014100 Quality Requirements.pdf

PDF 136 KB Posted

Attached to
Tape Library Fire Suppression Federal contract opportunity
Solicitation number
SCD-334545-GD
Issued by
Department of Energy Fermi National Accelerator Laboratory

View the file

Other files for this federal contract opportunity

Other files attached to Tape Library Fire Suppression, newest first.
File Type Posted
SCD-334545-GD Amendment 1.pdf PDF
SF1413-13e (1).pdf PDF
Fermilab Subcontractor Injury Illness Data Questionnaire.pdf PDF
010010 General Requirements.pdf PDF
FRA General Terms and Conditions for Construction (06.2022).pdf PDF
SOW.pdf PDF
013100 ESH Requirements.pdf PDF
General Decision Number IL20220008 Mod 13.pdf PDF
2022 Construction Insurance Requirements.pdf PDF
212400 Clean Agent Fire Suppression.pdf PDF
SARC.pdf PDF
Exhibit II - Payment Bond FL-42.pdf PDF
SCD-334545-GD.pdf PDF
013300 Submittals.pdf PDF
PUR-466_Proposal Certifications (1).pdf PDF
Exhibit II - Bid Bond FL-41.pdf PDF
Exhibit II Proposal Form.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FRA Quality Requirements August 2022

QUALITY REQUIREMENTS 014100-1

SECTION 014100 – QUALITY REQUIREMENTS

PART 1 GENERAL

1.1 PURPOSE

The Subcontractor is responsible for all activities necessary to manage, control, and document work so as to ensure compliance with the Subcontract documents. The

Subcontractor’s responsibility includes ensuring adequate Quality Control services are provided for work accomplished on- and off-site by his/her organization, suppliers, subtier contractors, technical laboratories, and consultants.

The work activities include safety, submittal management, testing and inspection, and all other functions relating to the requirement for quality construction. The Subcontractor shall implement a Quality Control program and designate a quality responsible person(s) to achieve these goals.

1.2 REFERENCES

The publications listed below form a part of this subcontract to the extent referenced.

010010 General Requirements

013100 Environment, Safety, and

Health Requirements

013300 Submittals

1.3 THE QUALITY CONTROL PROGRAM

Corporate Quality Control Plan: The Subcontractor shall furnish with the bid or proposal a copy of the corporate Quality Control Plan. Failure to submit such a document could constitute a non-responsive bid or proposal.

Project Quality Control Plan: On all projects, the Subcontractor shall furnish the Project

Quality Control (PQC) Plan to the Procurement Administrator, for review by FRA, not later than 10 working days after receipt of award of Subcontract. The plan shall identify personnel, procedures, control, instructions, test, records, and forms to be used specific to this project at Fermilab. The PQC Plan shall incorporate any changes in scope of work, due to directed field changes or supplemental agreements, as these changes occur.

1.4 REQUIREMENTS

The PQC Plan shall include, as a minimum, the following information to cover all construction operations, both onsite and offsite, including work by sub-tier contractors, fabricators, suppliers, and purchasing agents:

QUALITY REQUIREMENTS 014100-2

The name, qualifications, duties, responsibilities, and authorities of each person assigned a Quality Control function, including the identity of the

Project Quality Control Manager:

Depending on the complexity of the job, the Quality Control Project Manager may also serve as the project superintendent and/or competent person, reference 010010 General Requirements

As a minimum, the Project Quality Control Manager shall be responsible for the following:

Interface with CMO on all quality matters;

Maintain all quality related records;

Review / submit shop drawings;

Coordinate and participate in all preparatory, initial and follow-up meetings;

Attend weekly construction meetings;

Assure all required testing is performed;

Develop and maintain deficiency list;

Prepare and submit daily quality control reports;

Participate in beneficial occupancy, punch list and final inspections.

In addition, the Subcontractor shall provide as part of the Quality Control organization, specialized personnel to assist the Project Quality Control Manager for the discipline(s) specified below. These individuals may be employees of the Subcontractor or Sub-tier contractor; will be responsible to the Project Quality Control Manager; must be physically present at the construction site during work on their areas of responsibility; must have the necessary education and/or experience in accordance with the experience matrix listed herein. These individuals may perform other duties but must be allowed sufficient time to perform their assigned Quality Control duties as described 010010.

Control, verification, and acceptance testing procedures for each specific test required by the Subcontractor.

Procedures for tracking preparatory, initial, and follow-up control phases and control, verification, and acceptance tests including documentation.

A list of the definable features of work. A definable feature of work is a task that is separate and distinct from other tasks, has separate control requirements, and may be identified by different trades or disciplines, or it may be work by the same trade in a different environment.

1.5 ACCEPTANCE

Acceptance of the Subcontractor's PQC Plan is required prior to Notice to Proceed.

Acceptance is conditional and will be predicated on satisfactory performance during the construction.

FRA reserves the right to require the Subcontractor to make changes in his PQC Plan and operations including removal of personnel, as necessary, to obtain the quality specified.

QUALITY REQUIREMENTS 014100-3

Construction Subcontract Terms and Conditions). FRA review and acceptance will occur within 5 working days of the submittal of the PQC Plan.

PART 2 PRODUCTS - Not Used

PART 3 EXECUTION – Not Used

END OF SECTION