097Apricing_rev2026.xlsx

XLSX spreadsheet 28 KB Posted

Attached to
Competitive Selection OH|DOT097A23-3
Contract number
DOT097A23-3
Issued by
Ohio

About this file

This document is an Invitation to Bid (ITB) 097-23a for General Services for Traffic Counting, featuring a cost per count matrix for Quality Counts LLC. The contract covers multiple districts and regions, specifically Districts 1 & 2, 3 & 6, 4 & 12, 5 & 11, 7 & 8, and 9 & 10, with pricing structured across six distinct regions.

The contract encompasses a comprehensive range of traffic counting services, including counter/road tube spot counts for 1-4 and greater than 4 lanes, video turning movement counts, non-intrusive spot counts, and optional services like AI/machine learning counts and specialized data collection. Pricing varies by region, with costs ranging from $74 to $1,554.15 depending on the specific type of count, such as 24-hour volume measurements, axle classifications, highway ramp volumes, and specialized services like drone flights and fixed-wing aircraft usage. Additional services include law enforcement officer support and special data services like DataPoint and Big Data origin-destination/travel time analysis, with annual and per-project pricing structures.

View the file

Other files

File Type Posted
02_SignaturePage.pdf PDF
04_Affirmation_Disclosure.pdf PDF
05_QualificationsPacket.pdf PDF
097a-23.pdf PDF
Quality_Counts_LLC_Contract_Amendment-Signed.pdf PDF
05_QualificationsPacket.pdf PDF
097Apricing.xlsx XLSX spreadsheet
Quality_Counts_LLC_Contract_Amendment-Signed.pdf PDF
02_SignaturePage.pdf PDF
04_Affirmation_Disclosure.pdf PDF
097a-23.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1 (2) ITB 097-23a GENERAL SERVICES FOR TRAFFIC COUNTING tc={95EB9A04-C865-4795-A664-00331899A0F0}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

IS this "097-19" something we need to update?

COST PER COUNT MATRIX
Contractor:Quality Counts LLCDistricts:1 & 27 & 83 & 69 & 105 & 114 & 12
Pricing for Region:123456
ItemType of CountUnitUnit CostUnit CostUnit CostUnit CostUnit CostUnit Cost
Item A1-A10 and B1-B6 are required for at least 1 regionA - Counter/Road Tube Spot Count - 1 - 4 lanes.
A124-hr. volume total floweach$76.67$76.67$76.67$84.96$76.67$84.96
A224-hr. volume, by direction (will be used for 2 lane roadways)each$133.66$133.66$133.66$147.13$133.66$147.13
A324-hr. volume, by laneeach$185.46$185.46$185.46$204.11$185.46$204.11
A448-hr. volume, by laneeach$268.35$268.35$268.35$295.29$268.35$295.29
A524-hr. axle classification, by laneeach$309.79$309.79$309.79$340.88$309.79$340.88
A648-hr. axle classification, by laneeach$387.50$387.50$387.50$426.87$387.50$426.87
A724-hr. Highway Ramp volumeeach$102.57$102.57$102.57$112.93$102.57$112.93
A848-hr. Highway Ramp volumeeach$154.38$154.38$154.38$169.92$154.38$169.92
A924-hr. Highway Ramp axle classificationeach$164.74$164.74$164.74$181.32$164.74$181.32
A1048-hr. Highway Ramp axle classificationeach$216.54$216.54$216.54$238.30$216.54$238.30
B - Counter/Road Tube Spot Count - Greater than 4 lanes.
B124-hr. volume total floweach$107.75$107.75$107.75$119.15$107.75$119.15
B224-hr. volume, by directioneach$273.53$273.53$273.53$301.51$273.53$301.51
B324-hr. volume, by laneeach$413.40$413.40$413.40$454.85$413.40$454.85
B448-hr. volume, by laneeach$620.62$620.62$620.62$682.79$620.62$682.79
B524-hr. axle classification, by laneeach$568.82$568.82$568.82$625.80$568.82$625.80
B648-hr. axle classification, by laneeach$827.84$827.84$827.84$910.73$827.84$910.73
C - Video Turning Movement Count - optional
C1aPole mounted video turning movementhourly rate$81.85$81.85$81.85$90.14$81.85$90.14
C1bPole mounted video turning movementdaily rate$1,190.48$1,190.48$1,190.48$1,309.63$1,190.48$1,309.63
C2aPole mounted video turning movement - roundabouthourly rate$123.30$123.30$123.30$135.73$123.30$135.73
C2bPole mounted video turning movement - roundaboutdaily rate$1,786.24$1,786.24$1,786.24$1,965.48$1,786.24$1,965.48
D - Non-Intrusive Spot Count - optional
D1aTrailer mounted radarhourly rate
D1bTrailer mounted radardaily rate
D1cTrailer mounted radarweekly rate
D1dTrailer mounted radarmonthly rate
D2aPole mounted radarhourly rate$40.41$40.41$40.41$44.55$40.41$44.55
D2bPole mounted radardaily rate$776.04$776.04$776.04$853.75$776.04$853.75
D2cPole mounted radarweekly rate$2,433.80$2,433.80$2,433.80$2,677.28$2,433.80$2,677.28
D2dPole mounted radarmonthly rate$5,169.10$5,169.10$5,169.10$5,686.12$5,169.10$5,686.12
D3aTrailer mounted videohourly rate
D3bTrailer mounted videodaily rate
D3cTrailer mounted videoweekly rate
D3dTrailer mounted videomonthly rate
D4aPole mounted videohourly rate$45.59$45.59$45.59$50.77$45.59$50.77
D4bPole mounted videodaily rate$620.62$620.62$620.62$682.79$620.62$682.79
D4cPole mounted videoweekly rate$3,418.09$3,418.09$3,418.09$3,760.01$3,418.09$3,760.01
D4dPole mounted videomonthly rate$12,846.60$12,846.60$12,846.60$14,131.37$12,846.60$14,131.37
D5aVideo count without processing - one camera setuphourly rate$45.59$45.59$45.59$50.77$45.59$50.77
D5bVideo count without processing - one camera setupdaily rate$232.09$232.09$232.09$255.92$232.09$255.92
D5cVideo count without processing - one camera setupweekly rate$1,086.87$1,086.87$1,086.87$1,195.66$1,086.87$1,195.66
D5dVideo count without processing - one camera setupmonthly rate$3,418.09$3,418.09$3,418.09$3,760.01$3,418.09$3,760.01
D6aNon-motorized trail or spot counthourly rate$81.85$81.85$81.85$90.14$81.85$90.14
D6bNon-motorized trail or spot countdaily rate$1,190.48$1,190.48$1,190.48$1,309.63$1,190.48$1,309.63
D6cNon-motorized trail or spot countweekly rate$3,418.09$3,418.09$3,418.09$3,760.01$3,418.09$3,760.01
D6dNon-motorized trail or spot countmonthly rate$12,846.60$12,846.60$12,846.60$14,131.37$12,846.60$14,131.37
E - AI/Machine Learning Count Count - optional
E1aAI/Machine Learning Counthourly rate
E1bAI/Machine Learning Countdaily rate
E1cAI/Machine Learning Countweekly rate
E1dAI/Machine Learning Countmonthly rate
E1aNon-motorized trail or spot counthourly rate
E1bNon-motorized trail or spot countdaily rate
E1cNon-motorized trail or spot countweekly rate
E1dNon-motorized trail or spot countmonthly rate
E2aNon-motorized intersection/turning movement counthourly rate
E2bNon-motorized intersection/turning movement countdaily rate
E2cNon-motorized intersection/turning movement countweekly rate
E2dNon-motorized intersection/turning movement countmonthly rate
F - LEO
F1Law Enforcement Officerhourly rate$129.51$129.51$129.51$129.51$129.51$129.51
G - Special Services (add additional lines if needed) - optional
G1DataPointannually$41,444.00$41,444.00$41,444.00$41,444.00$41,444.00$41,444.00
G2Big Data OD/TTper project$10,361.00$10,361.00$10,361.00$10,361.00$10,361.00$10,361.00
G3Drone Flight (minimum 4 hours)hourly rate$518.05$518.05$518.05$518.05$518.05$518.05
G4Fixed Wing Aircraft (minimum 4 hours)hourly rate$1,554.15$1,554.15$1,554.15$1,554.15$1,554.15$1,554.15

IS this "097-19" something we need to update?

PID 108445

Sheet1 ITB 097-23a GENERAL SERVICES FOR TRAFFIC COUNTING tc={35C95618-A385-4BEF-9483-015165381310}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

Comment:

IS this "097-19" something we need to update?

COST PER COUNT MATRIX
Contractor:Quality Counts LLCDistricts:1 & 27 & 83 & 69 & 105 & 114 & 12
Pricing for Region:123456
ItemType of CountUnitUnit CostUnit CostUnit CostUnit CostUnit CostUnit Cost
Item A1-A10 and B1-B6 are required for at least 1 regionA - Counter/Road Tube Spot Count - 1 - 4 lanes.
A124-hr. volume total floweach$74.00$74.00$74.00$82.00$74.00$82.00
A224-hr. volume, by direction (will be used for 2 lane roadways)each$129.00$129.00$129.00$142.00$129.00$142.00
A324-hr. volume, by laneeach$179.00$179.00$179.00$197.00$179.00$197.00
A448-hr. volume, by laneeach$259.00$259.00$259.00$285.00$259.00$285.00
A524-hr. axle classification, by laneeach$299.00$299.00$299.00$329.00$299.00$329.00
A648-hr. axle classification, by laneeach$374.00$374.00$374.00$412.00$374.00$412.00
A724-hr. Highway Ramp volumeeach$99.00$99.00$99.00$109.00$99.00$109.00
A848-hr. Highway Ramp volumeeach$149.00$149.00$149.00$164.00$149.00$164.00
A924-hr. Highway Ramp axle classificationeach$159.00$159.00$159.00$175.00$159.00$175.00
A1048-hr. Highway Ramp axle classificationeach$209.00$209.00$209.00$230.00$209.00$230.00
B - Counter/Road Tube Spot Count - Greater than 4 lanes.
B124-hr. volume total floweach$104.00$104.00$104.00$115.00$104.00$115.00
B224-hr. volume, by directioneach$264.00$264.00$264.00$291.00$264.00$291.00
B324-hr. volume, by laneeach$399.00$399.00$399.00$439.00$399.00$439.00
B448-hr. volume, by laneeach$599.00$599.00$599.00$659.00$599.00$659.00
B524-hr. axle classification, by laneeach$549.00$549.00$549.00$604.00$549.00$604.00
B648-hr. axle classification, by laneeach$799.00$799.00$799.00$879.00$799.00$879.00
C - Video Turning Movement Count - optional
C1aPole mounted video turning movementhourly rate$79.00$79.00$79.00$87.00$79.00$87.00
C1bPole mounted video turning movementdaily rate$1,149.00$1,149.00$1,149.00$1,264.00$1,149.00$1,264.00
C2aPole mounted video turning movement - roundabouthourly rate$119.00$119.00$119.00$131.00$119.00$131.00
C2bPole mounted video turning movement - roundaboutdaily rate$1,724.00$1,724.00$1,724.00$1,897.00$1,724.00$1,897.00
D - Non-Intrusive Spot Count - optional
D1aTrailer mounted radarhourly rate
D1bTrailer mounted radardaily rate
D1cTrailer mounted radarweekly rate
D1dTrailer mounted radarmonthly rate
D2aPole mounted radarhourly rate$39.00$39.00$39.00$43.00$39.00$43.00
D2bPole mounted radardaily rate$749.00$749.00$749.00$824.00$749.00$824.00
D2cPole mounted radarweekly rate$2,349.00$2,349.00$2,349.00$2,584.00$2,349.00$2,584.00
D2dPole mounted radarmonthly rate$4,989.00$4,989.00$4,989.00$5,488.00$4,989.00$5,488.00
D3aTrailer mounted videohourly rate
D3bTrailer mounted videodaily rate
D3cTrailer mounted videoweekly rate
D3dTrailer mounted videomonthly rate
D4aPole mounted videohourly rate$44.00$44.00$44.00$49.00$44.00$49.00
D4bPole mounted videodaily rate$599.00$599.00$599.00$659.00$599.00$659.00
D4cPole mounted videoweekly rate$3,299.00$3,299.00$3,299.00$3,629.00$3,299.00$3,629.00
D4dPole mounted videomonthly rate$12,399.00$12,399.00$12,399.00$13,639.00$12,399.00$13,639.00
D5aVideo count without processing - one camera setuphourly rate$44.00$44.00$44.00$49.00$44.00$49.00
D5bVideo count without processing - one camera setupdaily rate$224.00$224.00$224.00$247.00$224.00$247.00
D5cVideo count without processing - one camera setupweekly rate$1,049.00$1,049.00$1,049.00$1,154.00$1,049.00$1,154.00
D5dVideo count without processing - one camera setupmonthly rate$3,299.00$3,299.00$3,299.00$3,629.00$3,299.00$3,629.00
D6aNon-motorized trail or spot counthourly rate$79.00$79.00$79.00$87.00$79.00$87.00
D6bNon-motorized trail or spot countdaily rate$1,149.00$1,149.00$1,149.00$1,264.00$1,149.00$1,264.00
D6cNon-motorized trail or spot countweekly rate$3,299.00$3,299.00$3,299.00$3,629.00$3,299.00$3,629.00
D6dNon-motorized trail or spot countmonthly rate$12,399.00$12,399.00$12,399.00$13,639.00$12,399.00$13,639.00
E - AI/Machine Learning Count Count - optional
E1aAI/Machine Learning Counthourly rate
E1bAI/Machine Learning Countdaily rate
E1cAI/Machine Learning Countweekly rate
E1dAI/Machine Learning Countmonthly rate
E1aNon-motorized trail or spot counthourly rate
E1bNon-motorized trail or spot countdaily rate
E1cNon-motorized trail or spot countweekly rate
E1dNon-motorized trail or spot countmonthly rate
E2aNon-motorized intersection/turning movement counthourly rate
E2bNon-motorized intersection/turning movement countdaily rate
E2cNon-motorized intersection/turning movement countweekly rate
E2dNon-motorized intersection/turning movement countmonthly rate
F - LEO
F1Law Enforcement Officerhourly rate$125.00$125.00$125.00$125.00$125.00$125.00
G - Special Services (add additional lines if needed) - optional
G1DataPointannually$40,000.00$40,000.00$40,000.00$40,000.00$40,000.00$40,000.00
G2Big Data OD/TTper project$10,000.00$10,000.00$10,000.00$10,000.00$10,000.00$10,000.00
G3Drone Flight (minimum 4 hours)hourly rate$500.00$500.00$500.00$500.00$500.00$500.00
G4Fixed Wing Aircraft (minimum 4 hours)hourly rate$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00$1,500.00

IS this "097-19" something we need to update?

PID 108445

File details come from the government source that posted it. Updated .