00017706 Exhibit G Site Maps.docx

DOCX document 18 MB Posted

Attached to
SPR892_879: Phase 3 Drilling Wickiup
Solicitation number
S-73000-00017706
Issued by
Oregon

About this file

This is an Exhibit G Site Maps document for a geotechnical drilling contract involving the Oregon Department of Transportation (ODOT), Oregon State University (OSU), and Portland State University (PSU) for diatomaceous silt research at the Wickiup Junction site. The project encompasses drilling, sampling, and in-situ testing services to support settlement and foundation analyses at a site underlain by diatomaceous soils. The scope includes establishment of borehole (BH) sites and Cone Penetration Test (CPT) locations, with specific entry points designated: the East BH site accessed northward after Burgess Road (marked with an orange star) and the West BH site accessed southward off Highway 97 (marked with a blue star). All work must be contained within the ODOT Right-of-Way, and personnel and vehicles are prohibited from crossing railroad tracks depicted on the site maps, with a mandatory 50-foot buffer maintained from the tracks during all operations.

The document provides detailed vicinity and site-specific maps illustrating potential exploration locations at Wikiup Junction, with the green line representing the general ODOT Right-of-Way boundary. The site maps serve as critical planning documents for contractors to understand the geographic constraints, access routes, and safety parameters governing the drilling operations. No pricing terms, bidding procedures, contract duration, award dates, or funding details are specified within this exhibit document, as it functions solely as a technical reference for site conditions and operational boundaries.

View the file

Other files

File Type Posted
00017706 Invitation.To.Bid.Services.docx DOCX document
00017706 Sample.Contract.docx DOCX document
00017706 Exhibit H FHWA Form 1273.pdf PDF
00017706 Sample.Contract~1.docx DOCX document
00017706 Bid.Cover.Sheet.docx DOCX document
00017706 Exhibit A Scope of Work and Specifications.docx DOCX document
00017706 Exhibit F Odot Best Managment For Drilling Practice.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT G – SITE MAPS

Drilling Site Maps with Expected CPT Locations

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS

OSU DIATOMACEOUS SILT RESEARCH DRILLING CONTRACT

Fall 2018 Page 1 of 13

SCOPE OF WORK AND TECHNICAL SPECIFICATIONS

PSU/OSU DIATOMACEOUS SILT RESEARCH DRILLING CONTRACT

August 2026 Page 13 of 19

Figure 1: Vicinity map of Wikiup Junction Site. Potential Bore Hole (BH) sites and potential CPT locations depicted. For East BH site locations entry will be North after Burgess Road depicted with Orange star. For West BH site locations entry will be to the South off Hwy97 depicted with Blue star. No vehicles or personnel may cross the RR tracks depicted as red line and during work remain 50 feet from the tracks.

Figure 2: Detailed site view for Wikiup Junction explorations. Green line is general representation of ODOT Right-of-Way, project work will be contained in ODOT Right-of-Way. No vehicles or personnel may cross the RR tracks depicted as red line and during work remain 50 feet from the tracks.

image1.png image2.png image3.png image4.png