This is a Contractor Prequalification Package issued by the Jordan Basin Improvement District (JBID) for four separate sewer construction projects located in various locations in Riverton and Herriman, Utah, crossing the Mountain View Corridor. The work consists of four projects to be bid separately: the 13800 South project requiring 500 linear feet of 18-inch sewer with 434 linear feet of trenchless guided bore in 36-inch steel casing and maximum excavation depth of 31 feet; the 12600 South project requiring 2,610 linear feet of 30-inch sewer with 342 linear feet of trenchless guided bore in 42-inch steel casing and maximum excavation depth of 26 feet; the 13200 South project requiring 1,328 linear feet of 18-inch sewer, 121 linear feet of 10-inch sewer, and 534 linear feet of trenchless guided bore in 36-inch steel casing with maximum excavation depth of 28 feet; and the 13400 South project requiring 1,726 linear feet of 15-inch sewer, 85 linear feet of 8-inch sewer, and 519 linear feet of trenchless guided bore in 30-inch steel casing with maximum excavation depth of 31 feet. All projects have a construction deadline of June 30, 2027, with UDOT authorization to proceed during the winter moratorium period from October 15 through April 15. Prequalification documents are available as of September 1, 2026, with prequalification proposals due by 2:00 PM on September 15, 2026. Qualified contractors will be notified on September 22, 2026, and only prequalified contractors will be permitted to submit bids.
Contractors must submit one electronic PDF copy through https://utah.bonfirehub.com with no embedded files, password-protected documents, or multimedia files. Prequalification evaluation criteria include personnel and qualifications, previous project experience with deep sewer pipeline excavation of 25 feet or deeper, trenchless construction guided boring capabilities (self-performed or subcontracted), successful completion of a project with JBID within the past 10 years, financial condition, and references. The proposed project manager must have a minimum of five years' experience as a project manager with relevant sewer construction experience, and the proposed superintendent must have a minimum of five years' experience as a superintendent with similar qualifications. Applicants must submit completed Contractor Qualification Form, Project Manager Qualification Form, and Project Superintendent Qualification Form with detailed project histories, owner contact information, and references. All applicants bear their own costs for participation, and materials submitted become the property of JBID. The OWNER reserves the right to contact references and request additional information. No appeals are permitted for applications deemed non-responsive due to incompleteness, lateness, or falsification of information.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2-Contractor Prequalification Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MULTIPLE MOUNTAIN VIEW CORRIDOR SEWER PROJECTS
JORDAN BASIN IMPROVEMENT DISTRICT
CONTRACTOR PREQUALIFICATION
09/01/26
CONTRACTOR
PREQUALIFICATION DOCUMENTS
FOR
MULTIPLE MOUNTAIN VIEW CORRIDOR SEWER
PROJECTS
LOCATION
VARIOUS LOCATIONS IN RIVERTON AND HERRIMAN
CROSSING THE MOUNTAIN VIEW CORRIDOR
SEPTEMBER 2026
OWNER
1253 W JORDAN BASIN LN
BLUFFDALE, UTAH 84065
NOTICE INVITING CONTRACTORS
TO PREQUALIFY TO BID
RECEIPT OF PREQUALIFICATION PROPOSAL: The Jordan Basin Improvement District (OWNER) will accept Prequalification Proposals from contractors interested in bidding on the multiple Mountain View Corridor sewer projects. Bids will only be accepted from those contractors that are pre-qualified by the OWNER.
Tentative Project Schedule
The tentative project schedule is as follows:
Pre-qualification documents available September 1, 2026 Pre-qualification proposals due September 15, 2026 Notification of qualified contractors September 22, 2026
DESCRIPTION OF WORK:
The general WORK includes the following four projects that will be bid separately:
• 13800 South Mountain View Corridor Sewer Project – 500 lf of 18-inch sewer, 434 lf trenchless construction guided bore (36-inch steel casing), 31 ft maximum sewer excavation, construction deadline June 2027.
• 12600 South Mountain View Corridor Sewer Project – 2,610 lf of 30-inch sewer, 237 lf trenchless construction guided bore (42-inch steel casing), 105 lf trenchless construction guided bore (42-inch steel casing), 26 ft maximum sewer excavation, construction deadline June 2027.
• 13200 South Mountain View Corridor Sewer Project – 1,328 lf of 18-inch sewer, 121 lf of 10-inch sewer, 534 lf trenchless construction guided bore (36-inch steel casing), 28 ft maximum sewer excavation, construction deadline June 2027.
• 13400 South Mountain View Corridor Sewer Project – 1,726 lf of 15-inch sewer, 85 lf of 8-inch sewer, 519 lf trenchless construction guided bore (30-inch steel casing), 31 ft maximum sewer excavation, construction deadline June 2027.
UDOT has authorized the projects to proceed during their typical winter moratorium of October 15th to April 15th. These projects will need to be completed by June 30, 2027
PREQUALIFICATION SUBMITTAL INSTRUCTIONS:
For the statement of interest and qualifications to be considered, one (1) electronic copy must be sent to the project solicitation portal on https://utah.bonfirehub.com., no later than 2:00 PM on Tuesday, September 15, 2026.
Instructions: Compile Prequalification Proposal into one single PDF file (including cover sheet, cover letter, etc.). You MAY NOT submit documents that are embedded (zip files), movies, wmp and mp3 files or password protected files, etc. Such actions may cause your proposal to be deemed as “non-responsive”.
PROJECT ADMINISTRATION: Interested contractors may obtain an electronic copy of the “Contractor Prequalification Documents” from the project solicitation portal https://utah.bonfirehub.com at No Charge.
OWNER'S RIGHTS RESERVED: The OWNER reserves the right to contact references contained within the Contractor submittal and/or from entities for which the Contractor has provided services as known by the OWNER or ENGINEER, to prequalify any or all contractors, request additional pre-qualification information, and to modify the schedule and scope of this project.
September 1, 2026 Date
Joel Thompson, General Manager https://utah.bonfirehub.com/ https://utah.bonfirehub.com/
CONTRACTOR PREQUALIFICATION REQUIREMENTS
General
The Jordan Basin Improvement District (OWNER) requests contractor prequalification statements for construction of multiple Mountain View Corridor sewer projects. This document describes the requirements for prequalification of contractors. The submittal requirements for prequalification statements and the evaluation criteria are included.
Purpose
The purpose of the prequalification process is to select those contractors the OWNER deems to be qualified and capable of completing the projects in conformance with the Contract Documents.
Only those firms that are prequalified by the OWNER will be allowed to submit bids. During the bidding process, additional qualifications set forth by the specifications will also need to be met by the prequalified contractor and/or associated subcontractors.
Selection as a prequalified contractor does not imply OWNER's acceptance or approval of the contractor's specific personnel, equipment, or methods, whether or not these items are described in the contractor's prequalification statement.
Project Description
The general WORK includes construction of the following four projects that will be bid separately:
• 13800 South Mountain View Corridor Sewer Project – 500 lf of 18-inch sewer, 434 lf trenchless construction guided bore (36-inch steel casing), 31 ft maximum sewer excavation, construction deadline June 2027.
• 12600 South Mountain View Corridor Sewer Project – 2,610 lf of 30-inch sewer, 237 lf trenchless construction guided bore (42-inch steel casing), 105 lf trenchless construction guided bore (42-inch steel casing), 26 ft maximum sewer excavation, construction deadline June 2027.
• 13200 South Mountain View Corridor Sewer Project - 1,328 lf of 18-inch sewer, 121 lf of 10-inch sewer, 534 lf trenchless construction guided bore (36-inch steel casing), 28 ft maximum sewer excavation, construction deadline June 2027.
• 13400 South Mountain View Corridor Sewer Project – 1,726 lf of 15-inch sewer, 85 lf of 8-inch sewer, 519 lf trenchless construction guided bore (30-inch steel casing), 31 ft maximum sewer excavation, construction deadline June 2027.
UDOT has authorized the projects to proceed during their typical winter moratorium of October 15th to April 15th. These projects will need to be completed by June 30, 2027
Prequalification will not exempt a contractor from meeting any of the requirements of the Contract Documents. The contractor's prequalification statement is not part of the Contract Documents.
Content of Statement of Qualifications
The prequalification statement shall include information requested in the Qualification Forms. The contractor shall complete and sign the Qualification Forms and submit it as part of the Statement of Qualifications.
Evaluation of Statement of Qualifications
Statements of Qualifications will be evaluated based on the following criteria:
• Personnel and qualifications
• Previous project experience with:
o deep sewer pipeline excavation (25 feet and deeper) o trenchless construction guided boring (self-performed or subcontracted work is acceptable) o successfully completed a project with JBID within the past 10 years
• Financial condition
• References
The OWNER shall be entitled to contact all references listed by the contractor, as well as references from entities for which the Contractor has provided services as known by the OWNER or ENGINEER.
The contractor, by submitting a Prequalification proposal expressly agrees that any information concerning the contractor in possession of said entities and references may be made available to the OWNER.
Confidentiality
All responses, inquiries, and correspondence relating to this Prequalification Application and all reports, charts, displays, schedules, exhibits, and other documentation produced by the offeror that are submitted to the District, as part of the proposal or otherwise, shall become the property of the District when received by the District and may be considered public information under applicable law. The District is subject to the disclosure requirements of the Government Records Access and Management Act, Title 63G, Chapter 2, Utah Code Annotated (“GRAMA”). The District generally considers proposals and all accompanying material to be public and subject to disclosure. Any material considered by the offeror to be proprietary must be accompanied by a written claim of business confidentiality containing a concise written statement of reasons supporting the claim.
Blanket claims that the entire Prequalification Application is confidential will be denied. The District cannot guarantee that any information will be held confidential. If the offeror makes a claim of business confidentiality, the District, upon receipt of a request for disclosure, will determine whether the material should be classified as public or nonpublic, and will notify the offeror of such determination. The offeror is entitled under GRAMA to appeal an adverse determination. The District is not obligated to notify the offeror of a request to see the offeror’s proposal, and will not consider a claim of confidentiality, unless the offeror's claim of confidentiality is made in a timely basis and in accordance with GRAMA.
The District reserves the right to request a contractor to clarify any part of his statement. Response to such requests must be made in writing and will become part of the statement of qualifications.
Unsolicited supplementary information and materials received after the deadline will not be considered in the evaluation.
Each submittal package for Bidder Prequalification must be signed by an individual who has the legal authority to bind the applicant on whose behalf that person is signing. If any information provided by the applicant is inaccurate, the applicant must immediately notify the District and provide updated, accurate information in writing and under penalty of disqualification prior to the date and time set for the close of the prequalification process.
Qualification Participation Reimbursement
Jordan Basin Improvement District (and its engineer) shall not be responsible for any direct or indirect cost incurred by applicants because of participation in this prequalification process. Each applicant shall bear its own expense in connection with the preparation and submission of materials and the provision of any supplemental information requested. Jordan Basin Improvement District (and its engineer) shall have no liability for cost incurred by applicants in connection with the review and evaluation of prequalification materials and any findings and determinations made thereafter. All materials and information submitted during the prequalification process will become the property of the Jordan Basin Improvement District and will not be returned to the Applicant.
Appeal Process
There is no appeal for applications that have been determined to be not qualified as a result of incompleteness, lateness, or falsification of information. The closing time for submission of prequalification packages will not be changed to accommodate supplementation of incomplete or late submissions.
Addenda and Interpretations
All requests for interpretation of the Application for Bidder Prequalification must be made in writing. To be given consideration, such requests must be received by no later than five (5) calendar days prior to the due date of this Prequalification Application. Any and all such interpretations and any supplemental instructions or changes will be in the form of written addenda which, if issued, will be issued not later than forty-eight (48) hours prior to the date and time fixed for submittal of the application. Acknowledgement of receipt of addenda must be included on the Applicant Certification.
Notification of Prequalified Contractors
All contractors submitting prequalification statements will be notified in writing if they did or did not prequalify. A brief explanation of reasons for not prequalifying will be provided to unsuccessful contractors. Only contractors which are prequalified will be invited to bid on the project. The OWNER's decision is final.
Contractor Qualification Form
Jordan Basin Improvement District
Multiple Mountain View Corridor Sewer Crossing Projects Prequalification
Contractor shall have successfully completed sewer projects collectively that meet the minimum following criteria:
o deep sewer pipeline excavation (25 feet and deeper) o trenchless construction guided boring (self-performed or subcontracted work is acceptable) o successfully completed a project with JBID within the past 10 years
Contractor shall provide the project information as requested below. Additional information may be attached as needed to demonstrate the minimum qualifications have been met.
Contractors Name: ______________________________________________________________
Years in operation: ________________Type of Entity__________________________________
Have you or any of your subsidiaries filed bankruptcy? _________________________________
Has your company had any claims related to your traffic control? Y / N
If ‘yes’, please describe on an attached sheet of paper the project and incident.
References will be checked.
Sewer Project 1: ______________________________________Date Completed: ____________ Name and Address of Owner: ______________________________________________________ Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________
Sewer Project 2: ______________________________________Date Completed: ____________ Name and Address of Owner: ______________________________________________________ Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________ Sewer Project 3: ______________________________________Date Completed: ____________ Name and Address of Owner: ______________________________________________________ Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________
Signature Title
Project Manager Qualification Form
Multiple Mountain View Corridor Sewer Crossing Projects Prequalification
Proposed Project Manager must have a minimum of 5 years experience as a project manager and identify what project experience they have with the following criteria:
o deep sewer pipeline excavation (25 feet and deeper) o trenchless construction guided boring (self-performed or subcontracted work is acceptable) o successfully completed a project with JBID within the past 10 years
Project Managers Name: _________________________________________________________
Years as a Project Manager: ______________
References will be checked.
Sewer Project 1: ______________________________________Date Completed: ____________ Name and Address of Owner: ______________________________________________________ Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________
Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________ Sewer Project 3: ______________________________________Date Completed: ____________ Name and Address of Owner: ______________________________________________________ Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________
Signature Title
Project Superintendent Qualification Form
Multiple Mountain View Corridor Sewer Crossing Projects Prequalification
Proposed Superintendent must have a minimum of 5 years experience as a superintendent and identify what project experience they have with the following criteria:
o deep sewer pipeline excavation (25 feet and deeper) o trenchless construction guided boring (self-performed or subcontracted work is acceptable) o successfully completed a project with JBID within the past 10 years
Superintendent Name: _________________________________________________________
Years as a Superintendent: ______________
References will be checked.
Sewer Project 1: ______________________________________Date Completed: ____________ Name and Address of Owner: ______________________________________________________ Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________
Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________
Sewer Project 3: ______________________________________Date Completed: ____________ Name and Address of Owner: ______________________________________________________ Contact Person: ________________________________Phone Number: ____________________ Length of Sewer Installed: ______________________LF Diameter: _________Inches Maximum Depth of Sewer Installed ______________ FT Trenchless Guided Boring Installed: ______________ LF Casing Diameter: _________Inches Additional Project Details: ________________________________________________________
Signature Title
| LOCATION |
| VARIOUS LOCATIONS IN RIVERTON AND HERRIMAN |
| SEPTEMBER 2026 |