1-204-17 VESTABURG WATERLINE REPLACEMENT IFB.pdf

PDF 46 MB Posted

Attached to
Malden Water Tank Replacement Contract Nos. 2025-03A & 2025-03B
Solicitation number
Not on record
Issued by
Washington County, Pennsylvania

About this file

This is a detailed engineering drawing and utilities list document for the Vestaburg Waterline Replacement Project, prepared by KLH Engineers, Inc. for the Tri-County Joint Municipal Authority in Washington County, Pennsylvania. The project involves two contract phases (2025-01A and 2025-01B) with specific water infrastructure improvements: Contract 2025-01A includes constructing approximately 2,700 linear feet of 6-inch diameter PVC water main and 950 linear feet of 2-inch diameter Yelomine water main, while Contract 2025-01B encompasses approximately 450 linear feet of 6-inch diameter PVC water main, 2,300 linear feet of 4-inch diameter PVC water main, and 2,900 linear feet of 2-inch diameter Yelomine water main. The project has an expected duration of 180 days, with electronic bids to be received via the PennBid Program by Tuesday, November 4, 2025, at 2:00 P.M. local time. A non-mandatory pre-bid conference is scheduled for Wednesday, October 22, 2025, at 10:00 A.M. at the Tri-County Joint Municipal Authority office.

The project is funded through the Commonwealth of Pennsylvania's COVID-19 APRA PA Small Water and Sewer Program, administered by the Commonwealth Financing Authority. Bidding documents are available at no cost through the PennBid website, and contractors must comply with prevailing minimum wage rates determined by the Pennsylvania Department of Labor and Industry. The documentation indicates that the project is open to all qualified contractors with no specific set-aside designations. Utilities involved in the project include Windstream, Columbia Gas of Pennsylvania, East Bethlehem Township, Consolidated Communications, Pennsylvania Electric Company, and others, all of whom must be notified prior to excavation in accordance with Pennsylvania Underground Utility Line Protection Law.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Drawing No.

Sheet No.

5173 Campbells Run Road Pittsburgh, PA 15205

Phone: 412.494.0510 Fax: 412.494.0426 info@klhengineers.com

KLH

ENGINEERS, INC

NOTE: IN ACCORDANCE WITH THE PENNSYLVANIA UNDERGROUND UTILITY LINE PROTECTION LAW, ACT 287 OF 1974 AS AMENDED BY ACT 50 OF 2017, THE CONTRACTOR MUST NOTIFY ALL UTILITY COMPANIES PRIOR TO EXCAVATION FOR FIELD LOCATION AND SIZE CONFORMATION. AT LEAST THREE (3) DAYS NOTIFICATION PRIOR TO THE ACTUAL START OF EXCAVATION IS REQUIRED. UTILITIES CAN BE NOTIFIED THROUGH THE PENNSYLVANIA ONE CALL SYSTEM, INC. BY CALLING 1-800-242-1776. THE PENNSYLVANIA ONE CALL DESIGN SERIAL NUMBER FOR THIS PROJECT IS 20251631132, 20251631327, 20251631422, 20251631497, 20251631577, 20251631635, 20251631713, 20251631810.

WASHINGTON COUNTY, PENNSYLVANIA

SCALE: 1" = 2000'

COMPANY: WINDSTREAM

ADDRESS: 1450 CENTER POINT RD

HIAWATHA, IA 52233

CONTACT: LOCATE DESK PERSONNEL

EMAIL: LOCATE.DESK@WINDSTREAM.COM

PHONE: 800-289-1901

COMPANY:COLUMBIA GAS OF PA INC

ADDRESS: 1600 DUBLIN RD

COLMBUS, OH 43215

CONTACT: LISA COLLINS

EMAIL: LDUGAN@NISOURCE.COM

PHONE: 614-325-5961

COMPANY:EAST BETHLEHEM TOWNSHIP

ADDRESS: 36 WATER ST.

PO BOX 136 FREDERICKTOWN, PA 15333

CONTACT: JULIE PAULL

EMAIL: EBTMA@WINDSTREAM.NET

PHONE: 724-377-2511

COMPANY:EAST BETHLEHEM TOWNSHIP

ADDRESS: 36 WATER ST

PO BOX 687

FREDERICKTOWN, PA 15333

CONTACT: MARYANN GIOVANELLI

EMAIL: EBTWP@ATLANTICBBN.NET

PHONE: 724-377-1777

COMPANY:VESTABURG NEW HILL JOINT

AUTHORITY

ADDRESS: 301 THIRD STREET

VESTABURG, PA 15368

CONTACT: DENNIS BEVANS

PHONE: 724-377-1420

PROJECT LOCATION

G1 Copyright © 2025 KLH Engineers, Inc., All Rights Reserved Worldwide.

No part of this document may be reproduced or transmitted in any form, by any means without written permission, except for brief excerpts in reviews or analysis.

TITLE SHEET

INDEX (CONTRACT - 2025-01 A

EXHIBIT 1 (CONTRACT - 2025-01 A)

EXHIBIT 2 (CONTRACT - 2025-01 A)

EXHIBIT 3 (CONTRACT - 2025-01 A)

INDEX (CONTRACT - 2025-01 B)

G1 G2 C1 C2 C3 G3 of 13

Order No.

COMPANY:CONSOLIDATED COMMUNICATIONS

ADDRESS:4008 GIBSONIA RD

GIBSONIA, PA 15044

CONTACT: GREG SCHNEIDER

EMAIL: GREG.SCHNEIDER@CONSOLIDATED.COM

PHONE: 724-443-9861

COMPANY:TRI COUNTY JOINT MUNICIPAL

AUTHORITY

ADDRESS: 26 MONONGAHELA AVE

PO BOX 758

FREDERICKTOWN, PA 15333-0758

CONTACT: JEFF TARLEY

EMAIL: FOREMAN@TRICOUNTYPA.ORG

PHONE: 724-377-2211

COMPANY: PENNSYLVANIA ELECTRIC CO

ADDRESS: 341 WHITE POND DR.

AKRON, OH 44320

CONTACT: MELLYSSA ADAMS

EMAIL: MADAMS@FIRSTENERGYCORP.COM

PHONE: 330-436-4013

COMPANY:LOWER TEN MILE JOINT SEWER

AUTHORITY

ADDRESS: 144 CHARTIERS RD

JEFFERSON, PA 15344

CONTACT: DAVE BRICHETTI

EMAIL: ITMJSA@ATLANTICBBN.NET

PHONE: 724-883-2743

TRI-COUNTY JOINT

MUNICIPAL AUTHORITY

DESCRIPTIONDWG. NO.SHEET NO.

RELEASED FOR BID

SEPTEMBER 2025

UTILITIES LIST DRAWING LIST

LOCATION MAP

CONTRACT NO. 2025-01 A - PHASE 3 (LS 22-38)

CONTRACT NO. 2025-01 B - PHASE 4 (LS 24-43)

VESTABURG WATERLINE REPLACEMENT

204-17

N

CALL BEFORE YOU DIG!

PENNSYLVANIA LAW REQUIRES

3 WORKING DAYS NOTICE FOR

CONSTRUCTION PHASE

AND 10 WORKING DAYS

IN DESIGN STAGE-STOP CALL

1-800-242-1776

PE

NN

SY

LV

ANIA ONE CALL SYSTEM

, INC

STOP-CALL BEFORE YOU D

IG

EXHIBIT 1 (CONTRACT - 2025-01 B)C4

EXHIBIT 2 (CONTRACT - 2025-01 B)C5

EXHIBIT 3 (CONTRACT - 2025-01 B)C6

EXHIBIT 4 (CONTRACT - 2025-01 B)C7

DETAIL SHEETDT111 of 13 DETAIL SHEETDT212 of 13 DETAIL SHEETDT313 of 13

AutoCAD SHX Text S:\Active Clients\204 Tri-County Joint Mun Auth\204-17 Vestaburg Waterline Replacement\Dwg\G204-17-001.dwg 9/26/2025 11:07 AM Plotted By: Jason Antitomas 9/26/2025 11:07 AM Plotted By: Jason Antitomas9/26/2025 11:07 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas

DT1

D E

T A

IL

S

R

LHC

T K

LO

K

LO

Order No.

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

Drawing No.

Sheet No.

C am pb el ls R un R oa d

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C of 13Copyright © 2025 KLH Engineers, Inc., All Rights Reserved Worldwide

204-17

Se pt em be r 2

V E

S T

A B

U R

G W

A T

E R

LI

N

E R

E P

LA

C

E M

E N

T C

O N

T R

A C

T N

O . 2

5-

A

5-

B W

A S

H

IN

G T

O N

C O

U N

T Y

, P E

N N

S Y

LV

A

N

IA

T R

I- C

O U

N T

Y J

O

IN

T M

U N

IC

IP

A L

A U

T H

O R

IT

Y

D ra w n

B y:

D at e Is su ed

F or

D at e R ev is io ns

9/

IS

SU

ED

F

O R

BI

D

S:\Active Clients\204 Tri-County Joint Mun Auth\204-17 Vestaburg Waterline Replacement\Dwg\DT204-17-001.dwg 9/26/2025 10:28 AM Plotted By: Jason Antitomas 9/26/2025 10:28 AM Plotted By: Jason Antitomas9/26/2025 10:28 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas

E

T A

IL

S

R

LHC

T K

LO

K

LO

Order No.

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

Drawing No.

Sheet No.

C am pb el ls R un R oa d

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C of 13Copyright © 2025 KLH Engineers, Inc., All Rights Reserved Worldwide

204-17

Se pt em be r 2

V E

S T

A B

U R

G W

A T

E R

LI

N

E R

E P

LA

C

E M

E N

T C

O N

T R

A C

T N

O . 2

5-

A

5-

B W

A S

H

IN

G T

O N

C O

U N

T Y

, P E

N N

S Y

LV

A

N

IA

T R

I- C

O U

N T

Y J

O

IN

T M

U N

IC

IP

A L

A U

T H

O R

IT

Y

D ra w n

B y:

D at e Is su ed

F or

D at e R ev is io ns

9/

IS

SU

ED

F

O R

BI

D

DT2

S:\Active Clients\204 Tri-County Joint Mun Auth\204-17 Vestaburg Waterline Replacement\Dwg\DT204-17-002.dwg 9/26/2025 10:29 AM Plotted By: Jason Antitomas 9/26/2025 10:29 AM Plotted By: Jason Antitomas9/26/2025 10:29 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas

E

T A

IL

S

R

LHC

T K

LO

K

LO

Order No.

D es ig ne d B y:

C he ck ed B y:

A pp ro ve d

B y:

D at e:

Drawing No.

Sheet No.

C am pb el ls R un R oa d

Pi tts bu rg h, P

A

Ph on e:

.4

.0

Fa x:

.4

.0 in fo kl he ng in ee rs

.c om

K L H

E N

G

IN

E E R

S

IN

C of 13Copyright © 2025 KLH Engineers, Inc., All Rights Reserved Worldwide

204-17

Se pt em be r 2

V E

S T

A B

U R

G W

A T

E R

LI

N

E R

E P

LA

C

E M

E N

T C

O N

T R

A C

T N

O . 2

5-

A

5-

B W

A S

H

IN

G T

O N

C O

U N

T Y

, P E

N N

S Y

LV

A

N

IA

T R

I- C

O U

N T

Y J

O

IN

T M

U N

IC

IP

A L

A U

T H

O R

IT

Y

D ra w n

B y:

D at e Is su ed

F or

D at e R ev is io ns

9/

IS

SU

ED

F

O R

BI

D

DT3

S:\Active Clients\204 Tri-County Joint Mun Auth\204-17 Vestaburg Waterline Replacement\Dwg\DT204-17-003.dwg 9/26/2025 10:28 AM Plotted By: Jason Antitomas 9/26/2025 10:28 AM Plotted By: Jason Antitomas9/26/2025 10:28 AM Plotted By: Jason Antitomas Plotted By: Jason AntitomasJason Antitomas

1_G204-17-001-G1
Sheets and Views
G1
2_G2_Vestaburg Waterline Replacement Overview 1
3_C1_Vestaburg Waterline Replacement 1
4_C2_Vestaburg Waterline Replacement 2
5_C3_Vestaburg Waterline Replacement 3
6_G3_Vestaburg Waterline Replacement Overview 2
7_G4_Vestaburg Waterline Replacement 1
8_G5_Vestaburg Waterline Replacement 2
9_G6_Vestaburg Waterline Replacement 3
10_G7_Vestaburg Waterline Replacement 4
11_DT204-17-001-DT1
Sheets and Views
DT1
12_DT204-17-002-DT2
Sheets and Views
DT2
13_DT204-17-003-DT3
Sheets and Views
DT3

File details come from the government source that posted it. Updated .