This is a Mini-RFP issued by the Oregon Department of Transportation (ODOT) on behalf of the City of Oregon City (Local Public Agency) for architecture and engineering services related to the Washington Street: Metro South - Abernathy Road public improvement project located in Oregon City, Clackamas County. The project involves modernization of road systems to provide safer access to community, retail, and entertainment facilities and support housing and business development. ODOT is soliciting proposals from eligible consultants holding existing Price Agreements (PA Series B39382 to B39414, Tier A and Tier B) to provide design, environmental, right-of-way analysis, and public involvement services, with potential construction administration and construction engineering inspection services during the construction phase. The Work Order Contract is anticipated to start in August 2026, with services potentially phased across design, right-of-way acquisition, and construction support. The deadline for proposer questions is five calendar days prior to the bid opening date listed in OregonBuys, and proposals must be submitted electronically through OregonBuys by the bid opening date. An intent to award notice is estimated within five business days after scoring is complete. The contract term will be negotiated with the successful proposer based on project phase requirements.
This procurement is funded by Federal Highway Administration federal discretionary formula funds, with all project funding required to be obligated by September 30, 2027 (end of federal fiscal year 2027) to avoid expiration, creating a compressed timeline for execution. The method of compensation will be determined by ODOT and may include cost-plus fixed-fee, fixed price for deliverables or milestones, time and materials, or price per unit arrangements, all negotiated following selection. A firm proposal offer is binding for not less than 180 days following the bid opening date. The City of Oregon City is responsible for final consultant selection under a two-tiered evaluation process per ORS 279C.125 and OAR 731-148-0260, with an LPA evaluation committee scoring proposals on understanding of requested services, technical approach, proposer capabilities, and project team qualifications, each worth up to 25 points. Additional insurance requirements include drone/unmanned aircraft systems coverage of $2,000,000. DBE participation goals and certified small business aspirational targets are reserved. Proposals must comply with all pass/fail requirements and include completed cover sheets, technical responses not exceeding 15 pages, and three key staff resumes not exceeding one page each.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Mini-RFP Template – OPO Approved (07/15/2025) S-73000-00016864
OREGON DEPARTMENT OF TRANSPORTATION
A&E and Related Services
MINI-RFP/ OregonBuys Bid Solicitation Number: S-73000-00016864 for
Work Order Contract (“WOC”) Assignment Under Price Agreement (“PA”) series
Full-Service A&E Price Agreements for ODOT and Local Agency Transportation Projects
PA Series No. B39382 to B39414 (Tier A and Tier B)
NOTE: Only Consultants that have been awarded a PA in the above PA series for the services identified in this Mini-RFP are eligible to respond to this Mini-RFP.
Project Name: Washington Street: Metro South - Abernathy Road
Project Location: Region 1 – Oregon City, Clackamas County, Oregon
ODOT Key Number: 23759
DBE Participation Goal: 0% (see section 1.3 for more information) – (RESERVED)
Certified Small Business Aspirational Target: (see section 1.3 for more information) –
(RESERVED)
LOCAL PUBLIC AGENCY PROJECT. Oregon Department Of Transportation (“ODOT” or “Agency”) is delivering this Project on behalf of the Local Public Agency (“LPA”), the City of Oregon City. Selection of Consultant will be a two-tiered process pursuant to ORS 279C.125 and OAR 731-148-0260, and the LPA is responsible for the final selection of the Consultant (see section 3 for more information).
PROPOSAL SUBMISSION DEADLINE: See “Bid Opening Date” for this Mini-RFP in OregonBuys.
Single Point of Contact: See “Purchaser” and “Info Contact”, including e-mail address, for this Mini-RFP in OregonBuys. This is the only point of contact for this Mini-RFP. All inquiries regarding this procurement, whether relating to the Mini-RFP process, administration, deadline or award, potential COI issues, or to the intent or technical aspects of the Services must be submitted in writing via e-mail to the Purchaser.
Accessibility: The Oregon Department of Transportation is committed to complying with all statutory requirements to ensure that it is providing information that is more accessible to people with disabilities, as required by section 508 of the Rehabilitation Act of 1973, as amended (29 U.S.C. 794d), and 36 C.F.R. 1194 Appendix A. This includes information regarding the solicitation process. Please contact the Single Point of Contact (“SPC”) identified in OregonBuys as the “Purchaser” to request
S018-OPO063025
reasonable accommodation for access, due to a disability, to information related to this solicitation, or the solicitation process, or both. Accommodation requests must be received by the SPC 3 business days prior to the Proposal Submission Deadline (see “Bid Opening Date” in OregonBuys).
COMMITMENT TO FAIR ACCESS: The State of Oregon is committed to taking steps towards promoting fair and accessible procurement processes for all small and resource-limited businesses by reducing obstacles and negative impacts. We encourage all interested businesses to participate in this contracting opportunity.
Non-Discrimination Notice: ODOT, in accordance with the Title VI of the Civil Rights Act of 1964, 78 Stat. 252. 42 U.S.C. 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted programs of the Department of Transportation issued pursuant to such Act, hereby notifies all eligible Bidders that it will affirmatively ensure that all eligible business enterprises will be afforded full opportunity to submit bids in response to this solicitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
SECTION 0.0 OREGONBUYS; SOLICITATION SCHEDULE
OregonBuys is the electronic procurement system used by Agency. This Mini-RFP is advertised in OregonBuys (https://oregonbuys.gov/bso/) as a Bid Solicitation, which is open only to registered vendors that have an existing PA, as identified on page 1, with Agency for the needed Services.
0.1 INFORMATION AND ATTACHMENTS INCORPORATED FROM OREGONBUYS
The Mini-RFP includes all documents, whether attached or incorporated by reference, and any addenda thereto, used for soliciting Proposals. In addition to the provisions set forth and linked within this Mini-RFP, this Mini-RFP incorporates by this reference the information published on the OregonBuys Bid Solicitation page for this Mini-RFP, including but not limited to:
• Details entered in the Header Information section of the Summary Tab; and
• All attachments, Amendments, notices, question and answer documents, and any other files linked in the Attachments section.
0.2 CROSSWALK OF TERMS USED IN OREGONBUYS
Definition of terms used in OregonBuys.
Amendment means “Addendum” or “Addenda” as defined in OAR 137-046-0110(1).
Bid Opening Date means “Closing” as defined in OAR 137-046-0110(6).
Master Blanket Purchase Order (“MBPO”) means Any form of contract, agreement (i.e. price agreement, on-call contract, etc.), purchase order or WOC.
Quote means Any form of offer submission by vendors; i.e., Bids, Proposals, Price Proposals, or any other type of offer in response to a Bid Solicitation.
https://oregonbuys.gov/bso/ https://oregonbuys.gov/
Vendor means Any form of business entity registered in OregonBuys. Only registered vendors are eligible to submit a Quote and enter into Purchase Orders, MBPOs, or Release Requisitions pursuant to a Bid Solicitation or Mini-RFP advertised in OregonBuys.
0.3 GUIDANCE FOR OREGONBUYS
For quick reference information regarding common questions from vendors when using OregonBuys, see User Guides under “OregonBuys eProcurement System” on the Contracting with ODOT webpage:
https://www.oregon.gov/odot/Business/Procurement/Pages/HowTo.aspx.
0.4 MINI-RFP SCHEDULE
All dates listed are subject to change.
ACTIVITY SCHEDULE/DEADLINE
Deadline for Proposer questions/clarifications/changes 5 calendar days prior to the Bid
Opening Date identified in OregonBuys for this Mini-RFP
Deadline for Proposal submittal See Bid Opening Date identified in
OregonBuys for this Mini-RFP
Posting of notice of intent to award Estimated 5 Business Days after all scoring is complete
SECTION 1.0 SOLICITATION INFORMATION AND REQUIREMENTS
1.1 ACRONYMS AND DEFINITIONS
Agency means the Oregon Department of Transportation.
BOC means Breakdown of Costs BOC NBR means Breakdown of Costs – Negotiated Billing Rates CA/CEI means construction contract administration / construction engineering inspection services.
COI means Conflict of Interest Consultant means an architect, engineer, photogrammetrist, transportation planner, land surveyor or provider of related services, or entity which employes any of the foregoing, performing Services for Agency under a contract or WOC.
CQP means Consultant Quality Plan DEQ means Department of Environmental Quality LPA means local public agency NTE means not-to-exceed OAR means Oregon Administrative Rule ODOT means Oregon Department of Transportation ORS means Oregon Revised Statute PA means Price Agreement PE means Preliminary Engineering Proposal means a written response to this Mini-RFP.
Proposer means a vendor which submits a Proposal https://www.oregon.gov/odot/Business/Procurement/Pages/HowTo.aspx
PS&E means Plans, Specifications & Estimates ROW means Right of Way SCM means Source Control Measures Services means the architectural, engineering, photogrammetrist, planning, land surveying or provider of related services, or combination of the foregoing, to be provided by the Consultant for the resulting WOC.
SOW means statement of work; part of a contract that outlines the tasks, deliverables, and timeline for the Project.
SPC means single point of contact; the Purchaser identified in OregonBuys.
State means the State of Oregon.
WOC means work order contract
1.2 SUMMARY OVERVIEW AND WORK ORDER CONTRACT (“WOC”) OBJECTIVES
The Washington Street: Metro South – Abernathy Road public improvement project (“Project”) includes modernization of road systems to provide easier, safer access to community, retail, and entertainment facilities to foster prosperous economic transformation, to support housing, business development and the development of the Rossman Landfill site in Oregon City.
Oregon Department of Transportation (“Agency” or “ODOT") is requesting Proposals from eligible Price Agreement holders (identified above) interested in providing design, environmental, right of way analysis and public involvement services through construction engineering support or Contract Administration/Construction Engineering Inspection (“CA/CEI”) for the Project, (if required during the construction phase of the Project). The specific A&E and Related Services are further described in Section 4 of this Mini-RFP. Agency reserves the right to modify the Services as necessary to meet Agency needs.
See Attachment C – Project Prospectus and Attachment D – Local Agency Technical Scoping Sheet.
The WOC is anticipated to start August 2026. The Project is funded by federal discretionary formula funds. As such, the funding for all Project phases must be obligated by the end of federal fiscal year (FFY) 2027 (September 30, 2027) to avoid expiration. Given these federal requirements, the Project has a very tight timeframe.
Proposers responding to this Mini-RFP do so solely at their expense. Agency is not responsible for any Proposer expenses associated with this Mini-RFP.
The selected Proposer and Agency will negotiate the delivery schedule, costs and final Statement of Work, within the scope of what is advertised here, for inclusion in the final WOC. Pending successful negotiations, the selected Proposer shall perform its obligations according to the WOC and applicable terms and conditions of the parent PA and exhibits thereto.
1.2.1 Funding Source(s).
Federal Highway Administration (“FHWA”) Federal discretionary formula funds through end of FFY 2027.
1.2.2 WOC Payment.
Payment will be made for completion of, or acceptable monthly progress on, tasks and deliverables in conformance with PA requirements and all applicable standards. The method of compensation will be determined by Agency and may be based on any of the following methods (may include more than 1 method – “Mixed”):
• Cost Plus Fixed-fee, up to a maximum NTE amount;
• Fixed Price for all Services; Fixed Price per Deliverable; Fixed Price per Milestone;
• Time and Materials, up to a maximum NTE amount;
• Price per Unit.
For further information see PA, Exhibit B, Compensation.
1.2.3 WOC Phases. The contracted Services are anticipated to be phased as follows:
• Phase I – Design
• Phase II – Right of Way (“ROW”) Acquisition
• Phase III – Construction – Contract Administration & Construction Engineering Inspection
(“CA/CEI”)
Agency may, at its discretion:
• Amend this WOC to add Phase II tasks, or
• Elect to complete Phase II tasks with in-house staff, or
• Award Phase II tasks to another consulting firm.
Agency and Consultant shall negotiate the detailed tasks, deliverables, schedule and costs for each phase Agency elects to add. Each added phase will be authorized only by written WOC amendment with all required approvals and signatures.
1.2.4 Offer Period.
A Proposer's Proposal in response to this Mini-RFP is a firm offer, irrevocable, valid and binding on the Proposer for not less than 180 days following the Bid Opening Date. Agency may request, either orally or in writing, that Proposer extend the offer period in writing.
Contingent upon Agency need and available funding, Agency may (for up to 9 months following the close of this Mini-RFP), in Agency’s sole discretion, make additional award(s). Agency may select the next ranked responsible Proposer who has submitted a responsive proposal (provided Proposer agrees to an extended offer period, which would cover the balance of the 9 months, if at that time the offer period stated in the paragraph above has expired or soon will expire), issue an intent to award. If agreement with that Proposer is not reached, Agency may offer award to the next ranked Proposer and so on until agreement is reached or until Agency terminates the process. Agency reserves the right to require confirmation of the qualifications of any Proposer.
1.2.5 Insurance Requirements.
In addition to the insurance requirements set forth in Exhibit C of the PA, the following Insurance requirements apply to the prospective WOC resulting from this Mini-RFP:
• Other - Drone / Unmanned Aircraft Systems (“UAS”) in the amount of $2,000,000.00
1.2.6 Future Work Limitations. For purposes of this Section, “Affiliate” or “Affiliates” of a Consultant means any person or entity that controls, is controlled by or is under common ownership or control with that Consultant.
• If a Consultant is performing or has performed preliminary or ongoing services related to the Project for ODOT or a local agency in which ODOT is delivering the Project, the Consultant may be precluded from future work. See ODOT Conflict of Interest Guidelines.
• If a Consultant or an Affiliate of Consultant enters into a WOC or other contract for the purposes of administering, managing, monitoring, inspecting, evaluating compliance with or otherwise overseeing a public contract, that Consultant or an Affiliate of that Consultant will not be eligible to enter into a public contract that is subject to administration, management, monitoring, inspection, evaluation or oversight by means of the personal services. See ORS 279C.307 regarding possible Agency applications for exceptions.
• If a Consultant or any Affiliate of Consultant enters into a WOC or other contract with Agency for the purpose of advising or assisting in developing specifications, a scope or statement of work, an invitation to bid, a request for proposals or other solicitation documents and materials related to a given procurement, the Consultant may not be eligible to propose/bid on the prospective procurement (based on a case-by-case assessment by Agency).
• If a Consultant is awarded a WOC to prepare an Environmental Impact Statement, Environmental Assessment, Categorical Exclusion or designs and plans/specifications for a project, that Consultant and its Affiliates will not be eligible to propose/bid on or enter into a contract to construct that project.
• If preliminary engineering and final design will be performed under the prospective WOC, Agency is not obligated to proceed with final design for any alternative. All reasonable alternatives will be evaluated and given appropriate consideration, and Consultant may not proceed with final design until the relevant NEPA decision documents have been issued (e.g., Categorical Exclusion, Finding of No Significant Impact, or Record of Decision).
• If a Consultant is awarded a WOC to prepare an Environmental Impact Statement, Environmental Assessment or Categorical Exclusion for a project, that Consultant and its Affiliates may prepare the designs/plans/specifications for the project or may propose under a separate solicitation to prepare designs/plans/specifications for the project only if Agency concludes that the NEPA document was prepared with objectivity. Agency is not obligated to proceed with final design for any alternative. All reasonable alternatives will be evaluated and given appropriate consideration, and Consultant may not proceed with final design until the relevant NEPA decision documents have been issued (e.g., Categorical Exclusion, Finding of No Significant Impact, or Record of Decision).
1.3 (RESERVED)
1.4 LOCAL PUBLIC AGENCY (“LPA”) PROJECT - (SEE SECTION 3 EVALUATION)
1.5 DISADVANTAGED BUSINESS ENTERPRISE (“DBE”) AND CERTIFIED SMALL BUSINESSES
On October 3, 2025, the U.S. Department of Transportation (USDOT) issued an interim final rule modifying the certification, compliance and reporting requirements of the Disadvantaged Business Enterprise program (DBE IFR). The DBE IFR was published in the Federal Register and took effect on October 3, 2025 (90 Fed Reg 47,969 (2025)). The DBE IFR requires the eligibility of all DBE certified firms to be reevaluated on an individualized basis, without reliance on race- or sex-based presumptions of disadvantage. The Oregon Certification Office for Business Inclusion and Diversity (“COBID”) administers the Unified Certification Program (“UCP”) for the State of Oregon and is responsible for performing the reevaluations and certifications of businesses that are certified under the DBE program. Pursuant to the DBE IFR, until the reevaluation process is completed, ODOT may not update its overall goal, set any contract DBE goals on federally funded projects or count any DBE participation toward DBE goals. In accordance with the DBE IFR, ODOT’s DBE requirements that were applicable to federally funded projects prior to the 10/03/2025 effective date of the rule are no longer in effect, and the DBE goal, reporting and compliance requirements set forth in this Contract are hereby suspended. Consultant acknowledges that the DBE goal and contractual requirements may be reinstated or modified for purposes of compliance with federal law as the DBE IFR is implemented.
Proposer acknowledges and agrees that if awarded the prospective WOC, it will cooperate in processing any contractual modifications ODOT deems necessary or appropriate to effectuate the DBE Program requirements that may result from the DBE IFR implementation or future modifications to the DBE Program and corresponding regulations.
1.5.1 DBE – (RESERVED)
1.5.2 CERTIFIED SMALL BUSINESS ASPIRATIONAL TARGETS (RESERVED)
1.6 QUESTIONS, CLARIFICATIONS, CHANGES, AND ADDENDA
The “Purchaser” identified in OregonBuys for this Mini-RFP is the Agency’s Single Point of Contact for this solicitation. All inquiries regarding this procurement, whether relating to the Mini-RFP process, administration, deadlines, award, potential COI issues, or to the intent or technical aspects of the Services must be submitted in writing via e-mail to the Purchaser. Failing to follow the foregoing requirements may result in Proposal rejection by Agency.
1.6.1 PROPOSER QUESTIONS, REQUESTS FOR CLARIFICATIONS/CHANGES, AND AGENCY
RESPONSES
All questions and requests for clarifications and changes must be received by the Purchaser via e-mail on or before the deadline for Proposer Questions/Clarifications/Changes set forth in section 0.4.
Agency answers to questions received by the Purchaser will be posted in OregonBuys to ensure that all Proposers base their Proposals on the same information. Agency answers to questions will provide clarifications and interpretations but will not change Mini-RFP or contract requirements, unless an Addendum is issued (see section 1.4.2, below).
1.6.2 ADDENDA
Answers to questions or requests for clarifications or changes that Agency receives and that Agency, in its sole discretion, determines are substantive and provide new information, will be issued as official Addenda to this Mini-RFP. Changes or modifications to this Mini-RFP will be binding on Agency only if in the form of official Addenda issued by the Agency and published on OregonBuys in the Bid Solicitation Attachments section for this Mini-RFP.
1.7 PUBLIC RECORDS
After the evaluation/selection and negotiation process is complete, Proposals will be open to public inspection in accordance with ORS 279C.107. If a Proposal contains any information that may be considered exempt from disclosure under the various grounds specified in Oregon Public Records Law, ORS 192.311 through 192.478, the Proposer must clearly designate the portions of its Proposal that Proposer claims are exempt from disclosure, along with a justification and citation to the authority relied upon. Proposer must also submit a second version of the Proposal with the text claimed as exempt from disclosure redacted. Application of the Oregon Public Records Law shall determine whether any information is actually exempt from disclosure. Identifying the Proposal in whole as exempt from disclosure is not acceptable. If Proposer fails to identify the portions of the Proposal that Proposer claims are exempt from disclosure and the authority used to substantiate that claim, Proposer is deemed to waive any future claim for non-disclosure of that information.
SECTION 2.0 PROPOSAL AND SUBMISSION REQUIREMENTS
Unless otherwise provided in this Mini-RFP, by submitting a Proposal, each Proposer agrees to be bound by and comply with the terms and conditions of the Proposer’s existing PA, as amended. Any Proposal conditioned on Agency’s acceptance of terms and conditions other than those set forth in the existing PA and the requirements specified in this Mini-RFP (as they may be revised by an addendum to this Mini-RFP) will be rejected as non-responsive.
The Proposal must be organized as directed herein. Any links to external information included in the Proposal and any Proposal attachments will not be considered or evaluated, unless specified in this Mini-RFP.
2.1 PASS/FAIL
Items in Section 2 marked as “PASS/FAIL” that are incomplete (except for minor informalities), not submitted by the Bid Opening Date, or are otherwise not in substantial conformance with the Mini- RFP requirements, will be rejected as non-responsive. Proposals must comply with ALL requirements marked as “PASS/FAIL” to be considered for further evaluation.
2.2 REQUIRED ITEMS AND SCORING DEDUCTIONS Notwithstanding the scoring deductions, to be considered responsive, the Proposer must substantially comply in all material respects with applicable solicitation procedures and requirements and the solicitation documents.
• Proposals will receive a 2% scoring deduction, based upon the total available points, for each item in section 2 marked as “REQUIRED” that is incomplete (except for minor informalities).
Incomplete items must be completed and submitted within 2 business days of a request by Agency. Incomplete items must be delivered to the Purchaser as identified in the request in order to provide an appropriate time stamp. Failure to complete and deliver incomplete “REQUIRED” items within 2 business days of request by Agency shall result in Proposal rejection. Time limitations will be based upon the time of the request sent by Agency and the time of the e-mail sent in response to Agency request.
• Scoring deductions are on an average score per Proposal basis and not a deduction per evaluator. For example, if a Proposer received an average score of 92 points from the evaluation committee, a 2 percent scoring deduction would result in a Proposal score of 90.
(Percentage will be rounded to either the lower number if under .5% or to the higher number if .5% or over.)
2.3 PROPOSAL DEADLINE AND SUBMISSION FORMAT (PASS/FAIL)
Agency will not accept Proposals submitted after the Bid Opening Date for this Mini-RFP in OregonBuys.
Proposals, including all attachments, forms, and other required items, must be submitted via OregonBuys. Submittal by any other means will be rejected.
2.4 PROPOSAL
2.4.1 PROPOSAL ORGANIZATION (REQUIRED)
Proposals must be organized as follows in a single PDF file:
• Proposal Cover Sheet (Attachment A) (See section 2.4.3 below)
• Technical Proposal (responses to Evaluation Criteria described in section 3.2 (See section 2.4.4 below)
• Key Staff Resumes (Attachment B) (See section 2.4.5 below)
Conflict of Interest disclosures, if any, must be submitted as a separate PDF file. See Attachment A Proposal Coversheet. The ODOT COI Guidelines and COI Disclosure Form are available on the Consultant Forms and Resources page (https://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx under Miscellaneous Procurement Forms).
2.4.2 PROPOSAL FORMAT (REQUIRED)
One Page is defined as: one side of a single 8-1/2" x 11" page, with 12-point minimum font size for the substantive text (including text in tables) and 11-point minimum font size for the Key Staff Resume and References forms. Any page over this size will be counted as 2 pages. Any page, or partial page, tabs, indexes or table of contents with substantive text, tables, graphics, charts, resumes, etc., will be counted as 1 page.
If a Proposer submits a Proposal exceeding a set page limit, Agency will consider the pages up to the allowable page limit and discard all subsequent pages subject to that limit.
Any links to external information included in the Proposal and any Proposal attachments will not be considered or evaluated, unless specified in this Mini-RFP. The Proposer may choose how to allocate the number of pages between any sections, within the overall page limit(s).
The total combined size of all files for the Proposal, including the Technical Proposal, Cover Sheet, and any forms or attachment required in this Mini-RFP must not exceed 5 megabytes.
2.4.3 PROPOSAL COVER SHEET (REQUIRED)
The Proposal must include a completed Proposal Cover Sheet using the form Attachment A - Proposal Cover Sheet (located on the Bid Solicitation Attachments section in OregonBuys). The Proposal Cover Sheet is excluded from the page limit under section 2.4.4 below. 2.4.4 TECHNICAL
PROPOSAL (REQUIRED)
The Technical Proposal must include written responses to the Evaluation Criteria set forth in section 3.2, in the order the criteria are presented in section 3.2. Technical Proposals must describe how Proposer meets the requirements that are specified in this Mini-RFP as related to the scoring criteria.
The Technical Proposals must be clear and concise.
The Technical Proposal must not exceed 15 pages. 1 page is defined as: one side of a single 8-1/2" x 11" page, with 12-point minimum font size for the substantive text (including text in tables) and 11-point minimum font size. Any page over this size will be counted as 2 pages. Any page, or partial page, tabs, indexes or table of contents with substantive text, tables, graphics, charts, resumes, etc., will be counted as 1 page.
If a Proposer submits a Technical Proposal exceeding the set page limit, Agency will consider the pages up to the allowable page limit and discard all subsequent pages subject to that limit.
2.4.5 KEY STAFF RESUMES (REQUIRED) – (Mini-RFP Attachment B) See Section 3.2.4 Key Staff Resumes may be included in the single Proposal file or they may be submitted as a separate file (one file for all Key Staff Resumes).
The Proposal must include 3 Key Staff Resumes, each not exceeding 1 page, using Attachment B – Key Staff Resumes (located on the Bid Solicitation Attachments section in OregonBuys).
2.4.6 REFERENCES (RESERVED)
2.4.7 MINIMUM REQUIREMENTS (PASS/FAIL)
Oregon Registered Professional Engineer Consultant may not provide engineering Services unless the Services are performed or provided under the full authority and responsible charge of an Oregon Registered Professional Engineer as defined in ORS 672.002(2). The Professional Engineer must be currently registered in active status with the Oregon State Board of Examiners for Engineering and Land Surveying and must supervise and direct the Services proposed under WOC. As required by Oregon law, Consultants shall place their official Oregon Registered Professional Engineer certified seal and signature on all reports, maps, design drawings, and specifications delivered under the WOC. In the space provided on the Proposal Cover Sheet (Mini-RFP Attachment A), list the name and registration number of at least one Oregon Registered Civil Engineer in active status intending to perform engineering Services under the WOC.
Registered Professional Land Surveyor When required by Oregon law, Consultants shall place their official Oregon Registered professional land surveyor PLS certified seal and signature on all reports, maps, design drawings, and specifications delivered to Agency or LPA under WOC. In the space provided on the Proposal Cover
Sheet (Mini-RFP Attachment A), list the name and registration number of at least one PLS intending to perform Services under the WOC.
2.4.8 Subcontractor Solicitation and Utilization Form – (RESERVED)
2.5 FALSE OR MISLEADING STATEMENTS
Any statements, written or verbal, provided by the Proposer deemed by the Agency to be false or misleading will result in all or portions of the Proposal, including response to section 3.1.2 Interviews/Follow Up Questions, if any, to be rejected and removed from consideration in the evaluation for WOC award.
2.6 ELECTRONIC PROPOSAL PROVISIONS
2.6.1 Agency reserves the right to reject any Proposal that is unreadable.
2.6.2 Per OAR 731-146-0150(4), in the event of a failure of an Electronic Procurement System or e-mail system that interferes with the ability to submit electronic Proposals or to otherwise participate in the procurement, Agency may cancel the procurement or may extend the date and time of receipt of electronic Proposals by providing notice of the extension immediately after the Electronic Procurement System or e-mail system becomes available.
2.6.3 By submitting a Proposal in response to this Mini-RFP, the Proposer (and if selected for award, also as the Consultant) agrees with Agency that signatures, and other forms of authorized representative certification, showing on documents submitted via OregonBuys or e-mail are “Electronic Signatures” under ORS Chapter 84 and bind the signing party and are intended to be and can be relied upon by the parties.
SECTION 3.0 PROPOSAL EVALUATION & CONSULTANT SELECTION
3.1 EVALUATION PROCESS
This is a local agency project for which ODOT is delivering the Project on behalf of the Local Public Agency (“LPA”), the City of Oregon City. Selection of Consultant will be a two-tiered process pursuant to ORS 279C.125 and OAR 731-148-0260, and the LPA is responsible for the final selection. Pursuant to OAR 731-148-0260(3)(b), under this Mini-RFP, the LPA will make its selection based on its evaluation of Proposals (and if applicable, interviews per Section 3.1.2) from the A&E Full-Service Price Agreement holders (“Tier two”), with the Price Agreement holders previously qualified by ODOT through an RFP issued under OAR 731-148-0220 (“Tier one”).
3.1.1 EVALUATION
Proposals meeting Pass/Fail criteria will be forwarded to an evaluation committee of at least 3 members that will independently review, score and rank Proposals according to the Scoring Criteria set forth in section 3.2.
Local Public Agency Projects: As this is an LPA two-tier selection process, the evaluation committee under this section will consist solely of LPA committee members.
ODOT will coordinate and facilitate the evaluation process, but not review, score and rank Proposals, interviews, follow-up questions, or references.
The outcome of the Evaluation process may result in:
(a) notice to Proposer(s) of selection or rejection for WOC negotiation and possible award;
(b) further steps to gather additional information for evaluation, (e.g. checking references, notice of placement on an interview list, requesting clarification); or
(c) cancellation of the Mini-RFP and either re-issuance of the Mini-RFP in the same or revised form or no further action by Agency with respect to the Mini-RFP.
Agency reserves the right to reject any or all Proposals and reserves the right to cancel this Mini-RFP at any time if doing either would be in the public interest as determined by Agency. Agency is not liable for any costs a Proposer incurs while preparing or presenting the Proposal or during further evaluation stages. All unreturned Proposals will become property of Agency and part of the public file without obligation to Agency.
3.1.2 INTERVIEWS/FOLLOW-UP QUESTIONS
LPA may conduct interviews/follow-up questions. If interviews/follow-up questions are conducted, the following will apply:
o The number of Proposers selected for interviews/follow-up questions is at the sole discretion of LPA.
o Interviews/follow-up questions responses may be evaluated by individuals that evaluated the written Proposals or by individuals which did not evaluate the written Proposals, at LPA’s discretion.
o Interview/follow-up questions scores (up to a maximum of 50 points) will be combined with the other criteria scores to arrive at a total score.
o LPA may conduct interviews/follow-up questions via teleconference, video conference, or in-person. Further details will be included with notification of time and date of interviews/follow-up questions, if conducted.
o Evaluation and scoring will be based on one or more of the following criteria:
o Understanding of Requested Services o Technical Approach o Proposer’s Capabilities o Project Team and Qualifications
3.1.3 REFERENCES – (RESERVED)
3.1.4 AGENCY CLARIFICATIONS
Agency may require any clarification it needs to understand the Proposer’s Proposal. Any necessary clarifications which are in the best interest of the Agency may be made before the Proposer is awarded a WOC, and some or all of the clarifications, and any resulting modifications, may become part of the final WOC.
3.2 SCORING CRITERIA
Proposal scoring will be based on the criteria stated in the subsections below.
3.2.1 EVALUATION ITEM 1 – Understanding of Requested Services MAX POINTS: 25 o Demonstrate a clear and concise understanding of the Scope of Services being requested in this RFP.
3.2.2 EVALUATION ITEM 2 – Technical Approach MAX POINTS: 25
o Given the information provided with this solicitation, describe Proposer’s approach for the prospective Project to cost effectively meet the Agency’s deliverables/objectives in the timeline needed. (15 points) o Describe what Proposer believes are the most critical elements of this Project that Proposer’s design team must address for a successful outcome. (5 points) o Describe what percentage of the work will be performed by Proposer versus subconsultants? (5 points)
3.2.3 EVALUATION ITEM 3 – Proposers Capabilities MAX POINTS: 25 o Provide an explanation describing Proposer’s staffing levels and capacity for this Project while potentially managing other projects. Describe how the Proposer can accommodate varying levels of work assigned for this Project while potentially managing other projects, including any limitations. (10 points) o Provide an explanation describing how Proposer can accommodate working on projects that may be located in various parts of Oregon. Describe Proposer’s branch or satellite offices located within the State and the types of services these locations are capable to perform. (10 points) o Provide an explanation of Proposer’s internal procedures and policies related to project management, quality assurance/quality control and cost control. (5 points)
3.2.4 EVALUATION ITEM 4 – Project Team and Qualifications MAX POINTS: 25 o Describe Proposer’s management and organizational structure, and how that structure aids the delivery of project Services - including delivery of CA/CEI Services. Describe how subconsultants will be selected for specific WOC assignments, utilized and managed to complete this Project. (5 points) o Describe extent of principal involvement in the performance of similar services by the firm. (5 points) o Describe experience of project manager(s) with similar interdisciplinary teams.
Using Attachment B “Key Staff Resumes” form provide 3 Key Staff Resumes, describe experience and qualifications of proposed project manager(s) (whether they are from the prime or a sub) with similar interdisciplinary teams. Include descriptions of similar projects, project outcomes, and customer feedback received (if any). Also provide the information requested in the form for other key members (including subconsultant staff that are key members) who are anticipated to perform the Services.
• Proposer can adjust the formatting as desired and expand or add fields but may not exceed 1 page per resume.
• Key Staff Resumes are NOT included in the Proposal page limit identified for this Contract. A maximum of 3 Key Staff Resumes may be submitted. Any resumes submitted beyond this limit will be discarded by Agency and will not be included in the evaluation. (up to 5 points per Key Staff Resume)
3.2.5 PROPOSAL SCORE SUMMARY
Maximum Points for Proposal 100 Maximum Points for Interviews/Follow-up Questions (if conducted) 50 Maximum Possible Total Score 150
3.2.1 METHOD OF AWARD
The total scores and selection for tentative WOC assignment will be determined as follows:
• Total Proposal Score = Total of all evaluator scores for a given Proposal, divided by the number of evaluators, minus any SCORING DEDUCTIONS received per section 2.2.
• Total Interview/Follow-up Questions Score (if conducted) = Total of all evaluator scores for a given interviewee, divided by the number of evaluators.
Final Score = Total Proposal Score plus Total Interview/Follow-up Questions Score (if conducted).
Based on Final Scores, Agency will issue an intent to award notice in OregonBuys and will negotiate the SOW, payment amount and methodology with the top ranked Proposer. If negotiations are not successful, Agency may terminate negotiations with the top ranked Proposer selected by the City of Oregon City and may begin negotiations with the next highest ranked Proposer selected by the City of Oregon City and so on, until successful negotiations are completed or Agency determines that cancellation of this Mini-RFP is in the best interest of the State.
3.3 AWARD REQUIREMENTS
Agency may reject a Proposal, rescind the intent to award notice, and select the next highest ranked firm for award if the apparent successful Proposer fails to provide the following required items within 7 calendar days of issuance of the intent to award notice, unless another date is specified in the intent to award notice.
3.3.1 COST DATA
Following development of the SOW, the selected Proposer shall submit a detailed Breakdown of Costs (“BOC”)) (BOCBOC-Negotiated Billing Rate (“BOC-NBR”) templates, as applicable, are available at https://www.oregon.gov/ODOT/Business/Procurement/Pages/PSK.aspx) with cost information as required in the WOC Assignment and Requirements Exhibit of the PA.
3.3.2 COMMITTED DBE BREAKDOWN AND CERTIFICATION FORM-AE – (RESERVED)
3.3.3 PROPOSER RESPONSIBILITY, DEBT OWED to STATE
Agency shall reject an offer and rescind the intent to award notice if Agency determines Proposer is not responsible or if Proposer has liquidated and delinquent debt owed to the State or any department or agency of the State.
3.3.4 CONSULTANT QUALITY PLAN (“CQP”)
A CQP consistent with the requirements of Agency’s “Consultant Quality Plan Guidance” (linked below) must be on file with Agency. The apparent successful Proposer shall provide a CQP for Agency’s review and approval if:
• An approved CQP for the applicable PA is not on file at Agency;
• The CQP on file is not in conformance with the requirements of the current Consultant Quality Plan Guidance linked below;
• The CQP on file is not applicable to the Services required for this Project; or
• There are changes to quality management processes or organizational structure from what is in the approved CQP while the PA is in effect.
If required per the above criteria, submit a new/updated CQP (in PDF) within 7 calendar days of intent to award notice (see instructions and e-mail box for submittal in section 4.1 of the Consultant Quality Plan Guidance linked below). Agency may rescind the award for any apparent successful Proposer that does not submit an updated CQP, if applicable, in the time requested and may select the next highest ranked firm for award.
The CQP must be developed consistent with requirements of Agency’s “Consultant Quality Plan Guidance” (https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance.pdf).
A sample CQP template, as referenced in the Consultant Quality Plan Guidance, is available at:
https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance_AppA_2share.docx.
The above documents and other QA/QC guidance can be found on the Quality Plans and Guides webpage at: https://www.oregon.gov/odot/ProjectDel/Pages/Quality-Guides.aspx.
3.3.5 ADDITIONAL INSURANCE REQUIREMENTS
The successful Proposer shall submit, within 7 calendar days of request by Agency, proof of the additional insurance coverages applicable to this WOC as set forth in section 1.2.5 under “Insurance Requirements”.
SECTION 4.0 STATEMENT OF WORK (or) SUMMARY OF TASKS, DELIVERABLES, & SCHEDULE Assigned WOC will be negotiated to include a detailed statement of work (“SOW”) and delivery schedule that may include, but is not limited to, any or all of the following types of tasks and deliverables that may be required for a given project assignment:
DESIGN
A. TASKS
Actual project tasks may include but are not limited to some or all of the following areas:
Task 1. Project Management
• Contract Management
• Subcontractor Management
• Project Schedules
• Project Meetings
• Project Site Visits Meetings
• Risk Management
• Quality Control Plan (must be on file with Agency before work can be authorized under a WOC)
• Quality Reviews
• Schedule, coordinate and supervise project work
• Maintain Liaison and Coordination with ODOT, FHWA, and Outside Agencies https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance.pdf https://www.oregon.gov/odot/ProjectDel/QAQC/consultantQPguidance_AppA_2share.docx https://www.oregon.gov/odot/ProjectDel/Pages/Quality-Guides.aspx
• Prepare Records of Decisions
• Monitor Project Budget
• Prepare, Maintain and Update Project Activity Schedule
• Provide Timely Responses to ODOT Comments
• FHWA funding participation eligibility
Task 3 – Planning Services
• Land Use and Transportation Plans and Project Review
• Land Use Permit Research
• Pre-Application Conference
• Local Agency Permit Applications
Task 5 – Survey
• Research and Data Collection
• Land Survey
• Horizontal and Vertical Control Network
• Control, Recovery, and Retracement (“CRR”)
• Topographic Surveys and Mapping
• Topographical Data and Basemap
• Monumentation Surveys
• Active ROW Acquisition Map
• ROW Addendum, Descriptions, and Sketch Maps
• Survey Records
Task 6 – Environmental Services
• NEPA Categorical Exclusion (“CE”) or Programmatic Agreement Categorical Exclusion (“PCE”) Determination and Approval
• PCE Validation or CE Closeout Documentation
• Vicinity and API Map
• Parks and Recreation Technical Memorandum
• National Environmental Policy Act ("NEPA") Parks and Recreation Technical
Memorandum or Report for EA or EIS Projects Baseline Report
• Temporary Occupancy Memorandum
• De Minimis Letter (Parks, Historic)
• Nationwide Programmatic (Historic Bridges)(Net Benefit)
• Individual Evaluation
• Draft Compliance and Stewardship (“C&S”) Form
• TNCU Proposal Documentation
• Conversion Proposal Documentation (Property Appraisals and NEPA Documentation
• Historic Resources
• Historic Resources Baseline Report
• Section 106 DOE
• Project Section 106 FOE Report(s)
• Memorandum of Agreement (“MOA”)
• Historic Resources Technical Report
• ORS 358.653 SHPO Coordination
• Cultural Resources – Archaeology
• Archaeological Resources Literature Review, Field Reconnaissance & Baseline
Report
• Literature review
• Field reconnaissance (Pedestrian survey)
• Cultural Resources Planning Study
• Phase I Archaeological Investigation with Technical Report
• Pedestrian Survey
• Subsurface Exploratory Probing and Archaeological Permit Application
• Phase I Technical Report
• Phase II Archaeological Investigation
• Archaeological Permit Application
• Archaeological Site Investigation
• Phase II Technical Report
• Determination of Eligibility (“DOE”)
• Cultural Plant Study Background Research, Logistics and Field Study Survey
• Cultural Plant Study Report
• Monitoring and Construction-related Activities
• Damage Assessments and Inadvertent Finds During Construction
• Site Visit and Photographs
• FHWA Visual Impact Assessment (“VIA”) Scoping Questionnaire
• FHWA VIA Memorandum
• Visual Impact Assessment
• Wetlands and Waters Delineation, and Permitting Services
• Wetlands and Waters Resources and Determination Fieldwork
• Wetland and Waters Impact Analysis Documentation
• Wetlands and Waters Delineation Report
• Environmental Permits and Clearances
• DSL General Authorization for Geotechnical Activities
• USACE Nationwide Permit for Geotechnical Activities
• Stormwater Management Plan (“SWMP”)
• Wetland Function Assessment Report
• Land Use Compatibility Statement (“LUCS”)
• Endangered Species Act (“ESA”)
• Federal-Aid Highway Program (“FAHP”) Programmatic ESA Documentation
• Bird Protection and Compliance, and Bat Colony Avoidance
Task 7 Public Involvement – Public Information – Public Engagement
• Public Involvement and Communications Plan
• Public Involvement or interagency meeting attendance
• Public Involvement or interagency meeting coordination and facilitation
• Preparation of materials for public meetings, open houses, and hearings
• Preparation and distribution of Communication Materials; graphics, Project
Fact Sheets, postcards and stakeholder emails
• Develop and maintain Web Pages and mailing and contact lists to disseminate information to the public
• Provide Technical Specialists as needed for public meetings and/or hearings
Task 8. Utility Coordination
• Perform tasks according to Chapter 10 of the ODOT Right of Way Manual
• Identify and Coordinate with Utility Owners
• Review Utility Relocation Plans and Relocation Time Requirement Letters
• Master Relocation Plan
• Reimbursement Review and Package
• Utility Billing Review, Approval, and Payment Recommendation
• Utility Certification
• Conflict Assessment
• Utility Company Coordination and Certification
• Utility Relocation Certification Assistance
• Data Collection
• Utility Report
• Notification and Coordination
• On-Site Utility Coordination Meetings
Task 9 – Geotechnical, Geologic, and Hazardous Materials Services
• Geologic Site Characterization
• Geotechnical and Geologic Services
• Site Reconnaissance and Subsurface Exploration Plan
• Geologic Reconnaissance
• Subsurface Exploration including: Drilling, sampling, in-situ soil testing
• Laboratory Testing of soils and rock material
• Geotechnical Design Deviation
• Slope Design, embankment design, slide stabilization design
• Material source evaluation
• Foundation evaluation and design
• Geotechnical and Geological Analysis
• Geology and Geotechnical Technical Reports
• Geotechnical element plan and specification preparation
• Construction observation of geotechnical project elements
• Additional Subsurface Explorations, Laboratory Testing, and Geologic
Reconnaissance
• Hazardous Materials Services
• Hazardous Materials Corridor Study (“HMCS”)
• Shoulder Soil Investigation
• Sample Collection and Reporting
• Site-Specific Investigation Work Plan and HASP
• Site-Specific Investigation Sampling and Reporting
Task 10 – Pavement Design Services
• Review Traffic Forecasts
• Review Geotechnical Data and As-Builts
• Pavement Field Exploration and Laboratory Testing
• Pavement Design Site Visit
• Pavement Design Analysis and Package
• Pavements Design Milestone Documents
Task 11 – Hydraulics and Stormwater
• Project Research and Initiation
• Hydrologic Analysis
• Hydraulic Engineering Performance Memorandum
• Pavement Drainage Design
• Water Resources Impact Assessment
• Storm Water Design Report
• Storm Water Operation and Maintenance Manual
• Detention and Water Quality Design
• Storm Drainage Design
• Backwater Analysis and Scour Analysis
• Culvert Hydraulic Design Analysis
• Culvert and Fish Passage Design and Plans
• Hydraulic Analysis and Report for Bridge and Large Culverts
• Temporary Water Management
• Temporary Water Management Design Analysis
• Stormwater Design Analysis Roadway and pavement drainage
• Stormwater DAP Design
• Stormwater Preliminary Design
• Stormwater Advanced Design
• Stormwater Final Design
• Stormwater Final PS&E
• Final water quality mitigation design plans and specifications – engineering function
Task 12 – Roadway Design
• Geometric Design
• Typical Sections
• Concept Alternatives Analysis
• Intersection Details
• Vertical and Horizontal Alignments
• Roadway Profiles of the Existing and Proposed Alignment
• Super-Elevation Diagrams
• Embankment and Excavation Profile Sheets
• 3D Roadway Design consistent with the Highway Design Manual
• Roadway Design Exceptions Requests
• Traffic Control Design
• Design Team Coordination and Document Assembly
• Multi-Modal Facility Design
Task 16 – Traffic Engineering and Management
• Transportation Analysis
• Plans and Policies Review
• Methodology and Assumptions Technical Memorandum
• Evaluation of Existing Conditions
• Inventory and Data Collection
• Existing Traffic Operations Analysis and Summary
• Future Year Background Traffic Analysis
• Traffic Analysis Report
• Concept Development and Evaluation
• Code Refinement and Adoption
• State and Region Traffic Engineer Approval Requests
• State and Region Traffic-Roadway Engineer Approvals
• Traffic Control Plans (TCP’s)
• Traffic Management Plan (TMP)
• Signal Design and Timing
• Traffic Control Design
• Traffic Signal PS&E Design
• Traffic Signal Interconnect Design
• ITS Design
• Signing and Striping Design
• Pavement Marking Design
• Illumination Design
• Traffic Technical Reports
Task 17 – Erosion and Sediment Control Design
• Erosion and Sediment Control DAP milestone Design
• Erosion and Sediment Control Preliminary, Advance and Final Design
• Erosion and Sediment Control Final PS&E Design
• Erosion and Sediment Control Design Quality Review
Task 18 Roadside Development
• Roadside Development DAP milestone Design
• Roadside Development Preliminary, Advance and Final Design
• Roadside Development Final PS&E Design
• Wetland Mitigation Preliminary, Advance and Final Design
Task 19 – Right of Way (“ROW”)
• Right of Way Technical Report per ODOT Guidance
• Prepare access list and coordinate closures with ODOT
• ROW Services Administration
• Research and Survey
• Provide original survey maps, field notes, and calculation sheets
• Prepare Legal Descriptions and Maps for Right of Way to be acquired
• Horizontal Control and Recovery Map
• ROW Information Tracking System (“RITS”) Management
• ROW Process Coordination
• ROW Schedule
• ROW Cost Estimating, Programming Estimate, Access Management, Title
Reports, and ROW Setting
• General Information Notice
• Right of Way Staking for Acquisition
• Right of Way Monumentation and Mapping
• File surveys with appropriate County Surveyor
• R/W Descriptions
• Obtain title documents and prepare conveyance documents
• Prepare all appraisals needed for Right of Way files
• Prepare relocation reports,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .