Date ______ Addendum No. ______ Date ______ Addendum No. ______ Date
Authorized Signature: ________________________________________
Printed Name / Title: ________________________________________
Date: ________________________________________
SECTION 5 - BID SCHEDULE
Bid Item Description Amount 1 Mobilization / site preparation $________________ 2 Excavation and trenching $________________ 3 12-inch storm drain pipe, fittings, bedding and installation
4 4-ft diameter x approx. 8-ft deep upper manhole
5 4-ft diameter x approx. 6-ft tall skate park infiltration sump/manhole
6 Drain rock / infiltration materials $________________ 7 Backfill and compaction $________________ 8 Surface restoration $________________ 9 Traffic/pedestrian control and site protection
10 Other:
TOTAL LUMP-SUM BID $________________
Unit Prices for Authorized Changes (Optional) Item Unit Unit Price Additional 12-inch storm drain pipe Linear foot $____________ Additional excavation/backfill Cubic yard $____________ Additional drain rock Cubic yard $____________ Asphalt restoration Square foot $____________ Concrete restoration Square foot $____________
SECTION 6 - BIDDER QUALIFICATIONS AND REFERENCES
Provide information demonstrating experience with underground drainage, utility, manhole, excavation, and site restoration work.
Years in Business: ________________________________________
Primary Contact: ________________________________________
Contractor License: ________________________________________
Insurance Carrier: ________________________________________
Comparable Project References Reference 1
Owner / Agency: ________________________________________
Project: ________________________________________
Contact / Phone or Email: ________________________________________
Approximate Contract Amount: ________________________________________
Year Completed: ________________________________________
Reference 2
Owner / Agency: ________________________________________
Project: ________________________________________
Contact / Phone or Email: ________________________________________
Reference 3
Owner / Agency: ________________________________________
Project: ________________________________________
Contact / Phone or Email: ________________________________________
SECTION 7 - CONTRACTOR CERTIFICATIONS
By signing below, the bidder certifies that:
• The information submitted with the bid is accurate to the best of the bidder's knowledge.
• The bidder has reviewed the project documents and has had an opportunity to inspect the site.
• The bidder will comply with applicable licensing, insurance, safety, utility locating, permit, and inspection requirements.
• The bidder will protect District property and repair damage caused by its operations.
• The bidder will maintain the work area in a safe and orderly condition.
• The bidder will coordinate material substitutions or material changes with the District before installation.
Company: ________________________________________
Authorized Representative: ________________________________________
Signature: ________________________________________
Date: ________________________________________
SECTION 8 - PROPOSED AGREEMENT TERMS
These terms are intended to provide the basic commercial framework for award. The District may issue a separate purchase order or agreement incorporating the final bid, approved alternates, addenda, and these bid documents.
11. Contract Sum. The contract sum will be the accepted lump-sum bid plus or minus written changes authorized by the District.
12. Scope. Contractor shall provide the labor, materials, equipment, supervision, and incidentals necessary to complete the accepted scope.
13. Schedule. Contractor shall coordinate commencement and completion with the District and promptly advise the District of conditions affecting the schedule.
14. Changes. Changes to price, scope, or time must be approved in writing by the District before the changed work is performed, except emergency measures necessary to protect life or property.
15. Payment. Contractor shall submit invoices in a form acceptable to the District. Final payment is subject to completion, cleanup, and acceptance of the work.
16. Insurance. Before starting work, contractor shall provide evidence of workers' compensation and general liability insurance acceptable to the District.
17. Safety. Contractor is responsible for construction means, methods, sequencing, trench/excavation safety, and protection of workers and the public.
18. Permits and Compliance. Contractor shall comply with applicable federal, state, county, municipal, utility, and construction requirements and obtain permits/inspections applicable to its work unless the District states otherwise in writing.
19. Damage and Restoration. Contractor shall repair damage caused by its work and restore disturbed areas included in the accepted bid.
20. Warranty. Contractor shall warrant workmanship and installed materials for at least one year after final acceptance, unless a longer warranty is provided.
SECTION 9 - PROJECT CLOSEOUT AND WARRANTY
• Complete all punch-list work.
• Remove debris, excess materials, temporary controls, and equipment.
• Restore disturbed areas included in the contract.
• Provide warranty information for installed materials and workmanship.
• Provide final invoice and any requested closeout documentation.
• Provide photographs or simple as-built information showing the installed alignment and manhole/sump locations if requested by the District.
Minimum workmanship warranty: one year from final acceptance, unless a longer warranty is stated in the successful bidder's proposal.
EXHIBIT A - CONCEPTUAL AERIAL DRAINAGE LAYOUT
The following aerial image is the conceptual sketch provided for the project. The blue line indicates the general proposed drainage route and the red points indicate conceptual structure locations. The alignment and dimensions must be field verified.
Conceptual only - not a surveyed or engineered construction alignment.
EXHIBIT B - TYPICAL MANHOLE DETAIL
The project source material includes a one-page typical local drain/manhole detail. It shows typical precast concrete manhole construction and drainage connections and is included by reference with this bid package.
Contractors shall verify its applicability to the proposed project and field conditions.
Attachment: Sheet 11.pdf - Typical Local Drain w/Sump Details
The District should issue the original PDF with these bid documents so bidders receive the full-resolution detail.
File details come from the government source that posted it. Updated .