00017723 Exhibit A Specifications.docx

DOCX document 49 KB Posted

Attached to
Horseshoe Bar Quary Chip Rock Production
Solicitation number
S-73000-00017723
Issued by
Oregon

About this file

This is an Exhibit A Specifications document for the State of Oregon Department of Transportation (ODOT) related to the Horseshoe Bar Quarry Chip Rock Production project. The project involves blasting, producing, and stockpiling 16,000 cubic yards of 3/8" - No. 4 graded medium chip aggregate at Horseshoe Bar Quarry, located approximately 16 miles south of Riley on US395D in the SW1/4 SE1/4 of Section 33, T. 25 S., R. 25 E. The project manager is Ramon Alonso, located at 63055 N. Hwy 97, Bldg. M, Bend, OR 97701. The contractor must attend a pre-work conference with the project manager at a mutually agreed-upon time and submit a project schedule before commencing work within 10 working days of receiving the Notice to Proceed. All work is governed by the 2024 Oregon Standard Specifications for Construction, with applicable specifications detailed in Sections 00200 and beyond, along with the special provisions outlined in this document.

The specifications detail comprehensive requirements for material source operations, including site development, blasting procedures, equipment restrictions, environmental protection measures, and site rehabilitation. Blasting operations are restricted to 7:00 a.m. to 6:00 p.m. Monday through Friday, with no blasting permitted on Saturdays, Sundays, or legal holidays. The contractor must steam clean all equipment prior to site entry and comply with all applicable state, county, and federal mining and fire laws. Environmental requirements include developing site-specific Erosion and Sediment Control Plans and Pollution Control Plans, maintaining stormwater control berms, and protecting cultural resources and migratory birds. Upon project completion, the contractor must remove all structures, equipment, and debris from the site and stabilize disturbed areas through seeding with a specified native seed mixture. Payment constitutes full compensation for all materials, equipment, labor, and incidentals necessary to complete the work as specified, with no separate payments for items not listed in the bid items. No separate payment is made for work performed under Sections 00235 and 00335; instead, payment is included in the stockpiled aggregate items.

View the file

Other files

File Type Posted
00017723 Sample Contract.docx DOCX document
00017723 Bid Cover Sheet.docx DOCX document
00017723 ITBgts.docx DOCX document
00017723 Exhibit E Material Source Narrative.pdf PDF
00017723 Exhibit B Plans.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Exhibit A – Specifications

Special Provisions

PROJECT NAME: Horseshoe Bar Quarry Chip Rock Production

SCOPE OF WORK: Work includes blasting, producing, stockpiling 16,000 cubic yards of 3/8” – No. 4 graded medium chip aggregate,.

WORK LOCATION: Horseshoe Bar Quarry, approximately 16 miles south of Riley on US395D in the SW1/4 SE1/4 of Section 33, T. 25 S., R. 25 E., W.M.

PROJECT MANAGER:

Ramon Alonso 63055 N. Hwy 97. Bldg. M Bend, OR 97701

APPLICABLE SPECIFICATIONS: The Specifications which are applicable to the work on this project are the 2024 Oregon Standard Specifications for Construction (“Standard Specifications”), which are by this reference incorporated herein, and the Special Provisions. The Standard Specifications include detailed technical specifications in Sections 00200 and beyond that apply to this ITB and any resulting Contract. Some sections of the technical specifications may be identified and modified in the Plans and Special Provisions. Sections of the technical specifications not identified in the Plans and Special Provisions remain applicable to the Contract according to their original terms.

Sections in Part 00100 of the Standard Specifications (General Conditions) are not applicable to the Contract unless they are specifically identified in the Plans and Specifications as being applicable. However, if a Part 00100 section that has been identified as being applicable references another section in Part 00100, or a technical specification (Parts 00200 and beyond) references a section from Part 00100, that section from Part 00100 applies to the Contract for purposes of supporting and giving full effect to the specification that referenced it. Bidders can access the Standard Specifications online at:

http://www.oregon.gov/ODOT/Business/Pages/Standard_Specifications.aspx

COOPERATION WITH UTILITIES: This project is located within the Oregon Utility Notification Center area, which is a utilities notification system for notifying owners of utilities about work being performed in the vicinity of their facilities. The contractor shall notify owners of Utilities prior to the performance of work in the vicinity of their Utilities. The utilities notification system telephone number is 811 (or use the old number which is 1-800-332-2344).

PAYMENT: Payment for all work under this contract is to be included in the bid items contained in Section 4.2 of the Contract. Payment constitutes full compensation to the Contractor for furnishing all Materials, Equipment, labor and incidentals necessary to complete the work as specified. There will be no separate payment for items not listed, as that work will be included in payment made for the items listed in Section 4.2 of the contact .

PAYMENT TO CONTRACTOR: The Contractor shall be paid according to Section 6.5 of the contract.

PRE-WORK CONFERENCE, SCHEDULE AND LIMITATIONS OF OPERATIONS: The Contractor shall meet with the Project Manager for a pre-work conference at a mutually agreed upon time. Work shall commence within 10 working days of this meeting providing the Notice to Proceed has been received. At the pre-work conference, Contractor shall submit a project schedule to plan, coordinate and control the progress of construction and traffic control installations. The project schedule will take into account the orderly, timely, and efficient prosecution of the work in sufficient detail to enable both the Contractor and the Project Manager to plan, coordinate, appraise, document, and control their respective contract responsibilities. The predicted completion date(s) for the project schedule shall be within the specified contract time.

SECTION 00235 - AGENCY PROVIDED MATERIAL SOURCES

Section 00235, which is not a Standard Specification, is included in this Project by Special Provision.

Description

00235.00 Scope - This Work consists of utilizing Agency provided prospective or mandatory material sources as the Contractor elects or as required for the construction of the Contract.

00235.01 Material Source Specific Requirements - The following prospective material source, for the production of 3/8” – No. 4 graded medium chip aggregate for this Project, that may warrant investigation and consideration for use by the Contractor on this Project is as follows:

(a) Prospective Material Source, Horseshoe Bar Reservoir Quarry:

Source Number - OR-13-068-5 DOGAMI Number - 13-0039 Location - Approximately 16 miles south of Riley on US395D in the SW1/4 SE1/4 of Section 33, T. 25 S., R. 25 E., W.M.

Access - Turn west at MP 16.27 of US395D, then travel approximately 2.25 miles on Egli Ridge Road to the source Available Area for Equipment Setup, Stockpiling, and Processing Aggregate:

Existing - 12 acres Development - 1 acre

00235.03 Laws - Conduct operations within the material source according to all applicable State, county, and federal laws including mining and fire laws. Provide, operate, and maintain wildland firefighting equipment appropriate for the current fire levels on-site at all times during all material source operations.

00235.04 Permits - Copies of the Plans, permit and the material source narrative for the material source are available for inspection at the Project Manager's office. Conform operations within the material source to the stipulations and conditions of these documents and to all of the requirements of the Contract.

Subsection
Source Name
Documents
00235.01(a)
Horseshoe Bar Reservoir Quarry
Department of Geology and Mineral Industries (DOGAMI) Operating Permit

00235.05 Pre-Work Meeting - Before occupying the material source, attend a pre-work meeting at the material source with the Project Manager and the following owners or representatives:

Subsection
Source Name
Contact Names and phone numbers
00235.01(a)
Horseshoe Bar Reservoir Quarry
ODOT Geologist Micah Lederer, 541-280-7821

00235.06 Source Occupancy - Coordinate material source occupancy with the Project Manager. The material source information listed in Table 00235-1 below is as shown in Exhibit B. Do not operate beyond the material source Work area boundary or in no Work area as shown in Exhibit B unless otherwise directed in writing.

Table 00235-1

Subsection
Source Name
Source items shown
00235.01(a)
Horseshoe Bar Reservoir Quarry
Work area boundary, excavation area, reject fines stockpile, scalpings stockpile, oversize storage area, no work area, safety berm, bench access road, stockpile and processing area, access road

00235.07 Source Development - If proposing changes to the material source development plan, submit a source development plan as an unstamped Working Drawing according to 00150.35. Do not begin Work in the material source until the source development plan has been approved in writing by the Project Manager.

Develop a site-specific Erosion and Sediment Control Plan for the material source according to 00280.04 and submit it to the Project Manager at or before the pre-work meeting. Construct stormwater control berm(s) as needed to control runoff. Do not allow any materials, including sediments, Aggregate or crushing by‑products to enter into waterways or Wetlands.

Develop a site-specific Pollution Control Plan for the material source according to 00290.30(b) and submit it to the Project Manager at or before the pre-work meeting. Include the following requirements in the Pollution Control Plan:

Do not discharge waste or by-product if it contains any substance in concentrations that could contaminate Soils or result in harm to fish, wildlife, or water sources.

Store all potentially hazardous materials and solid waste in a manner that prevents seepage into the ground or groundwater sources. Lined sumps or pits are allowable options for storage. If pits or sumps are used, construct adequate berms or provide other measures to prevent breaching of the pits or sumps.

For materials capable of causing water pollution if discharged, locate storage facilities in an area that prevents spillage into waterways or Wetlands.

Construction

00235.40 General - Steam clean off all debris (soil, dirt, plant parts, and vegetative matter) all vehicles and Equipment, prior to entering the site for the first time, and each subsequent time if the vehicle has left the Roadway outside the construction Project limits, before being brought back to the site. Notify the Project Manager before moving each vehicle onto the site. Certify, in writing, that the Equipment has been steam cleaned.

00235.41 Restrictions and Protection of Resources - Comply with the following for all operations within the material source:

Protect cultural resources according to 00290.50.

Protect migratory birds according to 00290.36(a).

Clear trees and shrubs and strip and stockpile soil overburden between September 1 and March 1. If operations are outside this time frame, notify the Project Manager 14 calendar days prior to source occupancy. The Project Manager will arrange to have an ODOT biologist conduct a required nesting bird survey throughout the site and relocate the nests if they are present.

Do not utilize, contaminate, or disperse material from existing stockpiles. If existing stockpiles interfere with the Contractor’s operations, move the stockpiles to other locations within the material source area as directed, at no additional cost to the Agency.

Limit mineral and Aggregate extraction, crushing, processing, and Equipment operation activities including drilling activities to one half-hour before sunrise to one half-hour after sunset, Monday through Saturday unless modifications to these hours are requested in writing and approved by the Project Manager. Do not conduct any operation on Sundays or legal holidays, as defined in ORS 279C.540.

00235.42 Source Setup - Before proceeding with Work in the material source, the following apply:

(a) Access:

Realignment and/or widening of Egli Ridge Road is not allowed. No Project Manager’s approval to perform this Work will be given.

Routine road maintenance activities such as grading and watering of the access road do not need review or approval. Maintain or develop drain dips, water bars, road crowning, in-slopes and out-slopes during road maintenance. Material can be added to the road surface, but aggregate material is not allowed in the ditches.

Realign and/or regrade the bench access road as shown in Exhibit B. Reconstruct the road with a width of 12 feet and a reasonably uniform grade, no steeper than 50 percent (1V:2H), for access to the upper bench by tracked vehicles.

If needed, use existing, loose and non-stockpiled material or clean soil or a combination of clean soil and rock, construct a stormwater control berm(s). Grade and leave level, all areas of the material source disturbed during construction of the stormwater control berm(s). Construct the stormwater control berm 3 feet high, with side slopes of 1V:2H. After completion of the stormwater control berm, seed according to 00235.46.

Use overburden or existing, loose and non-stockpiled material or imported or clean soil or a combination of clean soil and rock, to construct a safety berm(s) along the top edge of the new excavation or existing slopes as shown. Maintain a 10‑foot buffer between the top edge of the excavation or slope and the toe of the safety berm. Construct the berm 3 feet high, with side slopes of 1V:2H.

(b) Clearing and Grubbing - Before stripping of overburden clear and grub within the excavation area and any area to be developed as access road(s).

(c) Overburden - Before excavating, including drilling and blasting when required, strip and stockpile all soil overburden from within the excavation area and from areas to be developed as access road(s). Incorporate grass and small shrubs into the stockpiles. Do not remove grass or small shrubs from the overburden. Place stockpiles in the overburden storage area(s). Maintain a minimum 10‑foot buffer strip between the toe of the overburden storage area(s) and the excavation area. Smooth and contour overburden storage berms to form side Slopes no steeper than 1V:2H.

00235.43 Blasting - Perform blasting operations according to this Section and Section 00335, except that perimeter controlled blasting as described in 00335.40(a) is not required in the material source.

Restrict blasting to the hours of 7:00 a.m. to 6:00 p.m. Monday through Friday. Do not blast on Saturdays, Sundays, or legal holidays as defined in ORS 279C.540.

00235.44 Source Operations - The following apply during material source operations:

Construct slopes, bench, and floor of the excavation area as shown.

To control dust, apply water to material source access, haul road(s), and crushing and processing operations. Water from the reservoir adjacent to the site shall not be used.

Stockpile scalpings and reject fines in separate and accessible stockpiles as shown.

If the Contractor chooses to utilize this material source, maintain the condition of US395 within 1,000 feet of the intersection with Egli Ridge Road at all times. Provide traffic control related to ingress and egress movements in a manner that allows a safe work zone and safe passage of vehicles.

Maintain the livestock gate into the source at all times.

00235.45 Source Clean-up - The following apply at the completion of operations:

Leave no loose material on the site exceeding 1 foot diameter, except as noted below. Process all material loosened in the source by the Contractor that meets quality requirements, with the following exception:

· A maximum of 100 cubic yards of oversize material with a maximum dimension of 2.5 feet may be stockpiled in the material source. Consolidate oversize material as shown in Exhibit B.

Place all excess produced Aggregate remaining at the end of operations in separate and accessible stockpiles on Agency owned or controlled property in areas designated by the Project Manager, at no additional cost to the Agency.

Leave the material source haul road and bench access road open. Do not rip or block the roads except a berm or a few boulders greater than approximately three feet in diameter may be used to block off access to the upper bench areas.

Remove all loose, hanging or potentially dangerous Rock on or above the excavated surface.

Pile and burn all construction slash and combustible debris resulting from use and development of the source, including the preexisting refuse identified at the pre-work meeting, even if it is from outside the material source work area boundary except for grass and small shrubs that are incorporated into the overburden. Comply with all open burning regulations in effect at the time of source occupancy. If burning is not allowed, all construction slash and combustible debris become the property of the Contractor, to be treated as noncombustible and removed from material source.

00235.46 Seeding:

In addition to other areas with soil cover within the site disturbed by the Contractor's operations, stabilize the overburden storage areas, stormwater control berm(s), safety berms, and scalpings stockpile by seeding, mulching, and tackifying, as directed.

Furnish the following seed mixture:

Common/Botanical Seed Name
Broadcast Rate (PLS)
Bluebunch Wheatgrass/Pseudoroegneria spicata
7.7 lbs/acre
Idaho Fescue/Festuca idahoensis
5.5 lbs/acre
Indian Ricegrass/Achnatherum hymenoides
3.3 lbs/acre
Sandberg Bluegrass/Poa secunda
3.3 lbs/acre
Bottlebrush Squirreltail/Elymus elymoides
1.65 lbs/acre
Blue Flax/Linum lewisii
0.55 lbs/acre

Use only certified weed free seed. Provide copies of the certification to the Project Manager.

Furnish straw mulch according to 01030.15(b).

Apply a commercial straw mulch tackifier according to the manufacturer’s directions and at the recommended rate.

Apply seed and mulch according to Section 01030.

If conditions allow and the Contractor chooses, the area may be stabilized by applying seed using a range drill with a roller attachment. All areas seeded with the range drill and roller do not need to be subsequently covered with mulch and tackifier.

All variations to these requirements require written approval by the Project Manager.

00235.47 Source Vacating - Before vacating the material source the following apply:

Remove all structures, noncombustible debris, and equipment from the material source, even if it was pre-existing, except for grass and small shrubs incorporated into the overburden.

Remove solid waste and hazardous material from the site and dispose of properly. These include, but are not limited to, materials placed in sumps, tires, pipes, belts, screens and truck cleanings. Provide documentary evidence of proper disposal and verify the amount of material removed.

If a spill or dumping has occurred or if a spill or dumping is suspected to have occurred, clean up the contaminated materials according to Section 00290. After clean up, the Project Manager may, sample and test materials at the spill or dumping locations to verify the clean up has been completed. If the Project Manager’s verification testing demonstrates remaining contamination, perform additional clean up until the requirements of Section 00290 including 00290.20(g) are met.

Attend a post-work meeting at the material source to evaluate material source rehabilitation work with the Project Manager and attendees listed under 00235.05.

Measurement

00235.80 Measurement - No measurement of quantities will be made for Work performed under this Section.

Payment

00235.90 Payment - No separate or additional payment will be made for Work performed under this Section. Payment will be included in payment made for the appropriate items under which this Work is required.

SECTION 00335 - BLASTING METHODS AND PROTECTION OF EXCAVATION BACKSLOPES

Comply with Section 00335 of the Standard Specifications modified as follows:

00335.10 Materials - Replace this subsection, except for the subsection number and title, with the following:

Furnish all explosives and blasting caps that are no more than 1 year old. Furnish blasting caps from one lot number.

00335.40(a) General ‑ Replace the bullet that begins "Production Blasting ‑ Design blasting …" with the following bullet:

Production Blasting ‑ Design blasting in the Rock mass to be excavated to control flyrock, minimize ground vibration and air blast, and result in loosened and fragmented in‑place Rock of a size that can be removed, transported, or crushed to produce specified products. Lay out production blast holes in a consistent pattern that does not affect the perimeter control blast holes. Where production blast holes are made adjacent to Highways with specified closure restrictions, do not exceed the Contractor's ability to remove the volume of blasted material from the adjacent Highway within the specified closure time.

00335.40(d) Blasting Plan - Replace the paragraph that begins "Provide a separate blasting plan …" with the following paragraph:

Provide a separate blasting plan for each cut that requires blasting, prepared by a person qualified and experienced in blasting Work. Include in each plan individual major Rock cut areas or Rock production from a Material source. Similar minor Rock cut areas of less than 50 cubic yards, as well as Utility and culvert trenches, may be covered as a group in one generalized blasting plan.

Replace the paragraph that begins "The blasting plans will be …" with the following paragraph:

The Project Manager will review the blasting plans and discuss any concerns with the Contractor. Submit any proposed changes to the blasting plans in writing to the Project Manager for review before implementation. Submittal of blasting plans is for quality control and record‑keeping purposes.

Replace the paragraph that begins "Each blasting plans shall …" with the following paragraph:

Include the full details of the drilling and blasting patterns, vibration, flyrock, and noise reduction methods, blast area security measures and traffic control the Contractor proposes to use, in each blasting plan and provide the following information:

00335.40(g) Blasting According to Plan - Replace the paragraph that begins "After the Project Manager has reviewed …" with the following paragraph:

Perform all Production Blasting according to the submitted plan. Notify the Project Manager when any changes in conditions or results are observed. On the Day of each blasting occurrence and before detonation of the blast, the supervisor or blasting specialist in charge is required to certify, in writing, that the shots being carried out are consistent with the reviewed blasting plan.

00335.40(h) Blasting Report - Replace the bullet that begins "A copy of the color video …" with the following bullet:

A copy of the color video recording of the blast area(s), with sound, high definition (at least 1080p resolution, 24 fps), in a format commonly used for viewing with a computer or DVD player. Show an unobstructed view of the blast area, framed to show both above and below the blast area. Begin recording at least 10 seconds before the blast and continue recording until there is no visible dust. Use a free‑standing recording device that is not a cell phone or similar device, as approved by the Project Manager. Submit the type of recording device to be used at least 7 Calendar Days before the blast.

00335.90 Payment ‑ Replace the paragraph that begins "Payment will be payment …" with the following paragraph:

Payment will be payment in full for furnishing and placing all Materials, and for providing all Equipment, labor, and Incidentals necessary to complete the Work as specified.

SECTION 00680 - STOCKPILED AGGREGATES

Comply with Section 00680 of the Standard Specifications modified as follows:

Furnish Aggregates in stockpiles meeting the following requirements:

00680.11(b)(1) Quality - Replace this subsection, except for the subsection number and title, with the following:

Furnish Aggregates meeting the requirements of 00715.10(a), (c), (d), (e), (f) and (g).

00680.15 Aggregate Production Quality Control - Replace the paragraph that begins "Provide sampling, testing …" with the following paragraph:

Provide sampling, testing, and quality control during production of Aggregate according to Section 00165. Perform sampling and testing according to Section 00715, as applicable. Aggregates are evaluated for compliance according to the following:

00680.16 Acceptance of Aggregate - Replace this subsection, except for the subsection number and title, with the following:

The Contractor's quality control tests are used for acceptance of Aggregates if verified by the Quality Assurance Program. The Agency will perform Aggregate production quality assurance according to the following:

(a) ODOT-Administered Projects - Quality assurance testing on projects administered by ODOT is performed according to Section 00165.

(b) Projects Administered by Other Agencies - The quantity of quality assurance testing on projects administered by Agencies other than ODOT is at the discretion of the Agency or as specified.

00680.40(a) Source Sites - Replace this subsection, except for the subsection number and title, with the following:

Prepare and develop the source site according to Section 00235.

00680.41 Piling of Materials - Replace the paragraph that begins "Place each separate …" with the following paragraph:

Place each separate designated size of material to be stockpiled at a given site in a separate stockpile. Locate each stockpile to occupy as small an area as practicable, and separate each pile so that working room is adequate for removing the materials later. Pile Aggregate at heights not less than 8 feet, nor side Slopes flatter than 1V:1.5H, unless directed. Except in sand sheds, stockpile sanding materials to a height of 15 feet, or as directed.

00680.42 Places of Delivery - Replace the paragraph that begins "Places of delivery …" with the following paragraph:

Places of delivery and the tentative plans of distribution of the materials is shown or specified in Exhibit B.

Add the following to the end of this subsection:

Deliver 16,000 cubic yards of Graded Medium (3/8” – No. 4) Chip Aggregate, and stockpile at Horseshoe Bar Reservoir Quarry, located at US395, MP 16.27 as shown in Exhibit B.

00680.70 Cleaning Up Source Sites - Replace this subsection, except for the subsection number and title, with the following:

Clean up the source sites according to Section 00235.

00680.90 Payment ‑ Replace the paragraph that begins "The respective sizes …" with the following paragraph:

The respective sizes of stockpiled Aggregates is inserted in Section 00680.42.

Replace the paragraph that begins "Payment will be payment …" with the following paragraph:

Payment will be payment in full for furnishing and placing all Materials in stockpiles , and for providing all Equipment, labor, and Incidentals necessary to complete the Work as specified.

File details come from the government source that posted it. Updated .