This document is a set of paving and signal plans for the Umatilla County Old Oregon Trail Highway I-84: Emigrant Hill WIM Site Repaving Project, prepared by the Oregon Department of Transportation (ODOT) State Administration Federal Highway Division. The project involves replacing existing weight-in-motion (WIM) detection on I-84 at milepost 227.54 westbound and requires full depth continually reinforced concrete pavement (CRCP) repair. To isolate the work area and facilitate two-way traffic on the eastbound side of the interstate, the median concrete barrier will be broken. The project is scheduled for October 2026, with the work location spanning from I-84 milepost 224.02 to milepost 227.54, with prospective staging areas identified near Pendleton. The plans include typical sections, roadway details, traffic control specifications, intelligent transportation systems equipment details, and administration guidelines. The project contains a 15 percent Indian employment preference goal as specified in the sample contract and related specifications.
The plans reference Oregon Standard Drawings and Specifications, with detailed specifications for materials, installation methods, and quality standards for all components including asphalt concrete pavement (ACP), precast concrete barrier with pin and loop assemblies, pavement markings, conduit trenching, wire and cable installation, temporary traffic control devices, and temporary concrete barrier configurations. Traffic control plans specify required signage, barricade types and placement, temporary impact attenuators, and delineation methods appropriate for freeway operations at the posted speed. The document incorporates multiple standard drawing references for temporary and permanent installations, including details for barrier anchoring, securing concrete barriers to roadway surfaces, and methods for pavement edge treatment and transitions. All materials and construction shall comply with current Oregon Standard Specifications and professional engineering practices, with final alignment and specifications to be established by the engineer during field implementation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 00017767 Form A2 Bid Pricing Form.xlsx | XLSX spreadsheet | |
| 00017767 PI_ITB.docx | DOCX document | |
| 00017767 Addendum1.docx | DOCX document | |
| 00017767 Exhibit 5 Specifications.pdf | ||
| 00017767 Sample PI Contract.docx | DOCX document | |
| 00017767 Exhibit 7 Agency Furnished Materials.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UMATILLA
59V-103
UMATILLA COUNTY
OLD OREGON TRAIL HIGHWAY
I-84: EMIGRANT HILL WIM SITE REPAVING PROJECT
M C
-S
ST. HELENS
ASTORIA
TILLAMOOK
MCMINNVILLE
ALBANYNEWPORT
CORVALLIS
HOOD
RIVER
DALLES
THE
MADRAS
PRINEVILLE
BEND
COQUILLE
GRANTS
PASS
Ashland
BURNS
KLAMATH
FALLS
CONDON
MORO
PENDLETON
LA GRANDE
ENTERPRISE
VALE Ontario
PORTLAND
SALEM
MEDFORD
EUGENE
ROSEBURG
Athena
N. Powder
Unity Dayville
Sisters
Juntura
Frenchglen
Burns Jct.
McDermitt
Paisley
La Pine
Crescent
Biggs
Lexington
Hermiston Boardman
Ukiah
Arlington
Malin
Brookings
Coos Bay
Drain
Canyonvil le
Reedsport
Oakridge
Goshen Florence
Lincoln City
Waldport
Home Sweet
Detroit Antelope
Maupin
Forest Grove
Hebo
Cannon Beach
Seaside Rainier
Milton-Freewater
W
26 35 197
39519
3953197
Bonanza
Junction City
BAKER CITY
HEPPNER
Copperfield
Lake Silver
Junction CaveBEACH
GOLD
Orford Port
LAKEVIEW
CANYON
CITY
Day John
CITY
OREGON
HILLSBORO
DALLAS
Redmond
Val ley Jordan
(503) 232-1987).
The Oregon Utility Notification Center Is
The Center (Note: The Telephone Number For
You May Obtain Copies Of The Rules By Calling
Through OAR 952-001-0100.
Those Rules Are Set Forth In OAR 952-001-0001
By The Oregon Utility Notification Center.
Oregon Law Requires You To Follow Rules Adopted
ATTENTION:
LET'S ALL
WORK TOGETHER
TO MAKE THIS
JOB SAFE
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
F
IR
S T
S A F E T Y
OCTOBER 2026
UMATILLA COUNTY
OLD OREGON TRAIL HIGHWAY
I-84: EMIGRANT HILL WIM SITE REPAVING PROJECT
PAVING & SIGNAL
PLANS FOR PROPOSED PROJECT
DEPARTMENT OF TRANSPORTATION
STATE OF OREGON
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
A01A01STATE
30 84
"I-84" MP 227.54 WB
PROJECT LOCATION
"I-84" MP 224.02
PROSPECTIVE STAGING AREA
PENDLETON
Umatilla River
INDEX OF SHEETS
SHEET NO. DESCRIPTION
Title SheetA01
A02 Index Of Sheets Cont. & Std. Dwg. Nos.
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
T. 01 N., R. 34 E., W.M.
R_M26042_ts_01.dgn :: A01 8/4/2026 12:03:21 PM hwye53h
59V-103
UMATILLA COUNTY
OLD OREGON TRAIL HIGHWAY
I-84: EMIGRANT HILL WIM SITE REPAVING PROJECT
INDEX OF SHEETS, CONT.
SHEET NO. DESCRIPTION
BA01 Typical Sections
Details BB03 incl.
BB01 thru
ROADWAY DETAILS
TRAFFIC CONTROL
EB02 incl.
EB01 thru Traffic Control Details
INTELLIGENT TRANSPORTATION SYSTEMS
KA01 Site Plan
Equipment Details KB03 incl.
KB01 thru
ADMINISTRATION
FEDERAL HIGHWAY
DIVISION
OREGON
PROJECT NUMBER
NO.
SHEET
SEE SHEET A01
AVAILABLE UPON REQUEST
FINAL ELECTRONIC DOCUMENT
A02http://www.oregon.gov/ODOT/Engineering/Pages/Standards.aspx
Standard Drawings located on the web at:
F
O T
N E
MTRAPED
N
O G
E R
O
N
OI
T
ATROPS
N A
R T
Standard Dwg. Nos. R/W Map No. - N/A
Precast Concrete Barrier Pin And Loop Assembly For Temporary Installation- RD503
And Maintenance Purposes Only
Median Barrier Anchoring Details For Temporary Installation And Maintenance- RD515
Purposes Only
Securing Concrete Barrier To Roadway For Temporary Installation And- RD516
Maintenance Purposes Only
Asphalt Concrete Pavement (ACP) Details- RD610
Pavement Marking Standard Detail Blocks- TM500
Durable And High Performance Pavement Markings Surface And Groove- TM521
Installed Non-Profiled
Alignment Layout: General- TM560
Flag Board Mounting Details- TM204
General Conduit Trenching- TM700
General Conduit And Wire/Cable Installation - TM701
Tables, Abrupt Edge and PCMS Details- TM800
Temporary Barricades- TM820
Temporary Sign Supports- TM821
Temporary Sign Supports- TM822
Temporary Concrete Barrier And Rumble Strip Details- TM830
Temporary Impact Attenuators- TM831
Temporary Impact Attenuators- TM833
Freeway Sections- TM861
Freeway Sections- TM862
Freeway Or Divided Highway Speed Reduction (Paving Operations)- TM880
EA01 Traffic Control Details
R_M26042_ts_01.dgn :: A02 8/4/2026 12:03:26 PM hwye53h
2026.08.06 08:50:35 -07'00'
2026.08.06 08:52:53
2026.08.06 08:54:11
2026.08.06 08:55:23
2026.08.06 08:56:13
2026.08.06 08:33:25
2026.08.06 08:33:59 -07'00'
2026.08.06 08:34:36 -07'00'
2026.08.04 14:12:05
2026.08.04 14:12:46
2026.08.04 14:13:03
2026.08.04 14:13:24
RD503
MAINTENANCE PURPOSES ONLY
TEMPORARY INSTALLATION AND
PIN AND LOOP ASSEMBLY FOR
PRECAST CONCRETE BARRIER
R D
.d g n
REVISED DETAILS AND NOTES04-2021
14-JUL-2023N/A
J U
L
12-2021 REVISED NOTES
06-2023 REVISED NOTES, DETAILS AND TITLE CHANGE
LOOP BAR DETAIL
END VIEW A-A END VIEW B-B
" DIA.4
LOOP BAR
SIDE VIEW
TOP VIEW
grout, as directed non-shrinking finish flush with
(when reqd.)
2" dia.holes
"U" loop bar and
10"rad.
slots
"x2"2
" chamfer4
" x 2" slots2
#4 bars
"cl.2
" rad.8 provide a smooth transition between the slopes of the barrier slopes. Construct the 10" radius to
Dimensions marked thus are to the intersection point
" rad.4
" chamfer4
" rad.8
"x2" slots2
#4 bars
"cl.2
10" rad
"x2" slots2
"2
" chamfer4 keyway continuous
"2
"x52 keyway continuous
"2
"x52
"2
12"
"2
24"
" "2
" rad.4
T y p
12"
24"
"8
** 2
"8
** 4
" chamfer4
3'-3"
3'-3"
"8
2" ±
45°
"2
MEDIAN BARRIER
PLAN
ELEVATION
A
A
B
B
"2
2"
Laying length 12'-7"
Edge length 12'-6"
#4 Stirrup pairs
18"
5" 10" 20" nom. 20" nom. 20" nom. 20" nom. 20" nom. 20" nom. 10"
18"
5"
"2
3'-1
" dia. loop bar4 scupper
3"x12" bars each face
4 - 11'-8" #4
2"
2" dia. holes (When reqd.)
"U" loop bar see End Views A-A and B-B
For details not shown, see End Views A-A and B-B
For details not shown, PIN AND LOOP CONNECTION
SECTION C-CPLAN
CC
in place.
partially
Pin shown
(See general note 7) as directed
Grout over connecting pin, 1" clearance
" dia. loop bar4
" chamfer4
"U" loop bar
SHOULDER BARRIER
(NARROW BASE)
"8
2** side
Traffic
" 2
"8
"2 where reqd.
paving ledge
"x4"2
"2 grade
Finish "2
"2
"4
12"
(For assembly details and dimensions, see median barrier at left) be secured to roadway cannot be obtained shall where these dimensions barrier and placed in areas
Barrier used as shoulder*
"8
4**
** "8
"2 side
Traffic 2
4 " grade
Finish
(Secured)
12" min.
12"
24"
24" (Secured)
*66" (Unsecured)
(Unsecured)
*24" min.
(STANDARD)
(When reqd.)
and 2" dia. hole
"U" loop bar
(When reqd.)
and 2" dia. hole
"U" loop bar
#4 Rebar
(MEDIAN BARRIER)
#4 Rebar
(SHOULDER BARRIER)
STIRRUP ''M''
STIRRUP ''S''
"4
4"
"4
4"
4"
18"-22"
Var.
4"
8"
8"
"U' LOOP BAR DETAIL
#4 bar
"8
STANDARD BARRIER PIN
ALTERNATE PIN DETAILPIN DETAIL
side Traffic
" min. thkn.)8 1( circular washer " dia.4
12" or 2
1"x8 UNC placement beveled to facilitate
" may be2 1Bottom placement beveled to facilitate
" may be2 1Bottom
1"
"16
1" dia. pin
1" dia. pin shown.
part of pin or shall be welded as
1. Washer shall be forged as integral
PIN NOTES:
3° the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this concrete, unless otherwise shown.
and shall be 2 inches clear of nearest face of All reinforcement shall be full length as shown11.
barrier.
surfacing for the clear area behind temporary smooth, solid surfacing. Maintain smooth, solid unsecured barrier. Place temporary barrier on secured or 5.5 feet of clear space behind of 18 inches of clear space behind the barrier if For temporary installations, provide a minimum10.
fabrication.
connectors shall be hot-dip galvanized after All pins, bolts, dowels, loop bars, and9.
installations.
barrier that is maintained for use in temporary See Std. Dwgs.RD515 and RD516 for concrete barrier anchoring details (when being anchored).
See Std. Dwg. RD502 for new installations See Std. Dwgs. RD515 and RD516 for details.
than 8 feet in width shall be secured to roadway.
8. Precast concrete barrier used in medians less consistency, as directed.
cement grout, weak in strength and of thick holes or grouting of scuppers shall be Portland
7. Concrete grout for grouting over pins, pinning a minimum 2 inches of grout, as directed.
6. When scuppers are not required, plug them with assembly.
concrete median barrier with pin and loop
5. Temporary concrete barrier to be precast on plans.
locations with backfill behind barrier as shown
4. Narrow base shoulder barrier to be used only at to curvatures with radii greater than 770 feet.
Normal use of precast barrier units is restricted3.
1425 feet shall be 25 feet.
hord length for curves with radii exceedingc foot radius or less shall be 12.5 feet. Maximum Maximum chord length for curves with a 14252.
INSTALLATIONS.
ONLY. DO NOT USE FOR NEW PERMANENT
INSTALLATION AND MAINTENANCE PURPOSES
THIS DRAWING IS RETAINED FOR TEMPORARY1.
THIS SHEET:
GENERAL NOTES FOR ALL DETAILS ON
RD515
PURPOSES ONLY
INSTALLATION AND MAINTENANCE
DETAILS FOR TEMPORARY
MEDIAN BARRIER ANCHORING
R D
.d g n
REVISED DETAILS AND NOTES07-2022
14-JUL-2023N/A
J U
L
3"
18"2" dia. holes
16"16"
18" each unit as shown
#4 "S" bar each end, (Typ.)
"2
"x12" chamfer2
" chamfer2
"x84 each unit as shown
#4 "S" bar each end, (Typ.)
"2
Top
"2
16" (Typ
"4
24"
16"( Typ.)
"4
Top
9"
26"
(Typ.)
4" in width
Recess to be placing pin, as directed
Fill recess with grout after
17" tall barrier
15" standard barrier "2
4"2 pins as reqd.). Use 2 pins each end, each unit through surfacing into base. (Provide holes for
Standard barrier pin per Std. Dwg. RD503
(To be left in place)
" I.D. PVC plastic pipe4
Form hole for pin with
Finish grade
#4 "S" bar
4 per barrier section
2" dia. holes keyway
Continuous var. 1'-6" to 1'-10"
Grout bed 2"
Finish grade pvmt.
FOR PRECAST CONCRETE BARRIER
GROUT DETAIL
GROUTING OPTION
STANDARD BARRIER
PLAN VIEW AT S BAR
TALL BARRIER
PLAN VIEW AT S BAR
SECURING TO PAVEMENT OPTION
ELEVATION VIEW AT ANCHOR RODS
GROUTING HOLES PLAN
(Dimensions between 2" dia. holes are nominal)
Do not use for new construction.
This detail is retained for maintenance purposes.
01-2023 REVISED NOTES
MEDIAN CONCRETE BARRIER ANCHORING DETAILS
(See general note 1)
06-2023 REVISED NOTES AND TITLE CHANGE
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
"S" bars to be full length as shown.6.
be hot-dip galvanized after fabrication.
All pins, bolts, dowels, loop bars, and connectors shall5.
securing concrete barrier to roadway.
other details not shown. See Std. Dwg. RD516 for andSee Std. Dwgs. RD503 and RD546 for reinforcement4.
measured between nearest fog lines).
For use in medians with width less than 8 feet (as3.
otherwise shown.
be 2 inches clear of nearest face of concrete, unless
All reinforcement shall be full length as shown and shall2.
DO NOT USE FOR PERMANENT INSTALLATIONS.
INSTALLATION AND MAINTENANCE PURPOSES ONLY.
THIS DRAWING IS RETAINED FOR TEMPORARY1.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
RD516
PURPOSES ONLY
INSTALLATION AND MAINTENANCE
TO ROADWAY FOR TEMPORARY
SECURING CONCRETE BARRIER
R D
.d g n
REVISED NOTES01-2023
14-JUL-2023N/A
J U
L
(See Std. Dwg. RD503) used as anchor rod
Standard barrier pin
(See Std. Dwg. RD503) used as anchor rod
(Modified, omit washer)
Standard barrier pin side
Traffic
(See Std. Dwg. RD503) (See Std. Dwgs. RD503 & RD515)
MEDIAN INSTALLATION
Not allowed in narrow medians, see general notes 1 and 6
Secured using anchor rods (Angled) Secured using anchor rods (Vertical)
SHOULDER INSTALLATION SHOULDER OR MEDIAN INSTALLATION
Secured using grout
(See Std. Dwg. RD503)
(See Std. Dwg. RD505)
Secured by continuous shear key
SHOULDER OR MEDIAN INSTALLATION
side
Traffic
(See Std. Dwg. RD503) used as anchor rod
(Modified, omit washer)
Standard barrier pin
(See Std. Dwg. RD503) used as anchor rod
Standard barrier pin
(See Std. Dwgs. RD545 and RD546) (See Std. Dwgs. RD545 and RD515)
SHOULDER INSTALLATION
in narrow medians, see general notes 1 and 6
Secured using anchor rods (Angled) not allowed Secured using anchor rods (Vertical)
MEDIAN INSTALLATION
SHOULDER OR MEDIAN INSTALLATION
Secured using grout
THIS DETAIL IS RETAINED FOR MAINTENANCE PURPOSES.
(See Std. Dwgs. RD545 and RD546)
METHODS OF SECURING PRECAST CONCRETE BARRIER TO ROADWAY
CONCRETE BARRIER
PRECAST
CONCRETE BARRIER
PRECAST
CONCRETE BARRIER
PRECAST
CONCRETE BARRIER
PRECAST TALL (42")
CONCRETE BARRIER
PRECAST TALL (42")
CONCRETE BARRIER
PRECAST TALL (42")
CONCRETE BARRIER TO ROADWAY
METHODS OF SECURING CAST-IN-PLACE
(See general note 1)
METHODS OF SECURING PRECAST TALL (42") CONCRETE BARRIER TO ROADWAY
THIS DETAIL IS RETAINED FOR MAINTENANCE PURPOSES.
(See general note 1)
(See general note 1)(See general note 1)
(See general note 1)
(See general note 1)
(See general note 1)
06-2023 REVISED NOTES AND TITLE CHANGE
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
9. All pins, bolts, dowels, loop bars, and connectors shall be hot-dip galvanized after fabrication.
vertical reveal. Modify placement when required by plans, or as directed.
Normal permanent installation of concrete barrier is on top of finish grade, to provide 3 inch8.
Anchor rods are standard barrier pins, modified for shoulder installation, as shown.7.
nearest fog lines) shall be secured to roadway to resist impacts from both sides.
Precast concrete barrier used in medians less than 8 feet in width (as measured between6.
Temporary concrete barrier to be precast concrete median barrier with pin and loop assembly.5.
barrier sections, bridge rails, retaining walls, and similar existing or constructed objects.
Securing concrete barrier to roadway is in addition to connections between adjacent concrete4.
referenced for the selected method.
Select one of the securing methods shown. For details not shown, see the standard drawing(s)3.
As directed by the Engineer.c)
When required by plans, orb)
Barrier deflection requirements per Std. Dwg. RD503 cannot be obtained, ora)
Secure concrete barrier to roadway when any of the following conditions exist:2.
standard drawings) for details not shown.
PURPOSES ONLY. DO NOT USE FOR NEW PERMANENT INSTALLATIONS. See appropriate guardrail
CONCRETE BARRIER TO ROADWAY FOR TEMPORARY INSTALLATION AND MAINTENANCE
THIS STANDARD DRAWING IS INTENDED TO SHOW ACCEPTABLE METHODS OF SECURING1.
GENERAL NOTES FOR ALL DETAILS ON THIS SHEET:
RD610
DETAILS
PAVEMENT (ACP)
ASPHALT CONCRETE
R D
.d g n
25-JUL-2017N/A
J U
L
1" in 5'
Feather base course Taper 1" in 5'
AT GRAVEL APPROACHES
METHOD OF FEATHERING ACP PAVEMENT
OR BRIDGE ENDS WHEN NOT OVERLAYING THE BRIDGE
ACP PAVEMENT MATCH AT PROJECT ENDS
METHOD OF MATCHING EXTG. ACP INLAY SURFACING
TABLE 1
METHOD A *
METHOD B *
TAPER LENGTHS
ACP wearing course
(When present)
Feather ACP base course
Extg. pvmt.
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered
See project plans for method.
Taper (See Table 1)
Cold plane pvmt. removal
Taper (See Table 1)
Cold plane pvmt. removal
Posted Speed Taper Length
1" per 50'45 mph
1" per 100'> 45 mph
See "EDGE DETAIL"
Extg. pvmt.
wearing course thkn.
ACP unfeathered top ACP base course
Construct non-feathered
(See "EDGE DETAIL")
Top of ACP base, Extg. pvmt.
ACP wearing course
(When present)
Feather ACP base course
Extg. gravel surfacewearing course thkn.
ACP unfeathered
Thkn. - Var. (2" to 0)
Aggr. base
Thkn. - Var. (2" to 0)
(When present)
Asph. conc. base course
(Thkn. as shown on plans)
ACP wearing course
Extg. pvmt.
Thkn. - 2"
(When present)
ACP base course e x tg p v m t.
E d g e o f
See "EDGE DETAIL"
ACP wearing courseExtg. pvmt.
See "EDGE DETAIL"
Extg. A.C. pvmt.
Cold plane pvmt. removal
(Inlay to extg. asphalt conc. pvmt.)
not acceptable
Mill edge as shown
Nom. depth
Sawcut & seal
EDGE DETAIL
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM204
MOUNTING DETAILS
FLAG BOARD
T M
.d g n
10 DEC 2009N/A
D
E C o r
2"
½
Flag mounts to this face
Varies
1" thick
3/16"
SQUARE TUBING
SQUARE TUBING
OPTIONAL MOUNTING
BAR MATERIALS
flags.
mounting holes on may alter location of
Use of square tubing
Note:
*** Variable *** Variable
C" CHANNELS
"C" CHANNEL WITH EXTENSION
*** Regulatory or Guide Sign
MOUNTING BAR DETAIL
2" 2"18½"
16"
(7/16" diameter)
Mounting holes
FLAG DETAILS
sheet aluminum
1/16 " thick
WARNING
REGULATORY OR GUIDE SIGN
GUIDE SIGN
(2-POSTS)
(1 POST)
2" 2"
" min.
6"
* 36" x 36" ** 48" x 48"
6" min.
1½"
/8
1½"
½
" thick
7/6 "4
18½" 18½"
2"
* 36" x 36" Warning Sign
** 48" x 48" Warning Sign
V a ri e s
Varies
* 4½" * 4½" ** 12⅞" ** 12⅞" between sign and flags.
the required vertical clearance such a manner as to provide Mount extension to post in Note:
⅜" drive rivets.
Mount flag(s) to bar using fasteners to mount bar to metal post.
Use manufacturer recommended wood post.
Use ⅜" x 3" lag bolts to mount bar to are to be�" diameter.
All mounting holes (to post and to flags) Note:
bolt holes in extension and bar.
Drill holes in plate to align with ¼" to ½" thick.
4"x4" square.
Gusset plate.
Stainless Steel Note:
outside edge of sign.
no further than extends horizontally Outside edge of flag the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM500
STANDARD DETAIL BLOCKS
PAVEMENT MARKING
T M
.d g n
Changed Min. widths for CH, TM, TM-40, and TS07-2020
07-01-2020N/A
DISABLED PARKING DETAIL (white)
4" white edge line
Edge of pavement
17'
1'
20'
4"
Direction of Traffic
36° 36°
3'
4'
36° 3'
4'
LL
L
L
LL
LL
L
LLL
LL
L
TS
LL
LL
L
L
LL
4'
Direc tionofTr affic
36° 3'
L
9'
3'
8" white line
1'
20'
4'
4" 8 " white line
12'12'12'
L For traversable medianL
9'
3'
L
12'
LL
1'
' 6
1'
For Centerline
DLL DLL-2
36°
36° 3'
Direction of Traffic
BYLD
L E G E N D
36°
36°
Direction of Traffic
CH
For lane lines in drop lanes
LL
For lane lines in acceleration/deceleration lanes
40'
40'
40'
10'
10'
40'
For lane extensions and bike lane extensions For lane extensionsFor lane extensions
TM-40
30'10'
8'
40'
20'
30'
10'
40' 40'
30'
30'
(Typ.)
Wheel Stop
YD
NPL
YBWB
TWL
WD-2
NPR
ND
Direction of Traffic
YLD
TM
4 " space
NDW
Thru Traffic Side
WD
D
YW-2W
2'
4" space
36°
36°
L
4" space
4" space
4"
4"
30'
4" YELLOW LINE
4" WHITE BROKEN LINE
4" space
LL
L
L
LL
LL L
L
LL
8'8'
6'6' 6'
2'2'
8'
1' space
8'
4" YELLOW BROKEN LINE
8" WHITE LINE4" WHITE LINE
10'
40'40'
8'
2'
1'
1'
1'
8" WHITE DOTTED LANE LINE4" WHITE DOTTED LANE LINE
Yellow Line Narrow Double
Yellow Line Narrow Double
YIELD LINE (white) for field layout angle orientation for field layout angle orientationfor field layout angle orientation striping plans
Lane line dimensions are shown on the Or Thru Traffic Side
Direction Of Traffic, Increasing Stationing
1' WHITE BARS AT 20' SPACING
CHEVRON BARS
BICYCLE YIELD LINE (white)
4" YELLOW LINES
NO-PASS RIGHT
Yellow Line Narrow Double for field layout angle orientation
4" white line
R o u te
A c c e s s ib le w h ite lin e
1' WHITE BARS AT 20' SPACING
TRANSVERSE SHOULDER BARS
4" YELLOW DOTTED LINE
4" white line
1' YELLOW BARS AT 40' SPACING
TRANSVERSE MEDIAN BARS
distance between left turn refuges exceeds 200' For use at painted medians where
Increasing Stationing Increasing Stationing
Yellow Line Narrow Double
2' (Typ.)
8" WHITE DOTTED LINE4" WHITE DOTTED LINE
1' YELLOW BARS AT 20' SPACING
TRANSVERSE MEDIAN BARS
3' 5"
4" YELLOW LINES
NO-PASS LEFT
4" YELLOW LINES
TWO-WAY LEFT TURN
TWO 4" WHITE LINES
NARROW DOUBLE NO-LANE CHANGE
TWO 4" YELLOW LINES
DOUBLE NO-PASS
TWO 4" YELLOW LINES
NARROW DOUBLE NO-PASS
(thru traffic side )
HC
4.5' min.
min.
4.5' min.
4.5' min.
4.5' the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM521
NON-PROFILED
SURFACE & GROOVE INSTALLED
PAVEMENT MARKINGS
DURABLE & HIGH PERFORMANCE
T M
.d g n
Changed groove width for 4 in. markings07-2021
20-JAN-2023N/A
J A
N
Top of pavement
Marking Width
Thickness Material
SURFACE INSTALLED MARKINGS
Marking Length
A
Width
Marking
Thickness Material
Depth
Groove
Marking Length Taper 3 ± 1 in.
Taper 3 ± 1 in.
General Notes:
Durable Method 'A' & Method 'D'
2) See Standard Specification 00850.46 for marking installation tolerances.
1) See Standard Drawing TM500 and/or project plans for marking length and width dimensions.
B
GROOVE INSTALLED MARKINGS
B
GROOVE INSTALLED GROOVE AND MATERIAL DIMENSIONS
SECTION B - B
Var. 25 mils
Var.
Pavement Marking Material Type Thickness Material
Groove Depth
High Performance
Recess Depth
Marking Material
Pavement Marking Material Type
SECTION A - A
to top of material from top of pvmt.
Recess depth Top of pavement
Durable Method 'A' & Method 'B' & Method 'D'
25 milsHigh Performance
Thickness
120 mils220 ± 20 mils 45 ± 5 mils
60 ± 10 mils
SURFACE INSTALLED MATERIAL THICKNESS
Marking width + 1 ± 0.125 In.
01-2023 Changed groove width back to previous width for 4 in. markings the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
= Lane line dimensions are shown on the Striping plans.
TM560
GENERAL
ALIGNMENT LAYOUT:
T M
.d g n
MODIFIED CONTROL POINTS, ADDED NEW LAYOUT REQUIREMENTS AND DETAILS07-2025
11-JUL-2025N/A
J U
L
ACCOMPANIED BY DWGS.:
TM504
TM500, TM501, TM502, TM503,
GENERAL NOTES:
three dots if the line is broken.
of permanent pavement markings. These lines will be followed by
Typical layout transition details are marked by lines denoting location4.
different pavement marking and at the end of pavement markings.
pavement markings, where pavement markings transition to a
Use pavement marking transition detail marks at the start of3.
surfaces.
white paint on asphalt surfaces and black paint on concrete pavement
Use aerosol paint to mark layout transition details and control point;2.
Use control points to make continuous narrow guideline as specified.1.
LEGEND
LL
BROKEN LINE LAYOUT TRANSITION DETAIL
NO PASS LEFT LAYOUT TRANSITION DETAIL
TWO WAY LEFT LAYOUT TRANSITION DETAIL
LAYOUT TRANSITION DETAIL
DOUBLE LINES 4" TO 12" WIDTH
SOLID LINE LAYOUT TRANSITION DETAIL
ND D
WB YB WD YD DLL DLL-2 WD-2
W Y W-2
NPL NPR
TWL
INCREASED STATIONING
THRU TRAFFIC SIDE
THRU TRAFFIC SIDE
TANGENT SECTIONS
CONTROL POINT LAYOUT
CURVE SECTIONS
CONTROL POINT LAYOUT
CONTROL POINT
LL
Control points, typ.
40' maximum 40' maximum 40' maximum
Control points, typ.
mumixam'52 mumixam'52 mumixam'52
12" to 24"
LL
LL
See General Note 2
LL
LL
LL
LL
LL
INCREASED STATIONING
THRU TRAFFIC SIDE
NDW
NO PASS RIGHT LAYOUT TRANSITION DETAIL
LL
EXAMPLE LAYOUT TRANSITION DETAIL
Control point details above
See control point spacing
LL
LL for transversable medianND
LL for centerlineND typ.
6"-12"
See General Note 2
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM700
CONDUIT TRENCHING
GENERAL
T M
.d g n
01-2025
10-JAN-2025N/A
J A
N
2" Bedding
2" Cover
30"
24"
18"
18"
Thickness, Whichever Is Greater
6" Min. Or Match Existing Surface
Conduit
CLSM
Conduit
Non-Metallic
Metallic
Roadway & Shoulders Other AreasType Of Conduit
Or Upper Limit Of Excavation
Subgrade, Surrounding Ground, Top Of Trench, Bottom Of
When Using Rigid Metallic Conduit)
Sand Blanket (May Be Omitted
Top Of Existing Surface
CONDUIT OPEN TRENCH EXCAVATION & BACKFILL
under sidewalk, landscaped areas, etc.)
UNSURFACED AREAS (new roadway prior to paving, shoulders, 6" (Nominal)
Top Of Finished Surface
For The Entire Length Of The Conduit Run
Center Underground Marking Tape Over Conduit
MINIMUM COVER FROM FINISHED SURFACE
(Use Permit Depth If Greater Than These)
Minimum Cover From Top of Finished Surface
Minimum Cover Table)
Minimum Cover (See
Minimum Cover Table)
Minimum Cover (See
Optic Hand Hole As Per TM702, The Minimum Cover Depth Is 24 Inches.
2. For Non-Metallic Conduit Under Roadway & Shoulders Installed Horizontally Into Fiber
More Information.
To Accommodate The Minimum Radius ("R") Of The Conduit Elbow. See TM701 For
1. Additional Cover Depth May Be Necessary Near Foundations And Junction Boxes
Notes:
Than 6" According To 00405.46(C)(2).
Material. Compact Material In Layers Not Greater
Selected Granular Or Selected General (Native)
Along The Boundaries Of The Area To Be Removed
With An Approved Pavement Cutting Saw 2" Minimum Depth
When Excavating, Cut Sharp And Well Defined Pavement Edges
Finish To A Smooth Riding Surface.
00745, 00755, And 00756, As Applicable.
Compact Material According To 00744, Match Existing Surface Material: PCC Or ACP
6. Furnish Backfill Materials According To 00960.10
5. Do Not Backfill Trenches Until Inspected By The Engineer
4. Hold Trench Width To A Practical Minimum
Place All Conduit Before Paving Or Landscaping.
3. Excavate According To 00960.40. In Areas To Be Paved Or Landscaped, Changed To Avoid Obstructions.
2. Conduit Runs Shown On Plans Are For Bidding Purposes Only. Locations May Be
1. Install Conduit By Open Trench Method, Horizontal Directional Drilling, Or As Shown
General Notes:
(See Note 2)
CONDUIT OPEN TRENCH EXCAVATION & BACKFILL
EXISTING PAVED AREAS
NEW DRAWING (CONTENT FROM RETIRED TM471)
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
Standard Drawing, while
The selection and use of this
TM701
T M
.d g n
NEW DRAWING (CONTENT FROM RETIRED TM470 & TM471)01-2025
13-JAN-2026N/A
J A
N
Future Use (No Wires/Cables In Conduit). Leave 6 Feet Of Slack Pull Line.
6. Install Polyethylene Pull Line In All Conduits Noted On The Plans For
Poles, Cabinets Unless Otherwise Shown.
5. Leave A Minimum Of 2 Feet Slack In Each Wire And Cable In Junction Boxes,
4. Tape The Ends Of Unused Conductors With Insulated Vinyl Plastic Tape.
Common Wire Nut Unless Otherwise Shown.
And Install A Wire Nut. Do Not Join Multiple Locate Wires Under A All Conduits As A Locate Wire. Leave Slack As Shown Or Directed
3. Install No. 16 AWG TFFN Orange Base With Blue Tracertone Wire In
Unless Otherwise Shown.
Handheld Labeler (Brady M210 Label Maker With Vinyl B-595 Tape)
2. Label Wires And Cables With Permanent Tags As Shown Or Directed. Use
To Specification Section 00990 Bid Items.
1. See TM470 For Additional Wire/Cable Installation Requirements That Apply
Wire & Cable Installation General Notes:
LUBRICANT
Wires And Cables In Conduit Use Electrical Lubricants When Inserting
Pulls Are Made With Poles Or Controller Cabinets In Place
* Use A Pulley Device To Achieve A Straight Line If
Terminating End Points For Pulling Only Binding Material) Allowed Only At The Wire (Tapes, Straps, Ties, Or Other Temporarily Bundling Cables Or
The Conduit Opening* Pull In A Straight Line With
Cables By Hand Only Pull All Wires And
WIRE & CABLE INSTALLATION IN CONDUITS
CONDUIT INSTALLATION IN JUNCTION BOXES
CONDUIT INSTALLATIONS IN FOUNDATIONS
Junction Box
2" Min. To 3" Max.
Fiberglass Conduit Elbow
(Direction Of Conduit Run)
Plumb)
(Install
PVC Riser
Of The Conduit Run
Near The End Wall From The Direction
Enter Through The Bottom Of The Box
Conduit (Size As Shown On Plans).
2" Min. To 3" Max.
Fiberglass Riser (Install Plumb)
Foundation
Concrete
Fiberglass Elbow
Elbow
Fiberglass
Shown On Plans)
Conduit (Size As
Shown On Plans)
Conduit (Size As
Coupling
Coupling
Top Of Foundation
JB3 34"
JB2 18"
JB1 12"
From End Wall
2" To 3" Typ.
Diameters
Of Conduit
Max. Sum
Box Type
Junction
If Max. Sum Of Conduit Diameters In Junction Box Is Not Exceeded.
2. Larger Conduit Than Specified May Be Used At The Option And Cost Of The Contractor
Between Any Pole, Junction Box, Or Cabinet.
1. Install Non-Metallic Conduit Unless Otherwise Shown. Conduit Runs Shall Be Continuous
Conduit Installation General Notes:
Beyond Foundation
Conduit 10" To 12"
Extend Fiberglass
R
R
Diameter
Conduit
Coupling
Manufacturer's Recommendation.
Weld To Connect Conduit As Per
Full Circumference. Use Solvent
Conduit Ends Fit Together For Their
Make Cuts Square And True So
Non-Metallic Conduit
CONDUIT ENDS AND BUSHINGS
CONDUIT ELBOWS
CONDUIT COUPLINGS
3" Min.
Plug
Conduit
Foam
Wiring (Or Pull Line) Is Installed
Install Foam Conduit Plug After For Future Use Only)
(Or Pull Line in Conduit
Cables/Wires
R (min.)
Fiberglass Riser (In Foundations)
PVC Riser (In Junction Boxes) Or
1/2" To 1" Above Conduit Bushing
Diameter
Than Riser
" Larger1/2
Before Installing Wire
End Bell Conduit Bushings
Install Push-On PVC
3" 18"
2 1/2" 15"
2" 12"
1 1/2" 10"
Size Conduit For The Entire Length, Outlet To Outlet.
1. Slip Joints, Running Threads Or Reducing Couplings Not Allowed. Use The Same
Notes:
2. Temporarily Plug Or Cap Conduit Ends At All Times To Keep Debris Out
1. Ream Conduit Ends To Remove Rough Edges And Burrs
Notes:
Manipulation, Or Cutting In The Field)
(No Crimping, Flattening, Field
Standard Factory Fiberglass Bend
INSTALLATION
CONDUIT & WIRE/CABLE
GENERAL
01-2026 DELETED APPLICABILITY LANGUAGE IN CONDUIT IN FOUNDATIONS DETAIL
TM800
PCMS DETAILS
TABLES, ABRUPT EDGE AND
T M
.d g n
12-JUL-2024N/A
J U
L
Freeway
Use aggregate wedge when abrupt edge is 2 inches or greater.
four feet wide protect longitudinal abrupt edge as shown.
When paved shoulders adjacent to excavations are less than
NOTES:
shoulder, as far as practical.
Place cart / generator / power supply off of the on 10' spacing.
Use six tubular markers in shoulder taper outside shoulder, where practical.
Install Flagger Station Lighting beyond the
2" or GreaterExtg. pavement aggregate base rock
Shoulder or message sign (PCMS)
Portable changeable
20'
100'
4' B(III)R
Temp. Plastic Drums
Lighting
Flagger Station
50'
10'
Markers
28" Tubular
Place roll-up signs in advance of barricades.
plaques to the sign face using hook and loop fasteners.
If roll-up signs are used, attach the correct (CW21-9) throughout excavation area at spacings shown.
Continue signing and other traffic control devices
"RIGHT" (CW21-8C) riders with "LEFT" (CW21-8A) riders.
8' B(III)R barricades with 8' B(III)L barricades and replace the
If the excavation is located on left side of traffic, replace the abrupt edges of 1 inch or greater.
or other roadway work. Use abrupt edge signing for longitudinal
Abrupt edges may be created by paving, operations, excavations
GENERAL NOTES FOR ALL TCP DRAWINGS:
for max. spacing.
See TCD Spacing Table
Temp. Plastic Drums for max. spacing.
See TCD Spacing Table
28" Tubular Markers
UNDER TRAFFIC
UNDER CONSTRUCTION
EXCAVATION ABRUPT EDGE SIGN (PCMS) INSTALLATION
PORTABLE CHANGEABLE MESSAGE
LIGHTING DELINEATION
FLAGGER STATION
Sl.1:3
TAPER TYPES & FORMULAS
TEMPORARY BARRIER FLARE RATE TABLE
TAPER FORMULA
Merging (Lane Closure)
Shifting
Shoulder Closure
Flagging (See Drg. TM850)
Downstream (Termination)
"L"
"L"3 1"L"/3 or
50' - 100'
Varies (See Drawings)
"L"2 1"L"/2 or the Speed from the Tables below:
Use Pre-Construction Posted Speed to select
For Lane closures where W < 10', use "L" value for W = 10'.
Limit spacing adjustments to 30% of the "A" dimension for all speeds.
When necessary, sign spacing may be adjusted to fit site conditions.
Place traffic control devices on 10 ft. spacing for intersection and access radii.
NOTES:
SPEED (mph) MINIMUM FLARE RATE
M I N I M U M L E N G T H S T A B L E
"L" VALUE FOR TAPERS (ft) BUFFER "B" (ft)W = Lane or Shoulder Width being closed or shifted
20:1
19:1
18:1
16:1
14:1
12:1
10:1
9:1
8:1
FREEWAYS
SPEED (mph) W = 12 W = 14 W = 16
TRAFFIC CONTROL DEVICES (TCD) SPACING TABLE
20 - 30
35 - 40
45 - 55
60 - 70 700
100 100
15001000 2640
100 20
Device Spacing (ft)
Max. ChannelizingSign Spacing (ft) SPEED (mph)
A B C
CW21-8A
(As noted)
36x18
C W
(Mount on TSS)
(As needed)
42x18
CW21-8C
OR
C
W
Plaques
CW21-9
Abrupt edge
8' B(III)R 8' B(III)R
mi.4 1mi.4
1mi.4
EDGE
ABRUPT
RIGHT
LEFT
(Roll-up sign)
(As needed)
EDGE
ABRUPT 32x11
32x11
32x11
CENTER
RIGHT
LEFT
10≤W
30≤
W/60, S = Speed, W=WidthS45: L = WS, Speeds < 45: L =≥formula, for Speeds For Shoulder closures where W < 10', use "L" value for W = 10' or calculate "L" using
TYPICAL ABRUPT EDGE DELINEATION
Smart Work Zone Systems Portable Traffic Signals
Detail as shown is used for trailered and non-crashworthy components of:
barricade may be omitted when PCMS is placed behind a roadside barrier.
Use six drums in shoulder taper on 20' spacing. The drums and
Left shoulder, use Type B(III)L Right shoulder, use Type B(III)R Use the appropriate type of barricade panels for PCMS location.
Install PCMS beyond the outside shoulder, when possible.
To be accompanied by Dwg. Nos. TM820 & TM821.
divided highways or freeways when positive protection is not available, or as directed.
Provide a truck mounted attentuator (TMA) to protect the active work area on high speed
Flaggers, Traffic Control Measures, or as directed.
Coordinate and control pedestrian movements through a Temporary Accessible Route using
Combine drawing details to complete temporary traffic control for each work activity.
Do not locate sign supports in locations designated for bicycle or pedestrian traffic.
High speed highways have a pre-construction posted speed of 45 mph or higher.
Low speed highways have a pre-construction posted speed of 40 mph or less.
All other signs mounted on barrier sign supports shall not exceed 12 sq. ft. in total sign area.
All diamond shaped warning signs mounted on barrier sign supports shall be 36" by 36".
background of all temporary warning signs.
Use fluorescent orange sheeting for the All signs are 48" x 48" unless otherwise shown.
to indicate traffic movements.
Arrows shown in roadway are directional arrows sequential arrow boards.
Place a barricade approx. 20' ahead of all shown are the minimum required.
Signs and other Traffic Control Devices (TCD)
07-2022 Added a note for TPARs
07-2024 Added a note for TMAs the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM820
TEMPORARY BARRICADES
T M
.d g n
01-JUL-2020N/A
J U
L
LC
CL
CL
CL
sheeting on rail encapsulated lens
White and orange
Extg. ground
" 6 m in m in m in m in
V a r
4' min. - 8' max.
m in
V a r m in
"6 m in
24" min. - 48" max.
sheeting on rail encapsulated lens
White and orange
Extg. groundExtg. ground sheeting on rail encapsulated lens
White and orange
M in
V a r
"6
24" min.
direction toward which traffic must turn in detouring.
it is desirable that the stripes slope downward in the
Where a barricade extends entirely across a roadway, at an angle of 45° in the direction traffic is to pass.
Markings for barricade rails shall slope downward directions from the center of the barricade.
slope the chevron striping downward in both
Where both right and left turns are provided for, local road users.
across roadway unless access is required for may be used. Extend barricades completely
For full roadway closures, the C or LR barricade
NOTES:
Traffic Traffic
(For approaching traffic)(For approaching traffic)
(For approaching traffic)
Traffic
(For approaching traffic)
Traffic
BARRICADE RAIL LAYOUT
DIAGRAM FOR BARRICADE PLACEMENT AND SLOPE MARKING
BARRICADE NOTATION
B(III)R
LT. SIDE - L
CLOSED - C LT. / RT. - LR
RT. SIDE - R
TYPE I TYPE II TYPE III
is signed according to the TCP. See Dwg. No. TM844.
closed and a temporary pedestrian accessible route (TPAR)
Do not place barricades in sidewalks unless sidewalk is facility is properly closed and signed.
Do not block bike lanes or shoulders unless the space is limited.
Use 4' Type III barricades where horizontal
Use barricades from ODOT Qualified Products List (QPL).
Rails must be 8" min. to 12" max. in height.
For rails less than 36" long, 4" wide stripes shall be used.
from barricade.
Ballast shall not extend above bottom rail or be suspended may be placed on lower frame to provide additional ballast.
Sandbags (approximately 25 lb sack filled with sand)
GENERAL NOTES FOR ALL DETAILS:
Barricade type
Barricade on the roadway
Indicates barricade placement the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM821
TEMPORARY SIGN SUPPORTS
T M
.d g n
14-JUL-2023N/A
J U
L
4"x 4"x 12'
2 - 2"x 4" @ 45° angle
2"x 6"x 37"
36"
Sandbags per side (typ.)
lag screw
"x 3"8 31 -per side (typ.)
" dia. bolts8 32 -screw per side (typ.)
"x 3" lag8 31 -per support (typ.)
"x 3" lag screws8 32 -
"x 37"2 1"x 54 sign (typ.)
48"x 48" sign area of 20 sq. ft. or less.
Use Double Post TSS for a total
NOTES:
per support (typ.)
2 - 3/8" dia. bolts per support (typ.)
2 - 3/8" dia. bolts
4 - 2"x 6"
40"
"2 12 - 4"x 4"x 5
NOTES:
2' - 8" Sandbags
2' - 6"
A
"4
" - 12 ga. PSST2
" - 12 ga. x 4" PSST Stub2
PSST Stub
" - 12 ga. x 4"2 12 A
See DETAIL A
" - 12 ga. PSST4
" - 12 ga. PSST4 sign (typ.)
48"x 48" per support (typ.)
" dia. bolts8 3Two, support (typ.)
joining brace and
" dia. bolt8
NOTES:
1 - 2"x 4"
1 - 4"x 4"x 4"
2 - 2"x 4"
1 - 4"x 4"x 4"
1- 2"x 4" 40"
Sandbags lag screws
"x 4"8 34 -
4"x 4"x 10'
"x 3" lag screws8 32 -
2"x 4"x35" @ 45° angle
2"x 4"x 6"
"x 3" lag screws8 32 -
"x 4" lag screws8 34 -
" dia. bolts8 31 -
" dia. bolts8 31 -
" dia. bolts8 32 -
" dia. bolts8 31 -sign (typ.)
36"x 36"
" dia. bolts8 32 -
TEMPORARY SIGN SUPPORT GENERAL NOTES:
Sheeting
Retroreflective
Sheeting
Retroreflective
" Sheeting
Retroreflective m in and Right sides)
Sheeting (Left
Retroreflective
NOTES:
SIGN POST REFLECTIVE SHEETING PLACEMENT
Sheeting
Retroreflective Sheeting
Retroreflective signs. Do not mount signs on Type II or III Barricades.
Use Single Post TSS for mounting "Business Access" (CG20-11)
Use Single Post TSS for a total sign area of 12 sq. ft. or less.
Sheeting may be applied directly to post material; or applied to a rigid, lightweight substrate, then securely attached to the posts.
for wood post TSS's. Use 2" wide sheeting for PSST TSS's.
Apply sign post retroreflectivity to each TSS post facing front; and to the left and right sides of the TSS, as shown. Use 3" wide sheeting and "DO NOT ENTER". For "STOP" and "DO NOT ENTER" signs, used red ANSI Type III or IV retroreflective sheeting on the TSS posts.
Apply fluorescent orange, ANSI Type VIII or IX retroreflective sheeting to TSS posts, as shown, for all temporary signs, except "STOP"
Use A325 Bolts or equivalent.
welding. Repair Galvanizing according to ASTM A780.
designation G90. Remove Galvanizing from steel before
Galvanize steel according to ASTM A653 with coating
All members shall have a minimum yield stress of 50 ksi.
Use PSST TSS's for a total sign area of 16 sq. ft. or less.
Society (AWS) D.1.1.
Weld steel according to American Welding
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" PSST4
1Do not use bolt to secure 2
" - 12 ga. x 4" PSST Stub.2 1inside of the 2
" - 12 ga. PSST to extend entire length4
See Dwg. No. TM204 for flag board mounting detail.
(25 lb. max per bag) (min. 100 lbs per side of each TSS).
Place a minimum of 50 lbs of sandbags on each of the four TSS supports legs.
TSS posts.
away from traffic, or cover the sign. Do not cover reflective sheeting on the
When not in use, locate TSS as far from Public Traffic as practicable and turn
Do not place or stack ballast more than 24" above the ground.
See "Temporary Sign Placement" detail on TM822 for sign installation heights.
four sides (S4S) and free of heart center (FOHC).
For wooden TSS's, use either Douglas Fir or Hem Fir, which is surfaced
Do not locate TSS's in locations that block pedestrian or bicycle traffic.
Do not tip over TSS at any time.
Double Post Perforated Steel Square Tube (PSST) Single Post
DOUBLE POST DETAIL PERFORATED STEEL SQUARE TUBE (PSST) DETAIL SINGLE POST DETAIL
Front Right Left Front FrontRight Left Side
(No Scale)
DETAIL A
" - 12 ga. PSST4
" - 12 ga. PSST2
A A
(No scale)
SECTION A-A
the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM822
TEMPORARY SIGN SUPPORTS
T M
.d g n
01-JUL-2020N/A
J U
L
¼ ¼ as shown.
pedestrian pathway, maximum of 4" into it may extend a
7' above the sidewalk is installed less than
If bottom of plaque
B a c k o f c u rb m in m in
3' (min.)
4" max. *
2' (min.)
width is less than 6'
2' min. when the shoulder
6' - 12'
E d g e o f tr a ff ic l a n e m in m in . R
/W
1' min.
Urban Areas With Curb/Sidewalk surface, as shown.
minimum of 7'0" above pavement
(plaque) so bottom of sign is a bicycle traffic, install secondary sign shoulder or other surface used by adjacent to or intrude into a paved
Where temporary signs are located
E d g e o f tr a ff ic l a n e
Shoulder
Paved m in
R /W
1' min.
6' - 12'
E d g e o f tr a ff ic l a n e m in m in
TEMPORARY SIGN PLACEMENT
L 2-1/2"x 2-1/2"x 5/16"
"8 d eg head and clip
" dia. pin wth4
"16 5"x2
1"x 22 1L 2
"2
"16 5"x2
1"x 22 1L 2
" Sch. 40 pipe2 1210"
"2
"2
6" max.
of total sign area) (or, max. 12 sq. ft.
36" x 36" sign
2" Sch. 40 pipe
" Sch. 40 pipe2
Conc. Barrier
NOTES:
CONCRETE BARRIER SIGN SUPPORT
other than concrete.
Follow manufacturer recommendation when installing signs on barrier
Do not use clipped signs.
Weld steel according to American Welding Society (AWS) D.1.1.
Place support at connection between two concrete barrier sections.
Use for supporting a maximum 12 sq. ft. of total sign area.
Support fits both 32" and 42" tall "F" barrier.
All structural steel shall conform to ASTM A36.
and pinned when not in use.
Drill additional holes so sign can be rotated 90 degrees
To be accompanied by Dwg. Nos. TM670, TM671, TM687, TM688 & TM689.
according TCP Design Manual, MUTCD, ADA, or as directed.
Do not block bicycle lanes, sidewalks, or TPAR's with sign supports. Maintain minimum widths for these facilities
Rural Areas
Bicycles On Shoulder Rural or Urban Areas - Curb or No Curb
No Curb/Sidewalk Divided Highway/Freeway Medians the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM830
AND RUMBLE STRIP DETAILS
TEMPORARY CONCRETE BARRIER
T M
.d g n
12-JUL-2024N/A
J U
L
18" min.
O b s tr u c ti o n
Sl op e Va rie s
Traffic Side
(2 pins per barrier section)
(Modified, omit washer) used as anchor rod
Standard barrier pin
AC or PCC surface
Remove and replace existing striping as required.
crossovers and lane shifts.
across the area. Common application is staging for freeway
CPPR and inlay existing rumble strips prior to staging traffic
NOTES:
Existing Rumble Strip
18" Typical - Centerline Rumble Strips
24" Typical - Shoulder Rumble Strips
Grinding Width
UNDER CONSTRUCTION
Existing Rumble Strip
2" Nom.
OR
AA
EXISTING RUMBLE STRIP REMOVAL
or as directed inch ACP,2 1Level 2, CPPR and Inlay Area with or as directed inch ACP,2 1Level 2, CPPR and Inlay Area with
(4 pins per barrier section)
(Modified, omit washer) used as anchor rod
Standard barrier pin
AC or PCC surface
End View
SECTION A-A
(Shoulder Installation)
SECURING TEMPORARY CONCRETE BARRIER
(Median Installation)
SECURING TEMPORARY TALL CONCRETE BARRIER
Traffic Side
Traffic Side
End View
To be accompanied by Dwg. Nos. RD503, RD515 & RD516.
concrete.
Follow manufacturer recommendations when securing barriers other than surfacing for clear area behind temporary barrier.
Place temporary barrier on smooth, solid surfacing. Maintain, smooth solid angle of repose, or shoring as directed.
Excavation height greater than 3 feet requires proper backslope based on
Predrill pin holes for PCC pavement placement.
to Bridge Design Manual. See Chapter 1.13.1.10
DO NOT USE ON BRIDGE DECKS. Restrain barrier on bridge decks according
07-2021
01-2022
Revised clear space to obstruction
Added note for surfacing behind barrier
07-2024 Added note for securing barriers other than concrete
07-2024 Added references to roadway details for barrier pin and loop, and anchoring the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM831
TEMPORARY IMPACT ATTENUATORS
T M
.d g n
01-JUL-2020N/A
J U
L
27.5' (31' max.)
C AttenuatorL 700
1400 1400
1400 1400 2100
13.5' (15' max.)
(1' to 2')
Conc.Barrier typical installation 30" min. using
6" max. typical
6" min. typical
C AttenuatorL 200 200 400 700
700 1400
700 1400 1400
1400 2100
Conc.Barrier typical installation 30" min. using
(1' to 2')
6" max. typical
6" min. typical
C AttenuatorL
6" min. typical
6" max. typical
400 700 1400
1400 1400 2100
210014001400
20.5' (23' max.)
Conc.Barrier typical installation 30" min. using
(1' to 2')
C AttenuatorL 200 200 200 200 400
400 400 700 1400 1400 2100
210014001400700400400
6" max. typical
6" min. typical
38' (43' max.)
(1' to 2') typical installation 30" min. using
Conc.Barrier
GENERAL NOTES FOR ALL DETAILS:
Rt. Shldr. Placement
Gore Placement
Lt. Shldr. Placement
45 mph Layout 70 mph Layout
35 mph Layout 55 mph Layout
OBJECT MARKERS
To be accompanied by Dwg. No. TM833.
rock salt by weight to prevent freezing.
In cold climates, mix sand with 5%
45° slope and with 4" space between stripes.
5" wide shall be silk-screened on the sheeting at a with yellow encapsulated lens sheeting. Black stripes sheeting approx. 24" wide, 30" deep, and covered
" thick aluminum16 1The object marker shall be as shown above.
delineated with the appropriate object marker, The leading module of each attenuator shall be instructions and as approved by the engineer.
movement according to manufacturer's to shift, modules shall be anchored to prevent vibrations and surface slopes may cause modules in the field, as directed. At locations where
Final alignment of attenuator will be established within each module is mass of dry sand in pounds.
by both speed and manufacturer. Number shown
Typical attenuator layouts shown. Layouts may vary
Typical outside diameter of each module is 36".
Use Temporary Impact Attenuator from the QPL.
speed for attenuator selection.
For posted speeds not shown, use the next higher the Engineer.
the pre-construction posted speed, as approved by
Use the appropriate layout configuration based on
TEMPORARY IMPACT ATTENUATOR LAYOUTS
Single Barrier the current Oregon Standard Specifications.
All materials shall be in accordance with
DATE REVISION DESCRIPTION
OREGON STANDARD DRAWINGS
DATE
SDR
BOOK NO.
CALC.
Effective Date: June 1, 2026 - November 30, 2026
Professional Engineer.
first consulting a Registered and should not be used without sole responsibility of the user principles and practices, is the generally accepted engineering designed in accordance with
TM833
TEMPORARY IMPACT ATTENUATORS
T M
.d g n
01-JUL-2020N/A
J U
L
Concrete Barrier (1' to 2')
Up to 15°
Concrete Barrier typical installation
30" min. using
Concrete Barrier typical installation
30" min. using
Concrete Barrier
30" min.
6" min.
30" min.
6" min.
� Attenuator�
� Attenuator the traveled way to the temporary impact attenuator.
Minimum 2', otherwise maximize the distance from rock salt by weight to prevent freezing.
In cold climates, mix sand with 5% instructions and as approved by the engineer.
movement according to manufacturer's to shift, modules shall be anchored to prevent vibrations and surface slopes may cause modules in the field, as directed. At locations where Final alignment of attenuator will be established oriented toward oncoming traffic at angles up to 15°.
Divided or One-Way Attenuator layouts may be
Layouts may vary by both speed and manufacturer.
Attenuator layout shown is a typical layout.
Typical outside diameter of each module is 36".
Use Temporary Impact Attenuator from the QPL.
the Engineer.
the pre-construction posted speed, as approved by Use the appropriate layout configuration based on
GENERAL NOTES FOR ALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .