The document is an Experience and Capacity Response attachment for a solicitation by the Arizona Department of Environmental Quality (ADEQ) for a Capacity Development/Technical Assistance contract for small public drinking water systems. The primary respondent is Consor North America, Inc., a national transportation and water infrastructure consulting firm headquartered in Miami, Florida, with multiple offices including locations in Arizona, Oregon, and Colorado. The document details Consor's organizational profile, experience, capabilities, and qualifications for providing various water system-related services across multiple categories.

Consor is proposing to provide services in 17 different categories, including asset management plans, capacity development activities, training, construction administration, water system design, regulatory plan development, permit applications, funding assistance, corrosion control assessments, preliminary engineering reports, risk and resiliency assessments, system evaluations, water loss audits, water master planning, water quality compliance options, and well evaluations. The company demonstrates extensive experience through 3-4 project examples in each service category, spanning multiple states including Arizona, California, Oregon, Washington, and Texas. While specific contract pricing is not detailed, the document showcases Consor's technical expertise, with over 1,770 staff company-wide and significant experience in water infrastructure consulting, particularly in Arizona, where they have completed over 200 miles of water and wastewater projects and nearly 2,000 miles of pipeline assessment work.

View the file

Other files

File Type Posted
1-BPM006379_Solicitation_Attachment_14_-_Offer_Checklist.docx DOCX document
1-BPM006379_Solicitation_Attachment_1_-_Offer_and_Acceptance.docx DOCX document
1-BPM006379_Solicitation_Attachment_3_-_Forced_Labor_of_Ethnic_Uyghurs_Ban.docx DOCX document
1-BPM006379_Solicitation_Attachment_4_-_Confidential_Information_Designation.docx DOCX document
CTR074219__Contract_Amendment_1_-_Contract_Extension_to_10-31-26.pdf PDF
1-BPM006379_Solicitation_Attachment_12_-_Method_of_Approach.docx DOCX document
1-BPM006379_Solicitation_Attachment_6_-_Key_Personnel.docx DOCX document
1-BPM006379_Solicitation_Attachment_8_-_Organization_Profile.docx DOCX document
1-BPM006379_Solicitation_Attachment_9_-_Proposed_Subcontractors.docx DOCX document
2025-12-31 Consor GAWP.pdf PDF
BAFO Consor Attachment 13 - Pricing Sheet.pdf PDF
BPM006379 Solicitation Requirements.pdf PDF
Consor BPM006379_Solicitation_Attachment_13_-_Pricing_Sheet.docx DOCX document
1-Attachment-Supplement Insurance.pdf PDF
1-BPM006379_Solicitation_Attachment_11_-_References.docx DOCX document
1-Capacity DevelopmentTechnical Assistance to Small Public Drinkin.xlsx XLSX spreadsheet
2024-12-31 Consor GAWPP.pdf PDF
1-BPM006379_Solicitation_Attachment_2_-_Boycott_of_Israel_Disclosure.docx DOCX document
2024-12-31_Consor_GAWPP.pdf PDF
BAFO Consor Attachment 1 - Offer and Acceptance.docx DOCX document
BPM006379 Award Letter - Consor.pdf PDF
BPM006379_Solicitation_Attachment_1_-_Offer_and_Acceptance.docx DOCX document
CTR074219__Pricing_Sheet.pdf PDF
Consor BAFO Email.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 10 – Experience and Capacity Response

THE STATE MAY DETERMINE YOUR PROPOSAL NON-RESPONSIVE IF YOU DO NOT FULLY RESPOND.

The Offeror shall provide a narrative response to each section that demonstrates their understanding of the Scope of Work requirements and describes the company’s overall experience and capacity in providing the Services stated in this Solicitation. If there is a section that is not applicable to the Services required by the Scope of Work, you may mark it “N/A.”

Offeror shall provide a response either after each section or in a separate document entitled: “Attachment 10 - Experience and Capacity Response.” If a separate document is used, please clearly designate each section and double-check to ensure that each question has been answered. If any information provided is considered CONFIDENTIAL by Offeror, the information must be specifically included in the Confidential Information Designation Attachment and related documentation to be assessed for confidential treatment under A.A.C. R2-7-103.

1.0 Company Profile. The Offeror must include a narrative description of its organization. The narrative must include the following:

1.1 Date Established and ownership (public, partnership, subsidiary, etc.);

1.2 Is the Offeror a national or local company;

1.3 Address of “Main Office” (e.g. Corporate Headquarters and any satellite offices responsible for performance of proposed tasks;

1.4 Brief overview of business operations, with an emphasis on experience in regards to the Scope of Work (limit the response to this question to one page, font size 10 pt or greater);

1.5 Offeror's organizational chart relevant to the Contract, specifically identifying the key point of contact for all questions related to the submitted Offer. In addition, identify key point of contact for Task Order Offer Requests.

1.6 Full disclosure of any potential conflict of interest between the Offeror and any State employee who functions or has responsibilities in the review or approval of the undertaking or carrying out of the Contract;

1.7 A Statement of whether, in the last five (5) years, the Offeror has filed (or had filed against it) any bankruptcy or insolvency proceeding, whether voluntary or involuntary, or undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors, and if so, an explanation providing relevant details and current status;

1.8 A Statement of whether there are any pending Securities Exchange Commission investigations involving the Offeror, and if such are pending or in progress, an explanation providing relevant details and an attached opinion of counsel as to whether the pending investigation(s) may impair the Offeror’s performance in a Contract under this Solicitation;

1.9 A Statement documenting all open or pending litigation initiated by Offeror or where Offeror is a defendant or party in any litigation that may have a material impact on Offeror’s ability to deliver the contracted Services;

1.10 A Statement documenting all open or pending litigation initiated by Offeror or where Offeror is a defendant or party in any litigation with a public sector client;

1.11 Full disclosure of any public sector contracts terminated for cause or convenience in the past five (5) years;

1.12 Full disclosure of any criminal or civil offense.

Offeror Response:

1.0 Company Profile

1.1 Consor was established in 1980 and is a C corporation. Consor North America, Inc. is a subsidiary to Consor Engineers, Inc. (a Delaware Corporation), which is a subsidiary to: Consor Intermediate, LLC (a Delaware Corporation), which is a subsidiary to: Consor Holdings, LLC (a Delaware Corporation), owned in whole or part by: New Mountain Capital.

1.2 Consor is a national firm.

1.3 Address of Main Office:

HQ: 6505 Waterford District Drive, Suite 470, Miami, FL 33126
AZ: 2432 W Peoria Ave, Unit 1246, Phoenix, AZ 85029
OR: 1 SW Columbia St, Suite 1700, Portland, OR 97204
CO: 1157 W. Century Drive, Suite 220, Louisville, CO

1.4 Brief Overview: Consor North America, Inc. (Consor) is a national transportation and water infrastructure consulting firm offering planning, engineering, environmental, structural assessment, strategic communications, and construction services. For over four decades, Consor has provided quality engineering assessment and design services for the water, wastewater, and transportation industries. Our diverse team of experts live and work alongside clients, providing thoughtful solutions to create inspiring communities together. Consor gives equal focus to clients across Arizona whether remote, rural, or part of the metropolitan areas. People choose Consor because of our diverse expertise, knowing they will get a better experience and be better for the experience.

In 2022, Project Engineering Consultants, Ltd. (PEC) merged with Consor, significantly expanding our available service offerings and resources in Arizona. With over 80 technical and professional staff in our Arizona offices and more than 1,770 staff company wide. Our Arizona professionals have completed water treatment, water distribution, water reuse, and stormwater projects. Our transportation team specializes in simple and complex roadway design, traffic engineering, hydrology, multi modal facilities, and transit. Whether it be studies, complete design, or construction administration we can accomplish ADEQ’s goals. Consor’s local experience includes designs for over 200 miles of water, wastewater projects and nearly 2,000 miles of pipeline assessment work, and more than 100 projects delivered in Arizona for transportation.

1.5 Organization Chart

1.6 Consor has no actual or potential conflicts of interest with any State employee who functions or has responsibilities in the review or approval of the undertaking or carrying out of the Contract.

1.7 Consor has not filed (or had filed against it) any bankruptcy or insolvency proceeding in the past five (5) years, voluntary or involuntary, and has not undergone the appointment of a receiver, trustee, or assignee for the benefit of creditors.

1.8 Consor has no pending Securities Exchange Commission investigations pending, or otherwise that may impair Consor’s performance in this Contract.

1.9 Consor has no pending litigation initiated by Consor or where Consor is a defendant or party in any litigation that would have a material impact on Consor’s ability to deliver the contracted Services.

1.10 Consor has no open or pending litigation initiated or where Consor is a defendant or party in any litigation with a public sector client.

1.11 A Contract and Contract-Task Order held by Murraysmith, Inc., now known as Consor North America, Inc., was terminated for convenience by the City of Sweet Home, Oregon on July 28, 2021.

1.12 Consor has no criminal or civil offense to disclose.

2.0 Company Experience

2.1 If Offeror is proposing to provide services for Item #3 - Capacity Development Training (technical, managerial, financial), from Table 1, on page 3, Offeror shall respond to the following question #1:

Question 1:

ADEQ offers technical, managerial, and financial training through its Capacity Development program. Does your company have experience providing training, in person and/or virtual, on topics of water system operations and management? What subject matter are you offering to train on and what is the level of expertise of the proposed trainer(s)?

Offeror Response:

Consor and Consor team members have developed and prepared curriculum for the training and knowledge transfer of the following topics for a variety of public and private utilities, professional and industry society groups, and has led such trainings through virtual and in-person offerings.

Additionally, some of the Key Personnel identified with this offering, have, or do hold leadership positions with a variety of professional organizations who offer similar training for continuing education credits, and could also assist in obtaining qualification for credentials for continuing education if requested.

Water System Operations, Compliance, and Management Training Topics:

· Operator Certification Training

· Basic Water Treatment: Covers the fundamentals of water treatment processes, including screening, de-sanding, coagulation, sedimentation, filtration, and disinfection.

· Distribution System Operation and Maintenance: Focused on the operation and maintenance of water distribution systems, including pipe repair, leak detection, and water quality monitoring.

· Advanced Water Treatment: Provides in-depth knowledge of advanced treatment processes like membrane filtration, ion exchange, and activated carbon adsorption.

· Safety Training

· Confined Space Entry Awareness: Training on safe entry and work practices in confined spaces like water tanks and manholes.

· Hazardous Materials Handling Awareness: Focuses on the safe handling, storage, and disposal of hazardous chemicals used in water treatment.

· Personal Protective Equipment (PPE) Awareness: Training on the selection, use, and maintenance of PPE for various tasks in water operations.

· Regulatory and Compliance Training

· Introduction to Federal and State Drinking Water Regulations and Requirements. Gain awareness of the regulations that guide water treatment and drinking water.

· Safe Drinking Water Act (SDWA) Compliance: Understanding the federal regulations governing drinking water quality and the responsibilities of water systems.

· Cross-Connection Control and Backflow Prevention: Training on preventing contamination of potable water through cross-connections and backflow incidents.

· Emergency Response and Preparedness: Preparing for emergencies like natural disasters, contamination events, and system failures.

· Technical and Operational Training

· Drinking Water Technologies. Build awareness of the general techniques of water treatment.

· Pump and Motor Maintenance: Training on the operation, maintenance, and troubleshooting of pumps and motors used in water systems.

· Reading PFD’s and P&ID’s. Getting familiar with the process overview and systems.

· Water Treatment Unit Processes. Overview of the typical variables critical to process control. Coagulation, flocculation, sedimentation, filtration, and disinfection?

· Hydraulics. Basics of gravity and pressurized hydraulics in water treatment systems.

· Monitor and Measurement. What are the typical variables to be monitored and controlled?

· Laboratory Analyses for Process Control. The basics of laboratory analysis and techniques, and interpretation.

· Decision Making. Fundamentals of process control decision making for operators.

· SCADA Systems Training: Covers the use of Supervisory Control and Data Acquisition (SCADA) systems for monitoring and controlling water treatment and distribution processes.

· Instrumentation and Control: Focuses on the installation, calibration, and maintenance of instruments used to monitor water quality and system operations.

· Water Treatment Residuals Handling and Management

· PFAS Destruction

· Nitrate, Arsenic and Fluoride treatment

· Water Quality Monitoring and Testing

· Drinking Water Sources. Learn about water sources for water treatment. This is critical as it directly influences the water quality and how you treat.

· Microbiological Testing: Training on methods for detecting and quantifying microorganisms in water, such as coliform bacteria.

· Chemical Analysis: Covers techniques for testing water for various chemical parameters, including pH, chlorine residual, and turbidity.

· Sampling Procedures: Training on proper water sampling techniques for both routine monitoring and compliance testing.

· Management and Leadership Training

· Asset Management: Training on managing physical assets of a water system, including lifecycle management, maintenance scheduling, and capital improvement planning.

· Maintenance Management: Fundamentals, initial program setup and development, program maturation and implementation.

· Financial Management: Focuses on budgeting, rate setting, and financial planning for water utilities.

· Leadership and Supervision: Training on effective leadership, team management, and communication skills within the context of water utility operations.

· Customer Service and Communication

· Public Communication and Education: Training on how to effectively communicate with the public about water quality, conservation, and utility operations.

· Customer Service Skills: Focuses on handling customer inquiries, complaints, and providing information about water services.

· Specialized Training

· Corrosion Control: Training on methods to control corrosion in water distribution systems, which can affect water quality and infrastructure longevity.

· Water Loss Management: Focuses on techniques to identify, quantify, and reduce water loss in distribution systems.

We find that these trainings are crucial for ensuring that water system personnel are well-equipped to manage and operate drinking water systems safely and effectively.

The levels of the proposed trainers are advanced to expert consisting of the “key personnel” as listed within this offering. Additionally, mid-level and graduate level staff typically support such training, and can provide the entry level, and general awareness training as described above.

2.2 Project Descriptions:

For each deliverable from Table 1, on page 3, that the Offeror is proposing to provide:

Submit up to three (3) examples of your previous work as well as years of experience providing this deliverable. An example might cover more than one deliverable depending on the project. At the top of each page, include the deliverable “Item #(s)” and “Deliverable Description(s)” title from the table below. Limit each example to one (1) page. Use font size 10 pt or greater.

Each example shall include the following information:

a. Project Name;

b. Project Location (City and State);

c. Estimated Project Cost;

d. Project Begin and End Date;

e. Brief Description of the Project; and

f. Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.

Offeror Response: (3 per category):

Category #1 – Asset Management Plans

Project Name
Wickenburg Operations, Engineering and Management
Project Location (City and State)
Wickenburg, AZ
Estimated Project Cost
$124,800 (Annual Contract Value); $21,000 to date
Project Begin and End Date
November 2023 – February 2024
Brief Description of the Project
Consor provided supplemental operations and maintenance leadership, management, and oversight for the Town of Wickenburg facilities. Consor was responsible for evaluating, developing, and enacting a response plan to rectify compliance, assess the facility and operational strategies, and train the remaining Town staff in all asset, maintenance, process, laboratory, regulatory, and management requirements to sustain compliant operations of the facility. This also included the development of new standard operating procedures, preventative maintenance program, emergency response plans, training programs, and asset and maintenance management program.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Frederick Tack – Project Manager / Operator of Record

Dane Whitmer – Project Engineer

Category #2 – Capacity Development Activities

Project Name
Rockwood PUD Groundwater Supply Development Program
Project Location (City and State)
Gresham, OR
Estimated Project Cost
$5,456,347 (Consor Total Fees)
Project Begin and End Date
Phase 1 (06/2020 to 2021)

Phase 4 (11/2022 to 12/2023) Phase 6 (12/2021 to 09/52022 Phase 3 (03/2023 to 05/2024)

Brief Description of the Project
Consor was retained by Rockwood PUD and the City of Gresham to help develop and manage a program to allow them to develop a replacement source of supply when their contract with the City of Portland expires in 2026. Consor conducted planning, permitting, pilot testing, corrosion pipe loop testing and distribution assessment to support the projects. The Consor team has served as a trusted advisor and program manager, leading the District and Gresham through the Groundwater Development Master Planning process. The program consists of nine separate packages and the Consor team has led or supported design for six of those: Packages.

Package 1: Rehabilitation of Cascade Reservoir No. 1, a new Cascade Reservoir No. 2, a new Cascade Well No. 7 wellhouse, and finished and raw water transmission main improvements.

Package 3: New 141st Avenue Water Treatment Facility with space for capacity up to 4.3 MGD.

Package 4: Design of water treatment plant and a new booster pump station. treatment plant includes multiple vessel vertical skids with pyrolox advantage media, which was pilot tested at flow rates of 12 gpm/sq ft. The project includes land use permitting, SCADA, and the Well 4 wellhouse design.

Package 6: Construction of a new groundwater production well facility in Kirk Park, Cascade Well No. 9 (CW9), and an 18-inch / 30-inch diameter, 3,600-foot-long raw water transmission pipeline that will deliver untreated groundwater to the RWPUD headquarters site.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Matt Hickey – Project Manager

Jeff Fuchs - Principal Ann Quenzer – Principal Engineer Bob Griesinger – Cost Estimating Brad Mercure – Senior Engineer Dane Whitmer – Senior Engineer

Project Name
Gentle Path and Ocotillo Homes Water System Assistance
Project Location (City and State)
Wickenburg, and Tucson, Arizona
Estimated Project Cost
$13,000 (Consor Fees)
Project Begin and End Date
12/2021 to 04/2022

Brief Description of the Project

Consor was procured to by a design group for assistance and evaluating and sizing on-site water systems for two facilities. This included hydraulic analysis, material selection and modeling, to provide recommendations for expansion of the system. Systems for the Gentle Path water system included review of the background data, developing a water model using field information to calibrate the model and to verify the pipe size(s), available pressure, and pump size(s). Similar efforts were conducted for the Ocotillo Homes water system. In addition, Consor provided equipment recommendations, quotes from vendors, estimated delivery schedules, and conceptual sketch ups of equipment layouts and considerations for installation.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.

Project Name
Well 2B Equipping Design
Project Location (City and State)
Vacaville, CA
Estimated Project Cost
$361,770
Project Begin and End Date
5/2022 to 12/2023

Brief Description of the Project

Prior to this project, this utility worked diligently to try to rehabilitate Well 2 to meet capacity requirements. Though it was determined the well would be appropriately abandoned and a new well would be drilled. Consor supported the utility to evaluate and plan the improvements to expand the capacity of both the water production, and the operability and electrical redundancy for the system.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Nathan Nutter – Principal

Linda Scroggs – Project manager Shelby Carawan – Project Designer Ryan Ball – Design Drafter

Category #3 – Capacity Development Training (technical, managerial, financial)

Project Name
Wickenburg Operations, Engineering and Management
Project Location (City and State)
Wickenburg, AZ
Estimated Project Cost
$124,800 (Annual Contract Value); $21,000 to date
Project Begin and End Date
November 2023 – February 2024
Brief Description of the Project
Consor provided supplemental operations and maintenance leadership, management, and oversight for the Town of Wickenburg. Consor was responsible for developing the curriculum and implementing multiple training sessions to complete the training of the Town staff in all asset, maintenance, process, laboratory, regulatory, and management requirements to sustain compliant operations of the facility. This also included the development of new standard operating procedures, preventative maintenance program, training programs, and asset and maintenance management program.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Frederick Tack – Project Manager / Operator of Record

Category #4 – Construction Administration & Construction Management

Project Name
Water Main Replacement – Bethany Home Road: 2nd Ave to 2nd Street & Central Ave: Maryland Ave to Montebello Ave
Project Location (City and State)
Phoenix, AZ
Estimated Project Cost
$132,000 (Consor CA & CM Fees)
Project Begin and End Date
01/2021 to 03/2022
Brief Description of the Project
Consor provided engineering services for the new water main replacements within four quarter sections. Services included topographical survey, alignment evaluation and selection for the new water mains, water main profile and hydraulic design, connection of the new system to the existing system, and abandonment of the existing system in place. The design included 6,400 feet of 6-, 8-, and 12-inch diameter DIP water mains, 29 new water valves, 12 fire hydrants, other associated appurtenances, new meters, new service connections, pavement replacement, and other related items of work. This included preparation of the application and procuring the Approval to Construct (ATC) permit. During construction, Consor developed, verified, and prepared the record documents and procured the Approval of Construction (AOC).
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Tom Braatelien Project Manager

Mike Heaton – Resident Engineer Mark Mendon – Project Engineer

Project Name
Zone 1 – 16-inch Main – Dobbins Road from 35th Ave to 43rd Ave
Project Location (City and State)
Phoenix, AZ
Estimated Project Cost
$364,000 (Consor CA & CM Fees)
Project Begin and End Date
4/2021 to 11/2022
Brief Description of the Project
Consor provided CA&I services during construction which involved the installation of approximately 5,113 LF of 16-inch water line which connected water mains between 43rd Avenue and 35th Avenue. Consor supplied a full-time field inspector, Resident Engineer, survey, and other required personnel as required for the project.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Tom Braatelien Project Manager
Project Name
Dobbins Road 24-inch Water Main
Project Location (City and State)
Phoenix, AZ
Estimated Project Cost
$386,000 (Consor CA & CM Fees)
Project Begin and End Date
4/2021 to 11/2022
Brief Description of the Project
Consor provided CA&I services for the installation of approximately 5,249 linear feet (LF) of 24-inch diameter water line which connected water mains between 27th Avenue and 35th Avenue. Consor supplied a full-time field inspector, Resident Engineer, survey, and other required personnel as required for the project.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Tom Braatelien Project Manager

Category #5 – Design of water system improvements

Project Name
Water Main Replacement – Connection to Well 16 along Warner Rd. between Rural Rd. to McClintock Dr., and along University Dr. from Rural Rd. to McClintock Dr.
Project Location (City and State)
Tempe, AZ
Estimated Project Cost
$461,346
Project Begin and End Date
7/2018 to 7/2019
Brief Description of the Project
Conor provided design and permitting support for the replacement and improvement of the waterlines that connected the Tempe PWS to Well 16, and full pipeline replacements along Warner Rd. and University Dr. This project was permitted through two (2) separate Approvals to Construct (ATC’s) with the Maricopa County Environmental Services Department (MCESD).
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Tom Braatelien Project Manager
Project Name
South 57th Street Reservoirs No. 1 and No. 2 Evaluation and Rehabilitation
Project Location (City and State)
Springfield, OR
Estimated Project Cost
$2,300,000
Project Begin and End Date
10/2017 to 06/2020
Brief Description of the Project
Consor performed a structural seismic evaluation and overall condition assessment of two tanks at one site, a 1.0 million gallon (MG) and a 1.5 MG ground level potable water storage tank for SUB in 2017. Following the Pre-Design evaluation work, Consor moved directly into final design for rehabilitating the tanks, site piping and integration into the associated system piping and completed designs in early 2018. Consor performed construction administration and, along with our team of specialty subconsultants, provided periodic observation of the improvements for the multi-year, multi-tank improvement project. The project included replacing interior and exterior coating systems, a new seismic isolation valve vault, an expanded footing for the 1.5 MG tank, and upgraded water and drainage piping systems for both tanks’ interior and exterior piping configurations. All work and anniversary warranty inspections were completed by spring of 2022.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Justin Ford – Deputy Project Manager

Tom Boland – Project Manager

Project Name
Umpqua Indian Utility Cooperative, GAC Design and Installation
Project Location (City and State)
Canyonville, OR
Estimated Project Cost
$180,000 (Total Project Cost)
Project Begin and End Date
02/2021 to 06/2021
Brief Description of the Project
In Late January and early February 2021, UIUC experienced a significant taste and odor event in the drinking water system. The utility conducted testing for the two most commonly found taste and odor causing compounds in drinking water: Geosmin and 2-Mthylisoborneol (MIB). The results showed geosmin at levels more than 500 ppb —50 times those that can be detected by humans. To solve these concerns, UIUC implemented powdered activated carbon fed at the small sed basin that feeds water into the drinking water plant. In addition, Consor designed a post filter GAC installation for taste and odor removal. The system was a Calgon Model 12 with 20,000 lbs of Filtrasorb media. The installation was designed as an upflow contactor since it was after filtration and solids loading was low. It has continued to work effectively since installation. Design and installation were completed within three months during this emergency.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Lee Odell – Project Manager

Category #6 – Developing regulatory plans (e.g., O&M, EOP, ERP, cybersecurity)

Project Name
West Village Water Company Facility Report
Project Location (City and State)
Cameron, Coconino County, AZ
Estimated Project Cost
$15,000 (Consor Fees)
Project Begin and End Date
08/2022 to present
Brief Description of the Project
Consor worked for Central States Water Resources, LLC (CSWR) to perform a condition and compliance assessment for their West Village Water Facility in Coconino County, Arizona. The West Village Water Facility is a 43,200-gallon per day groundwater treatment facility serving 60 residences. The facility consists of one well, one 100,000-gallon bolted steel storage tank, hydropneumatic tank, two booster pumps, one air compressor, and one sodium hypochlorite chemical feed system. The purpose of the site visit was to inventory the existing facility components and develop a limited assessment of the physical and operational condition of the system. The assessment provided primary and secondary improvement recommendations and a planning level cost estimate. Consor is currently providing engineering design service for facility rehabilitation to improve the system.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Nicholas Henslee – Project Manager
Project Name
Winchester Water Company Facility Report
Project Location (City and State)
Cochise, AZ
Estimated Project Cost
$15,000 (Consor Fees)
Project Begin and End Date
12/2022 to 6/2023
Brief Description of the Project
Consor conducted a site visit of the Winchester Water Company, Water System in Cochise County, Arizona in December of 2022. This water facility consists of two separate well sites with a permitted total production capacity of 0.045 mgd combined. There a total of approximately 260 residential connections but only 141 are actively in service according to the permit. The primary components at Well site No. 1 are one (1) 10 hp well pump, two (2) 5 hp booster pumps, and two (2) ground storage tanks (11,400, and 15,000 gallons), and one (1) 2,000-gallon hydropneumatic tank. Well site No. 2 has one (1) 20 hp well pump, two (2) 5 hp booster pumps, one (1) 20,000-gallon ground storage tank and one (1) 2,000-gallon hydropneumatic tank. Site one is significantly older and in poor condition, site number two is newer and in fair to good condition overall. The primary items to address will be at well site number one where the well casing and hydropneumatic tank have failed and are inoperable, there is also insufficient storage capacity for the system requiring a new tank. High-level cost estimates for the initial and secondary improvements are $253,000 and $212,000 respectively with a total construction cost of $465,000.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Nicholas Henslee – Project Manager
Project Name
Wickenburg Operations, Engineering and Management
Project Location (City and State)
Wickenburg, AZ
Estimated Project Cost
$124,800 (Annual Contract Value); $21,000 to date
Project Begin and End Date
11/2023 –2/2024
Brief Description of the Project
Consor provided supplemental operations and maintenance leadership, management, and oversight for the Town of Wickenburg facilities. Consor was responsible for evaluating, developing, and enacting a response plan to rectify compliance, assess the facility and operational strategies, and train the remaining Town staff in all asset, maintenance, process, laboratory, regulatory, and management requirements to sustain compliant operations of the facility. This also included the development of new standard operating procedures, preventative maintenance program, emergency response plans, training programs, and asset and maintenance management program. Additionally, Consor provides ongoing engineering planning and design support as part of this project.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Frederick Tack – Project Manager / Operator of Record

Category #7 – Drinking water permit applications (e.g., ATC, AOC, APP, AZPDES)

Project Name
75th Ave & Grand Ave. PRV Station Upgrade
Project Location (City and State)
Peoria, AZ
Estimated Project Cost
$450,808 (Construction Cost); $59,900 (Design Fees); $23,300 (CA&I Fees)
Project Begin and End Date
3/2020 to 12/2021
Brief Description of the Project
Consor led the planning, design, permitting, and construction oversight for the upgrade of a key pressure reducing valve (PRV), as part of the City of Peoria water system, to optimize the performance, pressure, and capacity of the City’s pressure zone, below Olive Avenue. The project included the removal of an 8-inch diameter PRV, a new 10-inch diameter PRV, a 4-inch diameter new low flow by-pass, installation of a remote telemetry system, with SCADA enable capability.

Our team members prepared the details design drawings, report, and specifications, and prepared the application and procured the Approval to Construct (ATC) permit. During construction, Consor developed, verified, and prepared the record documents and procured the Approval of Construction.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Mark Lee – Project Manager

Tom Braatelien – Engineer of Record

Project Name
Water Main Replacement – Bethany Home Road: 2nd Ave to 2nd Street & Central Ave: Maryland Ave to Montebello Ave
Project Location (City and State)
Phoenix, AZ
Estimated Project Cost
$132,000 (Consor CA & CM Fees)
Project Begin and End Date
01/2021 to 03/2022
Brief Description of the Project
Consor provided engineering services for the new water main replacements within four quarter sections. Services included topographical survey, alignment evaluation and selection for the new water mains, water main profile and hydraulic design, connection of the new system to the existing system, and abandonment of the existing system in place. The design included 6,400 feet of 6-, 8-, and 12-inch diameter DIP water mains, 29 new water valves, 12 fire hydrants, other associated appurtenances, new meters, new service connections, pavement replacement, and other related items of work. This included preparation of the application and procuring the Approval to Construct (ATC) permit. During construction, Consor developed, verified, and prepared the record documents and procured the Approval of Construction (AOC).
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Tom Braatelien Project Manager
Project Name
Water Main Replacement – Connection to Well 16 along Warner Rd. between Rural Rd. to McClintock Dr., and along University Dr. from Rural Rd. to McClintock Dr.
Project Location (City and State)
Tempe, AZ
Estimated Project Cost
$461,346
Project Begin and End Date
7/2018 to 7/2019
Brief Description of the Project
Conor provided design and permitting support for the replacement and improvement of the waterlines that connected the Tempe PWS to Well 16, and full pipeline replacements along Warner Rd. and University Dr. This project was permitted through two separate Approvals to Construct (ATC’s) with the Maricopa County Environmental Services Department (MCESD).
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Tom Braatelien Project Manager

Category #8 – Funding assistance (e.g., PPL, PFA, RD-Apply)

Project Name
Arizona Water Company, Stanfield Groundwater Supply and Treatment Project, FY 2024 WaterSMART Drought Resiliency Project Grant Application
Project Location (City and State)
Stanfield, Arizona
Estimated Project Cost
$20,000 (grant application effort); $10,200,000 (Construction est.); $1,000,000 (Design and Permitting est.)
Project Begin and End Date
11/2023 through 8/2024 (Grant application and award only)
Brief Description of the Project
Arizona Water Company operates the community water system serving disadvantaged communities in and around Stanfield. This is Stanfield’s only source of drinking water and comes from groundwater. Stanfield’s supply is impaired by nitrate and arsenic contaminants presenting threats to public health. In response to this critical situation, the company will construct state-of-the-art groundwater treatment systems to lower arsenic and nitrates below the Maximum Contaminant Level. This project is designed to enhance water supply reliability and delivery of safe drinking water to approximately 640 residents.

Consor supported the development of the preliminary design, alternatives analysis budgetary capital and O&M cost estimates, and preparation of the WaterSmart Grant application and submitted to the US Bureau of Reclamation (USBR), which was award as one of only three (3) projects in Arizona, and 42 nation-wide. The USBR Funding award was $9,114,490.

The detailed design will start in September of 2024 and will be constructed in 2025 and 2026.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Frederick Tack –Technical Lead and Lead Grant Writer.
Project Name
WIFIA Funding Assistance
Project Location (City and State)
Newberg, Oregon, and Portland, Oregon
Estimated Project Cost
$30,000
Project Begin and End Date
2020 to 2024
Brief Description of the Project
The EPA’s Water Infrastructure Finance and Innovation Act loan program, better known as WIFIA, has helped dozens of communities across the country accelerate investment in needed water infrastructure projects by providing long-term, low-cost supplemental financing with favorable repayment terms and flexible requirements.

At Consor, we have successfully supported millions of dollars in WIFIA loan applications at all stages of development including Letter of Interest and loan application development, environmental compliance, engineering documentation, public communication, and project management.

Libby Bakke, a key member of our team, has played a pivotal role in educating utilities about the advantages of the WIFIA program. She has not only crafted effective Letters of Interest and facilitated the loan development process through productive dialogues with WIFIA staff but also designed communication strategies that highlight the significant cost savings for ratepayers that build long-term community support for the projects.

For this project example, after 50 years of operations, the City of Newberg’s existing groundwater treatment plant has limited ability to meet future community needs, current OHA requirements, and necessary seismic resiliency criteria. Consor guided the funding application with WIFIA to provide supplemental funding for the project and completed preliminary design.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Libby Barg Bakke – Project Manager, WIFIA Advisor

Lee Odell – Principal, Water Treatment

Project Name
Oak Lodge Water & Sewer District Consolidation
Project Location (City and State)
Oak Grove, OR
Estimated Project Cost
$100,000
Project Begin and End Date
2016-2018
Brief Description of the Project
Oak Lodge Water District and Oak Lodge Sanitary District were two independent utilities serving 30,000 residents in a suburb of Portland, Oregon. The two districts had parallel missions, their service areas coincided, and their headquarters were just 100 yards apart.

When the two district's elected boards of directors began the process of considering consolidation, they engaged Libby Bakke to help them assess the feasibility of a merger and develop a customer engagement strategy to educate voters. A financial analysis estimated cost savings of $4.25 million and pointed to opportunities for operational efficiencies. Under Oregon law, any merger required approval from voters in both districts before the proposed consolidation could take effect.

Libby conducted a joint public education campaign to enable citizens to hear more about the benefits of consolidation, ask questions, and express their views. The planned merger was well-received, and the measure was approved the districts’ voters with a 73% yes vote.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Libby Barg Bakke – Project Manager, Lead Strategy Advisor.

Category #11 – Preparing Corrosion Control Assessments & Treatment Recommendations

Project Name
Town of Payson PFAS/PFOA Preliminary Design Report and Pilot Development
Project Location (City and State)
Payson, AZ
Estimated Project Cost
$69,115
Project Begin and End Date
09/2023 to 03/2024
Brief Description of the Project
The Town of Payson had identified multiple wells within their system contaminated with PFAS chemicals and contracted with Consor to perform a Preliminary Design Report and conduct a pilot study of major treatments. Elements reviewed in the report included preliminary layouts, equipment sizing, cost estimating, and recommendations. Consor has leading experts in groundwater and novel chemicals treatment and facility design. Consor developed the approach and pilot protocol for testing different adsorptive technologies including GAC, Fluorasorb, and ion exchange. Subsequently the State of Arizona’s Department of Environmental Quality and EPA took over testing and will support the Town of Payson through design.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Dane Whitmer – Project Manager

Lee Odell – Technical Specialist Mark Lee - Principal

Project Name
Golden State Water Company, PFAS Assessment
Project Location (City and State)
Gravesboro, CA
Estimated Project Cost
$20,000 (Consor Fees)
Project Begin and End Date
09/2022 to 03/2023
Brief Description of the Project
Golden State Water Company has two well sites in its Norwalk, CA service area that have Perfluorooctanoic acid (PFOA) and Perfluorooctanesulfonic acid (PFOS) compounds detected at levels above the California notification levels of 6.5 parts per trillion for PFOS and 5.1 parts per trillion for PFOA. Consor described alternative treatment approaches and provides a recommendation for treatment at each site. Alternative treatment processes include GAC Adsorption, Ion Exchange, Filtration with Powdered Activated Carbon, High Pressure Membranes, and several emerging treatment systems. The recommended technology for the Studebaker Site was Ion Exchange (with anion resin) and the recommended technology for the Imperial Site was GAC Adsorption. The estimated costs of the facilities were developed for capital and 20-year lifecycle.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Lee Odell – Technical Director
Project Name
City of Salem PFAS Response Plan
Project Location (City and State)
Salem Oregon
Estimated Project Cost
$18,608 (Consor Fees)
Project Begin and End Date
09/22/2023 to 04/7/2024
Brief Description of the Project
Consor was a partner on the team that supported the development of a Public Works holistic PFAS response plan. The work includes developing a communications strategy to proactively share information and engage policymakers, the community and partner organizations in the City’s response to the emerging PFAS issues. The plan considers the risks and response to PFAS in wastewater, landfill leachate, stormwater, and other community sources. Salem’s Public Works Director and leadership from representing water, wastewater and stormwater are leading the effort to create the plan and begin implementation. The fate and transport of PFAS touches all aspects of the water cycle. Human exposure to PFAS is a public health concern primarily because relatively small amounts (on the order of parts per trillion) have been observed to cause adverse health effects. Consor Services included:

· Facilitating a risk and opportunities workshop

· Developing a communications strategy and messaging

· Creating PFAS talking points

· Supporting City Council briefings and presentations to the City Council

· Drafting and reviewing content for the City’s website

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Libby Barg Bakke – Principal

William Worth – Principal Engineer

Category #13 – Preparing Preliminary Engineering Reports (PER)

Project Name
East Mesa Interconnect Pipeline
Project Location (City and State)
Mesa, AZ
Estimated Project Cost
$328,000 (Consor Fees)
Project Begin and End Date
09/2021 to 06/2023
Brief Description of the Project
Consor completed an alignment study for the East Mesa Interconnect pipelines. The study determined the most suitable water main alignments to connect all three of the City’s water treatment plants together to provide redundancy and greater flexibility in the system. The proposed pipeline is 36 inches in diameter and approximately 20 miles in length.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Mark Lee – Project Manager
Project Name
South 57th Street Reservoirs No. 1 and No. 2 Evaluation and Rehabilitation
Project Location (City and State)
Springfield, OR
Estimated Project Cost
$2,300,000 (Total project cost)
Project Begin and End Date
10/2017 to 06/2022

Brief Description of the Project

Consor performed a structural seismic evaluation and overall condition assessment of two tanks at one site, a 1.0 million gallon (MG) and a 1.5 MG ground level potable water storage tank for SUB in 2017. Following the Pre-Design evaluation work, Consor moved directly into final design for rehabilitating the tanks, site piping and integration into the associated system piping and completed designs in early 2018. Consor performed construction administration and, along with our team of specialty subconsultants, provided periodic observation of the improvements for the multi-year, multi-tank improvement project. The project included replacing interior and exterior coating systems, a new seismic isolation valve vault, an expanded footing for the 1.5 MG tank, and upgraded water and drainage piping systems for both tanks’ interior and exterior piping configurations. All work and anniversary warranty inspections were completed by spring of 2022.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Tom Boland – Project Manager

Justin Ford – Deputy Project Manager

Project Name
Pilot Testing and Preliminary Engineering Report (PER) for Arsenic Iron & Manganese Removal
Project Location (City and State)
Yorba City, CA
Estimated Project Cost
$84,450 (PER portion of Consor Fees)
Project Begin and End Date
10/2021 to 12/2022
Brief Description of the Project
Consor developed the preliminary engineering report to outline the requirements, alternatives, approach, and calculations to support the preliminary design for a new arsenic, Iron, and manganese removal treatment system for the water utility of Yorba City, CA. This included development of alternatives for water treatment and water quality compliance report to gain regulator support and approval to implement a pilot system for demonstration, prior to the full detailed design and implementation.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Lee Odell – Principal

Nathan Nutter – Principal, wells Shanna Myers – Deputy Project Manager

Category #15 – Risk & Resiliency Assessments

Project Name
Yellowstone Pipeline Vulnerability Assessment
Project Location (City and State)
Spokane, WA
Estimated Project Cost
$119,896
Project Begin and End Date
03/2023 to 02/2024
Brief Description of the Project
Consor and a teaming partner were procured by the City of Spokane to complete a Vulnerability Assessment for City of Spokane's Yellowstone Pipeline with the intended goal of maximizing the efficiency, redundancy, and resiliency of a key groundwater well and pipeline system. An Emergency Response Plan (ERP) describes the water utility’s strategies, resources, plans, and procedures to prepare for and respond to any incident, natural or man-made, that threatens life, property, or the environment. Consor’s efforts focused on completing a condition assessment of the existing well facility and optional task for an assessment of alternative facility improvements/upgrades, for inclusion in the appendices of the ERP in accordance with America’s Water Infrastructure Act of 2018 (AWIA). Consor efforts included:

· Establishing and evaluating baseline conditions

· Emergency operation scenario development and groundwater modeling

· Conceptual monitoring program development

· Development and iteration of the ERP

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Chris Young – Project Manager

Elisheva Walters – Deputy Project Manager Jay Yazzie – Project Engineer

Project Name
Comprehensive Water System Master Plan Update
Project Location (City and State)
Duvall, WA
Estimated Project Cost
$224,462
Project Begin and End Date
09/2019 to 02/2022
Brief Description of the Project
Consor previously assisted the City of Duvall with their Comprehensive Water Plan and as part of a current Water System Plan update, Consor performed a Risk and Resilience Analysis of the City’s water system. The City operates a water system containing two storage tanks, one pump station, 15 pressure reducing valves, and approximately 42 miles of pipe. Using advanced modeling techniques, Consor performed a pipeline resiliency assessment to define the City’s critical pipe to show where a single pipe break could cause the most damage to the system and its customers.
Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
Elisheva Walters, Project Manager
Project Name
City of Bend Water Master Plan and System Vulnerability Assessment
Project Location (City and State)
Bend, OR
Estimated Project Cost
$67,127 (Vulnerability Assessment Only)
Project Begin and End Date
12/2020 to 05/2022

Brief Description of the Project

This was completed as part of an overall water master planning effort. Consor assessed the resiliency of the utilities water system under multiple emergency scenarios, including drought, earthquake, and fire in the watershed and groundwater contamination. The analysis includes a detailed assessment of the resiliency of the utilities distribution system using advanced modeling techniques. Our team is also completed condition assessments for likelihood of failure for pump stations, wells, reservoirs and PRV stations.

Names of the project manager and key personnel that worked on the project if they are currently employed with your firm.
David Stangel – Project Manager

Mark Cummings – Senior Engineer Todd Blacketter – Digital Design Kent Harjala – Digital Design

Category #16 – System Evaluations

Project Name
Sunizona Water Company Facility Report
Project Location (City and State)
Pearce, AZ
Estimated Project Cost
$15,000
Project Begin and End Date
09/2022 to 09/2024
Brief Description of the Project

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .