This is a Bid Tab document for the City of Brighton, Colorado, detailing the 18th Avenue Sanitary Sewer Rerouting Construction project. The bid schedule outlines 22 line items for construction work, including traffic control, mobilization, erosion control, pavement removal and replacement, sanitary line installation, manhole construction, and restoration activities. The project involves constructing sanitary sewer collection system improvements along South 18th Avenue, with specific quantities including 537 linear feet of 8" PVC sanitary line, 4 sanitary manholes, and various surface restoration elements. A contingency line item of $45,000 is included for minor contract revisions.

The bid tab shows unit pricing for each construction activity, with a total project scope focused on infrastructure replacement and improvement. While specific unit prices are not filled in, the document provides a comprehensive breakdown of expected work activities and quantities. The contingency amount of $45,000 suggests the city is preparing for potential unexpected project modifications. The bid appears to be a competitive solicitation for comprehensive sanitary sewer infrastructure work, with detailed specifications for pavement, sidewalk, and utility system modifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

25-009037

INVITATION TO BID
25-009037
18th Ave Sanitary Sewer Rerouting Construction
FEE SCHEDULE
Item No.DescriptionQuantityUOMUnit PriceTotal Price
1Traffic Control1LS$ - 0
2Mobilization1LS$ - 0
3Erosion and Sediment Control1LS$ - 0
4Sawcut & Remove Existing Asphalt Pavement (Full Depth)356SY$ - 0
5Mill Existing Asphalt Pavement (2")622SY$ - 0
6Sawcut & Remove Existing Concrete Sidewalk50SF$ - 0
7Sawcut & Remove Existing Curb & Gutter10LF$ - 0
8Remove Existing Sanitary Line65LF$ - 0
9Abandon Existing Sanitary Line in Place20LF$ - 0
108" PVC (SDR 35) Sanitary Line including Trenching & Backfill537LF$ - 0
1148" Dia. Sanitary Manhole4EA$ - 0
12Connect to Existing Sanitary Manhole1LS$ - 0
13Plug Existing Manhole1LS$ - 0
14Pavement Replacement (6" AC on 8" AB)356SY$ - 0
15Overlay Asphalt Pavement (2")622SY$ - 0
16Miscellaneous Restriping1LS$ - 0
17Concrete Sidewalk Replacement50SF$ - 0
18Curb & Gutter Replacement10LF$ - 0
19Landscaping Restoration300SF$ - 0
20Testing and Camera1LS$ - 0
21Surveying (Construction and Asbuilts)1LS$ - 0
22Minor Contract Revisions/Contingency1F/A$ 45,000.00$ 45,000.00
TOTAL PRICE$ - 0

Bid Amount in Writing: